CN207077399U - A kind of multifunctional building stonebreakers' hammer - Google Patents
A kind of multifunctional building stonebreakers' hammer Download PDFInfo
- Publication number
- CN207077399U CN207077399U CN201720818225.7U CN201720818225U CN207077399U CN 207077399 U CN207077399 U CN 207077399U CN 201720818225 U CN201720818225 U CN 201720818225U CN 207077399 U CN207077399 U CN 207077399U
- Authority
- CN
- China
- Prior art keywords
- rod
- hammer
- fixed
- nail
- contiguous block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Crushing And Pulverization Processes (AREA)
Abstract
The utility model discloses a kind of multifunctional building stonebreakers' hammer, including first body of rod, the 3rd body of rod, the second reserved block and the 4th body of rod, one end of first body of rod is fixed with handle, and first the other end of the body of rod be fixed with contiguous block, the top of the contiguous block is hinged with second body of rod, and second the one end of the body of rod away from contiguous block be fixed with handle, the side of the hammer body is fixed with the 3rd nail hammer, and the opposite side of hammer body is fixed with the second nail hammer, the 4th remote body of rod one end of the hammer body is fixed with rubble stone roller.The utility model is by being provided with the 4th body of rod, the 3rd body of rod, bolt and hammer body, and it is provided with the second screw on the 4th body of rod, the first screw is evenly arranged with the 3rd body of rod, so that the first screw of diverse location is corresponding with the second screw, and it is bolted to connection, so as to realize the length for adjusting this device, it is easy to use, is easy to be applied to different staff.
Description
Technical field
Building trade appurtenance technical field is the utility model is related to, specially a kind of multifunctional building stonebreakers' hammer.
Background technology
With the continuous development of society, the continuous progress of building trade, all kinds of appurtenances for building are by constantly improve, just
By taking a kind of stonebreakers' hammer as an example, such stonebreakers' hammer species on market today is various, can meet the use demand of people substantially, but
It is the problem of certain still be present, traditional such device is mostly fixed standard, both not readily portable, and can not adjust its length
Degree, it is impossible to meet the use demand of all kinds of people, while the function of traditional such stonebreakers' hammer is more single, it can only be by stone
Block carries out basic fragmentation, and the crushing that can not be more refined is inconvenient for use, and can usually have wood on the stone of building trade
Plate so that need to use other apparatus to remove the nail on plank before rubble is carried out, rubble operation can be carried out afterwards,
It is inconvenient for use.
Utility model content
The purpose of this utility model is to provide a kind of multifunctional building stonebreakers' hammer, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the utility model provides following technical scheme:A kind of multifunctional building stonebreakers' hammer, including
First body of rod, the 3rd body of rod, the second reserved block and the 4th body of rod, one end of first body of rod are fixed with handle, and the first bar
The other end of body is fixed with contiguous block, and the top of the contiguous block is hinged with second body of rod, and second body of rod is away from contiguous block
One end is fixed with handle, and the bottom of the contiguous block is fixed with scraper plate, and the top of scraper plate is fixed with the second reserved block, the company
Connect block bottom is internally provided with the second preformed groove to be cooperated with the second reserved block, and the contiguous block is away from first body of rod
One end is fixed with the 4th body of rod, and one end away from contiguous block is provided with the second screw at the top of the 4th body of rod, consolidates in the second screw
Surely there is bolt, the 4th body of rod is internally provided with inside groove, and the inside of inside groove is fixed with the 3rd body of rod, the 3rd body of rod
Top be evenly arranged with the first screw, and the first screw and bolt connection, the described one end of 3rd body of rod away from contiguous block is consolidated
Surely there is hammer body, and hammer body is fixed with the first reserved block close to one end of the 3rd body of rod, the 3rd body of rod is away from contiguous block one end
Be internally provided with the first preformed groove to be cooperated with the first reserved block, the top of the hammer body is fixed with nail puller, and hammers into shape
The bottom of body is fixed with the first nail hammer, and the side of the hammer body is fixed with the 3rd nail hammer, and the opposite side of hammer body is fixed with second
Nail hammer, the 4th remote body of rod one end of the hammer body are fixed with rubble stone roller.
Preferably, the surface of the handle and handle is provided with rubber sleeve.
Preferably, it is provided with hand-held region on first body of rod.
Preferably, internal thread is provided with the madial wall of first preformed groove, is set on the lateral wall of the first reserved block
There is the external screw thread to be cooperated with internal thread.
Preferably, first nail hammer, the second nail hammer and the 3rd nail hammer are in conical, and the first nail hammer, the second nail
The diameter of hammer and the 3rd nail hammer successively decreases successively.
Compared with prior art, the beneficial effects of the utility model are:The multifunctional building stonebreakers' hammer is by being provided with
4th body of rod, the 3rd body of rod, bolt and hammer body, and the second screw is provided with the 4th body of rod, on the 3rd body of rod uniformly
It is provided with the first screw so that the first screw of diverse location is corresponding with the second screw, and is bolted to connection, so as to
The length for adjusting this device is realized, is easy to use, is easy to be applied to different staff, while device is by being provided with connection
Block, and second body of rod is hinged with the top of contiguous block, and meanwhile it is pre- by the second preformed groove and second in the bottom of contiguous block
That stays block is fixedly connected with scraper plate so that device is easy to that the stone after fragmentation is carried out to sweep heap, is easy to use, while device passes through
First preformed groove is connected with the first reserved block spiral so that hammer body is attached with the 3rd body of rod, even if with installation, and is easy to more
Change, it is easy to use, while device is fixed with the first nail hammer by being provided with nail-fetching device, the bottom of hammer body in the bottom of hammer body, hammer
The side of body is provided with the second nail hammer, and the opposite side of hammer body is provided with the 3rd hammer body, and the one end of hammer body away from the 3rd body of rod is fixed
Have rubble stone roller so that be easy to carry out fragmentation successively to rubble so that stone fragmentation it is thinner, be easy to follow-up transport to shift, just
In the use of device.
Brief description of the drawings
Fig. 1 is structural profile illustration of the present utility model;
Fig. 2 is scraper plate combination diagram of the present utility model;
Fig. 3 is hammer body combination diagram of the present utility model;
Fig. 4 is hypophysis schematic top plan view of the present utility model;
In figure:The bodies of rod of 1- first;2- handles;The bodies of rod of 3- second;4- contiguous blocks;5- inside grooves;The bodies of rod of 6- the 3rd;The spiral shells of 7- first
Hole;8- bolts;The screws of 9- second;The preformed grooves of 10- first;11- nail pullers;12- hammer bodies;13- handles;14- holds region;15-
Scraper plate;The reserved blocks of 16- second;The preformed grooves of 17- second;The bodies of rod of 18- the 4th;The reserved blocks of 19- first;The nail hammers of 20- first;21- is broken
Stone grinds;The nail hammers of 22- the 3rd;The nail hammers of 23- second.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1-4, a kind of embodiment provided by the utility model:A kind of multifunctional building stonebreakers' hammer, including the
One body of rod 1, the 3rd body of rod 6, the second reserved block 16 and the 4th body of rod 18, one end of first body of rod 1 are fixed with handle 13, and first
The other end of the body of rod 1 is fixed with contiguous block 4, and hand-held region 14 is provided with first body of rod 1, is easy to hold, convenient that stone is entered
Power is exercised, is easy to rubble, the top of contiguous block 4 is hinged with second body of rod 3, and second one end of the body of rod 3 away from contiguous block 4 is consolidated
Surely there is a handle 2, the surface of handle 2 and handle 13 is provided with rubber sleeve, increasing friction force, is easy to hold, contiguous block 4
Bottom is fixed with scraper plate 15, and the top of scraper plate 15 is fixed with the second reserved block 16, and the bottom of contiguous block 4 is internally provided with and the
The second preformed groove 17 that two reserved blocks 16 cooperate, the one end of contiguous block 4 away from first body of rod 1 are fixed with the 4th body of rod 18,
And the one end of the top of the 4th body of rod 18 away from contiguous block 4 is provided with the second screw 9, bolt 8 is fixed with the second screw 9, the 4th
The body of rod 18 is internally provided with inside groove 5, and the inside of inside groove 5 is fixed with the 3rd body of rod 6, and the top of the 3rd body of rod 6 is uniformly arranged
There is the first screw 7, and the first screw 7 is connected with bolt 8, the 3rd one end of the body of rod 6 away from contiguous block 4 is fixed with hammer body 12, and
Hammer body 12 is fixed with the first reserved block 19 close to one end of the 3rd body of rod 6, and inside of the 3rd body of rod 6 away from the one end of contiguous block 4 is set
The first preformed groove 10 to be cooperated with the first reserved block 19 is equipped with, internal thread is provided with the madial wall of the first preformed groove 10,
The external screw thread to be cooperated with internal thread is provided with the lateral wall of first reserved block 19, is easy to the body of rod 6 of hammer body 12 and the 3rd solid
Fixed and dismounting, the top of hammer body 12 is fixed with nail puller 11, and the bottom of hammer body 12 is fixed with the first nail hammer 20, the first nail hammer
20th, the second nail hammer 22 and the 3rd nail hammer 23 be in cone, and the first nail hammer 20, the second nail hammer 22 and the 3rd nail hammer 23
Diameter successively decreases successively, is easy to carry out fragmentation to rubble successively so that the degree of stone fragmentation is thinner, is easy to follow-up stone broken
Split, the side of hammer body 12 is fixed with the 3rd nail hammer 22, and the opposite side of hammer body 12 is fixed with the second nail hammer 23, and hammer body 12 is away from
One end of four bodies of rod 18 is fixed with rubble and grinds 21.
Operation principle:In use, pass through the effect of bolt 8, the first screw 7 and the second screw 9 first so that adjustment dress
The length put, it is easy to the use of user, is connected afterwards by the first reserved block 19 with the spiral of the first preformed groove 10 so that hammer
Body 12 is fixed with the 3rd body of rod 6, is easy to follow-up dismounting and change, easy to use, afterwards by nail-fetching device 11 by stone
Plank on nail remove, user holds handle 13 and hand-held region 14 afterwards, and use device is hammered into shape vertically downwards, is passed through
Rubble grinds 21 and carries out preliminary fragmentation, uses successively afterwards, the first nail hammer 20, the second nail hammer 22 and the 3rd nail hammer 23 enter to stone
Row rubble so that the degree of grinding of stone is thinner, is easy to follow-up stone to transport, and after treating rubble, second body of rod 3 is opened up
Open, remove hammer body 12, be connected by the second preformed groove 17 with the second reserved block 16, the fixation of scraper plate 15 starts rubble
Carry out scraping heap, be easy to follow-up processing.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Claims (5)
1. a kind of multifunctional building stonebreakers' hammer, including first body of rod (1), the 3rd body of rod (6), the second reserved block (16) and the 4th
The body of rod (18), it is characterised in that:One end of first body of rod (1) is fixed with handle (13), and the other end of first body of rod (1)
Contiguous block (4) is fixed with, the top of the contiguous block (4) is hinged with second body of rod (3), and second body of rod (3) is away from contiguous block
(4) one end is fixed with handle (2), and the bottom of the contiguous block (4) is fixed with scraper plate (15), and the top of scraper plate (15) is fixed
There is the second reserved block (16), contiguous block (4) bottom is internally provided with second to be cooperated with the second reserved block (16)
Preformed groove (17), the one end of the contiguous block (4) away from first body of rod (1) are fixed with the 4th body of rod (18), and the 4th body of rod
(18) one end of top away from contiguous block (4) is provided with the second screw (9), and bolt (8) is fixed with the second screw (9), described
4th body of rod (18) is internally provided with inside groove (5), and the inside of inside groove (5) is fixed with the 3rd body of rod (6), the 3rd body of rod
(6) top is evenly arranged with the first screw (7), and the first screw (7) is connected with bolt (8), and the 3rd body of rod (6) is remote
One end of contiguous block (4) is fixed with hammer body (12), and hammer body (12) is fixed with the first reserved block close to one end of the 3rd body of rod (6)
(19), the 3rd body of rod (6) is internally provided with the to be cooperated with the first reserved block (19) away from contiguous block (4) one end
One preformed groove (10), the top of the hammer body (12) is fixed with nail puller (11), and the bottom of hammer body (12) is fixed with the first nail
Hammer into shape (20), the side of the hammer body (12) is fixed with the 3rd nail hammer (22), and the opposite side of hammer body (12) is fixed with the second nail hammer
(23), the one end of the hammer body (12) away from the 4th body of rod (18) is fixed with rubble stone roller (21).
A kind of 2. multifunctional building stonebreakers' hammer according to claim 1, it is characterised in that:The handle (2) and handle
The surface of hand (13) is provided with rubber sleeve.
A kind of 3. multifunctional building stonebreakers' hammer according to claim 1, it is characterised in that:On first body of rod (1)
It is provided with hand-held region (14).
A kind of 4. multifunctional building stonebreakers' hammer according to claim 1, it is characterised in that:First preformed groove (10)
Madial wall on be provided with internal thread, be provided with the lateral wall of the first reserved block (19) with internal thread cooperate outer spiral shell
Line.
A kind of 5. multifunctional building stonebreakers' hammer according to claim 1, it is characterised in that:First nail hammer (20),
Second nail hammer (22) and the 3rd nail hammer (23) are in cone, and the first nail hammer (20), the second nail hammer (22) and the 3rd follow closely
The diameter of hammer (23) successively decreases successively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720818225.7U CN207077399U (en) | 2017-07-07 | 2017-07-07 | A kind of multifunctional building stonebreakers' hammer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720818225.7U CN207077399U (en) | 2017-07-07 | 2017-07-07 | A kind of multifunctional building stonebreakers' hammer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207077399U true CN207077399U (en) | 2018-03-09 |
Family
ID=61426604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720818225.7U Expired - Fee Related CN207077399U (en) | 2017-07-07 | 2017-07-07 | A kind of multifunctional building stonebreakers' hammer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207077399U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108844838A (en) * | 2018-06-13 | 2018-11-20 | 贵州大学 | A kind of preceding mirror rigidity detection device of vehicles processing |
CN110439320A (en) * | 2019-09-11 | 2019-11-12 | 中国铁建电气化局集团北方工程有限公司 | A kind of concrete pillar forcible entry assistor |
-
2017
- 2017-07-07 CN CN201720818225.7U patent/CN207077399U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108844838A (en) * | 2018-06-13 | 2018-11-20 | 贵州大学 | A kind of preceding mirror rigidity detection device of vehicles processing |
CN110439320A (en) * | 2019-09-11 | 2019-11-12 | 中国铁建电气化局集团北方工程有限公司 | A kind of concrete pillar forcible entry assistor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207077399U (en) | A kind of multifunctional building stonebreakers' hammer | |
CN206373853U (en) | A kind of Multifunctional hardware hammer of convenient use | |
CN201962923U (en) | Coating shovel cutter | |
CN108741434A (en) | A kind of shoes skin hole punched device | |
CN206169859U (en) | Multistage roundness mould is with polishing grinding device | |
CN206188833U (en) | Overlap dismounting device in blast -furnace tuyere | |
CN208496851U (en) | Electric wrench adjustable sleeve | |
CN206029787U (en) | Civil engineering uses multi -functional hammer | |
CN107838877A (en) | A kind of architectural engineering multi-functional hammer | |
CN207888942U (en) | A kind of ceramic tile cutting clamper quickly accommodated | |
CN206066229U (en) | A kind of material laboratory sample polishing clamp | |
CN209717527U (en) | A kind of safe oil nozzle dismantling spanner | |
CN208605467U (en) | A kind of helix nailing that band is auxiliarily fixed | |
CN203201163U (en) | Bricklaying trowel | |
CN208098306U (en) | A kind of drug grinding device | |
CN208147764U (en) | A kind of device that can quickly take screw tap to break end | |
CN208213264U (en) | A kind of removable rock crushing plant | |
CN208152502U (en) | A kind of multifunctional putty metope device for grinding | |
CN206763010U (en) | A kind of new tilting-type ball mill | |
CN205734756U (en) | A kind of hardware hammer easy to use | |
CN206693756U (en) | A kind of copper door handle of convenient dismounting | |
CN206113940U (en) | Detection hammer for civil engineering | |
CN107538392A (en) | A kind of Multifunctional hardware spanner | |
CN216000393U (en) | Geological hammer for mine geological environment improvement research | |
CN203566596U (en) | Hand tool with extension and retraction functions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20190707 |