CN207079640U - A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus - Google Patents

A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus Download PDF

Info

Publication number
CN207079640U
CN207079640U CN201720876774.XU CN201720876774U CN207079640U CN 207079640 U CN207079640 U CN 207079640U CN 201720876774 U CN201720876774 U CN 201720876774U CN 207079640 U CN207079640 U CN 207079640U
Authority
CN
China
Prior art keywords
pile
cast
bottom sediment
place concrete
sediment thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720876774.XU
Other languages
Chinese (zh)
Inventor
唐胡乐
黄清华
汪岚峰
李福亮
庞许跃
薛金昌
卢鹏程
李文思
陈松
马炳剑
陆盛兴
李建锋
杜锦安
贾玉帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING LRK SCIENCE & TECHNOLOGY Co.,Ltd.
GUANGDONG RONGJUN CONSTRUCTION ENGINEERING TESTING Corp.,Ltd.
Guangzhou Guangjian Construction Engineering Testing Center Co.,Ltd.
Original Assignee
Beijing Lrk Science & Technology Co Ltd
Guangdong Rongjun Construction Engineering Ltd By Share Ltd
GUANGZHOU CONSTRUCTION QUALITY & SAFETY TESTING CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Lrk Science & Technology Co Ltd, Guangdong Rongjun Construction Engineering Ltd By Share Ltd, GUANGZHOU CONSTRUCTION QUALITY & SAFETY TESTING CENTER filed Critical Beijing Lrk Science & Technology Co Ltd
Priority to CN201720876774.XU priority Critical patent/CN207079640U/en
Application granted granted Critical
Publication of CN207079640U publication Critical patent/CN207079640U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus, include core drilling machine and drilling rod, vibrating sensor and displacement transducer are provided with the drilling rod, also includes control circuit, the vibrating sensor and displacement transducer are connected to process circuit.The utility model device is received the data of the sensor by control circuit by setting vibrating sensor and displacement transducer in rig, and by handling sensor signal control circuit, pile bottom sediment thickness is detected so as to realize.The utility model can be widely applied to cast-in-place concrete pile drilling core checking field as a kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus.

Description

A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus
Technical field
Cast-in-place concrete pile drilling core checking field is the utility model is related to, especially a kind of cast-in-place concrete pile pile bottom sediment Thickness detection apparatus.
Background technology
Foundation of concrete perfusion piles is widely used to city's political and ideological work as one of most important base form of engineering structure The fields such as journey, building, traffic engineering.An important factor for pile bottom sediment thickness is pile quality, directly affects bearing capacity of pile foundation Just.
The detection of pile bottom sediment thickness at present, mainly there are self-test and third party to detect two ways.Self-test can typically use Two methods, carried out before pile:Before one kind is casting concrete, by pair of Construction Party, management side and construction party tissue Hole quality is carried out an acceptance inspection, i.e., by pumping, after positive and negative circulation borehole cleaning, sediment thickness is measured using sash weight method, it is common practice that Be bonded to the starting point of lining rope with one piece of weight and then slowly transfer, to bottom hole after slowly put with putting on hand, amplitude should not be big, then Armrest sense obtains the substantially thickness of sediment, and this method precision is not high, estimates mainly by the experience of workmen;Another kind is logical Cross equipment and measure pile penetration, so as to measure sediment thickness, but operate comparatively laborious, general seldom use.Third party detects sediment Thickness, after concrete-pile pouring molding, unit is detected by third party sediment thickness is gone out by drill core test.
The underwater television occurred in recent years, sediment thickness problem can be checked as the supplementary means of drilling core checking.But water Lower TV is limited by bottom hole water body visibility;In addition, checked using underwater television before sediment, it is necessary to use clear water hole flushing repeatedly, powder It could be detected after dirt precipitation completely, whole process generally requires the two or three days, and equipment is heavy, in-convenience in use, if Each hole checks that sediment thickness cost is high using underwater television.
Drill core test concrete-pile bottom sediment thickness mainly passes through drilling rod drilling depth length and core boring sampling length at present Difference, with reference to drill bit when drilling through sediment penetration rate, whether there is situations such as brill synthesis determine, depend entirely on rig machine Long experience and professional quality, it is always denouncing for drill core test that can not accurately determine sediment thickness.
Term is explained:
(1) pile foundation
Pile foundation refers to the basis or straight with stake by post that the cushion cap of stake and stake top connection by being arranged in ground collectively constitutes The single-pile foundation connect in succession.
(2) reflection wave method
Reflection wave method includes detecting of bearing capacity of a pile and pile integrity detection.Wherein loading test is divided into single pile Vertical compression bearing capacity examination, vertically pulling-resistant bearing capacity examination and horizontal bearing force inspecting.The expection of engineering pile is led to using function Cross bearing capacity of single pile realization, be the defects of finding some influence bearing capacity of single piles the purpose of integrity detection, it is ensured that pile foundation it is durable Property, be advantageous to reliably judge bearing capacity of pile foundation and reduce potential safety hazard.
(3) core drilling method
Core drilling method be applied to detection cast-in-place concrete pile stake is long, concrete strength of pile, pile defect and its position, stake Bottom sediment thickness, judge or differentiate pile bottom force holding layer ground character, judge pile body integrity classification.Also it can detect diaphram wall Wall depth, walls concrete intensity, wall body defect and its position, wall bottom sediment thickness, judge or differentiate wall bed rock soil nature shape.
(4) pile defect
Cause pile body breaking, crack, necking down, the folder mud of pile structural strength and durability reduction (miscellaneous to a certain extent Thing), cavity, honeycomb, it is loose phenomena such as general designation.
(5) sediment thickness
Sediment refers to what drilling left with precipitation or collapse hole during borehole cleaning, the sediment do not taken away by circulating mud;Typically It is compared with coarse granule, sediment thickness is the floor height of this layer of sediment.
Utility model content
In order to solve the above-mentioned technical problem, the purpose of this utility model is:A kind of cast-in-place concrete pile pile bottom sediment thickness Detection means.
Drill bit of drilling machine is when by pile concrete and stake bed rock stone supporting course, because medium is different or medium has density Change, vibration frequency and vibration amplitude are changed, and vibrating sensor and displacement transducer, prison are installed in traditional core drilling machine These changes are surveyed, and the analysis of qualitative, quantitative is carried out by process circuit, to realize to concrete pile quality and stake bottom holding force The detection and monitoring of layer, reduce the influence of artificial subjective factor, so as to Accurate Determining pile bottom sediment thickness.
Technical scheme is used by the utility model:A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus, bag Core drilling machine and drilling rod have been included, vibrating sensor and displacement transducer are provided with the drilling rod, has also included control circuit, it is described Vibrating sensor and displacement transducer are connected to control circuit.
Further, the control circuit is also associated with wireless data transfer module.
Further, the control circuit is also associated with data memory module.
Further, the control circuit includes harmonic management module, acceleration processing module and abrupt climatic change module, institute State vibrating sensor and abrupt climatic change module is connected to by harmonic management module, institute's displacement sensors handle mould by acceleration Block is connected to abrupt climatic change module.
Further, the abrupt climatic change module is used to be filtered processing to the signal of harmonic management module.
Further, the harmonic management module is FFT calculator circuits.
The beneficial effects of the utility model are:The utility model device in rig by setting vibrating sensor and position respectively Displacement sensor, and by control circuit receive the sensor data, by handling sensor signal control circuit, Pile bottom sediment thickness is detected so as to realize.
Brief description of the drawings
Fig. 1 is the utility model drill bit structure schematic diagram;
Fig. 2 is the utility model device circuit structured flowchart;
Fig. 3 is the circuit structure block diagram of the utility model device further embodiment;
Fig. 4 is vibrating sensor output waveform figure in the utility model embodiment;
Fig. 5 is vibration frequency harmonic components figure under normal circumstances in the utility model embodiment;
