CN207062877U - One kind section adjustable water conservancy construction scaffold in space-efficient - Google Patents
One kind section adjustable water conservancy construction scaffold in space-efficient Download PDFInfo
- Publication number
- CN207062877U CN207062877U CN201720964497.8U CN201720964497U CN207062877U CN 207062877 U CN207062877 U CN 207062877U CN 201720964497 U CN201720964497 U CN 201720964497U CN 207062877 U CN207062877 U CN 207062877U
- Authority
- CN
- China
- Prior art keywords
- pillar
- spring
- cat ladder
- space
- water conservancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses one kind to save the adjustable water conservancy construction scaffold in space-efficient, including the first pillar and upper frame, the second pillar is provided with below first pillar, and second is provided with base below pillar, river bottom protection cover is provided with below the base, the first pillar lower inside is provided with spring pedestal, support stick is fixed with the left of first spring, the first pillar fix bar is fixed with the right side of first pillar, the second pillar fix bar is fixed with the right side of second pillar, and second pillar lower inside be provided with second spring, the both sides of the cat ladder cross bar are connected with cat ladder montant.The section space-efficient adjustable water conservancy construction construction erection can stretch the first pillar; the device is set to raise and decline; floor space can effectively be saved; save space; scaffold base, which can be effectively protected, to be corroded by long-time contact water; it is simultaneously compact-sized between each part, advantageously in the construction of scaffold.
Description
Technical field
Water conservancy construction equipment technical field is the utility model is related to, is specially that a kind of section adjustable water conservancy in space-efficient is applied
Work scaffold.
Background technology
With the development of Hydraulic and Hydro-Power Engineering, the scaffold of water conservancy construction is widely used, and most people use
It carrys out the implementation of ancillary works.According to for water conservancy construction scaffold, a big chunk defect being still present, just in the market
For example scaffold is excessive, trouble is not only carried back and forth, also accounts for a big chunk space, be unfavorable for the progress of construction, applied by tradition
The movements and postures of actors are influenceed, and can not adjust the height of scaffold, cause part work progress be difficult to continue the problem of, therefore we have proposed
One kind section adjustable water conservancy construction scaffold in space-efficient, to solve the problems, such as above-mentioned middle improve.
Utility model content
The purpose of this utility model is to provide a kind of section adjustable water conservancy construction scaffold in space-efficient, with solution
What certainly above-mentioned background technology proposed can not accomplish rubbish stirring is broken in the market, it is impossible to rubbish is removed from equipment and is done
Only, it is impossible to the problem of by device random mobile.
To achieve the above object, the utility model provides following technical scheme:One kind section adjustable water conservancy in space-efficient
Construction scaffold, including the first pillar and upper frame, the first pillar lower section are provided with the second pillar, and below the second pillar
Base is provided with, is provided with river bottom protection cover below the base, the first pillar lower inside is provided with spring pedestal, and spring
Chassis left side is provided with the first spring, and support stick is fixed with the left of first spring, and the is fixed with the right side of first pillar
One pillar fix bar, and guard post set is provided with above the first pillar, being fixed with the second pillar on the right side of second pillar consolidates
Fixed pole, and the second pillar lower inside is provided with second spring, is fixed with cat ladder below the upper frame, and the lower section of cat ladder has surely
Cat ladder cross bar, the both sides of the cat ladder cross bar are connected with cat ladder montant.
Preferably, first pillar and the second pillar form stretching structure, and the telescopic extensions of the first pillar and second
The equal length of pillar.
Preferably, the river bottom protection cover is trapezoidal, and uses macromolecule organic waterproof elastomeric material.
Preferably, the support stick is to be fixedly connected with the connected mode of the first spring, and the first spring and spring pedestal
Connected mode to be fixedly connected.
Preferably, the guard post set is provided with 4, and each guard post set is in cylinder.
Preferably, 9 cat ladder cross bars, and the distance between adjacent 2 cat ladder cross bars size phase are fixed with the cat ladder
Deng.
Compared with prior art, the beneficial effects of the utility model are:The adjustable water conservancy construction in the section space-efficient is used
Scaffold is provided with two section pillars, and can stretch the first pillar, the device is raised and is declined, effectively solves work progress
In can not lifting construction frame height the problem of, avoid improper use measure, construction is brought unnecessary influence, below device
Using support mode, floor space is effectively saved, saves space, reduce causes construction not because scaffold occupation of land is excessive
Just, scaffold base is provided with the guard post set of macromolecule organic waterproof material, and can be effectively protected scaffold base will not be by
Contact water for a long time and be corroded, at the same it is compact-sized between each part, advantageously in the construction of scaffold.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model side structure schematic view;
Fig. 3 is mplifying structure schematic diagram at A in the utility model Fig. 1.
In figure:1st, the first pillar, the 2, second pillar, 3, base, 4, river bottom protection cover, the 5, second pillar fix bar, 6, first
Post fix bar, 7, support stick, 8, upper frame, 9, guard post set, 10, cat ladder, 11, cat ladder cross bar, 12, cat ladder montant, 13, spring bottom
Seat, the 14, first spring, 15, second spring.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:One kind section adjustable water conservancy construction in space-efficient
With scaffold, including the first pillar 1, the second pillar 2, base 3, river bottom protection cover 4, the second pillar fix bar 5, the first pillar fix bar
6th, support stick 7, upper frame 8, guard post set 9, cat ladder 10, cat ladder cross bar 11, cat ladder montant 12, spring pedestal 13, the and of the first spring 14
Second spring 15, the lower section of the first pillar 1 is provided with the second pillar 2, and the lower section of the second pillar 2 is provided with base 3, the first pillar 1
Stretching structure is formed with the second pillar 2, and the equal length of the telescopic extensions of the first pillar 1 and the second pillar 2 can stretch the
One pillar 1, the device is raised and is declined, effectively solve the problems, such as in work progress can not lifting construction frame height, keep away
To exempt from improper use measure, construction is brought unnecessary influence, the lower section of base 3 is provided with river bottom protection cover 4, and river bottom protection cover 4 is trapezoidal,
And macromolecule organic waterproof elastomeric material is used, can be effectively protected scaffold base will not be rotten by long-time contact water
Erosion, the lower inside of the first pillar 1 is provided with spring pedestal 13, and the left side of spring pedestal 13 is provided with the first spring 14, the first bullet
The left side of spring 14 is fixed with support stick 7, support stick 7 with the connected mode of the first spring 14 to be fixedly connected, and the first spring 14 and
The connected mode of spring pedestal 13 prevents that support stick 7 and the pulling force of the first spring 13 are excessive, ejects support frame 7 to be fixedly connected
First spring 13, the right side of the first pillar 1 is fixed with the first pillar fix bar 6, and the top of the first pillar 1 is provided with guard post set 9,
Guard post set 9 is provided with 4, and each guard post set 9 can be effectively protected the top of upper frame 8, prevent in the course of work in cylinder
The pillar that the middle both sides of upper frame 8 are stretched out scratches workmen, and the right side of the second pillar 2 is fixed with the second pillar fix bar 5, and second
The lower inside of pillar 2 is provided with second spring 15, and the lower section of upper frame 8 is fixed with cat ladder 10, and the lower section of cat ladder 10 has cat ladder horizontal surely
Bar 11,9 cat ladder cross bars 11 are fixed with cat ladder 10, user is climbed up cat ladder 10, avoid cat ladder cross bar
11 is very few and cause awkward phenomenon, and the distance between adjacent 2 cat ladder cross bars 11 are equal in magnitude, cat ladder cross bar 11
Both sides are connected with cat ladder montant 12.
Operation principle:In water conservancy construction scaffold adjustable using the section space-efficient, first, by the scaffold
The place for needing to construct is put into, then the base 3 for being provided with river bottom protection cover 4 is put into water and gone, river bottom protection cover 4 can be effectively protected
Scaffold base will not be corroded by long-time contact water, and then construction worker can climb up upper frame 8 from cat ladder 10, in upper frame
Construction is operated on 8, can be by adjusting the first pillar 1, in the work of the first spring 14 when the height of scaffold is not in good time
Under, support stick 7 is stretched out the second pillar 2, so as to have the function that to fix the first pillar 1, raise the device, effective solution
Determined in work progress can not lifting construction frame height the problem of, avoid improper use measure, bring construction unnecessary
Influence, after construction terminates, support stick 7 is pressed in into the second pillar 2, the first pillar 1 is retracted in the second pillar 2 and goes, can be with
Reaching reduces the height of scaffold, the withdrawal of convenient construction frame, and here it is the adjustable water conservancy construction in the section space-efficient to use
The operation principle of scaffold.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it can still be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered
Row equivalent substitution, all within the spirit and principles of the utility model, any modification, equivalent substitution and improvements made etc., all should
Within the scope of protection of the utility model.
Claims (6)
1. one kind section adjustable water conservancy construction scaffold in space-efficient, including the first pillar(1)And upper frame(8), its feature
It is:First pillar(1)Lower section is provided with the second pillar(2), and the second pillar(2)Lower section is provided with base(3), it is described
Base(3)Lower section is provided with river bottom protection cover(4), first pillar(1)Lower inside is provided with spring pedestal(13), and spring bottom
Seat(13)Left side is provided with the first spring(14), first spring(14)Left side is fixed with support stick(7), first pillar
(1)Right side is fixed with the first pillar fix bar(6), and the first pillar(1)Top be provided with guard post set(9), described second
Post(2)Right side be fixed with the second pillar fix bar(5), and the second pillar(2)Lower inside is provided with second spring(15), institute
State upper frame(8)Lower section is fixed with cat ladder(10), and cat ladder(10)Lower section be fixed with cat ladder cross bar(11), the cat ladder cross bar
(11)Both sides be connected with cat ladder montant(12).
A kind of 2. section adjustable water conservancy construction scaffold in space-efficient according to claim 1, it is characterised in that:Institute
State the first pillar(1)With the second pillar(2)Form stretching structure, and the first pillar(1)Telescopic extensions and the second pillar(2)'s
Equal length.
A kind of 3. section adjustable water conservancy construction scaffold in space-efficient according to claim 1, it is characterised in that:Institute
State river bottom protection cover(4)It is trapezoidal, and use macromolecule organic waterproof elastomeric material.
A kind of 4. section adjustable water conservancy construction scaffold in space-efficient according to claim 1, it is characterised in that:
The support stick(7)With the first spring(14)Connected mode to be fixedly connected, and the first spring(14)With spring pedestal(13)
Connected mode to be fixedly connected.
A kind of 5. section adjustable water conservancy construction scaffold in space-efficient according to claim 1, it is characterised in that:Institute
State guard post set(9)It is provided with 4, and each guard post set(9)In cylinder.
A kind of 6. section adjustable water conservancy construction scaffold in space-efficient according to claim 1, it is characterised in that:Institute
State cat ladder(10)On be fixed with 9 cat ladder cross bars(11), and adjacent 2 cat ladder cross bars(11)The distance between it is equal in magnitude.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720964497.8U CN207062877U (en) | 2017-08-03 | 2017-08-03 | One kind section adjustable water conservancy construction scaffold in space-efficient |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720964497.8U CN207062877U (en) | 2017-08-03 | 2017-08-03 | One kind section adjustable water conservancy construction scaffold in space-efficient |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207062877U true CN207062877U (en) | 2018-03-02 |
Family
ID=61519442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720964497.8U Active CN207062877U (en) | 2017-08-03 | 2017-08-03 | One kind section adjustable water conservancy construction scaffold in space-efficient |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207062877U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075180A (en) * | 2020-01-02 | 2020-04-28 | 黄河水利职业技术学院 | Adjustable scaffold for water conservancy construction |
-
2017
- 2017-08-03 CN CN201720964497.8U patent/CN207062877U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075180A (en) * | 2020-01-02 | 2020-04-28 | 黄河水利职业技术学院 | Adjustable scaffold for water conservancy construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205840761U (en) | A kind of packaged type construction raises ladder | |
CN207062877U (en) | One kind section adjustable water conservancy construction scaffold in space-efficient | |
CN210289602U (en) | Movable herringbone ladder device | |
CN206503068U (en) | A kind of bridge construction anti-drop device | |
CN215107540U (en) | Movable shallow trench steel constructs protector | |
CN206279620U (en) | Reinforced concrete sway post and basic attachment structure | |
CN206109968U (en) | Antidumping reinforced structure of curved bridge of single -column mound | |
CN213203973U (en) | Protector of hydraulic and hydroelectric engineering side slope | |
CN210639161U (en) | Water environment ecological heavy metal pollution monitoring equipment | |
CN207988463U (en) | One kind can transverse shifting stable type building hanging basket | |
CN210828242U (en) | Lifting device for building water and electricity construction | |
CN208578411U (en) | A kind of compound guardrail with regulatory function | |
CN204081452U (en) | A kind of scaffold with pedal disjunctor hanging ladder structure | |
CN207419701U (en) | A kind of steel structure frame suitable for quick assembling | |
CN209179478U (en) | Jumping formwork truss | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN207959913U (en) | A kind of wall-connecting piece structure | |
CN207073069U (en) | Bridge construction safety anti-falling device | |
CN206360392U (en) | Attachment type raise scaffold periphery protecting wire net | |
CN204664629U (en) | Construction layer drags pump concrete delivery pipe shock bracket | |
CN218346741U (en) | Scaffold for construction that possesses protection architecture | |
CN218092167U (en) | Safety protection device for building construction | |
CN208337470U (en) | Typhoon protection photovoltaic bracket | |
CN213063007U (en) | Novel safety net is prevented weighing down by personnel of full hall support of bridge construction | |
CN208533535U (en) | A kind of pile foundation suspension device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221012 Address after: No.398, Xinlu Road, Xinbang Town, Songjiang District, Shanghai, 201605 Patentee after: Xinfang Construction Group Co.,Ltd. Address before: 363299 Sui'an Industrial Park, Sui'an Industrial Development Zone, Zhangpu County, Zhangzhou City, Fujian Province Patentee before: ZHANGPU BISU PHOTOELECTRIC TECHNOLOGY Co.,Ltd. |
|