CN207103896U - A kind of bus bar drilling equipment - Google Patents

A kind of bus bar drilling equipment Download PDF

Info

Publication number
CN207103896U
CN207103896U CN201721050506.9U CN201721050506U CN207103896U CN 207103896 U CN207103896 U CN 207103896U CN 201721050506 U CN201721050506 U CN 201721050506U CN 207103896 U CN207103896 U CN 207103896U
Authority
CN
China
Prior art keywords
gear
gear case
case
bus bar
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721050506.9U
Other languages
Chinese (zh)
Inventor
宋翰彪
刘文娟
闵家新
金大维
赵海英
吴莉威
赵岩
朱海荣
赫荣义
杜永军
高潇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201721050506.9U priority Critical patent/CN207103896U/en
Application granted granted Critical
Publication of CN207103896U publication Critical patent/CN207103896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model discloses a kind of bus bar drilling equipment, including:First gear case, multiple second gear casees and drill chuck being arranged at below first gear case, driving shaft is provided with first gear case, driving gear and planetary gear, driving shaft is fixedly connected with driving gear and extended to from the top of first gear case outside first gear case, planetary gear is multiple, it is meshed with driving gear, second gear case corresponds with planetary gear, travelling gear and working gear are provided with second gear case, wherein, travelling gear is connected with planetary gear, realization is synchronized with the movement, working gear is meshed with travelling gear, drill chuck is arranged at the lower section of second gear case, it is fixedly connected with working gear by connecting shaft, the bottom connection drill bit of drill chuck.The bus bar drilling equipment is rational in infrastructure, easy to use, can bore multiple holes simultaneously.

Description

A kind of bus bar drilling equipment
Technical field
Drilling equipment mechanical field is the utility model is related to, specifically provides a kind of bus bar drilling equipment.
Background technology
Known bus bar boring method is using drilling machine or hydraulic pressure card punch, is drilled or is punched one by one, is bored Need to be rule before hole, the center in hole of having good positioning, still, in process, hole center often still occurs The phenomenon of line sideslip so that after bus bar is superimposed, upper lower opening can not be completely superposed, it is also necessary to secondary repairing is carried out, It is horizontal to influence manufacture craft, efficiency is low, and the aperture of the bus bar after secondary repairing becomes big, causes the contact surface of bus bar relative Reduce, the hidden danger of increase bus heating in the future.
Therefore, a kind of bus bar drilling equipment is developed, can realize while bore multiple holes, it is urgently to be resolved hurrily to turn into people The problem of.
Utility model content
In consideration of it, the purpose of this utility model is to provide a kind of bus bar drilling equipment, to solve present bus bar Drilling can only drill one by one and the easy sideslip that drills, it is impossible to the problems such as being completely superposed.
Technical scheme provided by the utility model is:A kind of bus bar drilling equipment, including:First gear case, Duo Geshe Second gear case and the drill chuck being placed in below first gear case, driving shaft, driving gear and row are provided with first gear case Star gear, driving shaft are fixedly connected with driving gear and extended to from the top of first gear case outside first gear case, planet tooth Take turns to be multiple, be meshed with driving gear, second gear case is corresponded with planetary gear, and transmission is provided with second gear case Gear and working gear, wherein, travelling gear is connected with planetary gear, and realization is synchronized with the movement, working gear and travelling gear phase Engagement, drill chuck are arranged at the lower section of second gear case, are fixedly connected with working gear by connecting shaft, and the bottom of drill chuck connects Connect drill bit.
It is preferred that travelling gear and planetary gear be by being driven axis connection, power transmission shaft is through travelling gear and planetary Axis, both are made to be synchronized with the movement.
Further preferably, power transmission shaft runs through first gear case and second gear case, second gear case can around drive axis, By rotating second gear case, the adjustment to the distance between each drill chuck can be achieved, and then realize to distance between drilling Adjustment.
Further preferably, driving gear is arranged on the axis of first gear case.
Further preferably, planetary gear is uniformly laid along the circumferential of driving gear.
Further preferably, planetary gear is 4~6.
Further preferably, the diameter and the number of teeth of planetary gear and travelling gear are equal.
Further preferably, the 1/4~1/2 of the diameter of planetary a diameter of driving gear.
Further preferably, driving gear is equal with the diameter and the number of teeth of working gear.
Further preferably, drill chuck and drill bit clamping or threaded connection.
Bus bar drilling equipment provided by the utility model, driving gear are connected with the drive device on drilling machine, and drill bit is solid Due on drill chuck, the course of work of the bus bar drilling equipment is as follows:Driving shaft is connected with the drive device on drilling machine, is being driven Under the driving of dynamic device, spindle rotation, and driving gear, planetary gear, travelling gear and working gear rotation are driven successively, And then the drill chuck rotation being fixedly connected with working gear is driven, and it is final to drive the bit being connected on drill chuck, realize Drilling.
In bus bar drilling equipment provided by the utility model, the planetary gear engaged with driving gear is multiple, with row The second gear case that star gear coordinates is also to be multiple, it is possible to achieve porous to bore simultaneously, solve needs to bus bar one by one in the past The problem of drilling.
Bus bar drilling equipment provided by the utility model, it is simple in construction, easy to use, it can realize to bus bar simultaneously Beat multiple holes.
Brief description of the drawings
Below in conjunction with the accompanying drawings and embodiment is described in further detail to the utility model:
Fig. 1 is the structural representation of bus bar drilling equipment;
Fig. 2 is the top view of bus bar drilling equipment;
Fig. 3 is the sectional view of bus bar drilling equipment.
Embodiment
The utility model is further explained below in conjunction with specific embodiment, but does not limit to this practicality It is new.
As shown in Figure 1 to Figure 3, the utility model provides a kind of bus bar drilling equipment, including:It is first gear case 1, more The individual second gear case 2 and drill chuck 3 for being arranged at the lower section of first gear case 1, driving shaft 11, main is provided with first gear case 1 Moving gear 12 and planetary gear 13, driving shaft 11 are fixedly connected with driving gear 12 and extended to from the top of first gear case 1 Outside first gear case 1, planetary gear 13 is multiple, is meshed with driving gear 12, and second gear case 2 and planetary gear 13 are one by one It is corresponding, travelling gear 21 and working gear 22 are provided with second gear case 2, wherein, travelling gear 21 connects with planetary gear 13 Connecing, realization is synchronized with the movement, and working gear 22 is meshed with travelling gear 21, and drill chuck 3 is arranged at the lower section of second gear case 2, It is fixedly connected with working gear 22 by connecting shaft 23, the bottom connection drill bit of drill chuck 3.
