CN207079574U - Marine enrockment area bored concrete pile spillage control device - Google Patents

Marine enrockment area bored concrete pile spillage control device Download PDF

Info

Publication number
CN207079574U
CN207079574U CN201721037727.2U CN201721037727U CN207079574U CN 207079574 U CN207079574 U CN 207079574U CN 201721037727 U CN201721037727 U CN 201721037727U CN 207079574 U CN207079574 U CN 207079574U
Authority
CN
China
Prior art keywords
mud pit
marine
control device
pipeline
rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721037727.2U
Other languages
Chinese (zh)
Inventor
武学礼
袁书晓
张伟
林波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xindi Energy Engineering Technology Co Ltd
Original Assignee
Xindi Energy Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xindi Energy Engineering Technology Co Ltd filed Critical Xindi Energy Engineering Technology Co Ltd
Priority to CN201721037727.2U priority Critical patent/CN207079574U/en
Application granted granted Critical
Publication of CN207079574U publication Critical patent/CN207079574U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of marine enrockment area bored concrete pile spillage control device is the utility model is related to, the device includes:Small mud pit, big mud pit, the sieves in big mud pit being connected via pipeline and slush pump with small mud pit, the drilling rod hole that big mud pit enters pipeline and rig via mud is connected, and its medium and small mud pit is connected by pipeline with the perforate on the steel pile casting for the rig for being higher by construction time peak level certain distance above.The utility model reduces caused by the head differential pressure spillage at steel pile casting base opening and drift sand formation, reduces the pile foundation pore-forming time and ensure that the quality of pile using head difference inside and outside casing is reduced.

