CN207073694U CN201721099224.8U CN201721099224U CN207073694U CN 207073694 U CN207073694 U CN 207073694U CN 201721099224 U CN201721099224 U CN 201721099224U CN 207073694 U CN207073694 U CN 207073694U
Authority
CN
China
Prior art keywords
ring
mesolow
pipeline
tapping machine
upper left
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721099224.8U
Other languages
Chinese (zh)
Inventor
李魏同
张勇财
董泽峰
罗刚
陈尧
吴生强
彭静
黄明
邱建春
路晓卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
China Oil and Gas Pipeline Network Corp
National Pipeline Network Group Sichuan to East Natural Gas Pipeline Co Ltd
Original Assignee
Sinopec Sichuan East Gas Pipeline Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Sichuan East Gas Pipeline Co Ltd filed Critical Sinopec Sichuan East Gas Pipeline Co Ltd
Priority to CN201721099224.8U priority Critical patent/CN207073694U/en
Application granted granted Critical
Publication of CN207073694U publication Critical patent/CN207073694U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model drilling under pressure of pipeline technical field, more particularly to a kind of mesolow conduit aperture footpath tapping machine welding fixed equipment, it includes pipe nipple apparatus and the pipe nipple apparatus is removably fixedly mounted on to the cohesion device of the outer surface at the pipeline position for the valve treated the pipeline of perforate or treat perforate.Pipe nipple apparatus includes pedestal, the body being fixed on pedestal and the body being fixed on body of tubulose, and pedestal is provided with the passage of up/down perforation, and pedestal is connected by passage with body.Cohesion device includes lower armful of ring of reclinate arc, ring is embraced in the upper left of the arc bent to upper left and the upper right of the arc bent to upper right embraces ring.Stopping transportation can not had to by the utility model, it is simple to operate, safe and reliable that purposes, the devices such as empty detection are opened in online the greasing mouth for changing leakage, logical ball indicator replacing and blowing pipeline displacement with pressure.

Description

A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment
Technical field
A kind of the utility model drilling under pressure of pipeline technical field, and in particular to mesolow conduit aperture footpath tapping machine solderless Connect fixed equipment.
Background technology
T101B tapping machines are the common tools of drilling under pressure of pipeline, except perforate make it is out of trade, it may also be used for logical ball indicator The operations such as replacing, the replacing of greasing mouth.Tapping machine is in use, the connection of tapping machine and pipeline or pipeline auxiliary device facility is one Individual key, traditional connected mode is to treat position of opening one threaded pipe nipple of welding, because the method needs to get angry, therefore One side security is not high, is not on the other hand also applied to for the position of micro-leakage be present, the scope of application is smaller.With regard to tapping machine For fixing device, temporarily have no that related technical scheme discloses at present.
Utility model content
To solve the deficiencies in the prior art, the utility model provides a kind of mesolow conduit aperture footpath tapping machine welding Fixed equipment.The present apparatus can not have to stopping transportation, and online the greasing mouth for changing leakage, logical ball indicator replacing and pipeline with pressure blow Sweep displacement and open the purposes such as empty detection, device is simple to operate, safe and reliable, less than one hour of field operation time, except operation When emptying fall very small amount natural gas gas medium outside, without stopping transportation be vented main pipeline of long distance pipeline in a large amount of natural gas gas, to pipeline Normal operation do not influence.
Technical scheme provided by the utility model is as follows:
A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment, is comprised at least:
Pipe nipple apparatus;
And the pipe nipple apparatus is removably fixedly mounted on to the pipeline treated the pipeline of perforate or treat the valve of perforate The cohesion device of the outer surface at position.
Pass through above-mentioned technical proposal, stopping transportation can not had to, greasing mouth, the logical ball indicator of online replacing leakage with pressure are changed And empty detection etc. is opened in blowing pipeline displacement.Pipe nipple apparatus is detachably arranged in the pipeline for treating perforate by cohesion device or treated The outer surface at the pipeline position of the valve of perforate, it is not necessary to get angry and welded.
Specifically, the pedestal of the pipe nipple apparatus including tubulose, the body being fixed on the pedestal and being fixed on institute State the body on body, the body is provided with the passage of up/down perforation, the body by the passage respectively with the seat Body connects with the body.
Further, the body is provided with pressure release through hole, and one end of the pressure release through hole connects the passage, described to let out The other end of pressure through hole is provided with and communicated with high pressure resistant flexible pipe.
Based on above-mentioned technical proposal, it is possible to achieve drainage technology, the pressure release through hole set by pipe nipple apparatus is to natural gas Fully drained, pipe nipple apparatus cavity internal pressure can be reduced, ensure operating personnel's safety.
Further, the pressure release through hole is arranged on the side of the body, and the opposite side of the body is provided with spiral shell Line through hole, valve screw rod is connected with the tapped through hole internal thread, the valve screw rod is provided with valve swing handle.The valve Screw rod and the valve swing handle form valve.
Further, the outer surface smoother of the one end of the valve screw rod away from the valve swing handle, the valve screw rod Away from the valve swing handle one end it is pluggable enter the pressure release through hole in.
, can be by changeover valve swing handle mobile valve screw rod, so as to be turned on and off pressure release based on above-mentioned technical proposal Through hole.
Specifically, the cohesion device includes lower armful of ring of reclinate arc, the upper left of the arc bent to upper left The upper right for embracing ring and the arc bent to upper right embraces ring, and one end of the lower armful of ring can be removable with one end of the upper left armful ring That unloads is fixedly connected, and the other end that ring is embraced in the upper left can be removably fixedly connected with the left side of the body, described lower armful One end that the other end of ring can embrace ring with the upper right is removably fixedly connected, and the upper other end for embracing ring can be with described The right side of body is removably fixedly connected.
Further, one end of the lower armful of ring and one end of the upper left armful ring connect by the way that bolt is removably fixed Connect, the other end that ring is embraced in the upper left is removably fixedly connected with the bolt that passes on left of the body, the lower armful of ring One end that the other end and the upper right embrace ring is removably fixedly connected by bolt, the upper right embrace the other end of ring with it is described The right side of body is removably fixedly connected by bolt, the upper left embrace ring, the body, the upper right embrace ring and it is described under Embrace ring to be sequentially connected and circularize, the outer surface at the pipeline position of the pipeline for treating perforate or the valve for treating perforate is crimped on the upper left Embrace ring, the upper right embraces the inner surface of ring and the lower armful of ring.
Further, the both ends at the both ends of the lower armful of ring, the upper left armful ring and the upper right armful ring are provided with company Lug, the lower armful of ring are embraced ring with the upper left and are fixedly connected by engaging lug progress bolt, the lower armful of ring and the upper right Embrace ring bolt carried out by engaging lug and be fixedly connected, the upper left embrace ring and the upper right embrace ring respectively by engaging lug with it is described The left side of body carries out bolt with right side and is fixedly connected.
Under embrace ring, upper left embraces ring and upper right and embraces ring and can be bent into by X70 steel plate hots.
Based on above-mentioned technical proposal, it is possible to achieve embrace ring by lower armful of ring, upper left and upper right armful ring is removable by pipe nipple apparatus That unloads is firmly fixed on pipeline, so as to no longer need welding to operate.
Specifically, the lower surface of the pedestal is the appearance with the pipeline for treating perforate or the pipeline position for the valve for treating perforate The arc surfaced of face matching.
Further, O-ring seals are crimped with the lower surface of the pedestal, the O-ring seals, which are crimped on, treats perforate Pipeline or treat perforate valve pipeline position outer surface on.
Based on above-mentioned technical proposal, pipe nipple apparatus uses arc sealing surface and O-ring seal with pipeline or valve body contact face Sealing, can not only bear elevated pressures, and sealing effectiveness is good, and device installation is simple.
Generally, the advantages of technical scheme provided by the utility model:
1) pipe nipple apparatus and pipeline and valve body contact face are sealed using arc sealing surface and O-ring seal, can not only be born Elevated pressures, sealing effectiveness is good, and device installation is simple.
2) using drainage reduction technology, pipe nipple is provided with pressure relief opening at one and natural gas is fully drained device, can be with Device cavity internal pressure is reduced, ensures operating personnel's safety.
3) whole operation process is all that high pressure will not be formed in closed space progress, device, natural gas completely with work Industry is environmentally isolated, without the danger of combustion explosion, the whole safe devoid of risk of operation process.
4) leak and lead to ball indicator replacement problem using device processing valve greasing mouth, it is not necessary to which stopping transportation is largely vented Natural gas resource, economic and social benefit are considerable.
5) apparatus structure size is compact, is highly suitable for using during field operation narrow space.
6) short circuit takes bolt connection to get angry welding, substantially increases operational security.
Brief description of the drawings
Fig. 1 is the front view structure of tapping machine welding fixed equipment in mesolow conduit aperture footpath provided by the utility model Schematic diagram.
Fig. 2 is the pipe nipple apparatus of tapping machine welding fixed equipment in mesolow conduit aperture footpath provided by the utility model Partial rearview.
Fig. 3 is the pipe nipple apparatus of tapping machine welding fixed equipment in mesolow conduit aperture footpath provided by the utility model Partial top view.
In accompanying drawing 1,2,3, the structure list representated by each label is as follows:
1st, bolt, 2, pipe nipple apparatus, 201, pedestal, 202, body, 203, body, 204, pressure release through hole, 205, valve spiral shell Bar, 206, valve swing handle, 3, embrace ring down, 4, upper left embrace ring, 5, upper right embrace ring, 6, O-ring seals, 7, high pressure resistant flexible pipe.
Embodiment
Principle of the present utility model and feature are described below, illustrated embodiment is served only for explaining the utility model, It is not intended to limit the scope of the utility model.
In a detailed embodiment, as shown in Figure 1, 2, 3, mesolow conduit aperture footpath tapping machine welding is fixed and set It is standby to include pipe nipple apparatus 2 and the pipe nipple apparatus 2 is removably fixedly mounted on the pipeline for treating perforate or the valve for treating perforate Pipeline position outer surface cohesion device.
As shown in Figure 1, 2, 3, the pedestal 201 of pipe nipple apparatus 2 including tubulose, the body 202 that is fixed on pedestal 201 and The body 203 being fixed on body 202, the body 202 are provided with the passage of up/down perforation, and the body 202 is by described Passage connects with the pedestal 201 and the body 203 respectively.Body 202 is provided with pressure release through hole 204, pressure release through hole 204 One end communicating passage, the other end of pressure release through hole 204 are provided with and communicated with high pressure resistant flexible pipe 7.Pressure release through hole 204 is arranged on body 202 side, tapped through hole is provided with the opposite side of body 202, and valve screw rod 205 is connected with tapped through hole internal thread, Valve screw rod 205 is provided with valve swing handle 206.The outer surface smoother of the one end of valve screw rod 205 away from valve swing handle 206, valve The door one end of screw rod 205 away from valve swing handle 206 it is pluggable enter pressure release through hole 204 in.
As shown in figure 1, cohesion device includes lower armful of ring 3 of reclinate arc, the upper left of the arc bent to upper left The upper right for embracing ring 4 and the arc bent to upper right embraces ring 5, and the both ends of ring 4 and upper right armful ring 5 are embraced in both ends, the upper left of lower armful of ring 3 It is provided with engaging lug.The engaging lug of one end that the engaging lug for embracing one end of ring 3 down embraces ring 4 with upper left is detachable by bolt 1 Be fixedly connected, upper left embrace ring 4 the engaging lug of the other end be removably fixedly connected with the bolt 1 that passes on left of body 202. The engaging lug of one end that the engaging lug for embracing the other end of ring 3 down embraces ring 5 with upper right is removably fixedly connected by bolt 1, right The upper engaging lug of the other end for embracing ring 5 is removably fixedly connected with the right side of body 202 by bolt 1.Embrace ring 4, sheet in upper left Body 202, upper right embrace ring 5 and lower armful of ring 3 is sequentially connected and circularized, the pipeline position of the pipeline for treating perforate or the valve for treating perforate Outer surface is crimped on the inner surface that ring 4 is embraced in upper left, upper right embraces ring 5 and lower armful of ring 3.
As shown in Fig. 2 the lower surface of pedestal 201 is outer with the pipeline position of the pipeline for treating perforate or the valve for treating perforate The arc surfaced of surface matching, O-ring seals 6 are crimped with the lower surface of pedestal 201.Ring 4 and the right side are embraced in lower armful of ring 3, upper left Under the upper collective effect for embracing ring 5, the lower surface of pedestal 201 is pressed on O-ring seals 6, is pressed on and is waited out on O-ring seals 6 The pipeline in hole or treat perforate valve pipeline position outer surface on.
The operating principle of tapping machine welding fixed equipment in mesolow conduit aperture footpath provided by the utility model be with High_voltage isolation makes pipe nipple be internally formed a confined space.When carrying out Job Operations, unlatching is led to the body on pipe nipple apparatus The high pressure valve of screwed connection is crossed, the confined space formed between T101B tapping machines and pipe nipple apparatus, pressure release through hole is as natural Gas drain.Carry out every operation using T101B tapping machines, after the completion of operation, lift T101B tapping machine rotary heads, close high pressure Valve, after the pressure relief opening pressure release above T101B perforates, unloading down for damage, the purpose that can be changed with realization.Operation The natural gas of process leakage is vented by pressure release through hole all the time, high pressure will not be formed in device, and weather is complete in device Be isolated from the outside the danger of no combustion explosion entirely, and operating personnel will not be caused any harm, whole operation process safely, do not have It is risky.
The tool of perforate is carried out with tapping machine welding fixed equipment in mesolow conduit aperture footpath provided by the utility model Body operating procedure is as follows:
First step assembling device
It is determined that needing Seeding location, cohesion device and pipe nipple apparatus are installed, now personnel will wear positive-pressure type air and exhale Haustorium.
Second step to device test Lou
The valve that high pressure valve and pressure release through hole are closed after equipment is connected, to pipe nipple and pipeline or valve body contact surface Test Lou, now personnel will wear positive-pressure air respirator.
3rd step connects blow-down pipe
After confirming without leakage, the pressure release blow-down pipe of device, while the valve of the pressure release through hole on device for opening are connected.This When personnel to wear positive-pressure air respirator.
4th step installs T101B tapping machines
When confirmation operation field concentration of natural gas is zero, T101B tapping machines are installed, carry out related operation.
5th step operation finishes leak detection
After the completion of operation, whether there is leakage at Inspection, whole device is disassembled after qualified, operation is completed.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc., guarantor of the present utility model should be included in Within the scope of shield.

Claims (10)

1. a kind of mesolow conduit aperture footpath tapping machine welding fixed equipment, it is characterised in that comprise at least:
Pipe nipple apparatus (2);
And the pipe nipple apparatus (2) is removably fixedly mounted on the outer surface for the pipeline for treating perforate or treats the valve of perforate The cohesion device of the outer surface at the pipeline position of door.
2. tapping machine welding fixed equipment in mesolow conduit aperture footpath according to claim 1, it is characterised in that described The pedestal (201) of pipe nipple apparatus (2) including tubulose, the body (202) being fixed on the pedestal (201) and it is fixed on described Body (203) on body (202), the body (202) are provided with the passage of up/down perforation, and the body (202) passes through institute Passage is stated to connect with the pedestal (201) and the body (203) respectively.
3. tapping machine welding fixed equipment in mesolow conduit aperture footpath according to claim 2, it is characterised in that:It is described Body (202) is provided with pressure release through hole (204), and one end of the pressure release through hole (204) connects the passage, the pressure release through hole (204) the other end is provided with and communicated with the high pressure resistant flexible pipe (7) of pressure release.
4. tapping machine welding fixed equipment in mesolow conduit aperture footpath according to claim 3, it is characterised in that:It is described Pressure release through hole (204) is arranged on the side of the body (202), and the opposite side of the body (202) is provided with tapped through hole, Valve screw rod (205) is connected with the tapped through hole internal thread.
5. tapping machine welding fixed equipment in mesolow conduit aperture footpath according to claim 4, it is characterised in that:It is described One end of valve screw rod (205) is located at the body (202) outside, and is provided with valve swing handle (206), the valve screw rod (205) outer surface smoother of the other end, it may pass through the body (202) grafting and enter in the pressure release through hole (204).
6. according to any described mesolow conduit aperture footpath tapping machine welding fixed equipment of claim 2 to 5, its feature exists In:Lower armful of ring (3) of the cohesion device including reclinate arc, the upper left of the arc bent to upper left embrace ring (4) with And the upper right of the arc bent to upper right embraces ring (5), one end of the lower armful of ring (3) can embrace one end of ring (4) with the upper left Removably be fixedly connected, the upper left embrace ring (4) the other end can with the left side of the body (202) is removably fixed connects Connect, the other end of the lower armful of ring (3) can be removably fixedly connected with one end of the upper right armful ring (5), the upper armful of ring The other end can be removably fixedly connected with the right side of the body (202).
7. tapping machine welding fixed equipment in mesolow conduit aperture footpath according to claim 6, it is characterised in that:It is described The one end for embracing ring (3) down is removably fixedly connected with one end of the upper left armful ring (4) by bolt, and ring is embraced in the upper left (4) the other end is removably fixedly connected with the bolt that passes on left of the body (202), the lower armful of ring (3) it is another The one end for embracing ring (5) with the upper right is held removably to be fixedly connected by bolt, the upper right embraces the other end and the institute of ring (5) The right side for stating body (202) is removably fixedly connected by bolt, and ring (4), the body (202), described is embraced in the upper left Upper right embraces ring (5) and the lower armful of ring (3) is sequentially connected and circularized, and ring (4) is embraced in the upper left, the upper right embraces ring (5) and institute The inner surface for stating down armful ring (3) is crimped on the outer surface for the pipeline for treating perforate or treats the outer surface at the pipeline position of the valve of perforate On.
8. tapping machine welding fixed equipment in mesolow conduit aperture footpath according to claim 7, it is characterised in that:It is described Embrace the both ends of ring (3) down, ring (4) is embraced in the upper left and the both ends of the upper right armful ring (5) are provided with engaging lug, described lower armful Ring (3) is embraced ring (4) with the upper left and is fixedly connected by engaging lug progress bolt, and the lower armful of ring (3) embraces ring with the upper right (5) carry out bolt by engaging lug to be fixedly connected, ring (4) is embraced in the upper left and the upper right embraces ring (5) and passes through engaging lug respectively Bolt is carried out with the left side of the body (202) and right side to be fixedly connected.
9. according to any described mesolow conduit aperture footpath tapping machine welding fixed equipment of claim 2 to 5, its feature exists In:The lower surface of the pedestal (201) is to be matched with the outer surface of the pipeline for treating perforate or the pipeline position for the valve for treating perforate Arc surfaced.
10. tapping machine welding fixed equipment in mesolow conduit aperture footpath according to claim 9, it is characterised in that: The lower surface of the pedestal (201) is provided with O-ring seals (6), and the lower surface of the pedestal (201) passes through the O-ring seals (6) it is crimped on the pipeline for treating perforate or treats on the outer surface at pipeline position of the valve of perforate.
CN201721099224.8U 2017-08-30 2017-08-30 A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment Active CN207073694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721099224.8U CN207073694U (en) 2017-08-30 2017-08-30 A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721099224.8U CN207073694U (en) 2017-08-30 2017-08-30 A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment

Publications (1)

Publication Number Publication Date
CN207073694U true CN207073694U (en) 2018-03-06

Family

ID=61520853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721099224.8U Active CN207073694U (en) 2017-08-30 2017-08-30 A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment

Country Status (1)

Country Link
CN (1) CN207073694U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107575720A (en) * 2017-08-30 2018-01-12 中石化川气东送天然气管道有限公司 A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107575720A (en) * 2017-08-30 2018-01-12 中石化川气东送天然气管道有限公司 A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment

Similar Documents

Publication Publication Date Title
CN106051240A (en) Safety valve as well as online detecting device and online detecting method of safety valve
CN207073694U (en) A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment
CN107575720A (en) A kind of mesolow conduit aperture footpath tapping machine welding fixed equipment
CN206230053U (en) Punching device under pressure
CN108756810A (en) A kind of Pressurized petroleum wellhead driller
CN203162319U (en) On-line sampling valve
CN205225131U (en) Hole digger is prevented spouting by sleeve pipe
CN204573582U (en) A kind of cylinder joint dismounting protector
CN110542611A (en) Equipment pressure test adapter tube and pressure test method
CN105546257B (en) Do not stop the supple of gas or steam online boring device and method
CN107883101A (en) A kind of electric smelting bypasses saddle type
CN208090318U (en) A kind of full-automatic special liquid supply cabinet
CN209180677U (en) The online trapping device of coal gas drainer downpipe horn mouth
CN207945381U (en) Pneumatic pinch joint adjusts tail gas gathering and transporting device
CN203477890U (en) Chemical conveying connecting cabinet
CN207093012U (en) Pressure relief plug and Christmas tree
CN108008085A (en) The poison gas concentration monitoring device of diverse location in a kind of tail gas treatment device
CN206513879U (en) A kind of high pressure pipe joint test connection threeway
CN101403458A (en) Gas pipeline leakage can repairing method
CN108223938A (en) Pneumatic pinch joint adjusts tail gas gathering and transporting device
CN206112515U (en) Device is changed on line to gas drainer downtake valve
CN104174894B (en) A kind of method of the coal gas online perforate of instrument pressure pipe
CN207662872U (en) The poison gas concentration monitoring device of different location in a kind of tail gas treatment device
CN201779445U (en) Disposer for liquid chlorine steel cylinder
CN207007430U (en) A kind of preventer test device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200916

Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Co-patentee after: SINOPEC CHUANQI DONGSONG NATURAL GAS PIPELINE Co.,Ltd.

Patentee after: China Petroleum & Chemical Corp.

Address before: 430223 Hubei Wuhan City, Wuhan City, East Lake New Technology Development Zone Optics Valley Avenue No. 126 Sichuan Gas East pipeline project, the 1-5 layer of the Wuhan control center

Patentee before: SINOPEC CHUANQI DONGSONG NATURAL GAS PIPELINE Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee after: CHINA PETROLEUM & CHEMICAL Corp.

Patentee after: Sichuan East Natural Gas Pipeline Co.,Ltd.

Address before: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee before: CHINA PETROLEUM & CHEMICAL Corp.

Patentee before: SINOPEC CHUANQI DONGSONG NATURAL GAS PIPELINE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211116

Address after: Room 08-10, 6 / F, block a, No. 5, Dongtucheng Road, Chaoyang District, Beijing 100013

Patentee after: National Petroleum and natural gas pipeline network Group Co.,Ltd.

Patentee after: Sichuan East Natural Gas Pipeline Co.,Ltd.

Address before: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee before: CHINA PETROLEUM & CHEMICAL Corp.

Patentee before: Sichuan East Natural Gas Pipeline Co.,Ltd.