The bus bar drilling equipment, driving gear are connected with the drive device on drilling machine, and drill bit is fixed on drill chuck, should The course of work of bus bar drilling equipment is as follows:Driving shaft is connected with the drive device on drilling machine, under the driving of drive device, Spindle rotation, and driving gear, planetary gear, travelling gear and working gear rotation are driven successively, and then drive and work The drill chuck rotation that gear is fixedly connected, it is final to drive the bit being connected on drill chuck, realize drilling.
In the bus bar drilling equipment, the planetary gear that is engaged with driving gear is multiple, coordinating with planetary gear the Two gear-boxes are also to be multiple, it is possible to achieve and it is porous to bore simultaneously, solve the problems, such as to need to drill to bus bar one by one in the past.
As the improvement of technical scheme, if Fig. 1 is to as indicated at 3, travelling gear 21 passes through power transmission shaft 14 with planetary gear 13 Connection, power transmission shaft pass through travelling gear and planetary axis, both is synchronized with the movement.
In order to adapt to different pitch-rows while drill, as the improvement of technical scheme, power transmission shaft 14 runs through the He of first gear case 1 Second gear case 2, second gear case 2 can rotate around power transmission shaft 14, by rotating second gear case 2, can be achieved to each drill chuck 3 The distance between adjustment, and then realize adjustment to distance between drilling, specifically:Before drilling, first according to pitch-row Need, adjust the position of second gear case, the distance between drill bit is met pitch-row requirement, after to be adjusted, drilled .
In order to ensure the stability of drilling, as the improvement of technical scheme, driving gear 12 is arranged at first gear case 1 On axis.
In order to facilitate the distance of adjustment drilling, as the improvement of technical scheme, week of the planetary gear 13 along driving gear 12 Laid to uniform.
As the improvement of technical scheme, planetary gear 13 is 4~6.
As the improvement of technical scheme, the diameter and the number of teeth of planetary gear 13 and travelling gear 21 are equal.
As the improvement of technical scheme, the 1/4~1/2 of the diameter of a diameter of driving gear 12 of planetary gear 13.
As the improvement of technical scheme, driving gear 12 is equal with the diameter and the number of teeth of working gear 22.
In order to facilitate the replacing of drill bit, as the improvement of technical scheme, drill chuck 3 and drill bit clamping or threaded connection.
Embodiment 1
As shown in Figure 1 to Figure 3, bus bar drilling equipment, including:First gear case 1, multiple it is arranged at first gear case 1 The second gear case 2 and drill chuck 3 of lower section, driving shaft 11, driving gear 12 and planetary gear are provided with first gear case 1 13, driving shaft 11 is fixedly connected with driving gear 12 and extended to from the top of first gear case 1 outside first gear case 1, planet Gear 13 is multiple, is meshed with driving gear 12, second gear case 2 corresponds with planetary gear 13, in second gear case 2 Travelling gear 21 and working gear 22 are provided with, wherein, travelling gear 21 is connected with planetary gear 13, and realization is synchronized with the movement, work Make gear 22 to be meshed with travelling gear 21, drill chuck 3 is arranged at the lower section of second gear case 2, passes through company with working gear 22 Spindle 23 is fixedly connected, the bottom connection drill bit of drill chuck 3.
Embodiment 2
As shown in Figure 1 to Figure 3, bus bar drilling equipment, including:First gear case 1, multiple it is arranged at first gear case 1 The second gear case 2 and drill chuck 3 of lower section, driving shaft 11, driving gear 12 and planetary gear are provided with first gear case 1 13, driving shaft 11 is fixedly connected with driving gear 12 and extended to from the top of first gear case 1 outside first gear case 1, planet Gear 13 is multiple, is meshed with driving gear 12, second gear case 2 corresponds with planetary gear 13, in second gear case 2 Travelling gear 21 and working gear 22 are provided with, wherein, travelling gear 21 is connected with planetary gear 13 by power transmission shaft 14, is realized It is synchronized with the movement, working gear 22 is meshed with travelling gear 21, and drill chuck 3 is arranged at the lower section of second gear case 2, with the tooth that works Wheel 22 is fixedly connected by connecting shaft 23, the bottom connection drill bit of drill chuck 3.
Embodiment 3
As shown in Figure 1 to Figure 3, bus bar drilling equipment, including:First gear case 1, multiple it is arranged at first gear case 1 The second gear case 2 and drill chuck 3 of lower section, driving shaft 11, driving gear 12 and planetary gear are provided with first gear case 1 13, driving shaft 11 is fixedly connected with driving gear 12 and extended to from the top of first gear case 1 outside first gear case 1, planet Gear 13 is multiple, is meshed with driving gear 12, second gear case 2 corresponds with planetary gear 13, in second gear case 2 Travelling gear 21 and working gear 22 are provided with, wherein, power transmission shaft 14 runs through first gear case 1 and second gear case 2, and passes through The axis of travelling gear 21 and planetary gear 13, power transmission shaft can realize travelling gear and it is planetary be synchronized with the movement, second Gear-box 2 can rotate around power transmission shaft 14, and by rotating second gear case 2, the tune to the distance between each drill chuck 3 can be achieved It is whole, and then realize and the adjustment working gear 22 of distance between drilling is meshed with travelling gear 21, drill chuck 3 is arranged at second The lower section of gear-box 2, it is fixedly connected with working gear 22 by connecting shaft 23, the bottom connection drill bit of drill chuck 3.
Embodiment 4
As shown in Figure 1 to Figure 3, bus bar drilling equipment, including:First gear case 1, multiple it is arranged at first gear case 1 The second gear case 2 and drill chuck 3 of lower section, driving shaft 11, driving gear 12 and planetary gear are provided with first gear case 1 13, driving gear 12 is arranged on the axis of first gear case 1, and driving shaft 11 is fixedly connected with driving gear 12 and from first The top of gear-box 1 is extended to outside first gear case 1, and planetary gear 13 is multiple, is meshed with driving gear 12, second gear Case 2 is corresponded with planetary gear 13, and travelling gear 21 and working gear 22 are provided with second gear case 2, wherein, driving cog Wheel 21 is connected with planetary gear 13, and realization is synchronized with the movement, and working gear 22 is meshed with travelling gear 21, and drill chuck 3 is arranged at The lower section of second gear case 2, it is fixedly connected with working gear 22 by connecting shaft 23, the bottom connection drill bit of drill chuck 3.
Embodiment 5
As shown in Figure 1 to Figure 3, bus bar drilling equipment, including:First gear case 1, multiple it is arranged at first gear case 1 The second gear case 2 and drill chuck 3 of lower section, driving shaft 11, driving gear 12 and planetary gear are provided with first gear case 1 13, driving shaft 11 is fixedly connected with driving gear 12 and extended to from the top of first gear case 1 outside first gear case 1, planet Gear 13 is 4, and circumferential along driving gear 12 is uniformly laid, and be meshed respectively with driving gear 12, second gear case 2 with Planetary gear 13 is corresponded, and travelling gear 21 and working gear 22 are provided with second gear case 2, wherein, travelling gear 21 It is connected with planetary gear 13, realization is synchronized with the movement, and working gear 22 is meshed with travelling gear 21, and drill chuck 3 is arranged at second The lower section of gear-box 2, it is fixedly connected with working gear 22 by connecting shaft 23, the bottom connection drill bit of drill chuck 3.
Embodiment 6
As shown in Figure 1 to Figure 3, bus bar drilling equipment, including:First gear case 1, multiple it is arranged at first gear case 1 The second gear case 2 and drill chuck 3 of lower section, driving shaft 11, driving gear 12 and planetary gear are provided with first gear case 1 13, driving shaft 11 is fixedly connected with driving gear 12 and extended to from the top of first gear case 1 outside first gear case 1, planet Gear 13 is multiple, is meshed with driving gear 12, second gear case 2 corresponds with planetary gear 13, in second gear case 2 Travelling gear 21 and working gear 22 are provided with, wherein, travelling gear 21 is connected with planetary gear 13, and realization is synchronized with the movement, OK The diameter and the number of teeth of star gear and travelling gear are equal, the diameter 1/2 of planetary a diameter of driving gear, working gear 22 are meshed with travelling gear 21, and the diameter of working gear and the diameter of driving gear and the number of teeth are equal, and drill chuck 3 is arranged at The lower section of second gear case 2, it is fixedly connected with working gear 22 by connecting shaft 23, the bottom connection drill bit of drill chuck 3.
Embodiment 7
As shown in Figure 1 to Figure 3, bus bar drilling equipment, including:First gear case 1, multiple it is arranged at first gear case 1 The second gear case 2 and drill chuck 3 of lower section, driving shaft 11, driving gear 12 and planetary gear are provided with first gear case 1 13, driving shaft 11 is fixedly connected with driving gear 12 and extended to from the top of first gear case 1 outside first gear case 1, planet Gear 13 is multiple, is meshed with driving gear 12, second gear case 2 corresponds with planetary gear 13, in second gear case 2 Travelling gear 21 and working gear 22 are provided with, wherein, travelling gear 21 is connected with planetary gear 13, and realization is synchronized with the movement, work Make gear 22 to be meshed with travelling gear 21, drill chuck 3 is arranged at the lower section of second gear case 2, passes through company with working gear 22 Spindle 23 is fixedly connected, the bottom connection drill bit of drill chuck 3, drill chuck 3 and drill bit clamping.
Embodiment 8
As shown in Figure 1 to Figure 3, bus bar drilling equipment, including:First gear case 1, multiple it is arranged at first gear case 1 The second gear case 2 and drill chuck 3 of lower section, driving shaft 11, driving gear 12 and planetary gear are provided with first gear case 1 13, driving shaft 11 is fixedly connected with driving gear 12 and extended to from the top of first gear case 1 outside first gear case 1, planet Gear 13 is multiple, is meshed with driving gear 12, second gear case 2 corresponds with planetary gear 13, in second gear case 2 Travelling gear 21 and working gear 22 are provided with, wherein, travelling gear 21 is connected with planetary gear 13, and realization is synchronized with the movement, work Make gear 22 to be meshed with travelling gear 21, drill chuck 3 is arranged at the lower section of second gear case 2, passes through company with working gear 22 Spindle 23 is fixedly connected, and the bottom connection drill bit of drill chuck 3, drill chuck 3 is connected with drill bit thread.
Embodiment of the present utility model is elaborated above in conjunction with accompanying drawing, but the utility model is not limited to Above-mentioned embodiment, in those of ordinary skill in the art's possessed knowledge, the utility model can also not departed from Various changes can be made on the premise of objective.

Claims (10)

  1. A kind of 1. bus bar drilling equipment, it is characterised in that including:First gear case (1), multiple it is arranged at first gear case (1) second gear case (2) and drill chuck (3) below, first gear case (1) is interior to be provided with driving shaft (11), driving gear (12) it is fixedly connected with driving gear (12) and prolongs from the top of first gear case (1) with planetary gear (13), driving shaft (11) Extend first gear case (1) outside, planetary gear (13) is multiple, is meshed with driving gear (12), second gear case (2) and row Star gear (13) is corresponded, and travelling gear (21) and working gear (22) are provided with second gear case (2), wherein, transmission Gear (21) is connected with planetary gear (13), and realization is synchronized with the movement, and working gear (22) is meshed with travelling gear (21), drill bit Card (3) is arranged at the lower section of second gear case (2), is fixedly connected with working gear (22) by connecting shaft (23), drill chuck (3) Bottom connection drill bit.
  2. 2. according to bus bar drilling equipment described in claim 1, it is characterised in that:Travelling gear (21) is logical with planetary gear (13) Cross power transmission shaft (14) connection.
  3. 3. according to bus bar drilling equipment described in claim 2, it is characterised in that:Power transmission shaft (14) runs through first gear case (1) With second gear case (2), second gear case (2) can rotate around power transmission shaft (14), by rotating second gear case (2), can be achieved Adjustment to the distance between each drill chuck (3), and then realize the adjustment to distance between drilling.
  4. 4. according to bus bar drilling equipment described in claim 1, it is characterised in that:Driving gear (12) is arranged at first gear case (1) on axis.
  5. 5. according to bus bar drilling equipment described in claim 1, it is characterised in that:Planetary gear (13) is along driving gear (12) It is circumferential uniformly to lay.
  6. 6. according to bus bar drilling equipment described in claim 1, it is characterised in that:Planetary gear (13) is 4~6.
  7. 7. according to bus bar drilling equipment described in claim 1, it is characterised in that:Planetary gear (13) and travelling gear (21) Diameter and the number of teeth are equal.
  8. 8. according to bus bar drilling equipment described in claim 7, it is characterised in that:A diameter of driving gear of planetary gear (13) (12) the 1/4~1/2 of diameter.
  9. 9. according to bus bar drilling equipment described in claim 8, it is characterised in that:Driving gear (12) and working gear (22) Diameter and the number of teeth are equal.
  10. 10. according to bus bar drilling equipment described in claim 1, it is characterised in that:Drill chuck (3) connects with drill bit clamping or screw thread Connect.
CN201721050506.9U 2017-08-22 2017-08-22 A kind of bus bar drilling equipment Active CN207103896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721050506.9U CN207103896U (en) 2017-08-22 2017-08-22 A kind of bus bar drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721050506.9U CN207103896U (en) 2017-08-22 2017-08-22 A kind of bus bar drilling equipment

Publications (1)

Publication Number Publication Date
CN207103896U true CN207103896U (en) 2018-03-16

Family

ID=61577170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721050506.9U Active CN207103896U (en) 2017-08-22 2017-08-22 A kind of bus bar drilling equipment

Country Status (1)

Country Link
CN (1) CN207103896U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350506A (en) * 2017-08-22 2017-11-17 国网辽宁省电力有限公司辽阳供电公司 A kind of bus bar drilling equipment
CN109454457A (en) * 2018-11-26 2019-03-12 广东顶固集创家居股份有限公司 Brill attacks all-in-one machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350506A (en) * 2017-08-22 2017-11-17 国网辽宁省电力有限公司辽阳供电公司 A kind of bus bar drilling equipment
CN109454457A (en) * 2018-11-26 2019-03-12 广东顶固集创家居股份有限公司 Brill attacks all-in-one machine

Similar Documents

Publication Publication Date Title
CN107350506A (en) A kind of bus bar drilling equipment
CN104625145B (en) Multi-head drilling machine
CN207103896U (en) A kind of bus bar drilling equipment
CN103192241A (en) Method for machining combined herringbone tooth part
CN202752652U (en) Drilling machine for multiple holes of flanges
CN206588362U (en) A kind of multi-spindle drilling machine
CN210208744U (en) Gear ring excircle countersink drill counter bore tool
CN108723434A (en) A kind of lathe fixing device for drilling
CN102844160A (en) A machining assembly with the transmission adjustable into different positions
CN206216388U (en) A kind of laser positioning drilling machine
CN107570754A (en) One kind bores not rounded hole processing device
CN202015946U (en) Automatic drilling and tapping combined machine tool for three-forked base
CN103831450B (en) Span adjustable multi-shaft drilling device
CN204639794U (en) Indexing fixture dish
CN206382853U (en) A kind of axle of numerical control horizontal three bores milling tooth machining unit
CN103659961B (en) Drill bit device with convenient concentricity control function for concentric reducing circles
CN105710684B (en) Babinet drilling assembled tool
CN206263288U (en) Automatic double-head rig
CN204262419U (en) Rotary manual feed mechanism
CN104708051A (en) Multishaft drilling device
CN106002366A (en) Spline shaft positioning device
CN207668563U (en) A kind of fixed double-deck multi-shaft device
CN207709914U (en) A kind of drilling machine
CN203330793U (en) Side hole machining device
CN207522109U (en) A kind of auxiliary mould for the drilling of gear box casing circumferential surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant