- CN207077678U CN207077678U CN201720730844.0U CN201720730844U CN207077678U CN 207077678 U CN207077678 U CN 207077678U CN 201720730844 U CN201720730844 U CN 201720730844U CN 207077678 U CN207077678 U CN 207077678U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- connecting rod
- fix bar
- base
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
It the utility model is related to a kind of PFF insulations pipe forming apparatus,Including steel pipe,Retainingf key,Sealing ring,Base,Universal wheel,Holding box,Fix bar two,Illuminating lamp,Connecting rod two,Cylinder one and cylinder two,The cylinder one and cylinder two are each attached to chassis interior bottom,The left side of cylinder one is fixed with cylinder two,The upper end of cylinder one is fixed with fix bar one,The upper end of cylinder two is fixed with fix bar two,The connecting rod one and connecting rod two are respectively positioned on above base,The upper end of fix bar one is connected through base with connecting rod one,Sealing shroud and sealing ring are fixed with the base upper surface,The sealing ring is located inside sealing shroud,The holding box is fixedly connected with base,The holding box upper end offers charging aperture,The utility model is easy to pouring molding,Steel pipe can be sealed,The steel pipe of plurality of specifications can be applied to,It is and simple in construction,It is easy to operation.
Description
Technical field
Insulating tube manufacture accessories field is the utility model is related to, specially a kind of PFF insulations pipe forming apparatus.
Background technology
Single layer corrosion-proof heat insulation counterweight pipe is by FBE anticorrosive paints, polyurethane foam heat insulation material, outer protective polyethylene jacket tube
And a variety of organic-inorganic materials such as coagulation weight coating, take special manufacture craft to optimize the multilayer formed after processing and answer
Close structure.Steel pipe external anti-corrosion layer uses welding epoxy powder (FBE) anti-corrosion, has the work(of excellent anticorrosion and antikathode stripping
Can, while have the effect of the adhesive between polyurethane insulation coating and pipe surface concurrently;The second layer is polyurethane foam insulation layer, tool
Have that thermal conductivity factor system is low, rate of closed hole is high (> 90%), water absorption rate is small, density is low, good chemical stability;Third layer is height
Density polyethylene jacket sleeve pipe (HDPE), mainly provide the effect of the protection and anti-steam infiltration to foam heat-insulation layer;Outermost layer
It is the concrete weight-coating (CWC) being covered on high density polyethylene (HDPE) jacket sleeve pipe, plays stability of the increase pipeline in seabed,
Laying and preventing heat-insulation layer mechanically damaged in running;Pipe end tarpaulin, it is to prevent field joint to be destroyed
Shi Shui is entered in insulating tube body by the heat-insulation layer of pipe end, causes insulating tube water suction corrosion failure.At present, the poly- ammonia of monolayer heat-insulating pipe
The moulding by casting of ester cellular insulant completes end sealing using manual operation, insulation material leakage phenomenon often occurs, close
It is poor to seal effect, labor intensity is high.
Utility model content
The purpose of this utility model is that providing a kind of PFF is incubated pipe forming apparatus, and it can effectively solve the problem that background technology
Present in problem.
To achieve the above object, the utility model provides following technical scheme:A kind of PFF is incubated pipe forming apparatus, including
Steel pipe, retainingf key, connecting rod one, fix bar one, sealing shroud, sealing ring, base, universal wheel, holding box, fix bar two, illumination
Lamp, connecting rod two, cylinder one and cylinder two, the cylinder one and cylinder two are each attached to chassis interior bottom, the gas
The left side of cylinder one is fixed with cylinder two, and the upper end of cylinder one is fixed with fix bar one, and the upper end of cylinder two is fixed with fix bar
Two, the connecting rod one and connecting rod two are respectively positioned on above base, and the upper end of fix bar one passes through base and connecting rod one
It is connected, the upper end of fix bar two is connected through base with connecting rod two, and the connecting rod one and connecting rod two are symmetrical
Be fixed on retainingf key left and right ends, steel pipe be fixed with inside the retainingf key, be fixed with the base upper surface sealing shroud with
And sealing ring, the sealing ring are located inside sealing shroud, the holding box is fixedly connected with base, and the holding box upper end opens up
There is charging aperture.
Further, the base lower end is fixed with universal wheel.
Further, the upper end of fix bar two is fixed with illuminating lamp.
Further, the illuminating lamp is LED electricity-saving lamps.
Further, the fix bar one is fixedly connected by connecting rod one with retainingf key.
Further, the fix bar two is fixedly connected by connecting rod two with retainingf key.
Compared with prior art, the beneficial effects of the utility model are:Because the utility model with the addition of fix bar one, connection
Bar one, connecting rod two, fix bar two, retainingf key and steel pipe, the design is easy to carry out pouring molding to insulating tube, because of this practicality
New to the addition of cylinder one, cylinder two, sealing shroud and sealing ring, the design is easy to seal steel pipe lower end, because of this reality
Illuminating lamp is with the addition of with new, this is designed to propose illumination in night operation, because the utility model with the addition of holding box and enter
Material mouth, the design are easy to hold raw material, and because the utility model with the addition of universal wheel, the design is easy to staff to move this practicality
New, the utility model is easy to pouring molding, and steel pipe can be sealed, and can be applied to the steel pipe of plurality of specifications, and ties
Structure is simple, easy to operation.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation inside the utility model in the base;
In reference:1. steel pipe;2. retainingf key;3. connecting rod one;4. fix bar one;5. sealing shroud;6. sealing ring;7.
Base;8. universal wheel;9. holding box;10. charging aperture;11. fix bar two;12. illuminating lamp;13. connecting rod two;14. cylinder one;
15 cylinders two.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The all other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of PFF is incubated pipe forming apparatus, including steel pipe
1st, retainingf key 2, connecting rod 1, fix bar 1, sealing shroud 5, sealing ring 6, base 7, universal wheel 8, holding box 9, fix bar two
11st, illuminating lamp 12, connecting rod 2 13, cylinder 1 and cylinder 2 15, cylinder 1 and cylinder 2 15 are each attached to base 7
Inner bottom, the left side of cylinder 1 are fixed with cylinder 2 15, and the upper end of cylinder 1 is fixed with fix bar 1, the upper end of cylinder 2 15
Fix bar 2 11 is fixed with, connecting rod 1 and connecting rod 2 13 are respectively positioned on the top of base 7, and the upper end of fix bar 1 passes through base
7 are connected with connecting rod 1, and the upper end of fix bar 2 11 is connected through base 7 with connecting rod 2 13, connecting rod 1 and company
Extension bar 2 13 is symmetrically fixed on the left and right ends of retainingf key 2, steel pipe 1 is fixed with inside retainingf key 2, base 7 is fixed with upper surface
Sealing shroud 5 and sealing ring 6, sealing ring 6 are located inside sealing shroud 5, and holding box 9 is fixedly connected with base 7, the upper end of holding box 9
Offer charging aperture 10.
The lower end of base 7 is fixed with universal wheel 8, and the upper end of fix bar 2 11 is fixed with illuminating lamp 12, and illuminating lamp 12 saves for LED
Lamp, fix bar 1 are fixedly connected by connecting rod 1 with retainingf key 2, and fix bar 2 11 passes through connecting rod 2 13 and retainingf key 2
It is fixedly connected.
The utility model is at work:Steel pipe 1 is fixed using retainingf key 2 by staff first, then starts gas
Cylinder 1 and cylinder 2 15, the work of cylinder 1 drive fix bar 1 to move down, so as to drive connecting rod 1 to moving down
It is dynamic, agree to that the work of cylinder 2 15 drives connecting rod 2 13 to move down, so as to drive retainingf key 2 to move down, make steel pipe 1 downward
Mobile, until the lower end of steel pipe 1 is moved to inside sealing shroud 5, and the lower end of steel pipe 1 fits with sealing ring 6, and then staff is past
Poured in steel pipe 1, after the completion of pouring molding, staff, which starts cylinder 1 and cylinder 2 15, makes steel pipe 1 upward
Mobile, so as to take out the molding part in steel pipe 1, the utility model is easy to pouring molding, and steel pipe 1 can be sealed,
The steel pipe 1 of plurality of specifications can be applied to, and it is simple in construction, it is easy to operation.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above, for
For those skilled in the art, it is clear that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and without departing substantially from this
In the case of the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the utility model is by institute
Attached claim rather than described above limit, it is intended that will fall in the implication and scope of the equivalency of claim
All changes are included in the utility model.Any reference in claim should not be considered as to the involved right of limitation
It is required that.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of PFF is incubated pipe forming apparatus, including it is steel pipe (1), retainingf key (2), connecting rod one (3), fix bar one (4), close
Big envelope (5), sealing ring (6), base (7), universal wheel (8), holding box (9), fix bar two (11), illuminating lamp (12), connecting rod
Two (13), cylinder one (14) and cylinder two (15), it is characterised in that:The cylinder one (14) and cylinder two (15) are fixed
Cylinder two (15) is fixed with the left of base (7) inner bottom, the cylinder one (14), described (14) upper end of cylinder one is fixed with
Fix bar one (4), described (15) upper end of cylinder two are fixed with fix bar two (11), the connecting rod one (3) and connecting rod two
(13) it is respectively positioned on above base (7), described (4) upper end of fix bar one is connected through base (7) with connecting rod one (3), described
Fix bar two (11) upper end is connected through base (7) with connecting rod two (13), the connecting rod one (3) and connecting rod two
(13) symmetrically it is fixed on retainingf key (2) left and right ends, is fixed with steel pipe (1) inside the retainingf key (2), on the base (7)
Sealing shroud (5) and sealing ring (6) are fixed with end face, the sealing ring (6) is located at sealing shroud (5) inside, the holding box
(9) it is fixedly connected with base (7), holding box (9) upper end offers charging aperture (10).
A kind of 2. PFF insulations pipe forming apparatus according to claim 1, it is characterised in that:Base (7) lower end is fixed
There is universal wheel (8).
A kind of 3. PFF insulations pipe forming apparatus according to claim 1, it is characterised in that:On the fix bar two (11)
End is fixed with illuminating lamp (12).
A kind of 4. PFF insulations pipe forming apparatus according to claim 3, it is characterised in that:The illuminating lamp (12) is LED
Electricity-saving lamp.
A kind of 5. PFF insulations pipe forming apparatus according to claim 1, it is characterised in that:The fix bar one (4) passes through
Connecting rod one (3) is fixedly connected with retainingf key (2).
A kind of 6. PFF insulations pipe forming apparatus according to claim 1, it is characterised in that:The fix bar two (11) is logical
Connecting rod two (13) is crossed to be fixedly connected with retainingf key (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720730844.0U CN207077678U (en) | 2017-06-21 | 2017-06-21 | A kind of PFF is incubated pipe forming apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720730844.0U CN207077678U (en) | 2017-06-21 | 2017-06-21 | A kind of PFF is incubated pipe forming apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207077678U true CN207077678U (en) | 2018-03-09 |
Family
ID=61425991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720730844.0U Active CN207077678U (en) | 2017-06-21 | 2017-06-21 | A kind of PFF is incubated pipe forming apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207077678U (en) |
-
2017
- 2017-06-21 CN CN201720730844.0U patent/CN207077678U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202884378U (en) | Steel composite anti-corrosion pipe | |
CN106090459A (en) | A kind of prefabricated direct-buried steam insulation steel pipe | |
CN203962591U (en) | Multi-angle pipe fixing holder | |
CN207077678U (en) | A kind of PFF is incubated pipe forming apparatus | |
CN205350613U (en) | Corrosion -resistant gas pipe | |
CN205048077U (en) | Adiabatic tubular product under water keeps warm | |
CN103386764A (en) | Method for manufacturing super-huge type glass fiber reinforced plastic storage tank | |
CN207112198U (en) | A kind of steel strip reinforced PE helical bellowses for being easy to connection | |
CN206300523U (en) | A kind of explosion-proof sleeve pipe of heat exchanger | |
CN208886254U (en) | A kind of bell and spigot anti-corrosive steel tube | |
CN204717234U (en) | Directional traversing pipeline sheath tube end annular space waterproof construction | |
CN211649434U (en) | Internal stop type rubber ring butt joint structure of winding pipe | |
CN104986458A (en) | Storage tank and molding process thereof | |
CN207454955U (en) | A kind of traceable polyethylene pipe | |
CN204942785U (en) | A kind of wet type seabed conveying insulation pipe | |
CN206310098U (en) | A kind of high strength polyethylene pipe | |
CN206806965U (en) | A kind of novel high polymer cable blocks sealing system | |
CN203924862U (en) | The modularization housing structure of high-temperature flue gas desulfurized dust collection column | |
CN206076864U (en) | A kind of full lubrication high density polythene silicone core pipe | |
CN206054964U (en) | A kind of FRPP double-walled reinforcement bellows | |
CN204692797U (en) | A kind of two flat walls entwining tube | |
CN204755299U (en) | Novel water pump connecting pipe | |
CN204916843U (en) | Construction pipe storage rack | |
CN204962059U (en) | High leakproofness steel bushing steel presetting system insulating tube | |
CN207018730U (en) | Direct-burried composite steam pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |