Utility model content
Technical problem to be solved in the utility model is to provide one kind and exempts from drill integrated blind plate guide shoe, can be in completion
By building the pressure after construction, make to be connected to the integral type inner core on body and suppress de- and freely fall into shaft bottom under gravity, so that
Follow-up bore can be saved and remove process, construction risk is reduced, save engineering time and cost.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:One kind is exempted from drill integrated blind plate and drawn
Footwear, including body, the upper end of the body of tubular are machined with sleeve pipe internal thread, and lower half is uniformly machined with multiple cut off close to end face
Hole, blind plate design integrated inner core with guide shoe guide mechanism, and the integral type inner core first half is solid blind plate part, and lower half is
Hollow guide shoe guide mechanism, the outside of solid blind plate is machined with respectively cuts off groove and seal groove, the solid blind plate of integral type inner core
The medial surface of partial outside and body lower part, which is formed, to be coordinated, and hollow guide shoe guide mechanism exposes body lower end, cut off groove with
Body cuts off hole alignment, and pressure cuts off and hole and cut off in groove installed in cutting off, the seal assembly in seal groove and this
Internal side forms sealing.
The body bottom processes inclined-plane at 45 °, between the outer rim of blind plate part and guide shoe guide mechanism with 45 ° tiltedly
Step surface transition, forms with body bottom inclined-plane and coordinates, and guide shoe guide mechanism is designed to the 45 ° of tapers closed up downwards.
The integral type inner core use can bore cast and form.
The beneficial effects of the utility model are:De- be connected on body that build the pressure can be passed through after completion construction terminates
Integral type inner core, be allowed to freely fall into shaft bottom, so as to before subsequent construction, save special lower drilling tool and bore work except inner core
Sequence, construction risk is reduced, save the engineering time, shorten well construction period, reduce individual well cost.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description:
As shown in figure 1, of the present utility model exempts from drill integrated blind plate guide shoe, including body, the upper end of the body 1 of tubular
Be machined with sleeve pipe internal thread, lower half be uniformly machined with close to end face it is multiple cut off hole, blind plate is designed to guide shoe guide mechanism
Integral type inner core 4, the first half of integral type inner core 4 are solid blind plate parts, and lower half is hollow guide shoe guide mechanism, solid blind
The outside of plate is machined with respectively cuts off groove and seal groove, the outside of the solid blind plate part of integral type inner core 4 and body lower part it is interior
Side, which is formed, to be coordinated, and hollow guide shoe guide mechanism exposes the lower end of body 1, cuts off groove and alignd with the hole that cuts off of body 1, pressure is cut
Pin 2, which is arranged on, to be cut off hole and cuts off in groove, and the seal assembly 3 in seal groove is formed with body medial surface and sealed.
The bottom of body 1 processes inclined-plane at 45 °, with 45 ° between the outer rim of blind plate part and guide shoe guide mechanism
Sloping platform terrace transition, forms with the bottom inclined-plane of body 1 and coordinates, and guide shoe guide mechanism is designed to the 45 ° of tapers closed up downwards.
The use of integral type inner core 4 can bore cast and form.
Specifically, body 1 is made up of alloy pipe, and its upper end is machined with sleeve pipe internal thread, and lower half is close to end face
Uniformly being machined with six cuts off hole, is one section of smooth sealing surface inside it, and bottom processes sloping platform terrace at 45 °;Integral type
Blind plate and guide shoe guide mechanism are carried out integrated design by inner core 4, and use can bore cast and form, and its first half is solid blind
Plate part, lower half are hollow guide shoe guide mechanisms, are 45 ° of excessive sloping platform ranks therebetween, finally can be oblique with the end of body 1
Step, which is formed, to be coordinated, and is machined with the outside of solid blind plate and is cut off groove and seal groove, and seal assembly 3 is arranged in seal groove.
Guide shoe guide mechanism is designed to the 45 ° of tapers closed up downwards.Outside and body 1 of the final integral type inner core 4 by blind plate part
The sealing surface of inner side, which is formed, to be coordinated, and is now cut off groove and is alignd with the hole that cuts off of body, and pressure cuts off to be arranged on and cuts off hole and cut
In cotter way, and the seal assembly 3 in seal groove is formed with the sealing surface inside body 1 and sealed, and it is new so just to form this practicality
Type exempts from drill integrated blind plate guide shoe.
During pipe string tripping in, the guide shoe guide mechanism of integral type inner core 4 can play guiding function, prevent pipe string bottom
End is inserted into the borehole wall, and in work progress, blind plate can effective pressure-bearing so that completion tool used in completion construction is smooth
Realization act, construction terminate after, by well head suppress to setting pressure, the integral type inner core 4 being connected with body can be suppressed it is de-,
Shaft bottom can be freely fallen under Gravitative Loads, save the brill before later stage operation and remove inner core process, reduce construction risk, section
The engineering time is saved, reduces individual well cost.45 ° of sloping platform terraces of the lower end of body 2 design simultaneously are alternatively subsequent construction tripping in instrument
Guiding well is provided, can smooth tripping in.
The utility model is used in the completion construction in oil drilling engineering, and its main effect has two:First, in pipe
Guiding function is played during string tripping in, avoids pipe string bottom from being inserted into the borehole wall, beneficial to the smooth tripping in of pipe string;Second, constructed in completion
During operation, envelope pressure effect is played, is suppressed by well head, can make to reach predetermined pressure inside pipe string, so that in completion construction
Used completion tool can be acted smoothly in realization.
By improving existing blind plate pipe nipple and guide shoe, can will be connected to after completion construction by building the pressure on body
Integral type inner core is suppressed to take off and is allowed to freely fall into shaft bottom, and so as to before subsequent construction, save the process for falling down and boring and removing inner core, saving is applied
Between man-hour, shorten well construction period, reduce construction cost.
In summary, content of the present utility model is not limited in the above embodiments, in same area it is insighted it
Scholar can easily propose other embodiments within technological guidance's thought of the present utility model, but this embodiment is all wrapped
Include within the scope of the utility model.