CN207102829U - A kind of sandstone aggregate production system - Google Patents

A kind of sandstone aggregate production system Download PDF

Info

Publication number
CN207102829U
CN207102829U CN201720952810.6U CN201720952810U CN207102829U CN 207102829 U CN207102829 U CN 207102829U CN 201720952810 U CN201720952810 U CN 201720952810U CN 207102829 U CN207102829 U CN 207102829U
Authority
CN
China
Prior art keywords
breaker
mineral aggregate
intermediate bunker
size
aggregate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720952810.6U
Other languages
Chinese (zh)
Inventor
钱建铭
李连顺
郑威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Yu Zhi New Building Materials Co Ltd
Original Assignee
Liaoning Yu Zhi New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Yu Zhi New Building Materials Co Ltd filed Critical Liaoning Yu Zhi New Building Materials Co Ltd
Priority to CN201720952810.6U priority Critical patent/CN207102829U/en
Application granted granted Critical
Publication of CN207102829U publication Critical patent/CN207102829U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model embodiment provides a kind of sandstone aggregate production system, including the first intermediate bunker, the second intermediate bunker, the 3rd intermediate bunker, the 4th intermediate bunker, the first breaker, the second breaker, the 3rd breaker, the 4th breaker, the 5th breaker, the first screening plant, the second screening plant, the 3rd screening plant, the 4th screening plant and the 5th screening plant.Wherein, above-mentioned intermediate bunker, breaker and screening plant are connected by corresponding belt feeder respectively, realize circulation of the mineral aggregate between breaker, screening plant and intermediate bunker, and pass through the corresponding finished product tabia of screening plant final output, finished product rubble, rice finished product stone and finished sand, obtain user and carry out whole sandstone aggregates required during construction activity, user by number of ways without being obtained, so as to improve the efficiency of construction activity.

