CN207071292U - A kind of construction road induction type fully-automatic intelligent dust falling system - Google Patents

A kind of construction road induction type fully-automatic intelligent dust falling system Download PDF

Info

Publication number
CN207071292U
CN207071292U CN201721054267.4U CN201721054267U CN207071292U CN 207071292 U CN207071292 U CN 207071292U CN 201721054267 U CN201721054267 U CN 201721054267U CN 207071292 U CN207071292 U CN 207071292U
Authority
CN
China
Prior art keywords
induction type
automatic intelligent
type fully
dust falling
construction road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721054267.4U
Other languages
Chinese (zh)
Inventor
郑瑞华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichang Kun Fa Construction Co Ltd
Original Assignee
Yichang Kun Fa Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yichang Kun Fa Construction Co Ltd filed Critical Yichang Kun Fa Construction Co Ltd
Priority to CN201721054267.4U priority Critical patent/CN207071292U/en
Application granted granted Critical
Publication of CN207071292U publication Critical patent/CN207071292U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)

Abstract

A kind of construction road induction type fully-automatic intelligent dust falling system, it includes main pipeline, main pipeline connects with secondary duct, magnetic valve is provided with connecting pipe between main pipeline and adjutant road, the signal input part of magnetic valve and the delivery outlet of main control chip connect, the input port of main control chip and the signal output of Magnetic Sensor are connected, and at least one spray head is set in secondary duct., primarily to the solution usual airborne dust in construction site is larger, existing water spray dust's equipment operating efficiency is low, can not realize intelligent automatic start, the big technical problem of water consumption for it.

Description

A kind of construction road induction type fully-automatic intelligent dust falling system
Technical field
The utility model belongs to facilities and equipment field for building, and in particular to a kind of construction road induction type fully-automatic intelligent Dust falling system.
Background technology
For the call of the dust-proof improvement of response country, green building, the environmental protection concept in green building site are carried out.Building at present All construction sites in market are provided with depositing dust and sprayed on request, are found by investigation, and current live dust falling system exists following Problem:
1st, dust falling system control mode all uses manual control, it is impossible to realizes automation, intellectuality, adds work Amount;
2nd, using manual control, it is impossible to which in the case where there is airborne dust, timely opening controlling valve carries out depositing dust, causes to reach To effective dust-laying effect;
3rd, open whole piece spray system every time to work simultaneously, local free from dust position causes water resource also in water spray dust Serious waste.
The content of the invention
The purpose of this utility model provides a kind of construction road induction type fully-automatic intelligent dust falling system, it primarily to The construction usual airborne dust of passage in solution construction site is larger, and existing water spray dust's equipment operating efficiency is low, can not realize that intelligence is automatic Open, the big technical problem of water consumption.
In order to realize above-mentioned technical characteristic, the technical solution adopted in the utility model is:
A kind of construction road induction type fully-automatic intelligent dust falling system, it includes main pipeline, and main pipeline connects with secondary duct, Magnetic valve, the output of the signal input part and main control chip of magnetic valve are provided with connecting pipe between main pipeline and adjutant road Mouth connection, the input port of main control chip and the signal output of Magnetic Sensor are connected, and at least one spray head is set in secondary duct.
Above-mentioned Magnetic Sensor is arranged at secondary duct side.
Above-mentioned Magnetic Sensor is ground induction coil or huge Magnetic Sensor.
Above-mentioned multiple spray heads are equidistantly arranged in secondary duct.
Above-mentioned secondary duct is arranged at Magnetic Sensor(Road)Both sides.
It includes dust sensor, and the signal output of dust sensor and the input port of main control chip connect.
Above-mentioned main control chip is single-chip microcomputer or embedded system or CPLD systems.
Using said structure, the utility model has the following technical effect that:
1st, vehicle by when the system energy automatic sensing vehicle, and start the spray in vehicle range, which vehicle drives to In, spray startup is where.Other regions do not start, are effectively saved the waste of water resource;
2nd, when without vehicle by when, monitored in real time by the airborne dust inductor of both sides of the road, if airborne dust detected value surpasses When crossing setting value, the spray of automatic start monitored area carries out depositing dust.Realization automatically controls, and starts to drop when dust is just caused Dirt, with minimum water consumption so as to reaching optimal dust-laying effect.Manual control is not needed, reduces the input of human resources.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is circuit diagram of the present utility model;
Fig. 3 is using renderings of the present utility model.
Embodiment
As shown in figure 1, a kind of construction road induction type fully-automatic intelligent dust falling system, it includes main pipeline 1, main pipeline 1 Connected with secondary duct 2, magnetic valve 4 is provided with the connecting pipe 3 between main pipeline 1 and adjutant road 2, the signal of magnetic valve 4 is defeated Enter end to be connected with the delivery outlet of main control chip 5, the input port of main control chip 5 is connected with the signal output of Magnetic Sensor 6, in pair Pipeline 2 sets at least one spray head 7.
The Magnetic Sensor 6 is arranged at the side of secondary duct 2.
Preferably, Magnetic Sensor 6 is ground induction coil or huge Magnetic Sensor.
Further, multiple spray heads 7 can be equidistantly arranged in secondary duct 2, and secondary duct 2 is arranged at Magnetic Sensor 6 Both sides.
It also includes dust sensor 8, and the signal output of dust sensor 8 is connected with the input port of main control chip 5.
The main control chip 5 is single-chip microcomputer or embedded system or CPLD systems.
Optionally, circuit diagram as shown in Fig. 2 main control chip 5 select be model ATF1500A CPLD chips, magnetic pass What sensor 6 selected is CJMCU-150 BMM150 geomagnetic sensors, and the 5th pin and the earth magnetism of the input port of main control chip 5 sense The signal output part connection of device, 34 pins of the delivery outlet of main control chip 5 and the base stage of NPN type triode connect, the pole of NPN type three The colelctor electrode of pipe is connected with the control terminal of relay 9, and the controlled end of relay 9 is connected with magnetic valve 4, the model choosing of magnetic valve 4 That select is 35A-ACA-DDAA-1BA, and the model selection of relay 9 is RJ2S-CL-D24.
Use said structure, as shown in figure 3, in use, when vehicle 10 travels construction by ground electrification magnetic coil after, Signal is fed back to ground sense controller by magnet coil, and enabling signal is transferred to the magnetic valve of spray system by ground sense controller, from And start spray system work, road can be divided into every 10 meters of induction zones, often will all be started by an induction zone The spray system in the region.
Airborne dust inductor is installed in both sides of the road, when without vehicle by when, and after airborne dust reaches preset value again, airborne dust senses Device will feed back to signal controller, and controller will start corresponding magnetic valve, and the spray of automatic start monitored area is carried out Depositing dust, spray system access construction water compression system using 50 supervisors, and branch pipe is using 25 terminations connection fog-spray nozzle.

Claims (7)

  1. A kind of 1. construction road induction type fully-automatic intelligent dust falling system, it is characterised in that:It includes main pipeline(1), main pipeline (1)With secondary duct(2)Connection, in main pipeline(1)With secondary duct(2)Between connecting pipe(3)It is provided with magnetic valve(4), electricity Magnet valve(4)Signal input part and main control chip(5)Delivery outlet connection, main control chip(5)Input port and Magnetic Sensor(6) Signal output connection, in secondary duct(2)At least one spray head is set(7).
  2. A kind of 2. construction road induction type fully-automatic intelligent dust falling system according to claim 1, it is characterised in that:It is described Magnetic Sensor(6)It is arranged at secondary duct(2)Side.
  3. A kind of 3. construction road induction type fully-automatic intelligent dust falling system according to claim 2, it is characterised in that:It is described Magnetic Sensor(6)For ground induction coil or huge Magnetic Sensor.
  4. A kind of 4. construction road induction type fully-automatic intelligent dust falling system according to claim 1, it is characterised in that:It is described Multiple spray heads(7)Equidistantly it is arranged in secondary duct(2)On.
  5. A kind of 5. construction road induction type fully-automatic intelligent dust falling system according to claim 1 or 4, it is characterised in that: The secondary duct(2)It is arranged at Magnetic Sensor(6)Both sides.
  6. A kind of 6. construction road induction type fully-automatic intelligent dust falling system according to claim 1, it is characterised in that:It is wrapped Include dust sensor(8), dust sensor(8)Signal output and main control chip(5)Input port connection.
  7. A kind of 7. construction road induction type fully-automatic intelligent dust falling system according to claim 1 or 6, it is characterised in that: The main control chip(5)For single-chip microcomputer or embedded system or CPLD systems.
CN201721054267.4U 2017-08-22 2017-08-22 A kind of construction road induction type fully-automatic intelligent dust falling system Expired - Fee Related CN207071292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721054267.4U CN207071292U (en) 2017-08-22 2017-08-22 A kind of construction road induction type fully-automatic intelligent dust falling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721054267.4U CN207071292U (en) 2017-08-22 2017-08-22 A kind of construction road induction type fully-automatic intelligent dust falling system

Publications (1)

Publication Number Publication Date
CN207071292U true CN207071292U (en) 2018-03-06

Family

ID=61520739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721054267.4U Expired - Fee Related CN207071292U (en) 2017-08-22 2017-08-22 A kind of construction road induction type fully-automatic intelligent dust falling system

Country Status (1)

Country Link
CN (1) CN207071292U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111007771A (en) * 2019-12-18 2020-04-14 云南昆钢电子信息科技有限公司 Unloading and dedusting control device for rail transport electric locomotive under mine
CN116672836A (en) * 2023-06-08 2023-09-01 南京林业大学 Automatic control spraying device for building site fence

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111007771A (en) * 2019-12-18 2020-04-14 云南昆钢电子信息科技有限公司 Unloading and dedusting control device for rail transport electric locomotive under mine
CN116672836A (en) * 2023-06-08 2023-09-01 南京林业大学 Automatic control spraying device for building site fence
CN116672836B (en) * 2023-06-08 2024-01-16 南京林业大学 Automatic control spraying device for building site fence

Similar Documents

Publication Publication Date Title
CN203745816U (en) Spray dedusting intelligence control system
CN207071292U (en) A kind of construction road induction type fully-automatic intelligent dust falling system
CN206781549U (en) Charging electric vehicle switching device for multi-storied garage
CN104070597A (en) Mobile precast box girder curing machine
CN201992762U (en) Energy-saving control system of central air-conditioner based on power line carriers
CN203224748U (en) Environment monitoring data collector used for transformer station
CN104483917B (en) Multi-split current loop communication system
CN207504647U (en) Wide area intelligence mutual inductance takes electric control system
CN203164649U (en) Kitchen ventilator intelligent control system
CN203364343U (en) Intelligent fresh air and air conditioner linkage control device
CN205318242U (en) Automatic pump control case circuit of dust fall spraying
CN105953383B (en) A kind of Charging System of Central Air Conditioning monitoring device, system and method based on wireless wifi
CN204928859U (en) Meadow wireless monitoring system
CN108832727A (en) Cable tunnel inspection robot system and its control method based on wireless charging
CN209472387U (en) Direct current household power utilization system
CN204496233U (en) A kind of field control system
CN106647488A (en) Power switch control circuit applied to patrol robot
CN206947999U (en) A kind of multichannel automatic charge device
CN106871329A (en) A kind of central air-conditioning energy-saving system
CN206257785U (en) Pump energy saving control device
CN207442493U (en) A kind of device that multiple electrical appliances can be achieved and charge simultaneously
CN206302059U (en) A kind of switch cubicle of the quick secondary connection of energy
CN110542163A (en) Energy-saving cooling system for large machine room
CN204442323U (en) A kind of single live wire power getting radio frequency remote control switch
CN205606823U (en) VAV air conditioner charge system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180306

Termination date: 20180822