CN207098501U - A kind of crane span structure attachment structure - Google Patents

A kind of crane span structure attachment structure Download PDF

Info

Publication number
CN207098501U
CN207098501U CN201720890935.0U CN201720890935U CN207098501U CN 207098501 U CN207098501 U CN 207098501U CN 201720890935 U CN201720890935 U CN 201720890935U CN 207098501 U CN207098501 U CN 207098501U
Authority
CN
China
Prior art keywords
crane span
span structure
plugboard
fin
shell fragment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720890935.0U
Other languages
Chinese (zh)
Inventor
姚河伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Five Xiang Industry Ltd By Share Ltd
Original Assignee
Fujian Five Xiang Industry Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Five Xiang Industry Ltd By Share Ltd filed Critical Fujian Five Xiang Industry Ltd By Share Ltd
Priority to CN201720890935.0U priority Critical patent/CN207098501U/en
Application granted granted Critical
Publication of CN207098501U publication Critical patent/CN207098501U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

It the utility model is related to a kind of crane span structure attachment structure, including the first crane span structure and the second crane span structure, plugboard is respectively welded on two side plates of the first crane span structure, plugboard extends one end of the first crane span structure and multiple fins is equally spacedly provided with extension, neck is formed between adjacent two fins, fin is perpendicular to the side of plugboard, fin tilts to the other end of the first crane span structure, U-shaped board is respectively welded on two side plates of the second crane span structure, inserting groove is formed between the side plate of U-shaped board and the second crane span structure, correspond to one side of the plugboard provided with fin in U-shaped board and be provided with shell fragment, first crane span structure and the second crane span structure snap fit attachment fixation by plugboard and the grafting cooperation of inserting groove and shell fragment and neck.Crane span structure attachment structure of the present utility model, the substantial amounts of union piece such as bolt, nut, packing ring and cover buckle is eliminated, without bolt mounting holes are opened up on the side plate of crane span structure, improve the overall construction intensity of crane span structure, quick and easy for installation, structure is firm.

Description

A kind of crane span structure attachment structure
Technical field
The technical field of power circuit equipment is the utility model is related to, specifically a kind of crane span structure attachment structure.
Background technology
Cable testing bridge is as in power electrical apparatus system, the conventional supporting protection device of cable laying, to cable testing bridge The cable of interior laying plays a part of protecting and guiding cabling.Cable for needing laying over long distances, single crane span structure can not expire Sufficient length requirement, it is therefore desirable to connect multiple crane span structures, traditional connected mode is the connection in two adjacent crane span structures Place set crane span structure connection sheet, blending bolt, jam nut, lock washer and cover buckle by the both ends of crane span structure connection sheet respectively with two The side plate of crane span structure is connected, so as to realize being connected between crane span structure by crane span structure connection sheet.This mode not only needs Substantial amounts of union piece is configured, and it is cumbersome for installation, and efficiency is low.
Utility model content
The defects of in order to overcome above-mentioned prior art, technical problem to be solved in the utility model are to provide a kind of structure Simply, crane span structure attachment structure quick and easy for installation.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:
A kind of crane span structure attachment structure, including the first crane span structure and the second crane span structure, on two side plates of first crane span structure respectively Be welded with the plugboard parallel with side plate, the plugboard extend one end of the first crane span structure and on extension equidistantly Ground is provided with multiple fins, neck is formed between adjacent two fins, the fin is perpendicular to the side of plugboard, the fin Tilted to the other end of the first crane span structure, be respectively welded on two side plates of second crane span structure and be fixed with U-shaped board, U-shaped board and the The inserting groove coordinated with plugboard grafting is formed between the side plate of two crane span structures, is provided with fin corresponding to plugboard in the U-shaped board One side be provided with shell fragment, the shell fragment is parallel with fin, and first crane span structure and the second crane span structure pass through plugboard and grafting The grafting cooperation of groove and shell fragment and neck snap fit attachment fixation.
Wherein, U-shaped joint-cutting is offered in the U-shaped board, joint-cutting portion enclosed is formed to inserting groove inner bending The shell fragment.
Wherein, the top surface of the fin is arc surface.
Wherein, the fin is integrally formed with plugboard.
The beneficial effects of the utility model are:It is different from prior art, crane span structure attachment structure provided by the utility model, Two adjacent crane span structures snap fit attachment fixation by plugboard and the grafting cooperation of inserting groove and shell fragment and neck, exempt from The substantial amounts of union piece such as bolt, jam nut, lock washer and cover buckle is removed, without opening up bolt on the side plate of crane span structure Mounting hole, the overall construction intensity of crane span structure is improved, as long as by plugboard alignment inserting groove insertion during installation, it is easy for installation Fast, structure is firm.
Brief description of the drawings
Fig. 1 show the structural representation of the crane span structure attachment structure of the utility model embodiment.
Fig. 2 show the assembling design sketch of the crane span structure attachment structure of the utility model embodiment.
Fig. 3 show Fig. 2 front view.
Fig. 4 show Fig. 3 A-A sectional views.
Label declaration:
The crane span structures of 1- first;The crane span structures of 2- second;3- plugboards;4-U templates;30- fins;31- necks;40- inserting grooves;41- Shell fragment;42- joint-cuttings.
Embodiment
For detailed description technology contents of the present utility model, the objects and the effects, below in conjunction with embodiment and match somebody with somebody Accompanying drawing is closed to be explained.
It refer to shown in Fig. 1 to Fig. 4, the crane span structure attachment structure of the utility model embodiment, including the first crane span structure 1 and second Crane span structure 2, it is respectively welded on two side plates of first crane span structure 1 and is fixed with the plugboard 3 parallel with side plate, the plugboard 3 Extend one end of the first crane span structure 1 and multiple fins 30 are equally spacedly provided with extension, between adjacent two fins 30 Neck 31 is formed, the fin 30 tilts perpendicular to the side of plugboard 3, the fin 30 to the other end of the first crane span structure 1, institute State to be respectively welded on two side plates of the second crane span structure 2 and be fixed with U-shaped board 4, between the side plate of the crane span structure 2 of U-shaped board 4 and second formed with The inserting groove 40 that the grafting of plugboard 3 coordinates, plugboard 3 is corresponded in the U-shaped board 4 is provided with the one side of fin 30 and be provided with shell fragment 41, the shell fragment 41 is parallel with fin 30, and the crane span structure 2 of the first crane span structure 1 and second is inserted by plugboard 3 and inserting groove 40 Connect cooperation and shell fragment 41 and neck 31 snaps fit attachment fixation.
Operation principle of the present utility model is as follows:
During installation, the inserting groove 40 that the plugboard 3 of the first crane span structure 1 is aligned to the second crane span structure 2 inserts, convex in insertion process Rib 30 can promote shell fragment 41 to bring it about upward elastic deformation, fin 30 is passed through shell fragment 41, and arrive neck 31 Shell fragment 41 can be inserted in neck 31 under itself rebound effect during position, formed and be clasped with neck 31.Therefore in plugboard 3 Grafting cooperation and shell fragment 41 with inserting groove 40 with being clasped of neck 31, the connection of the first crane span structure 1 and the second crane span structure 2 It is reliable and stable.
It was found from foregoing description, the beneficial effects of the utility model are:Prior art is different from, the utility model provides Crane span structure attachment structure, adjacent two crane span structures pass through plugboard and the grafting cooperation of inserting groove and the buckle of shell fragment and neck It is fixedly connected, the substantial amounts of union piece such as bolt, jam nut, lock washer and cover buckle is eliminated, without in crane span structure Side plate on open up bolt mounting holes, the overall construction intensity of crane span structure is improved, as long as plugboard is directed at into inserting groove during installation Insertion, quick and easy for installation, structure is firm.
Further, as shown in Fig. 2 offering U-shaped joint-cutting 42 in the U-shaped board 4, the portion enclosed of joint-cutting 42 The shell fragment 41 is formed to the inner bending of inserting groove 40.
Further, as shown in figure 1, the top surface of the fin 30 is arc surface.
Further, the fin 30 is integrally formed with plugboard 3.
Embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, it is every The equivalents made using the utility model specification and accompanying drawing content, or directly or indirectly it is used in the technology neck of correlation Domain, similarly it is included in scope of patent protection of the present utility model.

Claims (4)

  1. A kind of 1. crane span structure attachment structure, it is characterised in that:Including the first crane span structure and the second crane span structure, two sides of first crane span structure It is respectively welded on plate and is fixed with the plugboard parallel with side plate, the plugboard extends one end of the first crane span structure and in extension On be equally spacedly provided with multiple fins, form neck between adjacent two fins, the fin perpendicular to the side of plugboard, The fin tilts to the other end of the first crane span structure, is respectively welded on two side plates of second crane span structure and is fixed with U-shaped board, U The inserting groove coordinated with plugboard grafting is formed between the side plate of template and the second crane span structure, corresponds to plugboard in the U-shaped board One side provided with fin is provided with shell fragment, and the shell fragment is parallel with fin, and first crane span structure and the second crane span structure pass through grafting Plate and the grafting cooperation of inserting groove and shell fragment and neck snap fit attachment fixation.
  2. 2. crane span structure attachment structure according to claim 1, it is characterised in that:U-shaped cut is offered in the U-shaped board Seam, joint-cutting portion enclosed form the shell fragment to inserting groove inner bending.
  3. 3. crane span structure attachment structure according to claim 1, it is characterised in that:The top surface of the fin is arc surface.
  4. 4. crane span structure attachment structure according to claim 1, it is characterised in that:The fin is integrally formed with plugboard.
CN201720890935.0U 2017-07-21 2017-07-21 A kind of crane span structure attachment structure Expired - Fee Related CN207098501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720890935.0U CN207098501U (en) 2017-07-21 2017-07-21 A kind of crane span structure attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720890935.0U CN207098501U (en) 2017-07-21 2017-07-21 A kind of crane span structure attachment structure

Publications (1)

Publication Number Publication Date
CN207098501U true CN207098501U (en) 2018-03-13

Family

ID=61545751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720890935.0U Expired - Fee Related CN207098501U (en) 2017-07-21 2017-07-21 A kind of crane span structure attachment structure

Country Status (1)

Country Link
CN (1) CN207098501U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038409A (en) * 2018-09-10 2018-12-18 镇江朝阳机电科技有限公司 A kind of Novel bridge frame
CN109378782A (en) * 2018-12-21 2019-02-22 天长市福骏金属制品有限公司 A kind of gantry connection structure and the installation method using the structure
CN112310905A (en) * 2020-10-29 2021-02-02 淄博永鑫电器有限公司 Spliced cable bridge

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038409A (en) * 2018-09-10 2018-12-18 镇江朝阳机电科技有限公司 A kind of Novel bridge frame
CN109378782A (en) * 2018-12-21 2019-02-22 天长市福骏金属制品有限公司 A kind of gantry connection structure and the installation method using the structure
CN109378782B (en) * 2018-12-21 2020-04-10 天长市福骏金属制品有限公司 Bridge frame connecting structure and mounting method using same
CN112310905A (en) * 2020-10-29 2021-02-02 淄博永鑫电器有限公司 Spliced cable bridge

Similar Documents

Publication Publication Date Title
CN207098501U (en) A kind of crane span structure attachment structure
JP3167551U (en) Clamp
CN105794062B (en) Cable connector and distribution box sub-assembly
US9306341B2 (en) Power adapter
CN203326276U (en) Connector
CN205666587U (en) Triangle -shaped cable fastening clip utensil
CN204335261U (en) Electronic installation
EP3295997B1 (en) Trampoline support frame
CN104410017A (en) Rapid cable fixing device
CN206505683U (en) A kind of display device housing and display device
CN203911119U (en) LED soft light bar connector
KR200451739Y1 (en) Wiring box with fixing member
CN205781409U (en) Cable cleat device
CN104966595A (en) Wiring device
CN207432257U (en) Anti-stab cutter protection set
CN214543420U (en) Security check equipment and fixing device thereof
US20060243475A1 (en) Trunking and connecting means therefor
CN203947619U (en) A kind of connecting structure of wall
WO2016173028A1 (en) Distribution box
CN208142754U (en) A kind of structural type anticorrosion cable gantry
JP2015190118A (en) Eaves parapet and method to exchange eaves parapet
CN211826196U (en) Multi-user intelligent electric energy meter
CN103178141B (en) Photovoltaic component terminal box and there is its photovoltaic module
CN209095415U (en) A kind of wiring board localization tool
CN203732585U (en) Electric-energy-meter casing mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313

Termination date: 20200721

CF01 Termination of patent right due to non-payment of annual fee