Fig. 6 is vibration frequency harmonic components figure under a kind of abnormal conditions in the utility model embodiment;
Fig. 7 is vibration frequency harmonic components figure under another abnormal conditions in the utility model embodiment;
Fig. 8 is displacement acceleration figure under normal circumstances in the utility model embodiment.
Embodiment
Specific embodiment of the present utility model is described further below in conjunction with the accompanying drawings:
A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus, reference picture 1, include core drilling machine and drilling rod 1, it is described Vibrating sensor 3 and displacement transducer 2 are provided with drilling rod 1, reference picture 2, also includes control circuit, the vibrating sensor Control circuit is connected to displacement transducer.
Reference picture 3, is further used as preferred embodiment, and the control circuit is also associated with wireless data transmission mould Block.
By wireless data transfer module, data and/or analysis result that control circuit obtains can be transmitted to cloud service The signal of control circuit can be analyzed data or directly obtained to device, cloud server, and user can directly pass through cloud service Device accesses data, and data are analyzed accordingly, so as to obtain pile bottom sediment Thickness sensitivity analysis result.
Reference picture 3, preferred embodiment is further used as, the control circuit is also associated with data memory module, uses , especially can be data cached when wireless data transmission has failure in the data of storage process circuit.
Reference picture 3, is further used as preferred embodiment, and the control circuit includes harmonic management module, accelerated Degree processing module and abrupt climatic change module, the vibrating sensor are connected to abrupt climatic change module, institute by harmonic management module Displacement sensors are connected to abrupt climatic change module by acceleration processing module.
Preferred embodiment is further used as, the abrupt climatic change module is used to carry out the signal of harmonic management module Filtering process.
Preferred embodiment is further used as, the harmonic management module is FFT calculator circuits.
User can be judged accordingly according to the data for handling to obtain in control circuit, if drill vibration frequency is humorous Low-frequency component mutation increases in wave component, then position density or the hardness increase of displacement are corresponded in the concrete of core drilling machine coring; If the harmonic components high frequency components mutation of drill vibration frequency increases, the position of displacement is corresponded in the concrete of core drilling machine coring Put density or hardness reduces.If forward mutation assay occurs in the acceleration of drill bit displacement, position is corresponded in the concrete of core drilling machine coring The position density or hardness of shifting reduce;If negative sense mutation occurs in the acceleration of drill bit displacement, in the concrete of core drilling machine coring The position density of corresponding displacement or hardness increase.
During core drilling machine samples, when the property for running into the concrete such as cavity, impurity, honeycomb, pile bottom sediment is sent out During raw change, the load that corresponding drill bit is subject to can also produce bigger change, so as to produce ratio on vibrating sensor More harmonic components, by the change of the composition and displacement transducer corresponding data of harmonic wave, user may determine that correspondingly The defects of local and related performance.
Vibrating sensor output waveform by harmonic components analysis as shown in figure 4, understand to deposit in its frequency domain under normal circumstances In a prominent crest, as shown in Figure 5.If the harmonic components low and medium frequency part increase of vibrating sensor, illustrates drill bit Vibration frequency reduces, and the load increase of rig, illustrates that rig has got into harder part this moment.Such as Fig. 6 harmonic components figure It is shown, relative to the waveform that a low frequency is superimposed on the basis of Fig. 5 fundamental waves, that is, there is low frequency mutation, can be with by observing waveform Draw, drill vibration frequency reduces, and illustrates that rig gets into density or hardness and becomes big such as reinforcing bar, ratchel etc relatively this moment Object, while occur high frequency higher hamonic wave on drill bit, while HFS becomes miscellaneous, the frequency values difference of the bossing of frequency Corresponding rig has got into different compositions, can by abrupt climatic change module according to the frequency values of above-mentioned bossing to it is possible into Analyzed.
If the harmonic components low and medium frequency part of vibrating sensor is reduced, illustrate the vibration frequency increase of drill bit, rig Load is reduced, and relative to Fig. 5 fundamental wave, the protrusion peak frequencies of low frequency part move to right in Fig. 7 harmonic components, that is, high frequency occur Mutation, can be drawn by observing waveform, the increase of drill vibration frequency, illustrate that rig gets into density this moment or hardness diminishes relatively , there is high frequency higher hamonic wave and equally correspond to rig respectively having got into not in cavity, honeycomb, pile bottom sediment etc. on drill bit Same composition, user can be analyzed possible composition by the frequency values of above-mentioned bossing.
Similarly, core drilling machine sampling during, fall off rate change keep within the specific limits, when run into cavity, honeycomb Speed can increase when structure, pile bottom sediment, and when passing through defect completely, speed can fall after rise, and performance rate acceleration is scarce when running into Speed has forward mutation assay when falling into, and when passing through defect completely, rate acceleration has negative sense mutation, as shown in figure 8, according to position The accelerating curve that displacement sensor is calculated, abscissa are the moment, unit s, and ordinate is acceleration magnitude, unit m/ s2, can be drawn by observing waveform, a positive sudden change of acceleration occurs in time 561s or so, shows that bit speed increases Add, illustrate that rig gets into cavity, honeycomb, pile bottom sediment etc. this moment, and there is the acceleration of a negative sense in time 876s or so Degree mutation, show that bit speed reduces, illustrate that rig gets into the object of such as reinforcing bar, ratchel etc this moment.
With reference to above-mentioned vibration frequency and bit location, user can also be by that can realize to coagulation to concrete fitting data The situation of the different defects of soil is made a concrete analysis of.
Above is preferably implement to be illustrated to of the present utility model, but the utility model is created and is not limited to institute State embodiment, those skilled in the art can also make a variety of etc. on the premise of without prejudice to the utility model spirit With conversion or replace, these equivalent deformations or replacement are all contained in the application claim limited range.

Claims (6)

  1. A kind of 1. cast-in-place concrete pile pile bottom sediment thickness detection apparatus, it is characterised in that:Include core drilling machine and drilling rod, it is described Vibrating sensor and displacement transducer are provided with drilling rod, also includes control circuit, the vibrating sensor and displacement sensing Device is connected to control circuit.
  2. A kind of 2. cast-in-place concrete pile pile bottom sediment thickness detection apparatus according to claim 1, it is characterised in that:It is described Control circuit is also associated with wireless data transfer module.
  3. A kind of 3. cast-in-place concrete pile pile bottom sediment thickness detection apparatus according to claim 1, it is characterised in that:It is described Control circuit is also associated with data memory module.
  4. A kind of 4. cast-in-place concrete pile pile bottom sediment thickness detection apparatus according to claim 1, it is characterised in that:It is described Control circuit includes harmonic management module, acceleration processing module and abrupt climatic change module, and the vibrating sensor passes through humorous Ripple processing module is connected to abrupt climatic change module, and institute's displacement sensors are connected to abrupt climatic change mould by acceleration processing module Block.
  5. A kind of 5. cast-in-place concrete pile pile bottom sediment thickness detection apparatus according to claim 4, it is characterised in that:It is described Abrupt climatic change module is used to be filtered processing to the signal of harmonic management module.
  6. A kind of 6. cast-in-place concrete pile pile bottom sediment thickness detection apparatus according to claim 4, it is characterised in that:It is described Harmonic management module is FFT calculator circuits.
CN201720876774.XU 2017-07-18 2017-07-18 A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus Active CN207079640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720876774.XU CN207079640U (en) 2017-07-18 2017-07-18 A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720876774.XU CN207079640U (en) 2017-07-18 2017-07-18 A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus

Publications (1)

Publication Number Publication Date
CN207079640U true CN207079640U (en) 2018-03-09

Family

ID=61423814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720876774.XU Active CN207079640U (en) 2017-07-18 2017-07-18 A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus

Country Status (1)

Country Link
CN (1) CN207079640U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288162A (en) * 2017-07-18 2017-10-24 广州市建设工程质量安全检测中心 A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288162A (en) * 2017-07-18 2017-10-24 广州市建设工程质量安全检测中心 A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus and method

Similar Documents

Publication Publication Date Title
CN107288162A (en) A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus and method
CN108318584B (en) Method for detecting pile body quality and inclination by combining single-hole acoustic wave with cross-hole CT
CN204401664U (en) A kind of castinplace pile pile bottom sediment and pile end groundwork checkout gear
CN203835373U (en) Device for detecting formed hole quality of foundation pile
CN108442419B (en) Building foundation detection device and detection method
CN104532886B (en) A kind of bored concrete pile pile bottom sediment and pile end groundwork checkout gear and method
WO2022267281A1 (en) Health diagnosis apparatus and method for roadbed service performance
CN1837515A (en) Technologic method for detecting construction quality of pile foundation by electricity detection method
CN209339193U (en) A kind of engineering pile body construction monitoring device based on BIM technology
Lehtonen et al. Full-scale embankment failure test under simulated train loading
CN112229357B (en) Method for detecting length and quality of tubular pile
CN109537580A (en) A kind of engineering pile body design and construction method based on BIM technology
CN207079640U (en) A kind of cast-in-place concrete pile pile bottom sediment thickness detection apparatus
CN108487336B (en) Geotechnical engineering pile foundation quality detection method
Åhnberg et al. Strength degradation of clay due to cyclic loadings and enforced deformation
CN111042216B (en) Comprehensive detection method for integrity and bearing characteristics of existing building foundation pile
CN110905012B (en) Building pile foundation detection method
CN106049567A (en) Detecting device for determining length of foundation pile by parallel earthquake method and detecting method thereof
CN113532544B (en) Real-time testing device for strain stiffness and stress state of soil body and construction testing method thereof
CN204439038U (en) A kind of ultrasound wave pile bottom sediment thickness measurement equipment
CN108625409A (en) Civil engineering structure pile detection assessment system and method
CN107449827A (en) A kind of rock-fill concrete structural level quality determining method and rock-fill concrete structural level quality evaluating method
Chernauskas et al. Defect detection and examination of large drilled shafts using a new cross-hole sonic logging system
CN112710536A (en) Cement soil compressive strength quality detection device and test method
Hajali et al. Cross-hole sonic logging and frequency tomography analysis of drilled shaft foundations to better evaluate anomalies locations

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210128

Address after: 510000 No. 5 Lane three North Lane, Yuexiu District Temple Road, Guangzhou, Guangdong

Patentee after: Guangzhou Guangjian Construction Engineering Testing Center Co.,Ltd.

Patentee after: GUANGDONG RONGJUN CONSTRUCTION ENGINEERING TESTING Corp.,Ltd.

Patentee after: BEIJING LRK SCIENCE & TECHNOLOGY Co.,Ltd.

Address before: 510600 3rd floor, No.5, Lane 3, North 1st Street, siyouxin Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU CONSTRUCTION QUALITY & SAFETY TESTING CENTER

Patentee before: GUANGDONG RONGJUN CONSTRUCTION ENGINEERING TESTING Corp.,Ltd.

Patentee before: BEIJING LRK SCIENCE & TECHNOLOGY Co.,Ltd.