CN207069569U - A kind of controlling switch - Google Patents
A kind of controlling switch Download PDFInfo
- Publication number
- CN207069569U CN207069569U CN201720707509.9U CN201720707509U CN207069569U CN 207069569 U CN207069569 U CN 207069569U CN 201720707509 U CN201720707509 U CN 201720707509U CN 207069569 U CN207069569 U CN 207069569U
- Authority
- CN
- China
- Prior art keywords
- switch
- manual emergency
- accident
- signal
- generating equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/20—Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems
Landscapes
- Control Of Turbines (AREA)
Abstract
The utility model provides a kind of controlling switch, including:Accident protection trip switch unit, there is the more than one accident protection trip switch of mutual logic or relation;Manual emergency halt switch unit, there are more than two manual emergency halt switches of mutual logical AND relation;Signal transmitting switch, it is connected between controller and scheduling station system, when generating equipment is grid-connected in an ON state, and is off when generating equipment is not grid-connected;Controller; it is connected with accident protection trip switch unit and manual emergency halt switch unit; in the case where generating equipment is grid-connected; signal or manual emergency stopping signal occurs to scheduling station system transmission failure; in the case where generating equipment is not grid-connected, generates and store accident generation signal or manual emergency stopping signal.Controlling switch of the present utility model, it can accurately send accident to scheduling station system as needed and signal occurs.
Description
Technical field
It the utility model is related to controlling switch, and in particular to the controlling switch sent for power plant signal.
Background technology
With the quickening of GPA process, management of the dispatching of power netwoks to GPA is also increasingly strict, entirely
Face is lifted and to improve GPA level extremely urgent.
When accident occurs for Power Plant Side generating equipment, signal occurs for accident must be to deliver to tune on a correct remote signalling position
Spend main station system.If accident occurs signal and can not correctly be uploaded to scheduling station system, influence accident alarm promptness and
Electric network security.
On the other hand, need to carry out prerun to generating equipment in power plant maintenance process, that is, generating equipment is not incorporated to electricity
The operation such as transmission test, electrical test is carried out in the case of net, now should not send irrelevant signal to scheduling station system.
Therefore, the upload of signal is occurred to accident, it is necessary to which grid automation requirement can be met, and can meets that power plant is sent out
The requirement of electric equipment prerun.
Utility model content
Utility model will solve the problems, such as
The utility model proposes to solve the above problems, its object is to provide one kind can as needed to
Scheduling station system accurately sends the controlling switch that signal occurs for accident.
The solution used to solve the problem
Controlling switch provided by the utility model, including accident protection trip switch unit, manual emergency halt switch list
Member, signal transmitting switch and controller, wherein the accident protection trip switch unit, is connected with generating equipment, have phase
The more than one accident protection trip switch of mutual logic or relation;The manual emergency halt switch unit, with generating equipment
It is connected, there are more than two manual emergency halt switches of mutual logical AND relation;The signal transmitting switch, is connected to institute
State between controller and scheduling station system, when generating equipment is grid-connected in an ON state, and when generating equipment is not grid-connected
It is off;The controller, with the accident protection trip switch unit and the manual emergency halt switch unit
It is connected, in the case where generating equipment is grid-connected, when the arbitrary accident protection trip switch trips, is judged as generating electricity
Device fails and generate accident and signal occur, and accident generation signal is sent to scheduling station system, and when all
Manual emergency halt switch when being switched on, be judged as that deadly condition occurs and generates manual emergency stopping signal, and will
The manual emergency stopping signal is sent to scheduling station system, in the case where generating equipment is not grid-connected, when the arbitrary thing
Therefore tripping operation or all manual emergency halt switches occur for trip protection switch when being switched on, generate and store accident hair
Raw signal or manual emergency stopping signal.
Preferably, the generating equipment includes steam turbine and steam turbine transformer unit.
Preferably, the signal transmitting switch is arranged on the accident protection tripping operation being connected with the steam turbine transformer unit
The side of switch element.
Preferably, the signal transmitting switch is handle type switch or knob switch.
Beneficial effect
According to controlling switch of the present utility model, it can accurately send accident to scheduling station system as needed and believe
Number, grid automation requirement can be met, and can meets the requirement of power plant generating equipment prerun.
Brief description of the drawings
Fig. 1 is the composition block diagram of the controlling switch provided according to an embodiment of the present utility model.
[description of reference numerals]
1000:Controlling switch 100:Accident protection trip switch unit
110:Accident protection trip switch 200:Manual emergency halt switch unit
210:Manual emergency halt switch 300:Controller
400:Signal transmitting switch 500:Scheduling station system
600:Generating equipment
Embodiment
Hereinafter, the controlling switch according to the utility model preferred embodiment is explained in detail with reference to the accompanying drawings.In addition, only to understanding
The part that technological maheup of the present utility model is necessary illustrates, and the explanation of remainder will be omitted, in order to avoid make this reality
It is unclear with new main idea confusion, this should be noticed.Moreover, in the process, clear property for convenience of description and conveniently
Property, the thickness of the lines shown in figure or the size of inscape and thickness etc. may be illustrated by exaggeration.
Fig. 1 is the composition block diagram of the controlling switch 1000 provided according to an embodiment of the present utility model.
As shown in figure 1, the controlling switch 1000 of the present embodiment includes:Accident protection trip switch unit 100, manual emergency
Halt switch unit 200, controller 300 and signal transmitting switch 400.
The accident protection trip switch unit 100, is connected with generating equipment 600, has the one of mutual logic or relation
Accident protection trip switch 110 more than individual.Here, it can set more than one (can in accident protection trip switch unit 100
To set 1,2 or more can also be set) accident protection trip switch 110, due to accident protection trip switch 110
Between be connected with logic or relation, therefore when any one accident protection trip switch 110 acts and when tripping, phase therewith
Controller 300 even can accurately and reliably judge that generating equipment 600 breaks down.
The manual emergency halt switch unit 200, is connected with generating equipment 600, has the two of mutual logical AND relation
Manual emergency halt switch 210 more than individual., can be with when emergency (that is, the deadly condition) such as fire occurs for power plant
By disconnecting the manual emergency halt switch 210 of manual emergency halt switch unit 200 come artificially emergency shutdown generating equipment
600.Here, two or more can be set (2 can be set, 3 can also be set in manual emergency halt switch unit 200
Or more) manual emergency halt switch 210, even if so as to because of maloperation and imprudence touches some manual emergency and stopped
Machine switch 210, and then in the case of being allowed to there occurs connection, therewith other manual emergency halt switches 210 of logical AND relation
Also in normal condition, therefore can avoid that unnecessary loss occurs.
The signal transmitting switch 400, is connected between controller 300 and scheduling station system 500, in generating equipment
In the case that 600 is grid-connected, in an ON state, and in the case where generating equipment 600 is not grid-connected, it is off.
The controller 300, it is connected with accident protection trip switch unit 100 and manual emergency halt switch unit 200.
In the case where generating equipment 600 is grid-connected (signal transmitting switch 400 is in an ON state), when the tripping operation of arbitrary accident protection is opened
110 are closed when tripping, the generating equipment 600 that controller 300 is judged as breaks down and generates accident generation signal, and by the thing
Therefore signal occurs and is sent via signal transmitting switch 400 to scheduling station system 500, and work as all manual emergency halt switches
210 when being switched on, and controller 300 is judged as that power plant occurs deadly condition (e.g., fire etc.) and generates manual emergency and shut down letter
Number, and the manual emergency stopping signal is sent to scheduling station system 500 via signal transmitting switch 400.In generating equipment
600 it is not grid-connected in the case of (signal transmitting switch 400 is off), when arbitrary accident protection trip switch 110 is sent out
During raw tripping operation, controller 300 generates accident and signal occurs, because now signal transmitting switch 400 is off-state, therefore accident
Generation signal will not be transferred to scheduling station system 500, and when all manual emergency halt switches 210 are switched on, control
Device 300 processed generates manual emergency stopping signal, because now signal transmitting switch 400 is off-state, therefore manual emergency stops
Machine signal will not be transferred to scheduling station system 500.Here, the controller 300 can be that industrial computer etc. can
The arbitrary computer equipment of the functions such as calculating, logic judgment, storage and control is realized, this is not specially limited.Controller
300, which can also store accident that is grid-connected and not generating and under net state, occurs signal and manual emergency stopping signal, so as to backstage
Analyzed and studied.
Here, signal transmitting switch 400 can be arranged on the accident being connected with as the steam turbine transformer unit of generating equipment
The side of trip protection switch element 100, signal transmitting switch 400 can use handle type switch or knob switch, so as to
Operating personnel are facilitated to be observed and operated.
More than, the composition of the controlling switch 1000 of the utility model embodiment is elaborated.Then, illustrate
The course of work of the controlling switch 1000 of the utility model embodiment.
When the generating equipment (steam turbine and/or steam turbine transformer unit) 600 in power plant is in and net state and normal work
When, connect signal transmitting switch 400.If generating equipment 600 breaks down, the accident protection being connected with generating equipment 600 is jumped
At least one accident protection trip switch 110 of lock switch element 100 can trip, and now the generation accident of controller 300 is believed
Number, and the signal transmitting switch 400 that the accident to signal state through the turned on occur is sent to scheduling station system 500.If go out
The emergencies such as fire occur for existing power plant, then artificially stop all manual emergencies of manual emergency halt switch unit 200
Machine switch 210 disconnects, and now controller 300 generates manual emergency stopping signal, and by the manual emergency stopping signal via connecing
The signal transmitting switch 400 of logical state is sent to scheduling station system 500.
Passed when the generating equipment (steam turbine and/or steam turbine transformer unit) 600 in power plant is in not simultaneously net state
When dynamic test, electrical test etc. operate, cut-off signal transmitting switch 400.In this case, even if at least one accident protection is jumped
The tripping operation of lock switch 110 or all manual emergency halt switches 210 are switched on, and then the generation accident of controller 300 is believed
Number or manual emergency stopping signal, because signal transmitting switch 400 is off, therefore controller 300 can not possibly be to
Scheduling station system 500 sends accident and signal or manual emergency stopping signal occurs.It is that is, not grid-connected in generating equipment 600
Under state, even if carrying out various test operations, controller 300 also will not send irrelevant signal to scheduling station system 500.
The above is only preferred embodiment of the present utility model, it is impossible to limits implementation model of the present utility model with this
Enclose, i.e., every simple equivalent substitution made according to the utility model claims and utility model description and modification,
All still fall within the scope that the utility model is covered.
Claims (4)
1. a kind of controlling switch (1000), it is characterised in that shut down including accident protection trip switch unit (100), manual emergency
Switch element (200), signal transmitting switch (400) and controller (300), wherein
The accident protection trip switch unit (100), is connected with generating equipment (600), has the one of mutual logic or relation
Accident protection trip switch (110) more than individual;
The manual emergency halt switch unit (200), is connected with generating equipment (600), has the two of mutual logical AND relation
Manual emergency halt switch (210) more than individual;
The signal transmitting switch (400), is connected between the controller (300) and scheduling station system (500), is generating electricity
When equipment (600) is grid-connected in an ON state, it is off when generating equipment (600) is not grid-connected;
The controller (300), with the accident protection trip switch unit (100) and the manual emergency halt switch unit
(200) it is connected, in the case where generating equipment (600) is grid-connected, when the arbitrary accident protection trip switch (110) is jumped
During lock, it is judged as that generating equipment (600) breaks down and generates accident and signal occurs, and accident generation signal is sent to tune
Main station system (500) is spent, and when all manual emergency halt switches (210) are switched on, it is judged as that non-reason occurs
Condition and generate manual emergency stopping signal, and the manual emergency stopping signal is sent to scheduling station system (500), generated electricity
In the case that equipment (600) is not grid-connected, when tripping operation or all institutes occur for the arbitrary accident protection trip switch (110)
When stating manual emergency halt switch (210) and being switched on, generate and store accident signal or manual emergency stopping signal occurs.
2. controlling switch (1000) as claimed in claim 1, it is characterised in that the generating equipment (600) include steam turbine with
And steam turbine transformer unit.
3. controlling switch (1000) as claimed in claim 2, it is characterised in that the signal transmitting switch (400) be arranged on
The side of the connected accident protection trip switch unit (100) of the steam turbine transformer unit.
4. the controlling switch (1000) as described in any one of claims 1 to 3, it is characterised in that the signal transmitting switch
(400) it is handle type switch or knob switch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720707509.9U CN207069569U (en) | 2017-06-16 | 2017-06-16 | A kind of controlling switch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720707509.9U CN207069569U (en) | 2017-06-16 | 2017-06-16 | A kind of controlling switch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207069569U true CN207069569U (en) | 2018-03-02 |
Family
ID=61509835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720707509.9U Active CN207069569U (en) | 2017-06-16 | 2017-06-16 | A kind of controlling switch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207069569U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107181243A (en) * | 2017-06-16 | 2017-09-19 | 大唐国际发电股份有限公司北京高井热电厂 | A kind of controlling switch |
-
2017
- 2017-06-16 CN CN201720707509.9U patent/CN207069569U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107181243A (en) * | 2017-06-16 | 2017-09-19 | 大唐国际发电股份有限公司北京高井热电厂 | A kind of controlling switch |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5758692B2 (en) | Nuclear power plant supervisory control system | |
US10890164B2 (en) | Systems and methods for remotely managing wind power generation | |
CN209784813U (en) | power-on/power-off power supply board control system | |
CN102868221A (en) | Intelligent drawer switch cabinet | |
CN103477607A (en) | Power automation installation and method for operating a power automation installation | |
CN207069569U (en) | A kind of controlling switch | |
Ransom et al. | Using GOOSE messages in a main-tie-main scheme | |
Prudenzi et al. | Smartening hospital electrical distribution for enhancing resilience | |
CN107181243B (en) | A kind of control switch | |
CN103558464A (en) | Method for on-line constant value calibration of 10kV protecting device | |
CN201392993Y (en) | DCS control module for nuclear power engineering transformer | |
Win et al. | Design and implementation of SCADA system based power distribution for primary substation (control system) | |
CN104991525B (en) | Power auto-control system | |
CN110473747A (en) | A kind of breaker and breaker operator recognition methods | |
CN207442445U (en) | Bus interconnection self-adaptive switching circuit and switching control system | |
CN208208350U (en) | A kind of nuclear power station diversity protection system and nuclear power station | |
KR101030986B1 (en) | Smart control system of power device based on information technology | |
CN204480043U (en) | The proving installation of pitch-variable system | |
CN105186457B (en) | Motor Protective Device | |
CN202257243U (en) | Miniature steamer distributed centralized control system | |
CN202333998U (en) | Intelligent recloser | |
CN104979907A (en) | Substation automation device detection method based on D5000 system | |
CN105071534B (en) | Breaker both sides isolator operation power supply smart feeding device | |
CN108063596A (en) | A kind of photovoltaic generating system and its control method | |
Ab Ghani et al. | Remote Terminal Unit Developed for Distribution Automation System (DAS) using MPLAB Software |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |