CN207051075U - The artificial device and system for preparing the rock mass of joint plane containing different directions - Google Patents
The artificial device and system for preparing the rock mass of joint plane containing different directions Download PDFInfo
- Publication number
- CN207051075U CN207051075U CN201721020450.2U CN201721020450U CN207051075U CN 207051075 U CN207051075 U CN 207051075U CN 201721020450 U CN201721020450 U CN 201721020450U CN 207051075 U CN207051075 U CN 207051075U
- Authority
- CN
- China
- Prior art keywords
- joint plane
- approaching channel
- blade
- opening
- tubular body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The artificial device and system for preparing the rock mass of joint plane containing different directions, belong to technical field of civil, including the hollow tubular body for placing rock sample, the first opening and the second opening are provided with tubular body, first opening is symmetrical arranged with the second opening centered on tubular body center, first opening in the second opening with being respectively arranged with the first approaching channel and the second approaching channel, also include blade, blade is adapted with two approaching channels, blade can in approaching channel telescopic movable, by blade along the second approaching channel, can be in the second opening insertion rock sample, until through, then passed from the first approaching channel, first approaching channel and the second approaching channel are flexibly connected with tubular body, the angle of two approaching channels and tubular body difference is adjustable, the center line of first approaching channel and the second approaching channel is on the same line.The apparatus structure is simple, easily operated, and cost is cheap, and the center containing different directions that efficiently can easily be made runs through or non-through structural plane rock sample, suitable for preparing rock sample.
Description
Technical field
The utility model belongs to technical field of civil, is related to a kind of artificial dress for preparing different directions joint plane rock mass
Put and system.
Background technology
, it is necessary to drill through natural rock sample during the mechanical characteristic and fracture mode of study of rocks, however, this mode is made
Valency is high, success rate is low, easily carrys out structural change to natural rock belt transect, therefore, studies some joint plane or more for convenience
Influence of the individual joint plane for rock mechanics, the mode for manually preparing rock sample are essential.Existing artificial prepare contains section
The mode of reason face rock sample has a lot, but is cut with natural sample mostly, then binds to form joint plane again with reagent, Huo Zheyong
The rock sample containing joint plane is made in the material that two kinds of stress intensities differ greatly.Although operation can obtain the rock containing joint plane more than
Sample, but the former to obtain natural sample with high costs, and be not readily available complete sample, it is also cumbersome during sample preparation;The latter is not then easily-controllable
The thickness and uniformity of filling are made, therefore the result obtained has certain discreteness, is not easy to study.
Therefore, a kind of artificial device and system for preparing different directions joint plane rock mass are needed badly, so as to quickness and high efficiency
Prepare the rock mass of different directions joint plane in ground.
Utility model content
Technical problem to be solved in the utility model is to overcome the cost of rock sample containing joint plane prepared by prior art
A kind of high, sample preparation uneven the shortcomings that causing result discrete, there is provided device that can manually prepare different directions joint plane rock mass
And system.
Technical scheme is used by the utility model solves its technical problem:Manually prepare different directions joint plane rock mass
Device, including for placing the hollow tubular body of rock sample, the first opening and the second opening are provided with tubular body, the
One opening is symmetrical arranged centered on tubular body center with the second opening, the first opening with second be open on be respectively arranged with the
One approaching channel and the second approaching channel, in addition to blade, blade are adapted with two approaching channels, blade can in approaching channel telescopic movable, will
Blade, can be in the second opening insertion rock sample, until through then being passed from the first approaching channel, the along the second approaching channel
One approaching channel and the second approaching channel are flexibly connected with tubular body, and the angle of two approaching channels and tubular body distinguishes adjustable, the first approaching channel
With the center line of the second approaching channel on the same line.
Further, tubular body side wall is provided with graduated scale, respectively further comprises two approaching channel supports, is set on approaching channel support
Protractor is equipped with, the bottom of approaching channel support is connected with tubular body, and its top is used for the bottom surface for supporting its corresponding approaching channel, respectively
Approaching channel support and approaching channel are fixed with screw by nut.
Further, tubular body side wall is provided with locating module, and locating module includes rectangular substrate, rectangular substrate and pipe
Shape body longitudinal cross-section is adapted, and rectangular substrate longitudinal direction both sides are provided with graduated scale, and locating module is provided centrally with angulometer, amount
Angle instrument is semicircle, and its base, which is provided with both ends, can launch the infra-red ray transmitting unit of infrared ray, in addition to infrared receiver
Unit, infrared receiver unit include the first receiving unit and the second receiving unit, and the first receiving unit is located at angulometer camber line
Left part avris, the second receiving unit are located at rectangular substrate longitudinal direction right part avris, pass through infra-red ray transmitting unit and infrared receiver
Unit is capable of the angle of fast positioning joint plane, adjusts the angle angle of approaching channel and tubular body, so as to which guiding blade is inserted, system
Obtain the joint plane.
Another technical scheme is used by the utility model solves its technical problem:Manually prepare different directions joint plane
The device of rock mass, including for placing the hollow split film of rock sample, be longitudinally formed and offer the bottom of through along it between split film
Portion and first openings and the second openings at top, each openings are provided with matched sliding part and for solid
Determine the fixture of sliding part, sliding part can slide in openings, and sliding part includes the first sliding part and the second sliding part, the
One sliding part and the second sliding part can slide in openings, be fixed on sliding part in openings suitably by fixture
Position, the opening inserted for blade with passing is formed between the first sliding part and the second sliding part.
Further, split film side wall is provided with locating module, and locating module includes rectangular substrate, rectangular substrate with it is split
Film longitudinal cross-section is adapted, and rectangular substrate longitudinal direction both sides are provided with graduated scale, and locating module is provided centrally with angulometer, angulometer
For semicircle, its base, which is provided with both ends, can launch the infra-red ray transmitting unit of infrared ray, in addition to infrared receiver unit,
Infrared receiver unit includes the first receiving unit and the second receiving unit, and the first receiving unit is located at angulometer camber line left part side
Side, the second receiving unit are located at rectangular substrate longitudinal direction right part avris, pass through infra-red ray transmitting unit and infrared receiver unit energy
The angle of enough fast positioning joint planes, adjustment opening, so as to which guiding blade is inserted, the joint plane is made.
Specifically, the blade is through type joint plane blade or non-through type joint plane blade, through type joint plane knife
The tip of piece is in isosceles triangle, and non-through type joint plane insert tip is in yi word pattern, and scale is provided with vane body.
Another technical scheme is used by the utility model solves its technical problem:Manually prepare different directions joint plane
The system of rock mass, including the above-mentioned artificial device for preparing different directions joint plane rock mass, in addition to strain controlling instrument, strain control
Instrument processed includes back-pressure disk and sampling dish, and the device for manually preparing different directions joint plane rock mass is placed in sampling dish, back-pressure disk
It is placed at the top of the artificial device for preparing different directions joint plane rock mass, in the presence of depression bar, back-pressure disk is compacted downwards rock sample,
The device that different directions joint plane rock mass is prepared manually in profit is sampled to rock sample.
Specifically, the blade is through type joint plane blade or non-through type joint plane blade, through type joint plane knife
The tip of piece is in isosceles triangle, and non-through type joint plane insert tip is in yi word pattern, and scale is provided with vane body.
The beneficial effects of the utility model are:The apparatus structure is simple, easily operated, greatly shorten sample preparation, sampling when
Between, because system is apparatus control, therefore the uniformity of sample can be effectively controlled, can also be obtained surely using special blade
The good joint plane of qualitative good integrality, cost is cheap, and follow-up use is not substantially expensive, is easy to efficiently easily obtained and meets the requirements
Center containing different directions run through or not through joint plane rock sample, and rock sample is complete, stability is good, overcomes existing brill Qu Tian
The shortcomings that so rock sample is costly, efficiency is low, thickness is uncontrollable, sample preparation is uneven, system operatio independence is strong, convenient, completes effect
Rate is high, saves manpower.The utility model is applied to prepare rock sample.
Brief description of the drawings
Fig. 1 is the structural representation of the artificial device for preparing different directions joint plane rock mass in embodiment 1;
Fig. 2 is the schematic diagram using the device sample making course of embodiment 1;
Fig. 3 is to run through joint plane process schematic using 1 prefabricated center of embodiment;
Fig. 4 is to run through the final schematic diagram of joint plane using 1 prefabricated center of embodiment;
Fig. 5 is the structural representation of embodiment 2;
Fig. 6 is the structural representation of the tubular body of embodiment 2;
Fig. 7 is the structural representation of the locating module of embodiment 2;
Fig. 8 is the schematic diagram that the infrared ray of the infrared emission unit transmitting of embodiment 2 is received by infrared receiver;
Fig. 9 is the enlarged drawing of the angulometer of embodiment 2;
Figure 10 is the structural representation of the approaching channel with protractor of embodiment 2;
Figure 11 is the structural representation through type joint plane blade of embodiment 2;
Figure 12 is the structural representation of the non-through type joint plane blade of embodiment 2;
Figure 13 is the system structure diagram of embodiment 3;
Wherein, 1 is steel pipe, and 2 be rock material, and 3 be approaching channel, and 31 be the first approaching channel, and 32 be the second approaching channel, and 4 be blade, 5
It is scale for locating module, 51,52 be angulometer, and 53 be infra-red ray transmitting unit, and 6 be protractor, and 7 be wedge-shaped stick, and 71 are
First wedge-shaped stick, 72 be the second wedge-shaped stick, and 73 be the 3rd wedge-shaped stick, and 74 be the 4th wedge-shaped stick, and 8 be split film, and 9 are
Wedge-shaped opening, 10 be strain controlling instrument, and 11 be depression bar, and 12 be back-pressure disk, and 13 be sampling dish.
Embodiment
Below in conjunction with the accompanying drawings and embodiment, the technical solution of the utility model is described in detail.
Embodiment 1
As shown in figure 1, the device of different directions joint plane rock mass is manually prepared, including hollow tubular body, tubulose sheet
The first opening and the second opening are provided with body, the first opening is symmetrically set with the second opening centered on the center of tubular body
Put, the first opening is respectively provided with an approaching channel, respectively the first approaching channel and the second approaching channel with the second opening, is set in the second approaching channel
Have a matched blade, blade can in the second approaching channel telescopic movable, the first approaching channel and the second approaching channel and tubular body
It is flexibly connected, the angle difference of two approaching channels and tubular body is adjustable, realizes the side of approaching channel and tubular body angle adjustable angle
Method has a lot, such as sets approaching channel support in each approaching channel bottom, and protractor is provided with approaching channel support, can by the protractor
To carry out accurately determining and adjusting to the angle of approaching channel and tubular body, draw in addition, protractor can also be separately positioned on first
Groove and the junction of the second approaching channel and tubular body.The bottom of approaching channel support is connected with tubular body, and its top is used to support it
The bottom surface of corresponding approaching channel, approaching channel support and approaching channel are fixed with screw by screw respectively, so having activity, are had
Body situation:When needing an angle [alpha], unscrew hold-doun nut, the angle of approaching channel and vertical direction adjusted into α by protractor,
Tightening nuts again, its approaching channel can be fixed.Approaching channel includes the first approaching channel and the second approaching channel, and accordingly, approaching channel support also has two,
It is corresponding with the first approaching channel and the second approaching channel respectively.Meanwhile tubular body side wall can be provided with graduated scale, in order to know
Rock sample height.
Based on cost and realize that effect, service life consider that tubular body uses steel pipe 1, in order to improve fixed effect, the
One approaching channel 31 and the second approaching channel 32 are welded on steel pipe 1, and pad is approaching channel 3 and opening junction, approaching channel 3 respectively with it is respective
Opening matches, and has the blade 4 of matching in one of approaching channel 3, blade 4 can be along an approaching channel such as insertion opening of the second approaching channel 32
In, run through complete sample rock sample along certain angle, then passed from another approaching channel such as the first approaching channel 31, form this angle
Joint plane, obtain the rock sample for running through joint plane along certain angle center.In view of being suitable for experimental implementation, the internal diameter of steel pipe 1
50mm, length 100mm.
In order to obtain the rock sample of the angle needed for experimenter, therefore, steel pipe side wall is provided with locating module 5, such as
The fitting of locating module 5 is arranged on tubular body outer wall, scleroid material can be selected, morphotropism is weak, and stability is good.Positioning
Module 5 includes rectangular substrate, and rectangular substrate is adapted with steel pipe longitudinal cross-section, i.e., the diameter of a width of tubular body, a length of tubulose
The height of body.Rectangular substrate longitudinal direction both sides are provided with length scale chi, and directly can also be drawn in its both sides has length scale 51.
Locating module is provided centrally with angulometer 52, and only can also be drawn at locating module center has angulometer scale, in addition to infrared
Line transmitter unit 53 and infrared receiver unit.Angulometer 52 is semicircle, and its base is that straight line is provided with both ends and can sent out
The infra-red ray transmitting unit of infrared ray is penetrated, infrared receiver unit includes the first receiving unit and the second receiving unit, and first connects
Receive unit and be located at angulometer camber line left part avris, be i.e. the first receiving unit is set along angulometer camber line left part avris, and second receives
Unit is located at rectangular substrate longitudinal direction right part avris;Can also the first receiving unit be located at angulometer camber line right part avris, second connects
Receive unit and be located at rectangular substrate longitudinal direction left part avris, as long as ensureing the first receiving unit with the second receiving unit not in locating module
The same side of central point, by the first receiving unit reading angular, the second receiving unit reads height, sent out by infrared ray
Penetrate unit and infrared receiver unit is capable of the angle of fast positioning joint plane and marks rock sample joint plane, adjust approaching channel and tubulose
The angle angle of body, so as to which guiding blade is inserted, the joint plane is made.Can be quickly by joint plane by locating module 5
Direction is guided out, the convenient angles and positions for adjusting approaching channel and blade.
Its blade can also use runs through type joint plane blade or non-through type joint plane blade such as Figure 11 and 12, so as to
In the good rock sample of the complete stability of acquisition.
The application method of this example is as follows, with following rock material and obtains containing the center with rock sample axial direction into 45 degree of directions
Exemplified by the rock sample of joint plane:
1. stock stirring:After each material of rock is mixed according to following mass fraction, and stir, obtain rock
Stone material, each quality of materials number are respectively:150 parts of sand, 16 parts of water, 1 part of cement.
2. fill:As shown in Fig. 2 the rock material point multilayer mixed (such as 4 layers) is filled in the steel pipe of sample preparation device
Face, each of which layer all hits reality same strike real number, to ensure homogeneous.
3. shaping:In order to obtain containing with rock sample axially into 45 degree directions center through joint plane rock sample, as Fig. 3,
Shown in Fig. 4, by blade 4 along approaching channel 3, inserted along osculum 5 in rock sample, until through so that blade 4 passes from the other end.
4. the demoulding:After the completion for the treatment of rock sample final set, by the taking-up out of steel pipe 1 by rock sample of hydraulic pressure bulldozing device, rock sample is put in
Natural curing 7 days, that is, obtain finally simulating rock sample at environment cool place is dry.Joint plane is run through at the different directions center manually prepared
Rock sample, after the sample demoulding, it is statically placed in the indoor maintenance in cool place.As needed, curing time is 1 to 7 days, during which answers periodic logging
Curing temperature, Reasonable adjustment care environments, it is ensured that its intensity is identical after the completion of each sample maintenance.
Embodiment 2
As shown in Figure 5-10, the artificial device for preparing different directions joint plane rock mass in this example, including for placing rock
The hollow split film 8 of sample, common split film are that two semicircle shells add a hollow circuit cylinder just formed on snare
Body, it is contemplated that ease of use and engaging stability, finished split film can be selected, its both-side opening is wedge-shaped opening.The
One openings and the second openings axial symmetry centered on split film axis are set, and two openings are preferably wedge-shaped opening 9, wedge shape
The positions and dimensions that mouth opens up run through depending on the width of face according to demand.It is longitudinally formed and offers through bottom along it between split film
And first openings and the second openings at top.Each openings are provided with matched sliding part and for fixing
The fixture of sliding part, sliding part can slide in openings, be fixed on sliding part in openings properly by fixture
Position, the opening inserted for blade with passing is formed between sliding part.When openings are wedge-shaped opening, accordingly, sliding part
For wedge-shaped stick 7.Sliding part is at least two, and in this example, the first wedge-shaped wedge of stick 71 and second is provided with the first openings
Shape stick 72, the 3rd wedge-shaped 73 and the 4th wedge-shaped stick 74 of stick is provided with the second openings, fixture is used as by the use of screw
It is fixed, the first wedge-shaped 71 and second wedge-shaped stick 72 of stick is inserted into the first openings, the first wedge-shaped He of stick 71
Second wedge-shaped stick 72 slides in the first openings, is fixed when sliding into correct position, the first wedge-shaped He of stick 71
The opening inserted or passed for blade is formed between second wedge-shaped stick 72, aperture position can change with wedge-shaped stick position
Become and change, therefore the opening of diverse location different angle can be formed.The application of wedge-shaped stick, it can facilitate in demand position
Opening insertion blade, the joint plane rock mass formed with certain angle.Tubular body side wall offers the approaching channel of variable-angle, approaching channel
It is flexibly connected with tubular body, the adjustable angle of approaching channel and tubular body.
Furthermore, it is possible to one or two is set such as the approaching channel in embodiment 1, to strengthen blade stability maintenance, to knife
Piece position carries out precise positioning, can also be not provided with approaching channel and directly insert or pass blade from opening.
Split film side wall is provided with such as the locating module in embodiment 1, the side of joint plane needed for your enough guides of locating module
To.Locating module includes rectangular substrate, and rectangular substrate is adapted with split film longitudinal cross-section, and rectangular substrate longitudinal direction both sides are provided with
Graduated scale, graduated scale can also be directly provided with wedge-shaped opening both sides, locating module is provided centrally with angulometer, and angulometer is half
Circle, its base, which is provided with both ends, can launch the infra-red ray transmitting unit of infrared ray, in addition to infrared receiver unit, infrared
Line receiving unit includes the first receiving unit and the second receiving unit, and the first receiving unit is located at angulometer camber line left part avris,
Second receiving unit is located at rectangular substrate longitudinal direction right part avris, can be fast by infra-red ray transmitting unit and infrared receiver unit
The angle of speed positioning joint plane, adjusts the opening between two sliding shoes on an openings, so as to which guiding blade is inserted, system
Obtain required joint plane.Thick lines in Fig. 8-9 are the infrared ray of infra-red ray transmitting unit transmitting, and lines both ends are then infrared ray
The position that receiving unit receives.The principle of angular surveying is as follows:When needing an angle [alpha], implemented by locating module, specifically
For:Rotary infrared line transmitter unit, makes ray at an angle in angulometer, reads ray using infrared receiver unit and is measuring
Scale on the avris of on the instrument of angle and rectangular substrate longitudinal direction, then again corresponding to tubular body side wall on the graduated scale of wedge-shaped opening both sides
Identical scale is read, adjusts the opening between two wedge-shaped sticks to the scale.
Further, it is also possible to set the approaching channel of the variable-angle with protractor, protractor can adjust and guide blade to insert
Angle, and the stability for controlling blade to insert, in order to which rapid and convenient adjusts the angle of approaching channel and tubular body exactly, its energy
It is enough that complete sample is inserted according to the demand guiding blade to joint plane, realize the simulation rock mass with certain angle joint plane.
As depicted in figs. 11-12, Figure 11 is that Figure 12 is non-through type joint plane blade through type joint plane blade.In order to protect
The acquired rock sample of card is not damaged by, and simple operation and stability, the end of the blade are improved using the blade shown in Figure 11-12
It is in type portion to hold, security when effectively improving operation, and contributes to laborsaving, raising operating efficiency;Through type joint plane blade, point
End is in isosceles triangle, the uniformity of confining force, helps to keep rock sample stability when through joint plane, is hardly damaged rock
Sample;Non-through type joint plane insert tip is in yi word pattern.Preferably, scale can also be provided with vane body, in order to
Know the depth in insertion rock mass.
Embodiment 3
As shown in figure 11, the system for manually preparing different directions joint plane rock mass, including above-mentioned artificial preparation not Tongfang
To the device of joint plane rock mass, in addition to strain controlling instrument, strain controlling instrument includes back-pressure disk and sampling dish, artificial to prepare difference
The device of direction joint plane rock mass is placed in sampling dish, and back-pressure disk is placed on the artificial dress for preparing different directions joint plane rock mass
Top set portion, in the presence of depression bar, back-pressure disk is compacted downwards rock sample, and the device of different directions joint plane rock mass is prepared manually in profit
Rock sample is sampled.Rock sample can be compacted, Wu Xuren by strain controlling instrument by adjusting the rising height of controller come pressure-like
Work carries out hammer layering and hits reality, improves efficiency, saves manpower.Strain controlling instrument can be with existing dynamic equipment, such as Nanjing soil instrument
The strain controlling instrument of field production.
The use principle of this example is as follows:
A. sample preparation
A. installed instruments according to such as Figure 13 system structure diagram.
B. compaction in layers
By the rock sample material mixed by necessary requirement, layering loads in split film, by the back-pressure on strain controlling instrument top
Disk is put into split film and it is touched material, locks the depression bar being connected with back-pressure disk, reads split film upper end and be aligned
The scale of depression bar is a, when that need to be compacted N layers, when being compacted n-th layer, calculates the height Δ h=(100- that base need to rise
100n/N)-a, strain rate is set, start " start and the stop " button in strain controlling instrument sample preparation area, start pressure-like, use stopwatch
Timing, " start and stop " the time required to Δ h is reached, being pressed, i.e. the lamination finishes in fact, then with same method, is compacted it
His layer, to the last one layer.
B. joint plane is prepared
After a rock sample has been compacted, if required joint plane is penetrability joint plane, and angle is α, then with red
The protractor of outside line, angle is guided with infrared ray, the wedge-shaped stick on split film is slided, reaches required angle, adjust simultaneously
The whole approaching channel with protractor, it is also α to make its angle, locks the angle, with the blade shown in Figure 11, is inserted along approaching channel, from
When the other end passes, blade is extracted out, work(is made in the joint plane;When not needing penetrability, then according to insertion depth, selection figure
The blade of scale is carried shown in 12, when yardstick needed for insertion, extracts blade out, then the joint plane produces success.
C. sample
After joint plane is produced successfully, the nut of locking back-pressure disk, pressure-raising bar certain altitude, it is ensured that one and half rock samples are turned on
Height above, strain rate is set, start " start and stop " button of sampling area, be stripped sample, you can to obtain certain
The sample of joint plane.
Claims (8)
1. the artificial device for preparing different directions joint plane rock mass, it is characterised in that including the hollow pipe for placing rock sample
Shape body, is provided with the first opening and the second opening on tubular body, the first opening with second be open using tubular body center as
Center symmetric setting, the first opening in the second opening with being respectively arranged with the first approaching channel and the second approaching channel, in addition to blade, blade
Be adapted with two approaching channels, blade can in approaching channel telescopic movable, can be along the second opening by blade along the second approaching channel
Insert in rock sample, until through, then passed from the first approaching channel, the first approaching channel and the second approaching channel with tubular body activity even
Connect, the angle difference of two approaching channels and tubular body is adjustable, and the center line of the first approaching channel and the second approaching channel is on the same line.
2. device as claimed in claim 1, it is characterised in that tubular body side wall is provided with graduated scale, respectively further comprises two
Individual approaching channel support, protractor is provided with approaching channel support, the bottom of approaching channel support is connected with tubular body, and its top is used to support
The bottom surface of its corresponding approaching channel, approaching channel support and approaching channel are fixed with screw by nut respectively.
3. device as claimed in claim 1, it is characterised in that tubular body side wall is provided with locating module, locating module bag
Rectangular substrate is included, rectangular substrate is adapted with tubular body longitudinal cross-section, and rectangular substrate longitudinal direction both sides are provided with graduated scale, positioning
Module centers are provided with angulometer, and angulometer is semicircle, and its base, which is provided with both ends, can launch the infrared ray hair of infrared ray
Penetrate unit, in addition to infrared receiver unit, infrared receiver unit includes the first receiving unit and the second receiving unit, and first
Receiving unit is located at angulometer camber line left part avris, and the second receiving unit is located at rectangular substrate longitudinal direction right part avris, by infrared
Line transmitter unit and infrared receiver unit are capable of the angle of fast positioning joint plane, adjust the angle angle of approaching channel and tubular body
Degree, so as to which guiding blade is inserted, the joint plane is made.
4. the artificial device for preparing different directions joint plane rock mass, it is characterised in that including hollow pair for placing rock sample
Film is opened, is longitudinally formed the first openings and the second openings offered through bottom and top between split film along it, each
Openings are provided with matched sliding part and the fixture for fixing sliding part, sliding part can be in openings
Slide, sliding part includes the first sliding part and the second sliding part, and the first sliding part and the second sliding part can be slided in openings
It is dynamic, sliding part is fixed on by suitable position in openings by fixture, formed between the first sliding part and the second sliding part
The opening inserted or passed for blade.
5. device as claimed in claim 4, it is characterised in that split film side wall is provided with locating module, and locating module includes
Rectangular substrate, rectangular substrate are adapted with split film longitudinal cross-section, and rectangular substrate longitudinal direction both sides are provided with graduated scale, locating module
Angulometer is provided centrally with, angulometer is semicircle, and its base, which is provided with both ends, can launch the infrared emitting list of infrared ray
Member, in addition to infrared receiver unit, infrared receiver unit include the first receiving unit and the second receiving unit, and first receives
Unit is located at angulometer camber line left part avris, and the second receiving unit is located at rectangular substrate longitudinal direction right part avris, sent out by infrared ray
Penetrate unit and infrared receiver unit unit is capable of the angle of fast positioning joint plane, adjustment opening, so that guiding blade is inserted,
The joint plane is made.
6. device as claimed in claim 4, it is characterised in that the blade is through type joint plane blade or non-through type section
Reason face blade, it is in isosceles triangle through the tip of type joint plane blade, non-through type joint plane insert tip is in yi word pattern, knife
Scale is provided with piece main body.
7. the artificial system for preparing different directions joint plane rock mass, it is characterised in that including as described in 1-6 any claims
The artificial device for preparing different directions joint plane rock mass, in addition to strain controlling instrument, strain controlling instrument include back-pressure disk and sampling
Disk, the device for manually preparing different directions joint plane rock mass are placed in sampling dish, and back-pressure disk is placed on artificial preparation not Tongfang
To at the top of the device of joint plane rock mass, in the presence of depression bar, back-pressure disk is compacted downwards rock sample, and different directions are prepared manually in profit
The device of joint plane rock mass is sampled to rock sample.
8. system as claimed in claim 7, it is characterised in that the blade is through type joint plane blade or non-through type section
Reason face blade, it is in isosceles triangle through the tip of type joint plane blade, non-through type joint plane insert tip is in yi word pattern, knife
Scale is provided with piece main body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721020450.2U CN207051075U (en) | 2017-08-15 | 2017-08-15 | The artificial device and system for preparing the rock mass of joint plane containing different directions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721020450.2U CN207051075U (en) | 2017-08-15 | 2017-08-15 | The artificial device and system for preparing the rock mass of joint plane containing different directions |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207051075U true CN207051075U (en) | 2018-02-27 |
Family
ID=61503063
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721020450.2U Expired - Fee Related CN207051075U (en) | 2017-08-15 | 2017-08-15 | The artificial device and system for preparing the rock mass of joint plane containing different directions |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207051075U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113092210A (en) * | 2021-04-08 | 2021-07-09 | 昆明理工大学 | Cylindrical test piece pouring mold with angle and position adjustable prefabricated section |
-
2017
- 2017-08-15 CN CN201721020450.2U patent/CN207051075U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113092210A (en) * | 2021-04-08 | 2021-07-09 | 昆明理工大学 | Cylindrical test piece pouring mold with angle and position adjustable prefabricated section |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106940274B (en) | Full-automatic rheological straight shear device and experimental operation method thereof | |
CN109030182A (en) | A kind of saturation clay probe intensity and strain softening parameter measuring apparatus based on full stream feeler inspection | |
CN105466742B (en) | A kind of remoulded sample preparation facilities | |
CN107991176A (en) | A kind of tensile test apparatus and its method of three axis of rock | |
CN202814770U (en) | Remolded soil sample preparation device for triaxial shear test | |
CN105571919B (en) | A kind of ring type sample preparation device for cutting experiment for ring | |
CN103983494A (en) | Test device of model for manufacturing rock masses containing interlayers and test method thereof | |
CN208888043U (en) | A kind of saturation clay probe intensity and strain softening parameter measuring apparatus based on full stream feeler inspection | |
CN108827729A (en) | A kind of rocks sample mould and preparation method of sample containing complicated joint | |
CN110095328B (en) | Device and method for preparing rock test pieces with different fracture positions, inclination angles and connectivity rates | |
CN207051075U (en) | The artificial device and system for preparing the rock mass of joint plane containing different directions | |
CN110118681B (en) | Device and method for preparing rock test pieces with different sizes and joint dip angles | |
CN108562466B (en) | A kind of cylinder rock sample multi-angle splitting device and its method | |
CN107367412A (en) | Sample preparation and sampling combination unit and method suitable for soil test standard specimen | |
CN108519259A (en) | A kind of artificial core and its preparation method and application | |
CN107941592A (en) | Essence built in one kind controls the prefabricated experimental method of variable fissure rock simulation | |
CN110967237A (en) | Concrete test piece with three-dimensional built-in cracks and manufacturing method thereof | |
CN110056335A (en) | Three axis multiple cracks hydraulic fracturing experiments devices of one kind and experimental method | |
CN102445398A (en) | Simulation testing method of soft rock and hard soil mechanical characteristics | |
CN209145580U (en) | A kind of three axis multiple cracks hydraulic fracturing experiments devices | |
CN106769753A (en) | For seepage tests trace structure column joint samples preparation method containing chisel | |
CN105952445A (en) | Boring test method under high ground stress condition based on mathematical and physical model | |
CN208187733U (en) | A kind of artificial multistage drawing out soil equipment | |
CN107505157A (en) | A kind of rotary cutting ring sampler | |
CN110579372B (en) | Novel undisturbed soil column sampling device and use method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180227 Termination date: 20180815 |
|
CF01 | Termination of patent right due to non-payment of annual fee |