Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720496529.6U
Other languages
Chinese (zh)
Inventor
陶德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Youbolin Machinery Equipment Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720496529.6U priority Critical patent/CN207092949U/en
Application granted granted Critical
Publication of CN207092949U publication Critical patent/CN207092949U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model has separated the convenient rig of elevator formula free of demolition, including conventional creeper undercarriage, and fixed frame is welded with creeper undercarriage, power station, supporting leg, operating desk and large arm mast are installed on chassis;The anterior installation unit head of large arm mast, rear portion installation hoist engine;Elevator is installed on the output shaft of unit head bottom.For elevator when loading and unloading more than 3.0 meters drilling rods, operating personnel, which need not climb to, dismantles elevator on drilling machine mast, and all handling drilling rod operations need to only be completed on the ground.Meanwhile handling drilling rod is easy to operate, quick, mast handling drilling rod is climbed up relative to traditional operating personnel, security and convenience greatly improve.

Description

The convenient rig of elevator formula free of demolition
Technical field
A kind of mechanical spindle-type drill is the utility model is related to, is mainly used in upright opening construction direction, belongs to.
Background technology
Traditional power head type drill rig is extremely difficult when loading and unloading drilling rod, and labor intensity is big.It is particularly big in handling length When 3.0m drilling rod, an operating personnel must be allowed to climb up drilling machine mast or boring tower the reason for by Human Height, during lower brill Overhead power head position, the elevator and righting drilling rod of dismounting lifting drilling rod, makes power head output shaft be connected with drilling rod thread, twists Tightly, this work high above the ground mode is very dangerous, and efficiency is low.The external side overturn on this problem using unit head Formula, i.e. unit head are moved down into the lowest part of mast, then using unit head top as rotating shaft, the jacking oil in unit head bottom Under cylinder effect, unit head is set to overturn 70 ° -90 ° to level, perpendicular to mast direction, then lift drilling rod alignment by operating personnel and move Power head output shaft screw thread is tightened, and unit head moves up while gradually withdraws jacking cylinder, until drilling rod is in bore position.
In view of it is above-mentioned the defects of, the design people, be actively subject to research and innovation, need not be dismantled to found one kind, pacify It is complete reliable, efficiently easily lift dismounting drilling rod method.
Utility model content
It need not be dismantled in order to solve the above technical problems, the purpose of this utility model is to provide one kind, securely and reliably, efficiently Easily lift dismounting drilling rod construction drill.
The utility model is achieved through the following technical solutions:A kind of convenient rig of elevator formula free of demolition, including carry out Band walking mechanism, is welded with fixed frame on creeper undercarriage, and power station 1, supporting leg 2, operation are provided with fixed frame Platform 3 and mast 4, power station 1, supporting leg 2 and mast 4 are installed on operating desk 3, and supporting leg 2 is symmetricly set on the two of operating desk 3 End, installs power station 1 and mast 4 is symmetrically mounted on the both sides of operating desk 3;The side of mast 4 is provided with unit head 5, opposite side Hoist engine 6 is installed, hoist engine 6 is connected by steel wire rope with elevator 7;Elevator 7 is arranged on the output shaft of the bottom of unit head 5 On 9.
When the elevator 7 that output shaft 9 connects loads and unloads drilling rod 8, unit head 5 is moved down into the minimum point of mast 4, while by 90 ° can be overturn and it is positioned on wellhead platform in elevator 7 is be hinged, operating personnel lifts the card that drilling rod 8 is positioned over elevator 7 At mouthful, unit head 5 is lifted after putting on latch 10, not pin 11, drilling rod 8 is reached the bore position of work, rotary power head 5, twists Thread between the screw thread and each drilling rod 8 of tight drilling rod 8 and output shaft 9, then carry out continuing construction drilling.
The elevator 7 include guide sleeve 7.1, carry corbel back slab 7.2, carry corbel back slab hangers 7.3, check plate 7.4 forms.Guide sleeve 7.1 are arranged on output shaft 9 by way of gap coordinates, and the bottom check plate 7.4 of guide sleeve 7.1 is fixed, and prevents from being oriented to Set 7.1 skids off;Carry corbel back slab 7.2 and be hinged on and carry on corbel back slab hangers 7.3, carrying corbel back slab 7.2 can freely revolve around corbel back slab hangers 7.3 is carried Turn, be fixed on guide sleeve 7.1;Latch 10 is arranged on and carries the bottom drilling rod side of the inserting side of corbel back slab 7.2.Carried when the square joint of drilling rod 8 is caught in After lead device inserts side, latch 10 and not pin 11 are inserted, prevents drilling rod 8 comes off from inserting side.
The guide sleeve 7.1 can be relative to slip and rotation with output shaft 9.When loading and unloading drilling rod 8, ensure output shaft 9 with Drilling rod thread smoothly loads and unloads.
Rig unloads drilling rod 8 using the lifting of unit head 5, or drives the lifting of elevator 7 to unload drilling rod 8 using hoist engine 6.
Compared with prior art, effectively income effect of the present utility model is:
The present apparatus does not need operating personnel to climb to and elevator is dismantled on mast, and all handling drilling rod operations only need on the ground Complete, handling drilling rod is easy to operate, quick, and relative to traditional operating type, security and convenience greatly improve.
Rig can fast and efficiently be completed to load and unload pipe action, reduce rig manufacture difficulty;
Operating personnel all work on the ground, without work high above the ground, improve security;
Described above is only general introduction of the present utility model, in order to better understand technological means of the present utility model, And can be practiced according to the content of specification, below with preferred embodiment of the present utility model and coordinate accompanying drawing describe in detail ginseng See the description of embodiment in embodiment.
Brief description of the drawings
Fig. 1 is the schematic diagram of rig;
Fig. 2 .1 are elevator schematic diagrames one;
Fig. 2 .2 are elevator schematic diagrames two;
Fig. 3 is handling drilling rod position view;
In figure:1 power station, 2, supporting leg, 3, operating desk, 4, mast, 5, unit head, 6, hoist engine, 7, elevator, 8, bore Bar, 9, output shaft, 10, latch, 11, do not sell, 7.1, guide sleeve, 7.2, carry corbel back slab, 7.3, carry corbel back slab hangers, 7.4, check plate.
Embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not limited to the scope of the utility model.
Referring to shown in Fig. 1-3, rig reaches aperture, adjustment supporting leg and large arm mast, ensures power head output shaft and construction Hole is vertical, aligns.
The elevator of power head output shaft connection overturns 90 ° of placements down to large arm mast lowest part, while elevator In on wellhead platform, operating personnel lifts drilling rod and is positioned over elevator bayonet socket, put on latch, not Xiao after lift unit head, make brill Bar reaches bore position, rotary power head, tightens drilling rod and power head output shaft screw thread and two drilling rod threads, then opens Well head plate carries out continuing construction drilling;When drilling arrives drilling rod square toes position, block the side of saving of drilling rod second with fork and be fixed on well On oralia, unit head, which rotates, unclamps screw thread, while repeats dress drilling rod operation, then withdraws from fork, continues to creep into drilling rod square toes, Drilling rod operation is unloaded in repetition, is sequentially completed a rod boring.The like, until drilling extremely construction hole depth.
Unload drilling rod (example -):The elevator of power head output shaft connection inserts side down to large arm mast lowest part, elevator Drilling rod first segment side is blocked, latch is put on, does not sell, unit head rises to the second section drilling rod and exposes the side of saving of drilling rod second, uses fork Block the side of saving of drilling rod second to be fixed on well head plate, pulling fork using hydraulic pressure is inserted in above on drilling rod square toes, releases, then unloads manually Open, the elevator under unit head is transferred to elevator with drilling rod and is positioned on well head plate, is extracted latch, is carried away drilling rod;Power After headband rut elevator rises a segment distance, elevator inserts side and blocks drilling rod first segment side, puts on latch, does not sell, repeats above-mentioned Pipe operation is unloaded, completes second drilling rod dismounting, the like, complete all drilling rod dismountings.

Claims (4)

1. the convenient rig of elevator formula free of demolition, it is characterised in that:The convenient rig includes creeper undercarriage, in crawler travel Fixed frame is welded with mechanism, power station (1), supporting leg (2), operating desk (3) and mast (4) are installed in fixed frame, is moved Power station (1), supporting leg (2) and mast (4) are installed on operating desk (3), and supporting leg (2) is symmetricly set on the both ends of operating desk (3), Installation power station (1) and mast (4) are symmetrically mounted on the both sides of operating desk (3);The side of mast (4) is provided with unit head (5), Opposite side is provided with hoist engine (6), and hoist engine (6) is connected by steel wire rope with elevator (7);Elevator (7) is arranged on power On the output shaft (9) of head (5) bottom;
During elevator (7) handling drilling rod (8) of output shaft (9) connection, unit head (5) is moved down into the minimum point of mast (4), It can overturn 90 ° simultaneously because elevator (7) is be hinged and be positioned on wellhead platform, operating personnel lifts drilling rod (8) and is positioned over At the bayonet socket of elevator (7), put on latch (10), not Xiao (11) afterwards lifted unit head (5), make drilling rod (8) reach work brill Hole site, rotary power head (5), tighten the connecting filament between the screw thread and each drilling rod (8) of drilling rod (8) and output shaft (9) Button, then carry out continuing construction drilling.
2. the convenient rig of elevator formula free of demolition according to claim 1, it is characterised in that:The elevator (7) includes Guide sleeve (7.1), carry corbel back slab (7.2), carry corbel back slab hangers (7.3), check plate (7.4) composition;Guide sleeve (7.1) is matched somebody with somebody by gap The mode of conjunction is arranged on output shaft (9), and the bottom of guide sleeve (7.1) is fixed with check plate (7.4), prevents guide sleeve (7.1) Skid off;Carry corbel back slab (7.2) and be hinged on and carry on corbel back slab hangers (7.3), carrying corbel back slab (7.2) can be around carrying corbel back slab hangers (7.3) freely Rotation, is fixed on guide sleeve (7.1);Latch (10) is arranged on and carries corbel back slab (7.2) bottom drilling rod side of inserting side;When drilling rod (8) side Joint is caught in after elevator inserts side, insertion latch (10) and Xiao (11).
3. the convenient rig of elevator formula free of demolition according to claim 2, it is characterised in that:The guide sleeve (7.1) with Output shaft (9) can be relative to slip and rotation.
4. the convenient rig of elevator formula free of demolition according to claim 1, it is characterised in that:Rig uses unit head (5) Drilling rod (8) is unloaded in lifting, or drives elevator (7) lifting to unload drilling rod (8) using hoist engine (6).
CN201720496529.6U 2017-05-07 2017-05-07 The convenient rig of elevator formula free of demolition Withdrawn - After Issue CN207092949U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720496529.6U CN207092949U (en) 2017-05-07 2017-05-07 The convenient rig of elevator formula free of demolition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720496529.6U CN207092949U (en) 2017-05-07 2017-05-07 The convenient rig of elevator formula free of demolition

Publications (1)

Publication Number Publication Date
CN207092949U true CN207092949U (en) 2018-03-13

Family

ID=61550378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720496529.6U Withdrawn - After Issue CN207092949U (en) 2017-05-07 2017-05-07 The convenient rig of elevator formula free of demolition

Country Status (1)

Country Link
CN (1) CN207092949U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930695A (en) * 2017-05-07 2017-07-07 陶德明 Exempt to dismantle the convenient rig of elevator formula

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930695A (en) * 2017-05-07 2017-07-07 陶德明 Exempt to dismantle the convenient rig of elevator formula
CN106930695B (en) * 2017-05-07 2024-02-27 陶德明 Disassembly-free elevator type portable drilling machine

Similar Documents

Publication Publication Date Title
US10563468B2 (en) Automatic auxiliary workover rig
CA1104321A (en) Low lift, elevatable high floor drilling mast and substructure arrangement therefor
JP2993763B2 (en) A device that supports a driven rig directly off center of the oil well
US10407937B2 (en) Methods for elevating drilling rig components with a strand jack
US20050193645A1 (en) Automatic method for installing mobile drilling rig at a drilling site
US7413393B1 (en) Method for loading and unloading substructures for a mobile drilling rig
CN208869129U (en) Telescopic building hoist day beam is set in elevator traction
WO2017166915A1 (en) Pipe processing device
CN110454100A (en) A kind of super single operation industrial robot device of drilling and repairing well and method
CN111535758A (en) Automatic processing method for 2-single-1-upright-column drilling machine tubular column
CN106219420A (en) A kind of fast erecting traveling tower crane
CN207092949U (en) The convenient rig of elevator formula free of demolition
CN202064840U (en) Four-drill column drill derrick
US4061233A (en) Drilling rigs
CN103590763A (en) Blowout preventer transportation and installation device of oil drilling platform
CN204827251U (en) Novel suit derrick upright
US9243461B1 (en) Catwalk mechanism and method for installing tubulars on a drill string
CN104389525B (en) Liftable working platform at front end of pile frame and operation method thereof
CN106930695A (en) Exempt to dismantle the convenient rig of elevator formula
CN110552359B (en) Support hanging basket type high and steep slope anchoring construction method
CN112031681A (en) Hydraulic workover rig
CN212337196U (en) Hydraulic workover rig
CN204163658U (en) With the rigid guide device of car folding type tourist bus
CN210829073U (en) Mechanical power head long-stroke feeding trailer drilling machine
CN110552627B (en) Support hanging basket type high and steep slope anchor and use construction equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210730

Address after: 102488 Tiangezhuang village, Fangshan street, Fangshan District, Beijing

Patentee after: BEIJING YOUBOLIN MACHINERY EQUIPMENT Co.,Ltd.

Address before: 102488 Tiangezhuang, Chengguan Street, Fangshan District, Beijing

Patentee before: Tao Deming

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20180313

Effective date of abandoning: 20240227