CN207074815U - New prepackage type concrete body box-type substation - Google Patents

New prepackage type concrete body box-type substation Download PDF

Info

Publication number
CN207074815U
CN207074815U CN201721126901.0U CN201721126901U CN207074815U CN 207074815 U CN207074815 U CN 207074815U CN 201721126901 U CN201721126901 U CN 201721126901U CN 207074815 U CN207074815 U CN 207074815U
Authority
CN
China
Prior art keywords
fixed
fixed cover
support frame
necks
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721126901.0U
Other languages
Chinese (zh)
Inventor
韩言广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN YIHUIDA ELECTRIC TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
HARBIN YIHUIDA ELECTRIC TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN YIHUIDA ELECTRIC TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HARBIN YIHUIDA ELECTRIC TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201721126901.0U priority Critical patent/CN207074815U/en
Application granted granted Critical
Publication of CN207074815U publication Critical patent/CN207074815U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

New prepackage type concrete body box-type substation,Including transformer station's body of wall,Support frame,Support frame as described above includes left support frame,Right support frame,Left support frame is symmetrical with right support frame,On the left of left support frame top connection transformer station's body of wall,On the right side of right support frame connection transformer station's body of wall,Left support frame includes support bar,Fixed cover connecting plate,No.1 fixed cover,No. two fixed covers,The No.1 fixed cover is identical with No. two fixed nested structures,There is No.1 neck inside No.1 fixed cover,Locating piece connects No.1 neck,The locating piece is stuck in No.1 neck,Locating piece connects transformer station's body of wall by expansion bolt,No.1 fixed cover connects locating piece by expansion bolt,The No.1 fixed cover connects transformer station's body of wall by expansion bolt,Expansion bolt sequentially passes through No.1 fixed cover,Locating piece connects transformer station's body of wall,There are No. three necks on the left of the No.1 fixed cover.

Description

New prepackage type concrete body box-type substation
Technical field
It the utility model is related to transformer station field, more particularly to a kind of new prepackage type concrete body box-type substation.
Background technology
In prepackage type concrete body box-type substation in use, because prepackage type concrete body box-type substation often build countryside in, so And because countryside wind-force is bigger, because prepackage type concrete body box-type substation structure is unreasonable, under the horizontal force of wind-force Prepackage type concrete body box-type substation is set to collapse.
Utility model content
The utility model is directed to deficiencies of the prior art, there is provided a kind of new prepackage type concrete body rational in infrastructure Box-type substation.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of new prepackage type concrete body box-type substation, including transformer station's body of wall, support frame, support frame as described above include left branch Support, right support frame, left support frame is symmetrical with right support frame, on the left of left support frame top connection transformer station's body of wall, right support On the right side of frame connection transformer station's body of wall, left support frame includes support bar, fixed cover connecting plate, No.1 fixed cover, No. two fixed covers, institute It is identical with No. two fixed nested structures to state No.1 fixed cover, there is No.1 neck, locating piece connection No.1 card inside No.1 fixed cover Groove, the locating piece are stuck in No.1 neck, and locating piece connects transformer station's body of wall by expansion bolt, and No.1 fixed cover passes through swollen Swollen bolt connection locating piece, the No.1 fixed cover connect transformer station's body of wall by expansion bolt, and expansion bolt sequentially passes through one Number fixed cover, locating piece connection transformer station's body of wall, have No. three necks on the left of the No.1 fixed cover, connection on the right side of fixed fixture block No. three necks, the fixed fixture block right side are stuck in No. three necks, have No. four necks inside locating piece, connect on the right side of fixed fixture block No. four necks are connect, are inserted on the right side of the fixed fixture block in No. four necks.
Inserted on the right side of the fixed fixture block through No. three necks in No. four necks, pass through No.1 spiral shell on the right side of the fixed fixture block Nail connection locating piece, fixed cover connecting plate inside have No. two necks, No. two necks of fixed fixture block left side connection, a fixed fixture block left side Side is inserted in No. two necks, and fixed fixture block, which passes on left fixing bolt and is connected, covers connecting plate.
The fixed cover connecting plate passes through three by No. two mode connects for screw No.1 fixed covers left sides, fixed cover connecting plate right side Number mode connects for screw fixes fixture block, and fixed cover connecting plate bottom connects No. two fixed covers, and No. two fixed covers are connected by expansion bolt Transformer station's body of wall, support bar top are connected in the middle part of set connecting plate, support bar bottom connection ground.
Beneficial effect:
In the presence of support frame, effectively disperseed active force of the external force to transformer station's body of wall, make transformer station's body of wall with Ground connection it is more firm, it is therefore prevented that prepackage type concrete body box-type substation collapses, and makes overall structure more reasonable, fixed fixture block, No. two screws, No. three screws, No.1 screw mutual cooperation under, fixed cover connecting plate is connected with No.1 fixed cover tighter It is close, at the same No.1 fixed cover, No. two fixed covers collective effect under, left support frame is connected with transformer station's body of wall more steady Gu make overall structure more reasonable.
Brief description of the drawings
Fig. 1 is new prepackage type concrete body box-type substation partial sectional view described in the utility model.
Fig. 2 is new prepackage type concrete body box-type substation support frame structure diagram described in the utility model.
Fig. 3 is new prepackage type concrete body box-type substation structure schematic diagram described in the utility model.
Embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of new prepackage type concrete body box-type substation, including transformer station's body of wall 01, support frame, support frame as described above include a left side Support frame, right support frame, left support frame is symmetrical with right support frame, the left side of left support frame top connection transformer station's body of wall 01, right Support frame connection transformer station's body of wall 01 right side, left support frame include support bar 02, fixed cover connecting plate 03, No.1 fixed cover 04, No. two fixed covers 05, the No.1 fixed cover 04 is identical with No. two structures of fixed cover 05, and the inside of No.1 fixed cover 04 has No.1 Neck 09, locating piece 07 connect No.1 neck 09, and the locating piece 07 is stuck in No.1 neck 09, and locating piece 07 passes through expanding screw Bolt 08 connects transformer station's body of wall 01, and No.1 fixed cover 04 connects locating piece 07, the No.1 fixed cover 04 by expansion bolt 08 Transformer station's body of wall 01 is connected by expansion bolt 08, expansion bolt 08 sequentially passes through No.1 fixed cover 04, the connection of locating piece 07 becomes Power station wall 01, the left side of No.1 fixed cover 04 have No. three necks 13, No. three necks 13 of the fixed right side of fixture block 06 connection, institute State the fixed right side of fixture block 06 to be stuck in No. three necks 13, the inside of locating piece 07 has No. four necks 16, and the fixed right side of fixture block 06 connects No. four necks 16 are connect, the fixed right side of fixture block 06 is inserted in No. four necks 16.
The right side of fixed fixture block 06 is inserted in No. four necks 16 through No. three necks 13, and the fixed right side of fixture block 06 is logical Cross No.1 screw 12 and connect locating piece 07, the inside of fixed cover connecting plate 03 has No. two necks 11, and the fixed left side of fixture block 06 connects No. two necks 11, the fixed left side of fixture block 06 are inserted in No. two necks 11, and it is solid that fixed fixture block 06 passes on left the connection of fixing bolt 10 Surely connecting plate 03 is covered.
The fixed cover connecting plate 03 connects the left side of No.1 fixed cover 04 by No. two screws 14, and fixed cover connecting plate 03 is right Side is connected fixture block 06 by No. three screws 15, and the bottom of fixed cover connecting plate 03 connects No. two fixed covers 05, No. two fixed covers Transformer station's body of wall 01 is connected by expansion bolt 08, the top of support bar 02 is connected in the middle part of set connecting plate 03, under support bar 02 Portion connects ground.
In the presence of support frame, active force of the external force to transformer station's body of wall 01 is effectively disperseed, has made transformer station's body of wall 01 be connected with ground it is more firm, it is therefore prevented that prepackage type concrete body box-type substation collapses, and makes overall structure more reasonable, in fixing card The screw 14, three of block 06, two screw 15, No.1 screw 12 mutual cooperation under, fixed cover connecting plate 03 is fixed with No.1 Set 04 connects closer, while under the collective effect of 04, No. two fixed cover 05 of No.1 fixed cover, makes left support frame and power transformation Wall 01 of standing connects more firm, makes overall structure more reasonable.

Claims (3)

1. a kind of new prepackage type concrete body box-type substation, it is characterized in that:Including transformer station's body of wall, support frame, support frame as described above Including left support frame, right support frame, left support frame is symmetrical with right support frame, and left support frame top connection transformer station's body of wall is left Side, right support frame connection transformer station's body of wall on the right side of, left support frame include support bar, fixed cover connecting plate, No.1 fixed cover, No. two Fixed cover, the No.1 fixed cover is identical with No. two fixed nested structures, has No.1 neck inside No.1 fixed cover, and locating piece connects No.1 neck is connect, the locating piece is stuck in No.1 neck, and locating piece connects transformer station's body of wall by expansion bolt, and No.1 is fixed Set by expansion bolt connect locating piece, the No.1 fixed cover by expansion bolt connection transformer station's body of wall, expansion bolt according to It is secondary that there is No. three necks, fixed fixture block through No.1 fixed cover, locating piece connection transformer station's body of wall, the No.1 fixed cover left side Right side connects No. three necks, is stuck on the right side of the fixed fixture block in No. three necks, has No. four necks, fixing card inside locating piece No. four necks of connection on the right side of block, the fixed fixture block right side are inserted in No. four necks.
2. new prepackage type concrete body box-type substation according to claim 1, it is characterized in that:On the right side of the fixed fixture block Inserted through No. three necks in No. four necks, pass through No.1 mode connects for screw locating piece, fixed cover connection on the right side of the fixed fixture block Intralamellar part has No. two necks, and No. two necks are connected on the left of fixed fixture block, fixes on the left of fixture block in No. two necks of insertion, fixing card Block, which passes on left fixing bolt and is connected, covers connecting plate.
3. new prepackage type concrete body box-type substation according to claim 2, it is characterized in that:The fixed cover connecting plate On the left of No. two mode connects for screw No.1 fixed covers, fixture block is fixed by No. three mode connects for screw on the right side of fixed cover connecting plate, it is fixed Cover connecting plate bottom and connect No. two fixed covers, No. two fixed covers connect transformer station's body of wall by expansion bolt, and support bar top connects Connect in the middle part of fixed cover connecting plate, support bar bottom connection ground.
CN201721126901.0U 2017-09-05 2017-09-05 New prepackage type concrete body box-type substation Expired - Fee Related CN207074815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721126901.0U CN207074815U (en) 2017-09-05 2017-09-05 New prepackage type concrete body box-type substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721126901.0U CN207074815U (en) 2017-09-05 2017-09-05 New prepackage type concrete body box-type substation

Publications (1)

Publication Number Publication Date
CN207074815U true CN207074815U (en) 2018-03-06

Family

ID=61520977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721126901.0U Expired - Fee Related CN207074815U (en) 2017-09-05 2017-09-05 New prepackage type concrete body box-type substation

Country Status (1)

Country Link
CN (1) CN207074815U (en)

Similar Documents

Publication Publication Date Title
CN207474980U (en) A kind of portable high-pressure electricity cabinet
CN201480680U (en) Novel stool
CN108560724A (en) A kind of easy-to-mount adjustable emergent building construction
CN207074815U (en) New prepackage type concrete body box-type substation
CN206174583U (en) Integration ready -package integrated communication tower
CN208329181U (en) A kind of easy-to-mount adjustable emergency building construction
CN208873804U (en) A kind of battery pack sliceable frame used in parallel
CN207453566U (en) A kind of ready-package hexagon beautifies computer room
CN202723063U (en) Storage cabinet with detachable stand feet
CN204040602U (en) With cross bar pole type tent
CN207613498U (en) A kind of dongle configuration for Foldable soft-bed
CN201714115U (en) Simple portable moving toilet
CN204715876U (en) A kind of small outdoor tent
CN205754141U (en) A kind of photovoltaic bracket track
CN204947367U (en) A kind of assembled box-type becomes housing
CN207766711U (en) A kind of combinable power amplifying device cabinet
CN202888659U (en) Box body of box-type transformer substation
CN204001962U (en) Single accommodation's tent
CN207944787U (en) Construction activity enclosing
CN203080891U (en) Construction fixing frame
CN207846654U (en) A kind of steel frame and its corner connector based on BIM
CN211253049U (en) Unmanned aerial vehicle battery quick plug structure
CN206727570U (en) Novel electric power communications crane span structure
CN202035771U (en) Convenient and applicable lifting stool
CN201767331U (en) Foldable table

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180306

Termination date: 20190905

CF01 Termination of patent right due to non-payment of annual fee