CN207093024U - A kind of cementing cement head with rubber plug indicator - Google Patents

A kind of cementing cement head with rubber plug indicator Download PDF

Info

Publication number
CN207093024U
CN207093024U CN201720686191.0U CN201720686191U CN207093024U CN 207093024 U CN207093024 U CN 207093024U CN 201720686191 U CN201720686191 U CN 201720686191U CN 207093024 U CN207093024 U CN 207093024U
Authority
CN
China
Prior art keywords
cementing
housing
leading screw
horizontal screw
screw lead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720686191.0U
Other languages
Chinese (zh)
Inventor
凌勇
王贵富
林志辉
杨红滨
付家文
刘文明
齐奔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201720686191.0U priority Critical patent/CN207093024U/en
Application granted granted Critical
Publication of CN207093024U publication Critical patent/CN207093024U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses a kind of cementing cement head with rubber plug indicator, including gland, cementing head body, backing pin and plug, outside is installed with the horizontal screw lead housing communicated with cementing head body in the middle part of cementing head body, horizontal screw lead is provided with horizontal screw lead housing, one end of horizontal screw lead is connected with the backing pin being integrally formed with horizontal screw lead, the horizontal screw lead other end is provided with the handwheel positioned at flat leading screw hull outside, vertical leading screw housing is fixed with horizontal screw lead housing side square crossing, vertical leading screw housing penetrates with horizontal screw lead housing junction, vertical leading screw is provided with vertical leading screw housing, it is carved with calibration loop in vertical leading screw middle and upper part, it can be intermeshed between leading screw and horizontal screw lead vertically.The utility model is simple in construction, and processing and manufacturing cost is low, good seal performance, easy maintenance, safe and reliable and can be suitably used for all cementing cement heads.

Description

A kind of cementing cement head with rubber plug indicator
Technical field
It the utility model is related to the solid completion tool of petroleum and natural gas well, more particularly to a kind of well cementation water with rubber plug indicator Mud head.
Background technology
Cementing head is Cementing specific purpose tool, is connected by landing joint with bunch tube or drilling rod during well cementation, for defeated Cementing fluid is sent to underground precalculated position.For cementing head as connection underground and the hinge of ground installation, being can not in cementing operation Or scarce key equipment.For control device cost, on the premise of normal construction is ensured, oil field generally uses both at home and abroad at present Straight-bar pin-blocking type cementing head, straight-bar pin-blocking type cementing head are to change the shape residing for plug using the contact relation of backing pin and plug State.Backing pin vertically passes in and out cementing head body by the rotation of handwheel, because plug is in cementing head body interior, is rotating handwheel When, whether technical staff by hand tentatively to perceive plug descending if can only touching cementing head lower end, however, at the scene noise it is excessive, In the case that cementing head body is thicker, it can not accurately conclude whether plug is descending.
It is not in place in backing pin opening, when plug is stuck in cementing head by backing pin and fails pressure, it can have a strong impact on that well cementation is applied Work causes to stay cement plug accident, once staying plug accident, oil well will be caused not go into operation normally, and the later stage bores plug well workover Somewhat expensive.Therefore, the cementing cement head for designing a kind of simple rubber plug indicator of band is particularly important.In existing band rubber plug indicator Cementing head in, have the cementing head of mechanical rubber plug indicator and magnetic induction rubber plug indicator, mechanical rubber plug indicator cement Head is to judge that plug passes through situation by thrust bearing and pointer combination;Magnetic induction rubber plug indicator cementing head then needs It is equipped with special magnet plug and secondary meter passes through situation to detect plug.While the existing cementing head with rubber plug indicator is also There is the drawbacks such as complicated, difficulty of processing is big, operation inconvenience, maintenance difficulty.
Utility model content
Technical problem to be solved in the utility model is, for a kind of simple in construction, easily operated and easily determine plug The cementing cement head with rubber plug indicator passed through.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:A kind of consolidating with rubber plug indicator Well cement head, including gland, cementing head body, backing pin and plug, the gland are enclosed on cementing head bodies top, cementing head body Bottom is connected on sleeve pipe, and tamponade liquid gate valve is provided with cementing head body upper part side, is distinguished in cementing head body lower part both sides Provided with cementing gate valve and for gate valve for slurry, cementing head inside is the consistent cavity of upper and lower internal diameter, positioned at backing pin and tamponade liquid gate valve Between cavity in be placed with plug, in the middle part of cementing head body outside be installed with the horizontal silk communicated with cementing head body Thick stick housing, horizontal screw lead is provided with horizontal screw lead housing, and one end of horizontal screw lead is connected with what is be integrally formed with horizontal screw lead Backing pin, the horizontal screw lead other end is provided with the handwheel positioned at flat leading screw hull outside, in horizontal screw lead housing side square crossing Vertical leading screw housing is fixed with, vertical leading screw housing penetrates with horizontal screw lead housing junction, is provided with vertical leading screw housing perpendicular Raw silk rings thick stick, vertical leading screw middle and upper part are carved with calibration loop, can be intermeshed between vertical leading screw and horizontal screw lead.
The horizontal screw lead housing for gate valve for slurry in 45 ° with being staggered.
When the backing pin retreats to cementing head inner body wall outside completely, the calibration loop on vertical leading screw is just exposed at perpendicular completely Raw silk rings thick stick housing tip.
The backing pin is provided with sealing gasket with horizontal screw lead transition position.
The plug maximum outside diameter is slightly less than cavity internal diameter.
The beneficial effects of the utility model are:On the basis of existing straight-bar pin-blocking type cementing head, with reference to horizontal screw thread with The worm gear auxiliary structure of vertical screw thread composition, overcome existing rubber plug indicator labyrinth and add-on device to cementing head sheet The defects of body strength reduction, on no operating habit for changing original well head operating personnel, by observing on vertical leading screw Calibration loop can just judge whether backing pin is outer easily and fall back on position, avoid and move back the possibility descending less than position influence plug outside backing pin, The cementing head is simple in construction simultaneously, and processing and manufacturing cost is low, good seal performance, easy maintenance, safe and reliable and can be suitably used for institute There is cementing cement head.
Brief description of the drawings
Fig. 1 is the structural representation of cementing cement head of the utility model with rubber plug indicator.
Fig. 2 is structural representation when handwheel shakes out rear plug downlink working.
Fig. 3 is the utility model rubber plug indicator and handwheel schematic diagram.
Wherein:1- glands;2- cavitys;3- cementing head bodies;4- horizontal screw lead housings;The vertical leading screw housings of 5-;6- scales Ring;7- handwheels;The vertical leading screws of 8-;9- horizontal screw leads;10- replaces gate valve for slurry;11- sleeve pipes;12- tamponade liquid gate valves;13- plugs;14- Backing pin;15- cementing gate valves;16- sealing gaskets.
Embodiment
It is new to this practicality below in conjunction with accompanying drawing to make the purpose of this utility model, technical scheme and advantage clearer The embodiment of type is set forth in.
As shown in figures 1 and 3, the cementing cement head of the present utility model with rubber plug indicator, including gland 1, cementing head Body 3, backing pin 14 and gland 1 described in plug 13 are enclosed on the top of cementing head body 3, and the bottom of cementing head body 3 is connected to sleeve pipe 11 On, tamponade liquid gate valve 12 is provided with the upper side of cementing head body 3, cementing is respectively equipped with the bottom both sides of cementing head body 3 Gate valve 15 and for gate valve for slurry 10, is the cavity 2 that upper and lower internal diameter is consistent inside cementing head, positioned at backing pin 14 and tamponade liquid gate valve 12 it Between cavity in be placed with plug 13, the level communicated with cementing head body 3 is installed with the outside of the middle part of cementing head body 3 Leading screw housing 4, horizontal screw lead 9 is provided with horizontal screw lead housing 4, one end of horizontal screw lead 9 is connected with and the one of horizontal screw lead 9 The backing pin 14 of formation, the other end of horizontal screw lead 9 is provided with the handwheel 7 positioned at the outside of horizontal screw lead housing 4, in horizontal screw lead housing 4 side square crossings are fixed with vertical leading screw housing 5, and vertical leading screw housing 5 penetrates with the junction of horizontal screw lead housing 4, vertically Vertical leading screw 8 is provided with leading screw housing 5, calibration loop 6 is carved with the vertical middle and upper part of leading screw 8, between vertical leading screw 8 and horizontal screw lead 9 It can be intermeshed.
The horizontal screw lead housing 4 for gate valve for slurry 10 in 45 ° with being staggered.
When retreating to cementing head 3 inwall of body outside the backing pin 14 is complete, the calibration loop 6 on vertical leading screw 8 is just completely outer It is exposed at the vertical top of leading screw housing 5.
The backing pin 14 is provided with sealing gasket 16 with the transition position of horizontal screw lead 9.
The maximum outside diameter of plug 13 is slightly less than the internal diameter of cavity 2.
The utility model uses process:As shown in figure 1, before cementing operation, backing pin is advanced into water by shaking handwheel The inside cavity of mud head body, turns on the gland of cementing head bodies top, plug is placed in cavity, makes plug descending and backing pin Contact, now the calibration loop on vertical leading screw enters vertical leading screw enclosure interior;Cementing operation has noted water by cementing gate valve After mud, cementing gate valve is closed and for gate valve for slurry, make backing pin is completely outer to retreat to cementing head body as shown in Fig. 2 shaking handwheel Inwall, while handwheel is shaken, vertical leading screw is up, when the calibration loop on vertical leading screw is exposed at vertical leading screw housing completely During top, show that plug has separated and descending with backing pin, then, by tamponade liquid gate valve toward when injecting tamponade liquid in cavity, Plug can be to continue traveling downwardly under the promotion of tamponade liquid, it is ensured that plug successfully enters well.
In summary, content of the present utility model is not limited in the above embodiments, in same area it is insighted it Scholar can easily propose other embodiments within technological guidance's thought of the present utility model, but this embodiment is all wrapped Include within the scope of the utility model.

Claims (5)

1. a kind of cementing cement head with rubber plug indicator, including gland (1), cementing head body (3), backing pin (14) and plug (13), the gland (1) is enclosed at the top of cementing head body (3), and cementing head body (3) bottom is connected on sleeve pipe (11), in water Mud head body (3) upper side is provided with tamponade liquid gate valve (12), and cementing lock is respectively equipped with cementing head body (3) bottom both sides Valve (15) and for gate valve for slurry (10), is the cavity (2) that upper and lower internal diameter is consistent inside cementing head, positioned at backing pin (14) and tamponade liquid lock Plug (13) is placed with cavity between valve (12), it is characterised in that outside is installed with the middle part of cementing head body (3) The horizontal screw lead housing (4) communicated with cementing head body (3), horizontal screw lead housing (4) is interior to be provided with horizontal screw lead (9), horizontal One end of leading screw (9) is connected with the backing pin (14) being integrally formed with horizontal screw lead (9), and horizontal screw lead (9) other end is provided with position Handwheel (7) on the outside of horizontal screw lead housing (4), in horizontal screw lead housing (4), side square crossing is fixed with vertical leading screw shell Body (5), vertical leading screw housing (5) are penetrated with horizontal screw lead housing (4) junction, and vertical thread is provided with vertical leading screw housing (5) Thick stick (8), vertical leading screw (8) middle and upper part are carved with calibration loop (6), can mutually nibbled between vertical leading screw (8) and horizontal screw lead (9) Close.
2. the cementing cement head with rubber plug indicator according to claim 1, it is characterised in that the horizontal screw lead housing (4) with being staggered for gate valve for slurry (10) in 45 °.
3. the cementing cement head with rubber plug indicator according to claim 1, it is characterised in that the backing pin (14) is completely outer When retreating to cementing head body (3) inwall, the calibration loop (6) on vertical leading screw (8) is just exposed at vertical leading screw housing (5) completely Top.
4. the cementing cement head with rubber plug indicator according to claim 1, it is characterised in that the backing pin (14) and level Leading screw (9) transition position is provided with sealing gasket (16).
5. the cementing cement head with rubber plug indicator according to claim 1, it is characterised in that the plug (13) is maximum outer Footpath is slightly less than cavity (2) internal diameter.
CN201720686191.0U 2017-06-13 2017-06-13 A kind of cementing cement head with rubber plug indicator Expired - Fee Related CN207093024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720686191.0U CN207093024U (en) 2017-06-13 2017-06-13 A kind of cementing cement head with rubber plug indicator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720686191.0U CN207093024U (en) 2017-06-13 2017-06-13 A kind of cementing cement head with rubber plug indicator

Publications (1)

Publication Number Publication Date
CN207093024U true CN207093024U (en) 2018-03-13

Family

ID=61552150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720686191.0U Expired - Fee Related CN207093024U (en) 2017-06-13 2017-06-13 A kind of cementing cement head with rubber plug indicator

Country Status (1)

Country Link
CN (1) CN207093024U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113236234A (en) * 2021-05-31 2021-08-10 濮阳中原三力创高机械设备有限公司 Manufacturing and application method of rubber plug downlink indicator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113236234A (en) * 2021-05-31 2021-08-10 濮阳中原三力创高机械设备有限公司 Manufacturing and application method of rubber plug downlink indicator

Similar Documents

Publication Publication Date Title
CN203403854U (en) Well mouth blowout preventer for large-diameter logging instrument
CN207093024U (en) A kind of cementing cement head with rubber plug indicator
CN204754862U (en) Cross twin cable inflatable packer
CN206144523U (en) Two overhead paddle check valves
CN113123742A (en) Well control system and method for offshore high-temperature high-pressure narrow safety density window well
CN203321465U (en) Bridge type concentric water distributor
CN111485854A (en) Mine is with preventing spouting guarantor's gas joint in
CN204827363U (en) It closes closed float collar to bump to press
CN204716202U (en) Intubate well cementing valve
CN107591769B (en) A kind of power cable pipeline waterproof plugging device
CN104153740B (en) Differential oil jacket coupling cock
CN212225173U (en) Mine is with preventing spouting guarantor's gas joint in
CN212454346U (en) Orifice closing device for grouting
CN204663477U (en) For catching ball device in plugging while drilling control valve
CN203285391U (en) Pressure-differential oil jacket communication valve
CN111520099A (en) Split type large-traffic casing head of oil gas well
CN202500521U (en) High-pressure large flow water inrush borehole safety system
CN203403818U (en) Float collar for floating casing running of extended reach well
CN203285375U (en) Blocking gauge cutter
CN203321405U (en) Sucker rod blowout preventer
CN207019720U (en) Integrated measuring piecing devices for water-tight equipment
CN203531847U (en) High-pressure bypass safety valve for downhole testing
CN205955727U (en) Test a tub ware in pit
CN201212375Y (en) Check valve
CN205955691U (en) Novel multi -functional blowout preventer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210218

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: China Petroleum Tianjin building Bohai Drilling Engineering Co., Ltd., No. 83, Second Street, economic and Technological Development Zone, Binhai New Area, Tianjin, 300457

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313

CF01 Termination of patent right due to non-payment of annual fee