CN207056735U - Wollastonite processing production line - Google Patents
Wollastonite processing production line Download PDFInfo
- Publication number
- CN207056735U CN207056735U CN201720536325.0U CN201720536325U CN207056735U CN 207056735 U CN207056735 U CN 207056735U CN 201720536325 U CN201720536325 U CN 201720536325U CN 207056735 U CN207056735 U CN 207056735U
- Authority
- CN
- China
- Prior art keywords
- conveyer belt
- vibratory sieve
- ore
- discharging opening
- production line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Crushing And Grinding (AREA)
- Disintegrating Or Milling (AREA)
Abstract
It the utility model is related to wollastonite processing production line, including crushing hierarchy system, broken hierarchy system includes the first jaw crusher, the charging aperture that the discharging opening of first jaw crusher passes through the first transmission jaw crusher of band connection second, the discharging opening of second jaw crusher connects the charging aperture of the first vibratory sieve, the discharging opening of first vibratory sieve passes through second transmission band connection the first ore laydown area, the 3rd conveyer belt is provided with below the screen cloth of first vibratory sieve, the charging aperture of the 3rd transmission vibratory sieve of band connection second, the discharging opening of second vibratory sieve connects the second ore laydown area, the 3rd ore laydown area is provided with below the screen cloth of second vibratory sieve, this beneficiating method is the combination of machinery conveying and picking, mineral processing production line is simple and easy, the ore of different size uses different beneficiation methods, efficiency can be improved, improve ore dressing rate and ore dressing speed.
Description
Technical field
It the utility model is related to ore class mineral processing production line, and in particular to wollastonite processing production line.
Background technology
The explored mineral species in Lianzhou City mainly have coal, iron, manganese, copper, molybdenum, lead, zinc, antimony, tin, tantalum, phosphorus, arsenic, silicon ash
23 kinds of stone, dolomite, marble, granite, talcum, graphite, gypsum etc., wherein coal reserves are up to 80,000,000 tons, main point
Cloth is in towns such as nine ponds, Long Ping, security personnel;Manganese ore reserves are the maximum manganese ore place of production in Guangdong up to 4,000,000 tons, be mainly distributed on west bank,
The towns such as planetesimal, big roadside;Wollastonite reserve is the unique place of production in Guangdong Province up to 5.5 hundred million tons;Marble(Calcium carbonate)Reserves are up to 78
Hundred million tons, and grade and purity are national highest, are exclusive characteristic resources;Wollastonite, marble(Calcium carbonate)Main distribution
In towns such as the Xijiang River, Long Ping, planetesimal, big roadsides.
The associated mineral of the wollastonite of Lianzhou City is mainly silica and calcium carbonate, and both associated minerals and wollastonite mine are equal
Belong to silicates, it is all close in color, proportion, foreign countries have wollastonite mine is crushed after, by multiple ore dressing, remove pomegranate
The impurity such as stone, then progressively remove silica and calcium carbonate with methods such as chemical substance, magnetic separation or flotation, but this choosing
Ore deposit complex process, it is costly.
Application publication number CN102239014A, application publication date 2011-11-09, it is entitled《The dry mineral processing of wollastonite mine
Method》Utility model, the dry mineral processing method that the utility model is used for wollastonite mine includes first and separating twice ore, right
Material is dried, and material of the x-ray fluorescence separation through crushing, according to grain size category to the materials classification, is transmitted in belt
Magnetic separation on machine, the magnetic separation on roller-type separator, to remove the impurity in varigrained wollastonite concentrate, grinding,
And the powder particle in extraction material, the drying to material are entered in first shredding stage and between the separating twice stage
OK, the x-ray fluorescence separation is carried out after separating twice, described to be sorted in x-ray fluorescence point according to grain size category
From carrying out at once afterwards, impact grinding is then carried out, the magnetic separation on belt conveyer, air finishing, then in roller-type point
From magnetic separation on device;Powder particle in the extraction material is in first shredding stage and separating twice stage and impact grinding
Carried out during ore, wherein the powder particle of all extractions is supplied in a roller of roller-type magnetic separtor;Can be right
The wollastonite concentrate of one or more granularities is dried, and it is therein miscellaneous to remove then to carry out electrostatic separation to dry concentrate
Matter, air finishing then is carried out so as to be divided into varigrained each several part to the product obtained after electrostatic separation;Can be right
One or more product sections carry out extra grinding, then remove electrostatic charge, and discarded wollastonite amount is reduced and most
The quality of finished product is improved.
Application publication number CN205761642U, application publication date 2016-07-06, it is entitled《Silicon ash ore reduction sorting system
System》Utility model, including jaw crusher, vibratory sieve, elevator and whirlwind disintegrating machine, the jaw crusher exit lead to
Piping connects the vibratory sieve, and the vibratory sieve is provided with inside top discharge mouth and lower discharge port and the vibratory sieve and is provided with screen cloth
With the conveying device below screen cloth, the screen cloth correspondingly connects the top discharge mouth, and the conveying device correspondingly connects
The lower discharge port is connect, the second conveying device is set at the top discharge mouth, the 3rd conveyer is set at the lower discharge port, it is described
Second conveying device connects the elevator, and elevator upper end connects the whirlwind disintegrating machine.
Utility model content
The utility model is machinery conveying and picking its object is to disclose a kind of wollastonite processing production line, this beneficiating method
Combination, mineral processing production line is simple and easy, and the ore of different size uses different beneficiation methods, can improve efficiency, improve
Ore dressing rate and ore dressing speed.
Realizing the technical scheme of wollastonite processing production line described in the utility model is:
Wollastonite processing production line, including broken hierarchy system, the broken hierarchy system include the first jaw crusher,
The discharging opening of first jaw crusher passes through the charging aperture of the first transmission jaw crusher of band connection second, described second Hubei Province
The discharging opening of formula disintegrating machine connects the charging aperture of the first vibratory sieve, and the discharging opening of first vibratory sieve is connected by the second conveyer belt
Connect the first ore laydown area, be provided with the 3rd conveyer belt below the screen cloth of first vibratory sieve, the described 3rd transmits band connection the
The charging aperture of two vibratory sieves, the discharging opening of second vibratory sieve connect the second ore laydown area, the sieve of second vibratory sieve
Side off the net is provided with the 3rd ore laydown area.
Further, the wollastonite processing production line also includes abandoned mine crushing system, and the abandoned mine crushing system includes
Two article of the 4th conveyer belt, the 4th conveyer belt are sequentially connected the 5th conveyer belt, the 6th conveyer belt and the 7th conveyer belt, and described
The seven transmission conveyer belts of band connection the 8th, the first discharging opening of described 8th conveyer belt one end connected double-layer vibratory sieve, the described 8th
The conveyer belt other end connects the charging aperture of gyratory crusher, and the 9th conveyer belt is provided with below the discharging opening of the gyratory crusher,
The 9th transmission conveyer belt of band connection the tenth, the tenth conveyer belt connected double-layer vibratory sieve charging aperture, the double-deck vibration
Second discharging opening of sieve connects the 11st conveyer belt, the charging aperture of the 11st transmission band connection impact cutting, the impact cutting
Discharging opening connect the 9th conveyer belt.
Further, the wollastonite processing production line also includes quality inspection platform, and the quality inspection platform is provided with six article the tenth
Two conveyer belts, described 12nd conveyer belt one end connect feeding machine, and the 12nd conveyer belt other end connects the 4th ore storage
Put area.
Further, the charging aperture of first jaw crusher, the discharging opening of the first jaw crusher, the 6th conveyer belt
Feeding machine is equipped between the 7th conveyer belt.
Further, hung below the screen cloth of the double-deck screen shale shaker by the 13rd conveyer belt and the 14th transmission band connection
Hanging moving conveyor belt.
Further, a diameter of 3CM of the screen cloth mesh of first vibratory sieve, the screen cloth mesh of second vibratory sieve
A diameter of 0.8CM.
Further, first vibratory sieve and the second vibratory sieve include four supporting legs, and two of which supporting leg is shorter than separately
Outer two supporting legs, the screen cloth are arranged on supporting leg, and the screen cloth both sides connect baffle plate, are additionally provided between the screen cloth and leg
Spring, the screen cloth are provided with vibrating device, and the vibrating device connects motor.
Further, first jaw crusher and the second jaw crusher include supporting steel, on the supporting steel
Side is provided with batcher, and disintegrating machine is provided with below the batcher, discharge bucket is provided with below the disintegrating machine.
Brief description of the drawings
Fig. 1 is the layout drawing of wollastonite processing production line described in the utility model;
Fig. 2 is the layout drawing that hierarchy system is crushed in wollastonite processing production line described in the utility model;
Fig. 3 is the layout drawing of abandoned mine crushing system in wollastonite processing production line described in the utility model;
Fig. 4 is the layout drawing of quality inspection platform in wollastonite processing production line described in the utility model;
Fig. 5 is the front view of vibratory sieve in wollastonite processing production line described in the utility model;
Fig. 6 is the front view of jaw crusher in wollastonite processing production line described in the utility model;
The title that each part is marked in figure is as follows:
11st, the first jaw crusher;12nd, the second jaw crusher;13rd, supporting steel;14th, batcher;15th, disintegrating machine;16、
Discharge bucket;21st, the first conveyer belt;22nd, the second conveyer belt;23rd, the 3rd conveyer belt;24th, the 4th conveyer belt;25th, the 5th conveyer belt;
26th, the 6th conveyer belt;27th, the 7th conveyer belt;28th, the 8th conveyer belt;29th, the 9th conveyer belt;210th, the tenth conveyer belt;211st,
11 conveyer belts;212nd, the 12nd conveyer belt;213rd, the 13rd conveyer belt;214th, the 14th conveyer belt;31st, the first vibratory sieve;
32nd, the second vibratory sieve;33rd, supporting leg;34th, screen cloth;35th, baffle plate;36th, spring;37th, vibrating device;38th, motor;41st, the first ore
Laydown area;42nd, the second ore laydown area;43rd, the 3rd ore laydown area;44th, the 4th ore laydown area;5th, double-deck screen shale shaker;6、
Gyratory crusher;7th, impact cutting;8th, feeding machine;9th, suspension type moving conveyor belt.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Embodiment:Wollastonite processing production line, including broken hierarchy system, the broken hierarchy system include first Hubei Province formula
Tcrude ore is broken into 30CM or so ore by disintegrating machine 11, first jaw crusher 11, completes head and breaks, described first Hubei Province
The discharging opening of formula disintegrating machine 11 connects the charging aperture of the second jaw crusher 12 by the first conveyer belt 21, in the first conveyer belt 21
Ore after both sides have employee enemy broken is selected, and the ore reduction after selecting is 10CM by the second jaw crusher 12
The ore of left and right, two broken, the charging apertures of discharging opening the first vibratory sieve 31 of connection of second jaw crusher 12 are completed, it is described
The discharging opening of first vibratory sieve 31 connects the first ore laydown area 41, the sieve of first vibratory sieve 31 by the second conveyer belt 22
Side off the net is provided with the 3rd conveyer belt 23, and the 3rd conveyer belt 23 connects the charging aperture of the second vibratory sieve 32, second vibration
The discharging opening of sieve 32 connects the second ore laydown area 42, and the 3rd ore laydown area is provided with below the screen cloth of second vibratory sieve 32
43, two ores after broken are classified by the first vibratory sieve 31 and the second vibratory sieve 32, the ore of different size can enter
To different ore laydown areas.
The wollastonite processing production line, in addition to abandoned mine crushing system, the abandoned mine crushing system include two article the 4th
Conveyer belt 24, the both sides of the 4th conveyer belt 24 are selected ore provided with employee, and the 4th conveyer belt 24 is sequentially connected
5th conveyer belt 25, the 6th conveyer belt 26 and the 7th conveyer belt 27, the 7th conveyer belt 27 connects the 8th conveyer belt 28, described
First discharging opening of one end connected double-layer vibratory sieve 5 of the 8th conveyer belt 28, the other end of the 8th conveyer belt 28 connection circular cone are broken
The charging aperture of broken machine 6, the discharging opening lower section of the gyratory crusher 6 are provided with the 9th conveyer belt 29, and the 9th conveyer belt 29 connects
The tenth conveyer belt 210, the charging aperture of 210 connected double-layer vibratory sieve of the tenth conveyer belt 5 are connect, the double-deck screen shale shaker 5 second goes out
Material mouth connects the 11st conveyer belt 211, and the 11st conveyer belt 211 connects the charging aperture of impact cutting 7, the impact cutting 7
Discharging opening connects the 9th conveyer belt 29, and after useful ore is selected by employee on the 4th conveyer belt 24, abandoned mine passes through biography
Sending band to transport gyratory crusher 6 to be crushed, the abandoned mine after the completion of crushing is transported on double-deck screen shale shaker 5 by conveyer belt,
The first discharging opening connection gyratory crusher 6 of double-deck screen shale shaker 5, the abandoned mine specification that the first discharging opening of double-deck screen shale shaker 5 comes out
It is larger, it is also necessary to gyratory crusher 6 is crushed, the second discharging opening of double-deck screen shale shaker 5 by transmitting band connection impact cutting 7,
Sand is made in abandoned mine in impact cutting 7, the charging aperture of the discharging opening connected double-layer vibratory sieve 5 of impact cutting 7, is followed so as to form one
Ring, know that abandoned mine could leave after becoming fine sand completely from the lower screens of double-deck screen shale shaker 5 in this circulation.
The wollastonite processing production line, in addition to quality inspection platform, the quality inspection platform are provided with six article of the 12nd conveyer belt
212, described one end of 12nd conveyer belt 212 connects feeding machine 8, and the other end of the 12nd conveyer belt 212 connects the 4th ore
Laydown area 44, employee is further selected ore in quality inspection platform, and ore completely out of question will enter the 4th ore deposit
Stone laydown area 44.
The charging aperture of first jaw crusher 11, the discharging opening of the first jaw crusher 11, the 6th conveyer belt 26 with
Be equipped with feeding machine 8 between 7th conveyer belt 27, feeding machine 8 be used for ore it is uniform, quantitative be supplied in feeding equipment.
Pass through the 13rd conveyer belt 213 and the connection hanging of the 14th conveyer belt 214 below the screen cloth of the double-deck screen shale shaker 5
Formula moving conveyor belt 9, husky product loading is finally made by the way that suspension type moving conveyor belt 9 is convenient.
A diameter of 3CM of the screen cloth mesh of first vibratory sieve 31, the screen cloth mesh of second vibratory sieve 32 it is straight
Footpath is 0.8CM.
The vibratory sieve 32 of first vibratory sieve 31 and second includes four supporting legs 33, and two of which supporting leg 33 is shorter than in addition
Two supporting legs 33, the screen cloth 34 are arranged on supporting leg 33, and the both sides of screen cloth 34 connect baffle plate 35, the screen cloth 34 and leg
Spring 36 is additionally provided between 33, the screen cloth 34 is provided with vibrating device 37, and the vibrating device 37 connects motor 38.
The jaw crusher 12 of first jaw crusher 11 and second includes supporting steel 13, the top of supporting steel 13
Provided with batcher 14, the lower section of batcher 14 is provided with disintegrating machine 15, and the lower section of disintegrating machine 15 is provided with discharge bucket 16.
The operation principle of the present embodiment:Tcrude ore is entered by feeding machine 8 to be entered wardrobe in first jaw crusher 11 and breaks,
Tcrude ore is broken into 30CM or so, the ore after crushing transports on the first conveyer belt 21, by manually choosing in transportation
Choosing, the ore less than 30CM is picked out, quite a few wollastonite mine lumpiness 30CM or so in the ore of select, impurity into
It is point few, this part ore enter the second jaw crusher 12 carry out it is two broken, by 30CM or so ore reduction into based on 10CM
Lump ore, after two is broken, the ore and crumb powder of all size mix, and cover raw ore, pass through the He of the first vibratory sieve 31
Ore is divided into three kinds of specifications by the second vibratory sieve 32:0-0.8CM, 0.8-3CM, 3-10CM, wherein 0-0.8CM particle are directly returned
Heap manufactures product from failing;The ore of this specification of 0.8-3CM, wollastonite fritter want more than calcium carbonate, the ratio of silica, because
This uses the anti-method ore dressing selected, that is, goes to pick a small amount of associated minerals, allow the wollastonite fritter left to flow directly into storage;3-10CM
It is easily recognized, the wollastonite of this lumpiness and other associated minerals have been sufficiently separated, and are laid on the 4th conveyer belt 24 and are at the uniform velocity flowed
Cross, the ore dressing in this stage is the useful ore of selection and classified, and is substantially divided into threadiness, compact shape, entrainment on a small quantity
The small lump ore of silica, different next manufacturing procedures is carried out respectively, the mine tailing after choosing is delivered directly to abandoned mine crushing system,
The ceramic body raw material that manufacturing market receives.
The beneficial effects of the utility model are:1)This mineral processing production line uses different ore dressing sides to the ore of different size
Method, efficiency can be improved, improve ore dressing rate and ore dressing speed;2)Flow regime+artificial separation is that different shape ore deposit is screened in sorting
Stone and selection utilize associated minerals, comprehensively utilize the outstanding technique of ore, on the conveyer belt of flowing, can simultaneously distinguish and pick fibre
Shape ore, compact shape ore, pure white calcium carbonate are tieed up, and is classified immediately;3)Device configuration has taken into full account machinery selection and work
The path trend of skill, whole flow process is motivated, and wollastonite mine services are faster chosen to be more, at the same consider quality inspection,
The continuity of tailings processing.Beneficiation cost is greatly reduced, improves the comprehensive utilization ratio of raw ore.
Claims (8)
1. wollastonite processing production line, it is characterised in that including crushing hierarchy system, the broken hierarchy system includes first Hubei Province
Formula disintegrating machine, the discharging opening of first jaw crusher by the charging aperture of the first transmission jaw crusher of band connection second,
The discharging opening of second jaw crusher connects the charging aperture of the first vibratory sieve, and the discharging opening of first vibratory sieve passes through the
Two transmission band connection the first ore laydown areas, the screen cloth lower section of first vibratory sieve are provided with the 3rd conveyer belt, and the described 3rd passes
Sending the charging aperture of the vibratory sieve of band connection second, the discharging opening of second vibratory sieve connects the second ore laydown area, and described second
The 3rd ore laydown area is provided with below the screen cloth of vibratory sieve.
2. wollastonite processing production line according to claim 1, it is characterised in that described useless also including abandoned mine crushing system
Ore deposit crushing system includes two article of the 4th conveyer belt, and the 4th conveyer belt is sequentially connected the 5th conveyer belt, the 6th conveyer belt and
Seven conveyer belts, the 7th transmission conveyer belt of band connection the 8th, the first of described 8th conveyer belt one end connected double-layer vibratory sieve
Discharging opening, the charging aperture of the 8th conveyer belt other end connection gyratory crusher, the discharging opening lower section of the gyratory crusher
Provided with the 9th conveyer belt, the 9th transmission conveyer belt of band connection the tenth, the tenth conveyer belt connected double-layer vibratory sieve charging
Mouthful, the second discharging opening of the double-deck screen shale shaker connects the 11st conveyer belt, and the 11st transmission band connection impact cutting enters
Material mouth, the discharging opening of the impact cutting connect the 9th conveyer belt.
3. wollastonite processing production line according to claim 1, it is characterised in that also put down including quality inspection platform, the quality inspection
Platform is provided with six article of the 12nd conveyer belt, and described 12nd conveyer belt one end connects feeding machine, the 12nd conveyer belt other end
Connect the 4th ore laydown area.
4. wollastonite processing production line according to claim 1, it is characterised in that the charging of first jaw crusher
Feeding machine is equipped between mouth, the discharging opening of the first jaw crusher, the 6th conveyer belt and the 7th conveyer belt.
5. wollastonite processing production line according to claim 2, it is characterised in that logical below the screen cloth of the double-deck screen shale shaker
Cross the 13rd conveyer belt and the 14th transmission band connection suspension type moving conveyor belt.
6. wollastonite processing production line according to claim 1, it is characterised in that the screen cloth mesh of first vibratory sieve
A diameter of 3CM, a diameter of 0.8CM of the screen cloth mesh of second vibratory sieve.
7. wollastonite processing production line according to claim 1, it is characterised in that first vibratory sieve and the second vibratory sieve
Include four supporting legs, two of which supporting leg is shorter than two other supporting leg, and the screen cloth is arranged on supporting leg, the screen cloth both sides
Baffle plate is connected, spring is additionally provided between the screen cloth and supporting leg, the screen cloth is provided with vibrating device, the vibrating device connection
Motor.
8. wollastonite processing production line according to claim 1, it is characterised in that first jaw crusher and second Hubei Province
Formula disintegrating machine includes supporting steel, and batcher is provided with above the supporting steel, and disintegrating machine is provided with below the batcher, described broken
Discharge bucket is provided with below broken machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720536325.0U CN207056735U (en) | 2017-05-16 | 2017-05-16 | Wollastonite processing production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720536325.0U CN207056735U (en) | 2017-05-16 | 2017-05-16 | Wollastonite processing production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207056735U true CN207056735U (en) | 2018-03-02 |
Family
ID=61504571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720536325.0U Expired - Fee Related CN207056735U (en) | 2017-05-16 | 2017-05-16 | Wollastonite processing production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207056735U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106964469A (en) * | 2017-05-16 | 2017-07-21 | 连州市新渝合矿产品有限公司 | Wollastonite processing production line |
-
2017
- 2017-05-16 CN CN201720536325.0U patent/CN207056735U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106964469A (en) * | 2017-05-16 | 2017-07-21 | 连州市新渝合矿产品有限公司 | Wollastonite processing production line |
CN106964469B (en) * | 2017-05-16 | 2023-08-15 | 连州市新渝合矿产品有限公司 | Wollastonite ore dressing production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108246490B (en) | Iron-increasing and silicon-reducing beneficiation method for high-iron-silicate lean magnetite ore | |
CN104874459B (en) | Useless ore-dressing technique is thrown in a kind of low-grade magnetite pre-selection | |
CN104607296B (en) | Ilmenite beneficiation method and equipment | |
CN107572850A (en) | A kind of preparation method of synthetic quartz slabstone quartz sand and silica flour | |
CN207254490U (en) | A kind of gangue processing system | |
CN109127112A (en) | A kind of ore-dressing technique handling high-grade or low grade hematite four kinds of products of production | |
CN102230070B (en) | Novel three-stage pre-dressing and crushing process for low-grade magnetite | |
CN108212464B (en) | Crushing and sorting equipment and process thereof | |
CN104117426B (en) | The method and its equipment of the copper ashes containing gold and silver are selected from domestic garbage burning electricity generation recrement | |
CN207056735U (en) | Wollastonite processing production line | |
RU2693203C1 (en) | Three-stage grinding line of magnetite-hematite ores | |
CN101537410A (en) | Integrated equipment of dry concentration, rough concentration and fine concentration of waste disposal site and technique thereof | |
CN105709923B (en) | Portable washing machine for gulch-gold | |
CN105833987B (en) | Shaping process in composite ore material screen | |
CN219187219U (en) | Separation of stubborn stones and steel ball of semi-autogenous mill and stubborn stone crushing system | |
CN202238241U (en) | Dry magnetic pre-separating device for fine broken ores | |
CN107159433A (en) | Separation system is concentrated in magnetic ore deposit dry separation screening | |
CN106964469A (en) | Wollastonite processing production line | |
CN208178076U (en) | A kind of sorting disposing system of dregs of incinerator | |
CN113426688B (en) | Mineral processing technology for high-sulfur composite iron ore and pre-selection production system thereof | |
CN106111534B (en) | A kind of modular bauxite by dry method sorting process | |
CN212284449U (en) | Magnetic dry separator | |
CN205570541U (en) | Magnetic force series connection sorter | |
CN104841550A (en) | Tailings resource recovery technology | |
CN215465006U (en) | Ore X-ray preselection-crushing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180302 Termination date: 20200516 |