Description

Marine enrockment area bored concrete pile spillage control device
Technical field
It the utility model is related to a kind of marine enrockment area bored concrete pile spillage control device.
Background technology
At sea during the cast-in-situ bored pile of enrockment area, because design stake top absolute altitude differs larger (8 meters or so of the discrepancy in elevation) with sea level And pile foundation is in marine enrockment area, pile foundation steel pile casting can not buried depth it is oversize, casing coating is relatively thin, in pile foundation construction process Head difference is excessive inside and outside middle casing, the spillage easily at steel pile casting base opening and drift sand formation, cause slurry coat method proportion reduce, from Analysis, makes body refuse in hole not exclude normally, bottom hole sediment is blocked up, makes the pile measurement for pouring completion unqualified.Spillage and spillage Slurry coat method proportion is caused to reduce, isolation.
Utility model content
Based on above mentioned problem, inventor has made intensive studies, as a result find by be higher by construction time peak level with On steel pile casting on perforate, reduce hole in mud liquid level, so as to reduce head difference inside and outside casing, reduce caused by head differential pressure Spillage at steel pile casting base opening and drift sand formation, ensures the proportion and denseness of mud in hole, and then ensure that the quality of pile.
A purpose of the present utility model is to provide a kind of marine enrockment area bored concrete pile spillage control device, the device bag Include:Small mud pit, big mud pit, the sieves in big mud pit being connected via pipeline and slush pump with small mud pit, The drilling rod hole that big mud pit enters pipeline and rig via mud connects, and its medium and small mud pit is by pipeline and is higher by the construction time most At a certain distance from above high water mark (for example, peak level above 0.5-3m, more preferably preferably 1-2.5m, 1.2-2m, such as 1.5m Place) rig steel pile casting on perforate connection.
Further, the volume of small mud pit can be 8-100 cubic meters, preferably 20-80 cubic meters, the body of big mud pit Product can be 150-1000 cubic meters, preferably 500-800 cubic meters.
Further, mesh size used in step (2) filtering is 30-140 mesh, preferably 50-100 mesh.
Another purpose of the present utility model is to provide marine enrockment area bored concrete pile spillage control method and comprised the following steps: (1) first be higher by construction time peak level certain distance above (for example, peak level above 0.5-3m, preferably 1-2.5m, At more preferably 1.2-2m, such as 1.5m) rig steel pile casting on perforate, aperture can be 1-10cm, preferably 3-5cm, by steel In casing hole mud liquid level reduce (such as to construction time peak level above 0.5-3m, more preferably preferably 1-2.5m, 1.2-2m, Such as at 1.5m), to reduce head difference inside and outside casing, reduce mud pressure in hole;
(2) one small mud pit is set in tapping, the big mud pit that mud is extracted into construction platform with slush pump enters Row filtering, oversize feeds back to the drilling rod hole of rig again, to ensure the proportion of mud and denseness, enable in hole body refuse effectively with Mud is smoothly discharged.Screenings is most water and fine deposit, can be discharged.
This technology mainly reduces head difference inside and outside casing, reduces steel pile casting base opening and drift sand formation caused by head differential pressure Locate spillage, ensure the proportion and denseness of mud in hole, and then ensure that the quality of pile.
The technology mainly using head difference inside and outside casing is reduced, reduces steel pile casting base opening and stream caused by head differential pressure Spillage at sand bed, reduce the pile foundation pore-forming time and ensure that the quality of pile.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model sea enrockment area bored concrete pile spillage control device.
Description of reference numerals:
1:Rig;2:Steel pile casting;3:Filling pile construction platform;4:Perforate;5:Small mud pit;6:Mud return duct;7:Greatly Mud pit;8:Mud enters pipeline;9:Riprap layer;10:Water level.
Embodiment
The utility model is further illustrated below in conjunction with accompanying drawing, it should be understood, however, that the following description is only used for Exemplary purpose, do not form to any restrictions of the present utility model.
As shown in figure 1, rig 1 is arranged on the filling pile construction platform 3 of riprap layer 9, it is high on the steel pile casting 2 of rig 1 Go out construction time peak level certain distance above (for example, peak level above 0.5-3m, more preferably preferably 1-2.5m, 1.2- At 2m, such as 1.5m) perforate 4 is set, perforate 4 connects small mud pit 5, and small mud pit 5 is via mud return duct 6 and slush pump (not shown) is connected with big mud pit 7, in big mud pit set sieves (not shown), big mud pit 7 via Mud is connected into pipeline 8 with the drilling rod hole of rig 1.
Comprised the following steps using said apparatus sea enrockment area bored concrete pile spillage control method:
(1) construction time peak level certain distance above is being higher by first, for example, peak level above 0.5-3m, excellent 1-2.5m is selected, the steel pile casting of the rig more preferably at 1.2-2m, such as 1.5m opens 1-10cm, preferably 3-5cm diameters hole, by steel Mud liquid level is reduced for example to construction time peak level above 0.5-3m, more preferably preferably 1-2.5m, 1.2-2m, example in casing hole At 1.5m), to reduce head difference inside and outside casing, reduce mud pressure in hole;
(2) one small mud pit is set in tapping, the big mud pit that mud is extracted into construction platform with slush pump enters Row filtering, oversize feeds back to borer drill rod hole again, to ensure the proportion of mud and denseness, enables in hole body refuse effectively with mud Slurry smoothly discharge.
Embodiment 1
Using the device shown in Fig. 1, opened first in the steel pile casting for the rig being higher by construction time peak level above 1.5m 3cm diametric holes, mud liquid level in steel pile casting hole is reduced for example at construction time peak level above 1.5m, to reduce in casing Outer head difference, reduce mud pressure in hole;
(2) about 30 cubic metres of small mud pits of one volume are set in tapping, mud is extracted into construction platform with slush pump On the about 150 cubic metres big mud pit of volume filtered, filtering sieve the mesh of aperture 50, sieves set bottom, oversize The drilling rod hole of rig rig is fed back to again, to ensure the proportion of mud and denseness, enables body refuse in hole effectively smooth with mud Discharge.As a result, do not open up hole compared to steel pile casting and in fairlead mud the drilling of conventional bored concrete pile, steel pile casting base opening and drift sand Spillage significantly reduces at layer, and the pile foundation pore-forming time reduces about 1/3 and ensure that pile quality is excellent.
Embodiment 2
Using the device shown in Fig. 1, opened first in the steel pile casting for the rig being higher by construction time peak level above 1.8m 6cm diametric holes, mud liquid level in steel pile casting hole is reduced for example at construction time peak level above 1.5m, to reduce in casing Outer head difference, reduce mud pressure in hole;
(2) about 10 cubic metres of small mud pits of one volume are set in tapping, mud is extracted into construction platform with slush pump On the about 300 cubic metres big mud pit of volume carry out the mesh of aperture 30 of Filtration Filtration sieve, sieves setting bottom, oversize is again Borer drill rod hole is fed back to, to ensure the proportion of mud and denseness, body refuse in hole is effectively smoothly discharged with mud.Knot Fruit, does not open up hole compared to steel pile casting and the conventional bored concrete pile of mud drills in fairlead, is leaked at steel pile casting base opening and drift sand formation Slurry significantly reduces, and the pile foundation pore-forming time reduces about 1/3 and ensure that pile quality is excellent.

Claims (5)

1. a kind of marine enrockment area bored concrete pile spillage control device, the device include:Small mud pit, via pipeline and slush pump with Big mud pit, the sieves in big mud pit of small mud pit connection, big mud pit enter pipeline and rig via mud The connection of drilling rod hole, its medium and small mud pit passes through the steel of pipeline and the rig for being higher by construction time peak level certain distance above Perforate connection on casing.
2. marine enrockment area bored concrete pile spillage control device according to claim 1, it is characterised in that small mud pit passes through Pipeline is connected with the perforate on the steel pile casting for the rig being higher by construction time peak level above 0.5-3m.
3. marine enrockment area bored concrete pile spillage control device according to claim 1, it is characterised in that small mud pit passes through Pipeline is connected with the perforate on the steel pile casting for the rig being higher by construction time peak level above 1.5m.
4. marine enrockment area bored concrete pile spillage control device according to claim 1, it is characterised in that the body of small mud pit Product is 8-100 cubic meters, and the volume of big mud pit is 150-1000 cubic meters.
5. marine enrockment area bored concrete pile spillage control device according to claim 1, it is characterised in that the screen cloth of sieves Aperture is 30-140 mesh.
CN201721037727.2U 2017-08-18 2017-08-18 Marine enrockment area bored concrete pile spillage control device Active CN207079574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721037727.2U CN207079574U (en) 2017-08-18 2017-08-18 Marine enrockment area bored concrete pile spillage control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721037727.2U CN207079574U (en) 2017-08-18 2017-08-18 Marine enrockment area bored concrete pile spillage control device

Publications (1)

Publication Number Publication Date
CN207079574U true CN207079574U (en) 2018-03-09

Family

ID=61419574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721037727.2U Active CN207079574U (en) 2017-08-18 2017-08-18 Marine enrockment area bored concrete pile spillage control device

Country Status (1)

Country Link
CN (1) CN207079574U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447751A (en) * 2017-08-18 2017-12-08 新地能源工程技术有限公司 Marine enrockment area bored concrete pile spillage control device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447751A (en) * 2017-08-18 2017-12-08 新地能源工程技术有限公司 Marine enrockment area bored concrete pile spillage control device and method
CN107447751B (en) * 2017-08-18 2023-04-14 新地能源工程技术有限公司 Slurry leakage control device and method for cast-in-place pile in offshore riprap area

Similar Documents

Publication Publication Date Title
CN101736732B (en) Pressure and water reduction construction method of ultra-deep foundation pit confined water
US3081828A (en) Method and apparatus for producing cuts within a bore hole
CN105804059B (en) Drilling pouring pile hole device and method
US4134461A (en) Marine structure and method of drilling a hole by means of said structure
US5428908A (en) Apparatus and method for subsidence deepening
CN109736338A (en) A kind of hydraulic engineering foundation pit pipe well combination light well point Yield rainfall relation method
CN108035700B (en) Simulation system and method for sand carrying rule of shaft of marine natural gas hydrate production well
CN103920310B (en) A kind of underground coal mine gas liquor release separator
CN104060621A (en) Construction method for super vacuum dewatering well and well tube structure used in construction method
CN105155606A (en) Port aeration type sludge clearing method
CN109881692A (en) Pre-assembled dewatering well
CN104695879B (en) A kind of stake holes is rinsed and takes out sand hole method
CN115144567B (en) Upstream type tailing dam accumulation surveying and stability evaluation method and system
CN207079574U (en) Marine enrockment area bored concrete pile spillage control device
CN107447751A (en) Marine enrockment area bored concrete pile spillage control device and method
CN110847200B (en) Dewatering and draining structure and dewatering and draining method for horizontal sand well of annular foundation pit
CN109339084A (en) Underwater big depth open caisson passes through the construction method of the hard soil layer for being difficult to abolish
NO173521B (en) UNDERGRADUATE STOCK CONSTRUCTION FOR PROCESSING AND STORAGE OF DRILL CAKES FROM DRILL OPERATIONS IN THE SEA SOUND, AND PROCEDURE FOR USING SUCH STOCK CONSTRUCTION
CN207092997U (en) A kind of mud circulating system
CN112983428B (en) Method for building underground water environment monitoring well
CN203463029U (en) Well pipe structure
CN106284267B (en) A kind of prospecting of offshore foundation and detection comprehensive platform
US2126576A (en) Apparatus for and method of boring into and treating earth material
CN209195306U (en) Middle-size and small-size drill drilling liquid closed-cycle system
CN203891785U (en) Special joint pipe assembly for throwing of gravels in pipe of hydrogeological water well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant