CN207074449U - Visualized management system in asset deployment production - Google Patents

Visualized management system in asset deployment production Download PDF

Info

Publication number
CN207074449U
CN207074449U CN201721088593.7U CN201721088593U CN207074449U CN 207074449 U CN207074449 U CN 207074449U CN 201721088593 U CN201721088593 U CN 201721088593U CN 207074449 U CN207074449 U CN 207074449U
Authority
CN
China
Prior art keywords
input
asset deployment
management
collector
asset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721088593.7U
Other languages
Chinese (zh)
Inventor
王小波
刘刚
张长春
雷婷
罗欢
刘璋
王豪阳
钟淘淘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wan Zhou Of Guo Wang Chongqing City Electrical Power Co Power Supply Branch
Wanzhou Power Supply Co of State Grid Chongqing Electric Power Co Ltd
Original Assignee
Wan Zhou Of Guo Wang Chongqing City Electrical Power Co Power Supply Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wan Zhou Of Guo Wang Chongqing City Electrical Power Co Power Supply Branch filed Critical Wan Zhou Of Guo Wang Chongqing City Electrical Power Co Power Supply Branch
Priority to CN201721088593.7U priority Critical patent/CN207074449U/en
Application granted granted Critical
Publication of CN207074449U publication Critical patent/CN207074449U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Information-based asset management field is the utility model is related to, Visualized management system in being produced more particularly to asset deployment.Compared with prior art, Visualized management system in the production of the utility model asset deployment, including Data Enter device, collector, NE Explorer, asset deployment administrative center, management terminal, process controller and display, the output end of described information input device connects the collector input, the collector output end connects the NE Explorer input, the NE Explorer output end connects asset deployment administrative center input, asset deployment administrative center output end connects the management terminal input respectively, the process controller input, the display input.

Description

Visualized management system in asset deployment production
Technical field
Information-based asset deployment management domain is the utility model is related to, visualizes and manages in being produced more particularly to asset deployment Reason system.
Background technology
Nowadays with the rapid development of information technology, each enterprise demand is continuously increased change, to the requirement of IT amount of assets More and more higher, current system still suffer from many problems, do not accomplish full automation and intellectuality, are deposited in account thing, accounts and properties, account card In difference, the management system cycle is unintelligible, and operation is lack of standardization, and efficiency is low, and cost is high, and information security cannot ensure.
Utility model content
For above-mentioned weak point of the prior art, the utility model aims to provide visual in a kind of asset deployment production Change management system, integrated assets cycle management is monitored management to links, normative construction flow, guarantee reasonability, Integrality and reversibility, automation dynamic grasp real-time, accurate assets information, realize that management is fine, clearly easy Operation, draws optimal case and monitors implementation.
To achieve the above object, the technical solution of the utility model:Visualized management system in asset deployment production, including Data Enter device, collector, NE Explorer, asset deployment administrative center, management terminal, process controller and display, institute The output end for stating Data Enter device connects the collector input, and it is defeated that the collector output end connects the NE Explorer Enter end, the NE Explorer output end connects asset deployment administrative center input, the asset deployment administrative center Output end connects the management terminal input, the process controller input, the display input respectively, wherein,
Described information input device, for caused system equipment information during assets production scheduling, environmental information, Third party device information carries out typing;
The collector, confluence analysis is carried out for receiving the signal of described information input device, and to it;
The NE Explorer, for by the data after the collector confluence analysis, with being previously stored in the network element pipe Reference data in reason device is compared, and carries out basic data anomaly analysis;
The asset deployment administrative center, for by the NE Explorer data carry out user, authority, configuration, The maintenance management that region and classification collect;
The management terminal, for carrying out including analysis, performance, report to the data in the asset deployment administrative center The process operation management of table, failed resource;
The process controller, for managing business datum analysis operation flow in the asset deployment administrative center;
The display, for the data status described in real-time display in asset deployment administrative center.
The beneficial effects of the utility model:Compared with prior art, pipe is visualized in the production of the utility model asset deployment Reason system, low cost, high efficiency, the asset management pattern of zero defect, reach automation, intelligentized system for unified management, it is real Now addition, mobile, change, tracing management are easier, and dynamic grasps existing network condition of assets, there is provided real-time, accurate assets are believed Breath, the more conducively development of new technology.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
1- information provider units in accompanying drawing;2- collectors;3- NE Explorer;4- system administration managers;5- explorers; 6- BPM devices;7- displays;8- third party's interface end;9- polling dispatching distributed capture managers;11- desktop pipes Manage device;12- operation management devices;13- computer lab management devices;15- changing interface devices.
Embodiment
The utility model is further described with reference to specific embodiment and accompanying drawing.
As illustrated, Visualized management system in the production of the utility model asset deployment, including Data Enter device 1, collection Device 2, NE Explorer 3, asset deployment administrative center 4, management terminal 5, process controller 6 and display 7, described information typing The output end of device 1 connects the input of collector 2, and the output end of collector 2 connects the input of NE Explorer 3, The output end of NE Explorer 3 connects the input of asset deployment administrative center 4, and the asset deployment administrative center 4 is defeated Go out end and connect the input of management terminal 5, the input of the process controller 6, the input of the display 7 respectively, wherein,
Described information input device 1, for believing caused system equipment information, environment during assets production scheduling Breath, third party device information carry out typing;
The collector 2, confluence analysis is carried out for receiving the signal of described information input device 1, and to it;
The NE Explorer 3, for by the data after the confluence analysis of collector 2, with being previously stored in the network element Reference data in manager 3 is compared, and carries out basic data anomaly analysis;
The asset deployment administrative center 4, for the data in the NE Explorer 3 to be carried out into user, authority, matched somebody with somebody Put, the maintenance management that region and classification collect;
The management terminal 5, for carrying out including analysis, performance, report to the data in the asset deployment administrative center 4 The process operation management of table, failed resource;
The process controller 6, for managing business datum analysis operation flow in the asset deployment administrative center 4, Realize the management control to business, service level, O&M, process analysis, computer room and internet behavior;
The display 7, for the data status described in real-time display in asset deployment administrative center 4;
Described information input device 1 is used to carry out data acquisition to the SNMP network equipments or/and non-SNMP equipment.
The collector 2 is included with third party's interface end 8, multithreaded architecture, polling dispatching distributed capture manager 9。
The process controller 6 includes desktop handler 11, operation management device 12 and computer lab management device 13.
The display 7 is provided with changing interface device 15, can arbitrarily change display interface according to the different demands of user.
Specifically, the system dynamic access Asset State and synchronous feedback Capital operation data, realize offline goods and materials account Checked with actual physical device On-line matching, it is ensured that existing network assets information is consistent completely with account information, ensures asset management Real-time, accuracy, lift daily management efficiency.System is by the various network equipments, server device states presentation of information into one Assets figure, the logical links between real discovering device, quickly finds and solves problem, the health of overall recognition whole network Situation, the performance of Internet resources is detected in real time, most complicated network state is clearly showed, finally exports form.
Further, the system is monitored to the life cycle of assets, analyzes service condition, is solved device resource and is utilized The problem of improper, it is ensured that the maximization of resource uses, and when IT assets overuse, can not meet the equipment of current business demand When, the timely alarm prompt change of meeting, if IT assets exceed life cycle, it will be prompted to undercarriage.The system is intuitively reacted by color Potential faults, there is provided the individualized homepage such as System Overview, abnormal guide look, my concern, TOPN sets function, analysis planning, adjusts Whole optimization system equipment.
The technical scheme provided above the utility model embodiment is described in detail, used herein specifically Individual example is set forth to the principle and embodiment of the utility model embodiment, and the explanation of above example is only applicable to help Assistant solves the principle of the utility model embodiment;Meanwhile for those of ordinary skill in the art, implement according to the utility model Example, the there will be changes in embodiment and application, in summary, this specification content should not be construed as To limitation of the present utility model.

Claims (5)

1. Visualized management system in asset deployment production, it is characterised in that including Data Enter device (1), collector (2), net First manager (3), asset deployment administrative center (4), management terminal (5), process controller (6) and display (7), described information The output end of input device (1) connects collector (2) input, and collector (2) output end connects the NE management Device (3) input, NE Explorer (3) output end connect asset deployment administrative center (4) input, the assets Management and running center (4) output end connects the management terminal (5) input, the process controller (6) input, institute respectively Display (7) input is stated, wherein,
Described information input device (1), for caused system equipment information during assets production scheduling, environmental information, Third party device information carries out typing;
The collector (2), confluence analysis is carried out for receiving the signal of described information input device (1), and to it;
The NE Explorer (3), for by the data after the collector (2) confluence analysis, with being previously stored in the network element Reference data in manager (3) is compared, and carries out basic data anomaly analysis;
The asset deployment administrative center (4), for the data in the NE Explorer (3) to be carried out into user, authority, matched somebody with somebody Put, the maintenance management that region and classification collect;
The management terminal (5), for carrying out including analysis, performance, report to the data in the asset deployment administrative center (4) The process operation management of table, failed resource;
The process controller (6), for managing the interior business datum analysis operation flow of asset deployment administrative center (4);
The display (7), for the data status described in real-time display in asset deployment administrative center (4).
2. Visualized management system in asset deployment production as claimed in claim 1, it is characterised in that:Described information input device (1) it is used to carry out data acquisition to the SNMP network equipments or/and non-SNMP equipment.
3. Visualized management system in asset deployment production as claimed in claim 1, it is characterised in that:The collector (2) Including with third party's interface end (8), multithreaded architecture, polling dispatching distributed capture manager (9).
4. Visualized management system in asset deployment production as claimed in claim 1, it is characterised in that:The process controller (6) desktop handler (11), operation management device (12) and computer lab management device (13) are included.
5. Visualized management system in asset deployment production as claimed in claim 1, it is characterised in that:The display (7) Provided with changing interface device (15).
CN201721088593.7U 2017-08-28 2017-08-28 Visualized management system in asset deployment production Expired - Fee Related CN207074449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721088593.7U CN207074449U (en) 2017-08-28 2017-08-28 Visualized management system in asset deployment production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721088593.7U CN207074449U (en) 2017-08-28 2017-08-28 Visualized management system in asset deployment production

Publications (1)

Publication Number Publication Date
CN207074449U true CN207074449U (en) 2018-03-06

Family

ID=61521136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721088593.7U Expired - Fee Related CN207074449U (en) 2017-08-28 2017-08-28 Visualized management system in asset deployment production

Country Status (1)

Country Link
CN (1) CN207074449U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109598163A (en) * 2018-11-30 2019-04-09 武汉铭天信息科技有限责任公司 A kind of asset management equipment based on intelligent hand-held terminal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109598163A (en) * 2018-11-30 2019-04-09 武汉铭天信息科技有限责任公司 A kind of asset management equipment based on intelligent hand-held terminal

Similar Documents

Publication Publication Date Title
US11616703B2 (en) Scalable visualization of health data for network devices
Huang et al. Cloud manufacturing service platform for small-and medium-sized enterprises
CN109669992A (en) A kind of implementation method of data visualization conversion
CN107070692A (en) A kind of cloud platform monitoring service system analyzed based on big data and method
CN105447681A (en) Physicochemical detection control and information management system
CN105096047A (en) Overall process task control and assessment system and realization method thereof
CN103533084A (en) Real-time DMS (device management system) of B/S (browser/server) framework and method thereof
CN109117341A (en) A kind of monitoring method of virtual machine, device, equipment and medium
Girtelschmid et al. Big data in large scale intelligent smart city installations
Hammad et al. Provenance as a service: A data-centric approach for real-time monitoring
CN108734778A (en) A kind of technical supervision data visualization method and system
Kesavan et al. A visual analytics framework for reviewing streaming performance data
CN207074449U (en) Visualized management system in asset deployment production
US8850321B2 (en) Cross-domain business service management
CN107918560A (en) A kind of server apparatus management method and device
CN108762730A (en) Software module standardizes development approach and software system development method
Chircu et al. Visualization and machine learning for data center management
CN116629802A (en) Big data platform system for railway port station
CN101123533A (en) Operation and maintenance device for communication power supply
Henning Prototype of a scalable monitoring infrastructure for Industrial DevOps
CN116151787A (en) IT operation and maintenance management system
Dayal et al. Collaborative business intelligence: enabling collaborative decision making in enterprises
CN105843728A (en) Method for remotely controlling servers under cloud computing environment by using WMI plug-in
Zhang et al. Research on it operation and maintenance and management and maintenance methods in cloud computing environment
Vasilev et al. I4. 0 Component Models based on IEC/EN 62264

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180306

Termination date: 20190828