CN207063317U - Steel construction cable-stayed support for building - Google Patents

Steel construction cable-stayed support for building Download PDF

Info

Publication number
CN207063317U
CN207063317U CN201721019006.9U CN201721019006U CN207063317U CN 207063317 U CN207063317 U CN 207063317U CN 201721019006 U CN201721019006 U CN 201721019006U CN 207063317 U CN207063317 U CN 207063317U
Authority
CN
China
Prior art keywords
stay bolt
bolt bar
fixedly connected
rotating shaft
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721019006.9U
Other languages
Chinese (zh)
Inventor
李岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721019006.9U priority Critical patent/CN207063317U/en
Application granted granted Critical
Publication of CN207063317U publication Critical patent/CN207063317U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses the steel construction cable-stayed support for building, including base, crossbeam is provided with the top of the base, the both sides of the base top and the both sides of crossbeam bottom have been fixedly connected with fixed block, column is fixedly connected with the top of base top fixed block, and the top of column is fixedly connected with the fixed block of crossbeam bottom.The utility model is by setting being used cooperatively for base, crossbeam, fixed block, column, the first stay bolt bar, the second stay bolt bar, the first locating piece, the second locating piece, support bar, first rotating shaft, the second rotating shaft, connecting rod, limiting plate, spring, kelly, screw rod and nut, solves the problems, such as existing stay bolt bar stability difference when in use, this is used for the steel construction cable-stayed support of building, possesses the advantages of stability is high, add the weight capacity of stay bolt bar, reduce potential safety hazard, user's use is facilitated, so as to improve the practicality of the stay bolt bar.

Description

Steel construction cable-stayed support for building
Technical field
Building appliance technical field is the utility model is related to, particularly for the steel construction cable-stayed support of building.
Background technology
The structure that steel construction is made up of steel material, it is one of main building construction types, structure is mainly by shaped steel With steel plate etc. made of the component composition such as girder steel, steel column, steel truss, generally use weld seam between each component or part, bolt or Rivet interlacement, because its deadweight is lighter, and easy construction, it is widely used in the fields such as large-sized workshop, venue, Super High.
Steel construction needs to use stay bolt bar to be supported when in use, but existing stay bolt bar use when It is poor to wait stability, potential safety hazard easily occurs, the use to user impacts, it has not been convenient to which user uses, and reduces existing There is the practicality of stay bolt bar.
Utility model content
The purpose of this utility model is to provide the steel construction cable-stayed support for building possess the advantages of stability is high, Solves the problems, such as existing stay bolt bar stability difference when in use.
To achieve the above object, the utility model provides following technical scheme:For the steel construction cable-stayed support of building, bag Base is included, crossbeam is provided with the top of the base, the both sides of the base top and the both sides of crossbeam bottom are fixedly connected with There is fixed block, column, and the fixation at the top of column and crossbeam bottom are fixedly connected with the top of base top fixed block Block is fixedly connected, and the first stay bolt bar and the second stay bolt bar, the first stay bolt bar and are fixedly connected with the top of the base The top of two stay bolt bars is fixedly connected with the bottom of crossbeam, on the right side of the bottom and the second stay bolt bar on the left of the first stay bolt bar Bottom be fixedly connected with the first locating piece, the top on the right side of the first stay bolt bar and the top on the left of the second stay bolt bar are equal The second locating piece is fixedly connected with, the bottom of second locating piece and the top of the first locating piece are connected with support Bar, and two support bars are flexibly connected by first rotating shaft, the front surface of the first stay bolt bar passes through the second rotating shaft and second Stay bolt bar is flexibly connected, and the front surface of second rotating shaft and the back side are arranged with connecting rod, and the inside of connecting rod is vertically set Limiting plate is equipped with, the side of the limiting plate is fixedly connected with spring, and the opposite side of the limiting plate is fixedly connected with kelly, and Side of the kelly away from limiting plate is through to the inside of the second rotating shaft, and the connecting rod is fixedly connected close to the side of first rotating shaft There is screw rod, side of the screw rod away from connecting rod is through to the outside of first rotating shaft, and positioned at first rotating shaft outside screw rod Thread surface is connected with nut, and nut contacts close to the side of first rotating shaft with first rotating shaft.
Preferably, the junction of the fixed block and column is bolted to connection, and the quantity of the column is two, And two columns are symmetrical set on the second rotating shaft.
Preferably, the top of first locating piece is flexibly connected by the first movable axis with support bar, and described second is fixed The bottom of position block is flexibly connected by the second movable axis with support bar.
Preferably, the surface of the connecting rod offers the through hole being used cooperatively with the second rotating shaft, and the limiting plate is remote The side of connecting rod inwall is fixedly connected with pulling block, and side of the pulling block away from limiting plate is through to the outside of connecting rod, described The front surface of connecting rod and the back side offer the chute being used cooperatively with pulling block.
Preferably, the bottom of the first stay bolt bar and top and the top and bottom of the second stay bolt bar pass through fixation respectively Part at the top of the bottom of crossbeam and base with being fixedly connected, and the first stay bolt bar and the second stay bolt bar are in arranged in a crossed manner.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is by setting base, crossbeam, fixed block, column, the first stay bolt bar, the second stay bolt bar, first Locating piece, the second locating piece, support bar, first rotating shaft, the second rotating shaft, connecting rod, limiting plate, spring, kelly, screw rod and nut Be used cooperatively, solve the problems, such as existing stay bolt bar stability difference when in use, this is used for the steel construction of building Cable-stayed support, possess the advantages of stability is high, add the weight capacity of stay bolt bar, reduce potential safety hazard, facilitate user Use, so as to improve the practicality of the stay bolt bar.
2nd, the utility model is played a part of being easy to pull limiting plate, slided by connecting rod surface by the setting of pulling block The setting of groove, play a part of being easy to pulling block to move left and right, by the setting of part and part junction fixture, avoid zero There is the phenomenon to come off when in use in part, adds stability when part uses, passes through setting for connecting rod surface through hole Put, play a part of being easily installed connecting rod, by the setting of the first movable axis and the second movable axis, determine support bar and first Position block and the second locating piece are not in the phenomenon to drop when being flexibly connected, and add stability when part uses, By the setting of bolt, play a part of being easy to vertical columns.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the fragmentary sectional elevation view of the utility model connecting rod;
Fig. 3 is the utility model A close-up schematic view;
Fig. 4 is the utility model B close-up schematic view.
In figure:1 base, 2 crossbeams, 3 fixed blocks, 4 columns, 5 first stay bolt bars, 6 second stay bolt bars, 7 first locating pieces, 8 Second locating piece, 9 support bars, 10 first rotating shafts, 11 second rotating shafts, 12 connecting rods, 13 limiting plates, 14 springs, 15 kellies, 16 spiral shells Bar, 17 nuts, 18 pulling blocks.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, for the steel construction cable-stayed support of building, including base 1, the top of base 1 is provided with crossbeam 2, the both sides at the top of base 1 and the both sides of the bottom of crossbeam 2 have been fixedly connected with fixed block 3, the junction of fixed block 3 and column 4 It is bolted to connection, by the setting of bolt, plays a part of being easy to vertical columns 4, the quantity of column 4 is two, and Two columns 4 are symmetrical set on the second rotating shaft 11, and column 4 is fixedly connected with positioned at the top of the top fixed block 3 of base 1, And the top of column 4 is fixedly connected with the fixed block 3 of the bottom of crossbeam 2, the top of base 1 is fixedly connected with the He of the first stay bolt bar 5 Second stay bolt bar 6, the bottom and top of the first stay bolt bar 5 and the top and bottom of the second stay bolt bar 6 respectively by fixture with The bottom of crossbeam 2 is fixedly connected with the top of base 1, by the setting of part and part junction fixture, avoids part Occur the phenomenon to come off when in use, add stability when part uses, and the first stay bolt bar 5 and the second stay bolt bar 6 in arranged in a crossed manner, and the bottom of the top of the first stay bolt bar 5 and the second stay bolt bar 6 with crossbeam 2 is fixedly connected, the first stay bolt bar 5 The bottom on the bottom in left side and the right side of the second stay bolt bar 6 has been fixedly connected with the first locating piece 7, and the top of the first locating piece 7 leads to Cross the first movable axis to be flexibly connected with support bar 9, by the setting of the first movable axis and the second movable axis, make support bar 9 and The locating piece 8 of a positioning block 7 and second is not in the phenomenon to drop when being flexibly connected, and is added steady when part uses Qualitative, the bottom of the second locating piece 8 is flexibly connected by the second movable axis with support bar 9, the top on the right side of the first stay bolt bar 5 and The top in the left side of the second stay bolt bar 6 has been fixedly connected with the second locating piece 8, the bottom of the second locating piece 8 and the first locating piece 7 Top is connected with support bar 9, and two support bars 9 are flexibly connected by first rotating shaft 10, the positive table of the first stay bolt bar 5 Face is flexibly connected by the second rotating shaft 11 with the second stay bolt bar 6, and the front surface of the second rotating shaft 11 and the back side are arranged with connecting rod 12, the surface of connecting rod 12 offers the through hole being used cooperatively with the second rotating shaft 11, by the setting of the surface through hole of connecting rod 12, Play a part of being easily installed connecting rod 12, side of the limiting plate 13 away from the inwall of connecting rod 12 is fixedly connected with pulling block 18, leads to The setting of pulling block 18 is crossed, plays a part of being easy to pull limiting plate 13, and side of the pulling block 18 away from limiting plate 13 is through to company The outside of extension bar 12, the front surface of connecting rod 12 and the back side offer the chute being used cooperatively with pulling block 18, pass through connecting rod The setting of 12 surface chutes, play a part of being easy to pulling block 18 to move left and right, and the vertically arranged limited location in inside of connecting rod 12 Plate 13, the side of limiting plate 13 are fixedly connected with spring 14, and the opposite side of limiting plate 13 is fixedly connected with kelly 15, and kelly 15 Side away from limiting plate 13 is through to the inside of the second rotating shaft 11, and connecting rod 12 is fixedly connected close to the side of first rotating shaft 10 There is screw rod 16, side of the screw rod 16 away from connecting rod 12 is through to the outside of first rotating shaft 10, and positioned at the outside of first rotating shaft 10 The thread surface of screw rod 16 is connected with nut 17, and nut 17 contacts close to the side of first rotating shaft 10 with first rotating shaft 10.
In use, screw rod 16 is passed through first rotating shaft 10 by user, screwed by nut 17, user pulls pulling block 18, make pulling block 18 drive limiting plate 13 to move, limiting plate 13 drives kelly 15 to be retracted to the inside of connecting rod 12, and user is even Extension bar 12 is enclosed on the surface of the second rotating shaft 11, and user unclamps pulling block 18, and limiting plate 13 is promoted by the elastic force of spring 14, spacing Plate 13 promotes the inside of the removal connecting rod 12 of kelly 15 to stick into the inside of the second rotating shaft 11 and can be fixed, and has reached stability High effect.
In summary:This is used for the steel construction cable-stayed support of building, by setting base 1, crossbeam 2, fixed block 3, column 4th, the first stay bolt bar 5, the second stay bolt bar 6, the first locating piece 7, the second locating piece 8, support bar 9, first rotating shaft 10, the second rotating shaft 11st, connecting rod 12, limiting plate 13, spring 14, kelly 15, screw rod 16 and nut 17 are used cooperatively, and solve existing stay bolt Bar when in use stability difference the problem of.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. for the steel construction cable-stayed support of building, including base(1), it is characterised in that:The base(1)Top be provided with Crossbeam(2), the base(1)The both sides at top and crossbeam(2)The both sides of bottom have been fixedly connected with fixed block(3), the bottom of positioned at Seat(1)Top fixed block(3)Top be fixedly connected with column(4), and column(4)Top and crossbeam(2)The fixation of bottom Block(3)It is fixedly connected, the base(1)Top be fixedly connected with the first stay bolt bar(5)With the second stay bolt bar(6), described One stay bolt bar(5)With the second stay bolt bar(6)Top and crossbeam(2)Bottom be fixedly connected, the first stay bolt bar(5)It is left The bottom of side and the second stay bolt bar(6)The bottom on right side has been fixedly connected with the first locating piece(7), the first stay bolt bar(5) The top on right side and the second stay bolt bar(6)The second locating piece has been fixedly connected with the top of left side(8), second locating piece (8)Bottom and the first locating piece(7)Top be connected with support bar(9), and two support bars(9)Pass through first turn Axle(10)It is flexibly connected, the first stay bolt bar(5)Front surface pass through the second rotating shaft(11)With the second stay bolt bar(6)Activity is even Connect, second rotating shaft(11)Front surface and the back side be arranged with connecting rod(12), and connecting rod(12)Inside vertically set It is equipped with limiting plate(13), the limiting plate(13)Side be fixedly connected with spring(14), the limiting plate(13)Opposite side It is fixedly connected with kelly(15), and kelly(15)Away from limiting plate(13)Side be through to the second rotating shaft(11)Inside, institute State connecting rod(12)Close to first rotating shaft(10)Side be fixedly connected with screw rod(16), the screw rod(16)Away from connecting rod (12)Side be through to first rotating shaft(10)Outside, and be located at first rotating shaft(10)Outside screw rod(16)Thread surface connect It is connected to nut(17), and nut(17)Close to first rotating shaft(10)Side and first rotating shaft(10)Contact.
2. the steel construction cable-stayed support according to claim 1 for building, it is characterised in that:The fixed block(3)With Column(4)Junction be bolted to connection, the column(4)Quantity be two, and two columns(4)On second Rotating shaft(11)It is symmetrical set.
3. the steel construction cable-stayed support according to claim 1 for building, it is characterised in that:First locating piece (7)Top pass through the first movable axis and support bar(9)It is flexibly connected, second locating piece(8)Bottom pass through second live Moving axis and support bar(9)It is flexibly connected.
4. the steel construction cable-stayed support according to claim 1 for building, it is characterised in that:The connecting rod(12)'s Surface offers and the second rotating shaft(11)The through hole being used cooperatively, the limiting plate(13)Away from connecting rod(12)The side of inwall It is fixedly connected with pulling block(18), and pulling block(18)Away from limiting plate(13)Side be through to connecting rod(12)Outside, it is described Connecting rod(12)Front surface and the back side offers and pulling block(18)The chute being used cooperatively.
5. the steel construction cable-stayed support according to claim 1 for building, it is characterised in that:The first stay bolt bar (5)Bottom and top and the second stay bolt bar(6)Top and bottom pass through fixture and crossbeam respectively(2)Bottom and base (1)Top be fixedly connected, and the first stay bolt bar(5)With the second stay bolt bar(6)In arranged in a crossed manner.
CN201721019006.9U 2017-08-15 2017-08-15 Steel construction cable-stayed support for building Expired - Fee Related CN207063317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721019006.9U CN207063317U (en) 2017-08-15 2017-08-15 Steel construction cable-stayed support for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721019006.9U CN207063317U (en) 2017-08-15 2017-08-15 Steel construction cable-stayed support for building

Publications (1)

Publication Number Publication Date
CN207063317U true CN207063317U (en) 2018-03-02

Family

ID=61515831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721019006.9U Expired - Fee Related CN207063317U (en) 2017-08-15 2017-08-15 Steel construction cable-stayed support for building

Country Status (1)

Country Link
CN (1) CN207063317U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396906A (en) * 2018-04-18 2018-08-14 陈立国 One kind being used for the telescopic steel construction cable-stayed support of building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396906A (en) * 2018-04-18 2018-08-14 陈立国 One kind being used for the telescopic steel construction cable-stayed support of building

Similar Documents

Publication Publication Date Title
CN209179196U (en) A kind of arc frame of steel construction
CN207508587U (en) A kind of overhead rail train body welding tooling
CN207063317U (en) Steel construction cable-stayed support for building
CN206668844U (en) A kind of stagewise mechanical shock absorption plate
CN206982078U (en) A kind of steel structure welding auxiliary block
CN208266701U (en) A kind of bracket discharge mechanism
CN208293371U (en) A kind of novel bridges and roads base cushion construction template bracket
CN208686046U (en) The slipper bracket of highly-safe architectural engineering
CN207188239U (en) A kind of high strength nut aperture automatic detection screening plant
CN205674024U (en) A kind of grinding wheel head structure of novel stone polishing machine
CN212373443U (en) Transfer car (buggy) for assembly type structure
CN208346659U (en) A kind of highly-safe road and bridge crack ruggedized construction
CN209637301U (en) A kind of combined type stage
CN206476173U (en) Pad pasting rotating jig
WO2022041748A1 (en) Line arrangement mechanism for hanging-type industrial robot and use method therefor
CN208266887U (en) A kind of structure convenient for the building foundation pit inner support quickly removed
CN207326271U (en) A kind of bearing seat of jaw crusher welding tooling
CN208383008U (en) Workpiece Quick detection tool
CN207534677U (en) A kind of linking arm tooling
CN207806106U (en) A kind of cleaning device of the fastener nut inner ring of optimization
CN207723918U (en) A kind of new automobile lower swing arm stent holder
CN205183974U (en) Novel chasing bar with bearing structure
CN205834732U (en) A kind of damping base for auto parts machinery casting mould
CN205821976U (en) A kind of easy-to-mount high intensity overlapping beam slab
CN205463122U (en) Vibrating screen

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302

Termination date: 20180815