Description

A kind of sandstone aggregate production system
Technical field
Mine technology field is the utility model is related to, more particularly to a kind of sandstone aggregate production system.
Background technology
Sandstone aggregate is the indispensable Important building material of building trade, wherein, for carrying out three conjunctions of roadbed filling Soil, the rubble for the dispensing as concrete, sandstone etc. are all within the category of sandstone aggregate, are singly as concrete batching Rubble sandstone just need the stone of several kinds of specifications, sand.For at present, the production of the stone or sand of every kind of specification is all independent Carry out, i.e., a producer or a set of production equipment can only produce a kind of rule in one of which product or certain product Lattice, user needs that all required raw material could be obtained by number of ways when carrying out construction activity, bothersome laborious, so as to Cause the less efficient of construction activity.
Utility model content
In view of this, the utility model provides a kind of sandstone aggregate production system, for producing plurality of specifications simultaneously Sandstone aggregate, user is avoided to obtain the difficulty of whole sandstone aggregates by number of ways when carrying out construction activity.
In order to solve the above problems, the utility model discloses a kind of sandstone aggregate production system, including the first middle material Storehouse, the second intermediate bunker, the 3rd intermediate bunker, the 4th intermediate bunker, the first breaker, the second breaker, the 3rd crush Device, the 4th breaker, the 5th breaker, the first screening plant, the second screening plant, the 3rd screening plant, the 4th sieve Separating device and the 5th screening plant, wherein:
First breaker is used to enter the white clouds grey matter rock raw ore gathered from massif by blasting method Row break process;
First screening plant is used to carry out screening process to the mineral aggregate of first breaker output, and by size Mineral aggregate more than 60mm is sent into the first intermediate bunker, and size is transported among described second between the mineral aggregate less than 15~60mm Feed bin, mineral aggregate of the size no more than 15mm is transported to default tabia stockyard as finished product tabia.
Second breaker is used to the first intermediate bunker Mineral Material carrying out break process;
Second screening plant is used to the mineral aggregate of second breaker output carrying out screening process, and by size Mineral aggregate more than 30mm is sent into the second intermediate bunker, and mineral aggregate of the size less than 10mm is sent into the 3rd intermediate bunker, size is situated between The 4th intermediate bunker is sent into 10mm and 30mm mineral aggregate;
3rd breaker is used to the mineral aggregate of second intermediate bunker carrying out break process;
3rd screening plant is used to the mineral aggregate of the 3rd breaker output carrying out screening process, and by size Mineral aggregate more than 30mm is sent into the second intermediate bunker, and mineral aggregate of the size less than 10mm is sent into the 3rd intermediate bunker, size is situated between The 4th intermediate bunker is sent into 10~30mm mineral aggregate;
4th breaker is used to carry out break process to the mineral aggregate of the 4th intermediate bunker;
4th screening plant is used to carry out screening process to the mineral aggregate of the 4th breaker output, and by size Mineral aggregate between 10~25mm is transported to default rubble stockyard as finished product rubble, the mineral aggregate by size between 4.75~10mm Default rice clitter field is transported to as rice finished product stone, mineral aggregate of the size more than 25mm is sent into the 4th intermediate bunker, will Mineral aggregate of the size less than 4.75mm is sent into the 3rd intermediate bunker;
5th breaker is used to carry out break process to the mineral aggregate of the 3rd intermediate bunker;
5th screening plant is used to carry out screening process to the mineral aggregate of the 5th breaker output, and by size Mineral aggregate between 0.075~2.36mm is sent into default Machine-made Sand finished bin as finished sand, and size is more than to 2.36 mineral aggregate Return the charging aperture of defeated time the 5th breaker.
Optionally, the 5th breaker includes roller crushing device and sand making machine, wherein:
The roller crushing device is used to carry out break process to the mineral aggregate of the 3rd intermediate bunker;
The sand making machine is used to carry out break process to the mineral aggregate of roller crushing device output, and is output to described the Five screening plants.
Optionally, the 5th breaker also includes powder concentrator, wherein:
The mineral aggregate that the powder concentrator is used to export the sand making machine carries out processing of gathering dust, by size less than 0.075mm's Mineral aggregate is transported to default stone flour finished bin as finished product stone flour.
Optionally, the size of the mineral aggregate of first intermediate bunker is less than or equal to 200mm.
Optionally, first breaker includes jaw crusher.
Optionally, second breaker includes cone crusher.
Optionally, the 3rd breaker includes cone crusher.
Optionally, the 4th breaker includes vertical shaft type impact crusher.
Optionally, in addition to washing sieve and the 5th intermediate bunker, wherein:
The washing sieve is used to carry out the finished product tabia washing screening processing, and by size more than 0.075mm's Mineral aggregate is sent into the 5th intermediate bunker, and waste processing is carried out using mineral aggregate of the size less than 0.075mm as mud;
Mineral aggregate in 5th intermediate bunker is then transported to the charging aperture of the 5th breaker through conveying device.
Optionally, in addition to filter press, wherein:
The filter press is used to the mud Jing Guo chemicals treatment carrying out press filtration processing, and by described in the return of obtained clear water Washing sieve.
It can be seen from the above technical proposal that the utility model provides a kind of sandstone aggregate production system, including first Intermediate bunker, the second intermediate bunker, the 3rd intermediate bunker, the 4th intermediate bunker, the first breaker, the second breaker, Three breakers, the 4th breaker, the 5th breaker, the first screening plant, the second screening plant, the 3rd screening plant, 4th screening plant and the 5th screening plant.Wherein, above-mentioned intermediate bunker, breaker and screening plant are respectively by corresponding Belt feeder is connected, and realizes circulation of the mineral aggregate between breaker, screening plant and intermediate bunker, and by screening plant most Corresponding finished product tabia, finished product rubble, rice finished product stone and finished sand are exported eventually, that is, are obtained required during user's progress construction activity Whole sandstone aggregates, user by number of ways without being obtained, so as to improve the efficiency of construction activity.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of sandstone aggregate production system embodiment provided by the utility model;
Fig. 2 is the structural representation of another sandstone aggregate production system embodiment provided by the utility model.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Embodiment one
Fig. 1 is a kind of structural representation of sandstone aggregate production system embodiment provided by the utility model.
Shown in reference picture 1, the sandstone aggregate production system that the present embodiment provides is used to utilize the ore deposit collected from massif Sandstone aggregate needed for stone production building, the sandstone aggregate include finished product tabia, finished product rubble, rice finished product stone, finished sand etc..
The system includes the first intermediate bunker 10, the second intermediate bunker 20, the 3rd intermediate bunker 30, the 4th intermediate bunker 40th, the broken dress of the first breaker 110, the second breaker 120, the 3rd breaker 130, the 4th breaker the 140, the 5th Put the 150, first screening plant 210, the second screening plant 220, the 3rd screening plant 230, the 4th screening plant 240 and the 5th sieve Separating device 250.
It is connected between above-mentioned feed bin, breaker, screening plant by mineral aggregate conveying device, specifically includes feeding Machine, belt feeder etc..Feeding machine is divided to open type and enclosed type two kinds of common types, specifically has electro-vibrating feeder, rod to shake Dynamic batcher and screw(-type) feeder, can be chosen according to the actual demand of production.
Raw material needed for the system production the mode such as come from through explosion, hammering, extrude, drill through and being gathered from massif White clouds grey matter rock raw ore, after above-mentioned raw materials ore is obtained by rod vibratory sieve carry out screening process, by bulk Raw ore is transported to the first breaker, and the granular material screened out is temporarily stacked, so as to after mining terminates to mountain The body surface of a wound carries out landfill covering, in order to carry out agricultural planting or afforestation.
Because the lower raw ore volume of just exploitation is larger, thus the preferred jaw crusher of the first breaker, jaw crushing For machine after raw ore is broken, the mineral aggregate after being crushed by belt feeder is output to the first screening plant.
First screening plant is used to carry out screening process to the mineral aggregate of jaw crusher output, defeated by different discharging openings Go out the mineral aggregate of sizes.Wherein, size is output to the first intermediate bunker more than 60mm mineral aggregate, by size between 15~ 60mm mineral aggregate is output to the second intermediate bunker.Also include the mineral aggregate that a part of size is less than 15mm in the mineral aggregate of output, this Part is exactly finished product tabia, therefore finished product tabia is transported to preset tabia stockyard 100, so as to enter one to it The utilization of step.
Second breaker is used to obtain mineral aggregate progress from the first intermediate bunker using feeding machine and belt feeder further Break process, multiple sizes are also then included by broken mineral aggregate, the mineral aggregate of this part by discharging opening output, therefore, Second screening plant is transported to by corresponding belt feeder after broken.The preferred cone crusher of second breaker, the circle Cone crusher is used to slightly break the mineral aggregate of the first intermediate bunker.
Second screening plant is used to carry out screening process to the mineral aggregate of the second breaker output, therefrom obtains multiple sizes Mineral aggregate, specifically include size more than 30mm, the mineral aggregate between 10~30mm and less than 10mm, pass through corresponding skin here Mineral aggregate of the size more than 30mm is transported to the second intermediate bunker with machine, mineral aggregate of the size between 10~30mm is sent into the 4th Intermediate bunker, mineral aggregate of the size less than 10mm is transported to the 3rd intermediate bunker.
3rd breaker is used to utilize feeding machine and corresponding the belt feeder feeding from the second intermediate bunker, and will obtain Mineral aggregate carry out break process again, be output to the 3rd screening plant after broken.The 3rd preferred circular cone type of breaker is broken Broken machine, for the mineral aggregate of the second intermediate bunker to be carried out into thin broken, to obtain smaller size of mineral aggregate.
3rd screening plant is used to carry out screening process to the mineral aggregate of the 3rd breaker output, and passes through different output Mouth exports various sizes of mineral aggregate, and its size is respectively more than 30mm, between 10~30mm and less than 10mm.On obtaining After the mineral aggregate for stating size, mineral aggregate of the size more than 30mm is returned into the second intermediate bunker using different belt feeders, by size Mineral aggregate less than 10mm is transported to the 3rd intermediate bunker, and mineral aggregate of the size between 10~30mm is transported into the 4th middle material Storehouse.
4th breaker is used to carry out quartering hammer to the mineral aggregate of the 4th intermediate bunker, from above, the 4th middle material The size of the mineral aggregate in storehouse is between 10~30mm.The 4th preferred vertical shaft type impact crusher of breaker, its ore deposit exported The size of material is not more than 30mm, and is output to the 4th screening plant and carries out screening process.
4th screening plant is used to carry out screening process to the mineral aggregate of the 4th breaker output, after screening, can obtain To rice finished product stone and other sizes of finished product rubble, size of the size between 10~25mm between 4.75~10mm Mineral aggregate.Finished product rubble is transported to by default rubble stockyard 200 by corresponding belt feeder after sieving, rice finished product stone is conveyed To default rice clitter field 300, meanwhile, mineral aggregate of the size more than 25mm is returned into the 4th intermediate bunker, so as to again to it Break process is carried out, mineral aggregate of the size less than 4.75mm is also output to the 3rd intermediate bunker.
5th breaker is used to obtain mineral aggregate from the 3rd intermediate bunker by feeding machine and belt feeder, then to acquirement Mineral aggregate carries out break process.5th breaker includes two-stage equipment, and first order equipment is roller crushing device, for mineral aggregate First time processing is carried out, the sand making machine as second level equipment is then output to, for the mineral aggregate of input to be made into Machine-made Sand.
5th screening plant is used to carry out the mineral aggregate that exports in sand making machine screening process, the size screened out between 0.075~2.36mm mineral aggregate is finished sand, and being transported to default Machine-made Sand finished bin 400 by belt feeder is kept in, Mineral aggregate of the size more than 2.36mm returns to the charging aperture of rolling disintegrator.
Powder concentrator (not shown) is additionally provided with 5th screening plant, and powder concentrator is used to mineral aggregate is carried out during sand processed Gather dust processing, be less than 0.075mm finished product stone flour so as to obtain size, and stone flour warehouse for finished product is transported to by corresponding air duct 500 is temporary.
It can be seen from the above technical proposal that a kind of sandstone aggregate production system is present embodiments provided, including in first Between feed bin, the second intermediate bunker, the 3rd intermediate bunker, the 4th intermediate bunker, the first breaker, the second breaker, the 3rd Breaker, the 4th breaker, the 5th breaker, the first screening plant, the second screening plant, the 3rd screening plant, Four screening plants and the 5th screening plant.Wherein, above-mentioned intermediate bunker, breaker and screening plant pass through corresponding skin respectively Band machine is connected, and realizes circulation of the mineral aggregate between breaker, screening plant and intermediate bunker, and final by screening plant Corresponding finished product tabia, finished product rubble, rice finished product stone and finished sand are exported, that is, is obtained required during user's progress construction activity Whole sandstone aggregates, user by number of ways without being obtained, so as to improve the efficiency of construction activity.
Embodiment two
Fig. 2 is the structural representation of another sandstone aggregate production system embodiment provided by the utility model.
Shown in reference picture 2, the sandstone aggregate production system that the present embodiment provides is set up on the basis of a upper embodiment Washing sieve 260 and the 5th intermediate bunker 50.
Washing sieve is used for using water to the further washing screening processing of finished product tabia progress, so as to will wherein different chis Very little mineral aggregate separation, further to utilize.Ore deposit of the size more than 0.075mm can be obtained by the screening process of washing sieve Material and mud, wherein include the mineral aggregate less than 0.075mm, but do not have value in mud.
After sieving, mineral aggregate of the size more than 0.075mm is transported to the 5th intermediate bunker, the mineral aggregate of the 5th intermediate bunker Enter back into sand processing processed in the sand making machine of the 5th breaker.
In addition, the system also includes filter press 270, washing sieve screens out the mud come and is sent into slurry can, by medicament Filter press is re-fed into after processing, filter press is then used to carry out press filtration processing to the mud Jing Guo chemicals treatment, and obtained clear water returns Return in washing sieve, be at the same time used to the tank that washing sieve supplies water is also required to that required water is continuously replenished.
Each embodiment in this specification is described by the way of progressive, what each embodiment stressed be with The difference of other embodiment, between each embodiment identical similar part mutually referring to.
Although having been described for the preferred embodiment of the utility model embodiment, those skilled in the art once learn Basic creative concept, then can make other change and modification to these embodiments.So appended claims are intended to solve It is interpreted as including preferred embodiment and falls into having altered and changing for the utility model embodiment scope.
Finally, it is to be noted that, herein, such as first and second or the like relational terms be used merely to by One entity or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or operation Between any this actual relation or order be present.Moreover, term " comprising ", "comprising" or its any other variant meaning Covering including for nonexcludability, so that process, method, article or terminal device including a series of elements are not only wrapped Those key elements, but also the other element including being not expressly set out are included, or is also included for this process, method, article Or the key element that terminal device is intrinsic.In the absence of more restrictions, wanted by what sentence "including a ..." limited Element, it is not excluded that other identical element in the process including the key element, method, article or terminal device also be present.
Technical scheme provided by the utility model is described in detail above, specific case pair used herein Principle and embodiment of the present utility model are set forth, and the explanation of above example is only intended to help and understands that this practicality is new The method and its core concept of type;Meanwhile for those of ordinary skill in the art, according to thought of the present utility model, having There will be changes in body embodiment and application, in summary, this specification content should not be construed as to this practicality New limitation.

Claims (10)

1. a kind of sandstone aggregate production system, it is characterised in that among the first intermediate bunker, the second intermediate bunker, the 3rd Feed bin, the 4th intermediate bunker, the first breaker, the second breaker, the 3rd breaker, the 4th breaker, the 5th break Crushing device, the first screening plant, the second screening plant, the 3rd screening plant, the 4th screening plant and the 5th screening plant, its In:
First breaker is used to break the white clouds grey matter rock raw ore gathered from massif by blasting method Broken processing;
First screening plant is used to carry out screening process to the mineral aggregate of first breaker output, and size is more than 60mm mineral aggregate is sent into the first intermediate bunker, and size is transported into second middle material between the mineral aggregate less than 15~60mm Storehouse, mineral aggregate of the size no more than 15mm is transported to default tabia stockyard as finished product tabia;
Second breaker is used to the first intermediate bunker Mineral Material carrying out break process;
Second screening plant is used to the mineral aggregate of second breaker output carrying out screening process, and size is more than 30mm mineral aggregate is sent into the second intermediate bunker, and mineral aggregate of the size less than 10mm is sent into the 3rd intermediate bunker, by size between 10mm and 30mm mineral aggregate is sent into the 4th intermediate bunker;
3rd breaker is used to the mineral aggregate of second intermediate bunker carrying out break process;
3rd screening plant is used to the mineral aggregate of the 3rd breaker output carrying out screening process, and size is more than 30mm mineral aggregate is sent into the second intermediate bunker, mineral aggregate of the size less than 10mm is sent into the 3rd intermediate bunker, by size between 10 ~30mm mineral aggregate is sent into the 4th intermediate bunker;
4th breaker is used to carry out break process to the mineral aggregate of the 4th intermediate bunker;
4th screening plant be used for the 4th breaker output mineral aggregate carry out screening process, and by size between 10~25mm mineral aggregate is transported to default rubble stockyard as finished product rubble, using size between 4.75~10mm mineral aggregate as Rice finished product stone is transported to default rice clitter field, mineral aggregate of the size more than 25mm is sent into the 4th intermediate bunker, by size Mineral aggregate less than 4.75mm is sent into the 3rd intermediate bunker;
5th breaker is used to carry out break process to the mineral aggregate of the 3rd intermediate bunker;
5th screening plant be used for the 5th breaker output mineral aggregate carry out screening process, and by size between 0.075~2.36mm mineral aggregate is sent into default Machine-made Sand finished bin as finished sand, mineral aggregate of the size more than 2.36 is returned defeated Return the charging aperture of the 5th breaker.
2. sandstone aggregate production system as claimed in claim 1, it is characterised in that the 5th breaker is broken including roll-in Crushing device and sand making machine, wherein:
The roller crushing device is used to carry out break process to the mineral aggregate of the 3rd intermediate bunker;
The sand making machine is used to carry out break process to the mineral aggregate of roller crushing device output, and is output to the 5th sieve Separating device.
3. sandstone aggregate production system as claimed in claim 2, it is characterised in that the 5th breaker also includes selecting powder Machine, wherein:
The mineral aggregate that the powder concentrator is used to export the sand making machine carries out processing of gathering dust, and size is less than to 0.075mm mineral aggregate Default stone flour finished bin is transported to as finished product stone flour.
4. sandstone aggregate production system as claimed in claim 1, it is characterised in that the chi of the mineral aggregate of first intermediate bunker It is very little to be less than or equal to 250mm.
5. sandstone aggregate production system as claimed in claim 1, it is characterised in that first breaker is broken including jaw Broken machine.
6. sandstone aggregate production system as claimed in claim 1, it is characterised in that second breaker includes circular cone type Disintegrating machine.
7. sandstone aggregate production system as claimed in claim 1, it is characterised in that the 3rd breaker includes circular cone type Disintegrating machine.
8. sandstone aggregate production system as claimed in claim 1, it is characterised in that the 4th breaker includes vertical shaft type Impact crusher.
9. the sandstone aggregate production system as described in any one of claim 1~8, it is characterised in that also including washing sieve and Five intermediate bunkers, wherein:
The washing sieve is used to carry out the finished product tabia washing screening processing, and size is more than to 0.075mm mineral aggregate The 5th intermediate bunker is sent into, waste processing is carried out using mineral aggregate of the size less than 0.075mm as mud;
Mineral aggregate in 5th intermediate bunker is then transported to the charging aperture of the 5th breaker through conveying device.
10. sandstone aggregate production system as claimed in claim 9, it is characterised in that also including filter press, wherein:
The filter press is used to the mud Jing Guo chemicals treatment carrying out press filtration processing, and obtained clear water is returned into the washing Sieve.
CN201720952810.6U 2017-08-01 2017-08-01 A kind of sandstone aggregate production system Active CN207102829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720952810.6U CN207102829U (en) 2017-08-01 2017-08-01 A kind of sandstone aggregate production system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720952810.6U CN207102829U (en) 2017-08-01 2017-08-01 A kind of sandstone aggregate production system

Publications (1)

Publication Number Publication Date
CN207102829U true CN207102829U (en) 2018-03-16

Family

ID=61579840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720952810.6U Active CN207102829U (en) 2017-08-01 2017-08-01 A kind of sandstone aggregate production system

Country Status (1)

Country Link
CN (1) CN207102829U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111940064A (en) * 2020-07-23 2020-11-17 江苏山宝集团有限公司 Processing technology of high-quality aggregate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111940064A (en) * 2020-07-23 2020-11-17 江苏山宝集团有限公司 Processing technology of high-quality aggregate

Similar Documents

Publication Publication Date Title
CN207357319U (en) A kind of sandstone process units
CN105921246B (en) A kind of Machine-made Sand production system and its production method
CN202097009U (en) Sand-making production system for environment-friendly dry-method collector
CN205925925U (en) Machine -made sand production system
CN104370485A (en) Production system and production method of machine-made gravels
CN108480016B (en) The efficient rubble sand production technology of factory's formula environment-protecting intelligent
CN205517935U (en) A product reducing mechanism for in high -calcium ash production process
CN109317285A (en) A kind of sandstone aggregate production system
CN109317284B (en) Machine-made sand production system
CN207238203U (en) A kind of Machine-made Sand production system
CN202700602U (en) Stone crushing and sand making production line
CN210753123U (en) Broken production line of mechanism sand
CN204911726U (en) Gold mine stone primary mineral system of roughly selecting
CN207102829U (en) A kind of sandstone aggregate production system
CN202538896U (en) Stone breaking and sand-making production line
CN109317287A (en) A kind of sandstone aggregate production technology
CN206526918U (en) Building rubbish treatment device
CN204220251U (en) Calcined coke deep processing device
CN109317282A (en) A kind of fine work aggregate production system
CN108772173A (en) A kind of granite waste stone dust recycles production line and its technique
CN209452003U (en) A kind of ore reduction screening system
CN207056692U (en) A kind of ball mill device
CN109317286B (en) Rice stone production system
CN206152936U (en) Breaker of recycle marble waste material
CN215087403U (en) Aggregate crushing and screening production line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant