CN207069569U - A kind of controlling switch - Google Patents

A kind of controlling switch Download PDF

Info

Publication number
CN207069569U
CN207069569U CN201720707509.9U CN201720707509U CN207069569U CN 207069569 U CN207069569 U CN 207069569U CN 201720707509 U CN201720707509 U CN 201720707509U CN 207069569 U CN207069569 U CN 207069569U
Authority
CN
China
Prior art keywords
switch
manual emergency
accident
signal
generating equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720707509.9U
Other languages
Chinese (zh)
Inventor
田丰
谢洪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING GAOJING CO-GENERATION POWER PLANT OF DATANG INTERNATIONAL POWER GENERATION Co Ltd
Original Assignee
BEIJING GAOJING CO-GENERATION POWER PLANT OF DATANG INTERNATIONAL POWER GENERATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GAOJING CO-GENERATION POWER PLANT OF DATANG INTERNATIONAL POWER GENERATION Co Ltd filed Critical BEIJING GAOJING CO-GENERATION POWER PLANT OF DATANG INTERNATIONAL POWER GENERATION Co Ltd
Priority to CN201720707509.9U priority Critical patent/CN207069569U/en
Application granted granted Critical
Publication of CN207069569U publication Critical patent/CN207069569U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems

Landscapes

  • Control Of Turbines (AREA)

Abstract

The utility model provides a kind of controlling switch, including:Accident protection trip switch unit, there is the more than one accident protection trip switch of mutual logic or relation;Manual emergency halt switch unit, there are more than two manual emergency halt switches of mutual logical AND relation;Signal transmitting switch, it is connected between controller and scheduling station system, when generating equipment is grid-connected in an ON state, and is off when generating equipment is not grid-connected;Controller; it is connected with accident protection trip switch unit and manual emergency halt switch unit; in the case where generating equipment is grid-connected; signal or manual emergency stopping signal occurs to scheduling station system transmission failure; in the case where generating equipment is not grid-connected, generates and store accident generation signal or manual emergency stopping signal.Controlling switch of the present utility model, it can accurately send accident to scheduling station system as needed and signal occurs.

Description

A kind of controlling switch
Technical field
It the utility model is related to controlling switch, and in particular to the controlling switch sent for power plant signal.
Background technology
With the quickening of GPA process, management of the dispatching of power netwoks to GPA is also increasingly strict, entirely Face is lifted and to improve GPA level extremely urgent.
When accident occurs for Power Plant Side generating equipment, signal occurs for accident must be to deliver to tune on a correct remote signalling position Spend main station system.If accident occurs signal and can not correctly be uploaded to scheduling station system, influence accident alarm promptness and Electric network security.
On the other hand, need to carry out prerun to generating equipment in power plant maintenance process, that is, generating equipment is not incorporated to electricity The operation such as transmission test, electrical test is carried out in the case of net, now should not send irrelevant signal to scheduling station system.
Therefore, the upload of signal is occurred to accident, it is necessary to which grid automation requirement can be met, and can meets that power plant is sent out The requirement of electric equipment prerun.
Utility model content
Utility model will solve the problems, such as
The utility model proposes to solve the above problems, its object is to provide one kind can as needed to Scheduling station system accurately sends the controlling switch that signal occurs for accident.
The solution used to solve the problem
Controlling switch provided by the utility model, including accident protection trip switch unit, manual emergency halt switch list Member, signal transmitting switch and controller, wherein the accident protection trip switch unit, is connected with generating equipment, have phase The more than one accident protection trip switch of mutual logic or relation;The manual emergency halt switch unit, with generating equipment It is connected, there are more than two manual emergency halt switches of mutual logical AND relation;The signal transmitting switch, is connected to institute State between controller and scheduling station system, when generating equipment is grid-connected in an ON state, and when generating equipment is not grid-connected It is off;The controller, with the accident protection trip switch unit and the manual emergency halt switch unit It is connected, in the case where generating equipment is grid-connected, when the arbitrary accident protection trip switch trips, is judged as generating electricity Device fails and generate accident and signal occur, and accident generation signal is sent to scheduling station system, and when all Manual emergency halt switch when being switched on, be judged as that deadly condition occurs and generates manual emergency stopping signal, and will The manual emergency stopping signal is sent to scheduling station system, in the case where generating equipment is not grid-connected, when the arbitrary thing Therefore tripping operation or all manual emergency halt switches occur for trip protection switch when being switched on, generate and store accident hair Raw signal or manual emergency stopping signal.
Preferably, the generating equipment includes steam turbine and steam turbine transformer unit.
Preferably, the signal transmitting switch is arranged on the accident protection tripping operation being connected with the steam turbine transformer unit The side of switch element.
Preferably, the signal transmitting switch is handle type switch or knob switch.
Beneficial effect
According to controlling switch of the present utility model, it can accurately send accident to scheduling station system as needed and believe Number, grid automation requirement can be met, and can meets the requirement of power plant generating equipment prerun.
Brief description of the drawings
Fig. 1 is the composition block diagram of the controlling switch provided according to an embodiment of the present utility model.
[description of reference numerals]
1000:Controlling switch 100:Accident protection trip switch unit
110:Accident protection trip switch 200:Manual emergency halt switch unit
210:Manual emergency halt switch 300:Controller
400:Signal transmitting switch 500:Scheduling station system
600:Generating equipment
Embodiment
Hereinafter, the controlling switch according to the utility model preferred embodiment is explained in detail with reference to the accompanying drawings.In addition, only to understanding The part that technological maheup of the present utility model is necessary illustrates, and the explanation of remainder will be omitted, in order to avoid make this reality It is unclear with new main idea confusion, this should be noticed.Moreover, in the process, clear property for convenience of description and conveniently Property, the thickness of the lines shown in figure or the size of inscape and thickness etc. may be illustrated by exaggeration.
Fig. 1 is the composition block diagram of the controlling switch 1000 provided according to an embodiment of the present utility model.
As shown in figure 1, the controlling switch 1000 of the present embodiment includes:Accident protection trip switch unit 100, manual emergency Halt switch unit 200, controller 300 and signal transmitting switch 400.
The accident protection trip switch unit 100, is connected with generating equipment 600, has the one of mutual logic or relation Accident protection trip switch 110 more than individual.Here, it can set more than one (can in accident protection trip switch unit 100 To set 1,2 or more can also be set) accident protection trip switch 110, due to accident protection trip switch 110 Between be connected with logic or relation, therefore when any one accident protection trip switch 110 acts and when tripping, phase therewith Controller 300 even can accurately and reliably judge that generating equipment 600 breaks down.
The manual emergency halt switch unit 200, is connected with generating equipment 600, has the two of mutual logical AND relation Manual emergency halt switch 210 more than individual., can be with when emergency (that is, the deadly condition) such as fire occurs for power plant By disconnecting the manual emergency halt switch 210 of manual emergency halt switch unit 200 come artificially emergency shutdown generating equipment 600.Here, two or more can be set (2 can be set, 3 can also be set in manual emergency halt switch unit 200 Or more) manual emergency halt switch 210, even if so as to because of maloperation and imprudence touches some manual emergency and stopped Machine switch 210, and then in the case of being allowed to there occurs connection, therewith other manual emergency halt switches 210 of logical AND relation Also in normal condition, therefore can avoid that unnecessary loss occurs.
The signal transmitting switch 400, is connected between controller 300 and scheduling station system 500, in generating equipment In the case that 600 is grid-connected, in an ON state, and in the case where generating equipment 600 is not grid-connected, it is off.
The controller 300, it is connected with accident protection trip switch unit 100 and manual emergency halt switch unit 200. In the case where generating equipment 600 is grid-connected (signal transmitting switch 400 is in an ON state), when the tripping operation of arbitrary accident protection is opened 110 are closed when tripping, the generating equipment 600 that controller 300 is judged as breaks down and generates accident generation signal, and by the thing Therefore signal occurs and is sent via signal transmitting switch 400 to scheduling station system 500, and work as all manual emergency halt switches 210 when being switched on, and controller 300 is judged as that power plant occurs deadly condition (e.g., fire etc.) and generates manual emergency and shut down letter Number, and the manual emergency stopping signal is sent to scheduling station system 500 via signal transmitting switch 400.In generating equipment 600 it is not grid-connected in the case of (signal transmitting switch 400 is off), when arbitrary accident protection trip switch 110 is sent out During raw tripping operation, controller 300 generates accident and signal occurs, because now signal transmitting switch 400 is off-state, therefore accident Generation signal will not be transferred to scheduling station system 500, and when all manual emergency halt switches 210 are switched on, control Device 300 processed generates manual emergency stopping signal, because now signal transmitting switch 400 is off-state, therefore manual emergency stops Machine signal will not be transferred to scheduling station system 500.Here, the controller 300 can be that industrial computer etc. can The arbitrary computer equipment of the functions such as calculating, logic judgment, storage and control is realized, this is not specially limited.Controller 300, which can also store accident that is grid-connected and not generating and under net state, occurs signal and manual emergency stopping signal, so as to backstage Analyzed and studied.
Here, signal transmitting switch 400 can be arranged on the accident being connected with as the steam turbine transformer unit of generating equipment The side of trip protection switch element 100, signal transmitting switch 400 can use handle type switch or knob switch, so as to Operating personnel are facilitated to be observed and operated.
More than, the composition of the controlling switch 1000 of the utility model embodiment is elaborated.Then, illustrate The course of work of the controlling switch 1000 of the utility model embodiment.
When the generating equipment (steam turbine and/or steam turbine transformer unit) 600 in power plant is in and net state and normal work When, connect signal transmitting switch 400.If generating equipment 600 breaks down, the accident protection being connected with generating equipment 600 is jumped At least one accident protection trip switch 110 of lock switch element 100 can trip, and now the generation accident of controller 300 is believed Number, and the signal transmitting switch 400 that the accident to signal state through the turned on occur is sent to scheduling station system 500.If go out The emergencies such as fire occur for existing power plant, then artificially stop all manual emergencies of manual emergency halt switch unit 200 Machine switch 210 disconnects, and now controller 300 generates manual emergency stopping signal, and by the manual emergency stopping signal via connecing The signal transmitting switch 400 of logical state is sent to scheduling station system 500.
Passed when the generating equipment (steam turbine and/or steam turbine transformer unit) 600 in power plant is in not simultaneously net state When dynamic test, electrical test etc. operate, cut-off signal transmitting switch 400.In this case, even if at least one accident protection is jumped The tripping operation of lock switch 110 or all manual emergency halt switches 210 are switched on, and then the generation accident of controller 300 is believed Number or manual emergency stopping signal, because signal transmitting switch 400 is off, therefore controller 300 can not possibly be to Scheduling station system 500 sends accident and signal or manual emergency stopping signal occurs.It is that is, not grid-connected in generating equipment 600 Under state, even if carrying out various test operations, controller 300 also will not send irrelevant signal to scheduling station system 500.
The above is only preferred embodiment of the present utility model, it is impossible to limits implementation model of the present utility model with this Enclose, i.e., every simple equivalent substitution made according to the utility model claims and utility model description and modification, All still fall within the scope that the utility model is covered.

Claims (4)

1. a kind of controlling switch (1000), it is characterised in that shut down including accident protection trip switch unit (100), manual emergency Switch element (200), signal transmitting switch (400) and controller (300), wherein
The accident protection trip switch unit (100), is connected with generating equipment (600), has the one of mutual logic or relation Accident protection trip switch (110) more than individual;
The manual emergency halt switch unit (200), is connected with generating equipment (600), has the two of mutual logical AND relation Manual emergency halt switch (210) more than individual;
The signal transmitting switch (400), is connected between the controller (300) and scheduling station system (500), is generating electricity When equipment (600) is grid-connected in an ON state, it is off when generating equipment (600) is not grid-connected;
The controller (300), with the accident protection trip switch unit (100) and the manual emergency halt switch unit (200) it is connected, in the case where generating equipment (600) is grid-connected, when the arbitrary accident protection trip switch (110) is jumped During lock, it is judged as that generating equipment (600) breaks down and generates accident and signal occurs, and accident generation signal is sent to tune Main station system (500) is spent, and when all manual emergency halt switches (210) are switched on, it is judged as that non-reason occurs Condition and generate manual emergency stopping signal, and the manual emergency stopping signal is sent to scheduling station system (500), generated electricity In the case that equipment (600) is not grid-connected, when tripping operation or all institutes occur for the arbitrary accident protection trip switch (110) When stating manual emergency halt switch (210) and being switched on, generate and store accident signal or manual emergency stopping signal occurs.
2. controlling switch (1000) as claimed in claim 1, it is characterised in that the generating equipment (600) include steam turbine with And steam turbine transformer unit.
3. controlling switch (1000) as claimed in claim 2, it is characterised in that the signal transmitting switch (400) be arranged on The side of the connected accident protection trip switch unit (100) of the steam turbine transformer unit.
4. the controlling switch (1000) as described in any one of claims 1 to 3, it is characterised in that the signal transmitting switch (400) it is handle type switch or knob switch.
CN201720707509.9U 2017-06-16 2017-06-16 A kind of controlling switch Active CN207069569U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720707509.9U CN207069569U (en) 2017-06-16 2017-06-16 A kind of controlling switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720707509.9U CN207069569U (en) 2017-06-16 2017-06-16 A kind of controlling switch

Publications (1)

Publication Number Publication Date
CN207069569U true CN207069569U (en) 2018-03-02

Family

ID=61509835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720707509.9U Active CN207069569U (en) 2017-06-16 2017-06-16 A kind of controlling switch

Country Status (1)

Country Link
CN (1) CN207069569U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107181243A (en) * 2017-06-16 2017-09-19 大唐国际发电股份有限公司北京高井热电厂 A kind of controlling switch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107181243A (en) * 2017-06-16 2017-09-19 大唐国际发电股份有限公司北京高井热电厂 A kind of controlling switch

Similar Documents

Publication Publication Date Title
JP5758692B2 (en) Nuclear power plant supervisory control system
US10890164B2 (en) Systems and methods for remotely managing wind power generation
CN209784813U (en) power-on/power-off power supply board control system
CN102868221A (en) Intelligent drawer switch cabinet
CN103477607A (en) Power automation installation and method for operating a power automation installation
CN207069569U (en) A kind of controlling switch
Ransom et al. Using GOOSE messages in a main-tie-main scheme
Prudenzi et al. Smartening hospital electrical distribution for enhancing resilience
CN107181243B (en) A kind of control switch
CN103558464A (en) Method for on-line constant value calibration of 10kV protecting device
CN201392993Y (en) DCS control module for nuclear power engineering transformer
Win et al. Design and implementation of SCADA system based power distribution for primary substation (control system)
CN104991525B (en) Power auto-control system
CN110473747A (en) A kind of breaker and breaker operator recognition methods
CN207442445U (en) Bus interconnection self-adaptive switching circuit and switching control system
CN208208350U (en) A kind of nuclear power station diversity protection system and nuclear power station
KR101030986B1 (en) Smart control system of power device based on information technology
CN204480043U (en) The proving installation of pitch-variable system
CN105186457B (en) Motor Protective Device
CN202257243U (en) Miniature steamer distributed centralized control system
CN202333998U (en) Intelligent recloser
CN104979907A (en) Substation automation device detection method based on D5000 system
CN105071534B (en) Breaker both sides isolator operation power supply smart feeding device
CN108063596A (en) A kind of photovoltaic generating system and its control method
Ab Ghani et al. Remote Terminal Unit Developed for Distribution Automation System (DAS) using MPLAB Software

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant