CN207047667U - Novel bridge construction paver - Google Patents

Novel bridge construction paver Download PDF

Info

Publication number
CN207047667U
CN207047667U CN201720960765.9U CN201720960765U CN207047667U CN 207047667 U CN207047667 U CN 207047667U CN 201720960765 U CN201720960765 U CN 201720960765U CN 207047667 U CN207047667 U CN 207047667U
Authority
CN
China
Prior art keywords
sliding shoe
plate
screed
fixed
paver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720960765.9U
Other languages
Chinese (zh)
Inventor
于香英
倪晓燕
胡紫日
胡向阳
Original Assignee
Hebei Vocational and Technical College of Building Materials
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Vocational and Technical College of Building Materials filed Critical Hebei Vocational and Technical College of Building Materials
Priority to CN201720960765.9U priority Critical patent/CN207047667U/en
Application granted granted Critical
Publication of CN207047667U publication Critical patent/CN207047667U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

Novel bridge construction paver,Including paver fuselage,Supporting plate,Fixed board slot,Pull plate,Pull lever,Screed,The paver fuselage both sides are connected set,There is fixed board slot inside the fixed cover,There is fixed plate on the right side of the supporting plate,The fixed plate is adapted with fixed board slot,The fixed plate is connected board slot by multiple fixing screws,In the fixed board slot of fixed plate insertion,Connection paver fuselage on the inside of the supporting plate,Connection pull plate in the middle part of the supporting plate,Have inside the pull plate and slide grooving,The slip grooving is adapted with slip cap,Grooving is slided in the slip cap connection,There is sliding shoe groove inside the slip cap,The pull lever right-hand member has sliding shoe,The sliding shoe is adapted with sliding shoe groove,The sliding shoe groove connects sliding shoe,The sliding shoe slides in sliding shoe groove.

Description

Novel bridge construction paver
Technical field
It the utility model is related to paver field, more particularly to a kind of novel bridge construction paver.
Background technology
Basic unit and the various material paving operations of surface layer need to use paver on bridge pavement, but existing bridge construction With paver connection built on the sand, make screed that play easily occur at work, influence the laying quality of bridge pavement.
Utility model content
The utility model is directed to deficiencies of the prior art, there is provided a kind of novel bridge construction of stable connection is used Paver.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of novel bridge construction paver, including paver fuselage, supporting plate, fixed board slot, pull plate, pulling Bar, screed, the paver fuselage both sides are connected set, have fixed board slot, the supporting plate inside the fixed cover Right side has fixed plate, and the fixed plate is adapted with fixed board slot, and the fixed plate is connected by multiple fixing screws Board slot, the fixed plate insertion are fixed in board slot, connection paver fuselage on the inside of the supporting plate, are connected in the middle part of the supporting plate Pull plate, the pull plate inside, which has, slides grooving, and the slip grooving is adapted with slip cap, the slip cap connection cunning Dynamic grooving, the slip cap inside have sliding shoe groove, and the pull lever right-hand member has sliding shoe, the sliding shoe and sliding shoe Groove is adapted, and the sliding shoe groove connects sliding shoe, and the sliding shoe slides in sliding shoe groove.
Connection oblique pull plate on the left of the paver fuselage, the oblique pull plate connection brace upper end, the brace lower end Supporting plate is connected, the screed both sides connect installation set, and the pull lever left end connects installation set, connected on the right side of the screed Support set is connect, connects pull lever on the inside of the support set, the pull lever is sequentially inserted into support set, installation set.
There are fastening plates on the left of the supporting plate, be adapted on the inside of the fastening plates with screed, the screed both sides Fastening plates are connected, the screed slides in fastening plates, and the screed both sides have multiple adjustment holes, and the adjustment hole is equal Even to be distributed on screed, the fastening plates connect adjustment hole by adjusting screw, and the adjustment hole is mutually nibbled with adjusting screw Close.
Beneficial effect:
Fixed plate is connected board slot by multiple fixing screws, makes supporting plate stable with paver fuselage opposed configuration, Pull plate upper end is fixed on the supporting plate, it is determined that the stability that supporting plate is connected with pull plate, slip cap are fixed on slip cap In groove, make slip cap and pull plate stable connection, sliding shoe slides in sliding shoe groove, enables the angle of pull lever and pull plate Degree keeps vertical, oblique pull plate connection brace upper end, brace lower end connection supporting plate, makes supporting plate relative with paver fuselage Structure is more firm, and pull lever left end is fixed in installation set, makes pull lever and installation set stable connection, is connected on the outside of support set Pull lever, enable pull lever keep level, make sliding shoe be slided in sliding shoe groove more steady, and make screed is relative to prop up Bracing plates devices are more firm, are coordinated by the adjustment hole of adjusting screw and diverse location, the height of screed is adjusted, enter And the thickness of paving concrete pavement is adjusted, when screed rises, pull lever raises with screed, and sliding shoe is sliding in sliding shoe groove It is dynamic, make during road surfacing, angle will not be changed, and prevent play, and this novel bridge construction is connected with paver Firm, making screed, angle is not susceptible to change at work, does not influence the laying quality of bridge pavement.
Brief description of the drawings
Fig. 1 is novel bridge construction paver structural representation described in the utility model.
Fig. 2 is pull plate described in the utility model, slip cap, sliding shoe structural representation.
Fig. 3 is fastening plates described in the utility model, installation set structural representation.
Embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of novel bridge construction paver, including paver fuselage 1, supporting plate 6, fixed board slot 8, pull plate 10, Pull lever 15, screed 18, the both sides of paver fuselage 1 are connected set 7, and the inside of fixed cover 7 has fixed board slot 8, the right side of supporting plate 6 has fixed plate 2, and the fixed plate 2 is adapted with fixed board slot 8, and the fixed plate 2 is by multiple Fixing screws 9 are connected board slot 8, in the fixed board slot 8 of the insertion of fixed plate 2, the inner side of the supporting plate 6 connection paver machine Body 1, the middle part of the supporting plate 6 connection pull plate 10, the inside of pull plate 10, which has, slides grooving 11, the slip grooving 11 It is adapted with slip cap 12, grooving 11 is slided in the connection of slip cap 12, and the inside of slip cap 12 has sliding shoe groove 13, institute Stating the right-hand member of pull lever 15 has sliding shoe 14, and the sliding shoe 14 is adapted with sliding shoe groove 13, and the sliding shoe groove 13 connects Sliding shoe 14, the sliding shoe 14 slide in sliding shoe groove 13.
The left side of the paver fuselage 1 connection oblique pull plate 4, the oblique pull plate 4 connects the upper end of brace 5, the brace 5 Lower end connects supporting plate 6, and the both sides of screed 18 connect installation set 16, and the left end of pull lever 15 connects installation set 16, institute The right side of screed 18 connection support set 17, the inner side of the support set 17 connection pull lever 15 are stated, the pull lever 15 is sequentially inserted into In support set 17, installation set 16.
The left side of supporting plate 6 has fastening plates 3, and the inner side of fastening plates 3 is adapted with screed 18, the screed 18 both sides connect fastening plates 3, and the screed 18 slides in fastening plates 3, and the both sides of screed 18 have multiple adjustment holes 19, the adjustment hole 19 is evenly distributed on screed 18, and the fastening plates 3 connect adjustment hole 19, institute by adjusting screw 20 Adjustment hole 19 is stated to be intermeshed with adjusting screw 20.
Fixed plate 2 is connected board slot 8 by multiple fixing screws 9, makes supporting plate 6 and the opposed configuration of paver fuselage 1 Stable, the upper end of pull plate 10 is fixed in supporting plate 6, it is determined that the stability that supporting plate 6 is connected with pull plate 10, slip cap 12 It is fixed on and slides in grooving 11, make slip cap 12 and the stable connection of pull plate 10, sliding shoe 14 is slided in sliding shoe groove 13, made Pull lever 15 can be vertical with the angle holding of pull plate 10, and oblique pull plate 4 connects the upper end of brace 5, the lower end of brace 5 connection branch Fagging 6, make supporting plate 6 more firm with the opposed configuration of paver fuselage 1, the left end of pull lever 15 is fixed in installation set 16, is made Pull lever 15 and the stable connection of installation set 16, the outside of support set 17 connection pull lever 15, enable the keep level of pull lever 15, make The slip in sliding shoe groove 13 of sliding shoe 14 is more steady, and makes the device of 18 relative support plate of screed 6 more firm, passes through tune The adjustment hole 19 of section screw 20 and diverse location coordinates, and the height of screed 18 is adjusted, and then adjusts paving concrete pavement Thickness, when screed 18 rises, pull lever 15 raises with screed 18, and sliding shoe 14 slides in sliding shoe groove 13, makes 18 During road surfacing, angle will not be changed, and paver stable connection is used in this novel bridge construction, makes screed 18 Angle is not susceptible to change at work, does not influence the laying quality of bridge pavement.

Claims (3)

1. a kind of novel bridge construction paver, it is characterized in that:Including paver fuselage, supporting plate, fixed board slot, pulling Plate, pull lever, screed, the paver fuselage both sides are connected set, have fixed board slot inside the fixed cover, described There is fixed plate, the fixed plate is adapted with fixed board slot, and the fixed plate is connected by multiple fixing screws on the right side of supporting plate Fixed board slot is connect, the fixed plate insertion is fixed in board slot, connection paver fuselage on the inside of the supporting plate, in the supporting plate Portion connects pull plate, has inside the pull plate and slides grooving, and the slip grooving is adapted with slip cap, the slip cap Grooving is slided in connection, has sliding shoe groove inside the slip cap, and the pull lever right-hand member has a sliding shoe, the sliding shoe and Sliding shoe groove is adapted, and the sliding shoe groove connects sliding shoe, and the sliding shoe slides in sliding shoe groove.
2. novel bridge construction paver according to claim 1, it is characterized in that:Connect on the left of the paver fuselage Oblique pull plate, the oblique pull plate connection brace upper end are connect, the brace lower end connects supporting plate, the screed both sides connection Installation set, the pull lever left end connect installation set, and support set is connected on the right side of the screed, connects and draws on the inside of the support set Lever, the pull lever are sequentially inserted into support set, installation set.
3. novel bridge construction paver according to claim 2, it is characterized in that:Have on the left of the supporting plate tight Gu plate, the fastening plates inner side is adapted with screed, and the screed both sides connect fastening plates, and the screed is in fastening plates Interior slip, the screed both sides have multiple adjustment holes, and the adjustment hole is evenly distributed on screed, and the fastening plates are led to Mode connects for screw adjustment hole is overregulated, the adjustment hole is intermeshed with adjusting screw.
CN201720960765.9U 2017-08-03 2017-08-03 Novel bridge construction paver Expired - Fee Related CN207047667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720960765.9U CN207047667U (en) 2017-08-03 2017-08-03 Novel bridge construction paver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720960765.9U CN207047667U (en) 2017-08-03 2017-08-03 Novel bridge construction paver

Publications (1)

Publication Number Publication Date
CN207047667U true CN207047667U (en) 2018-02-27

Family

ID=61499055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720960765.9U Expired - Fee Related CN207047667U (en) 2017-08-03 2017-08-03 Novel bridge construction paver

Country Status (1)

Country Link
CN (1) CN207047667U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395117A (en) * 2020-03-24 2020-07-10 安徽中桥建设集团有限公司 Road surface paving device for highway construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395117A (en) * 2020-03-24 2020-07-10 安徽中桥建设集团有限公司 Road surface paving device for highway construction

Similar Documents

Publication Publication Date Title
CN203755117U (en) Equipment device for improving slip-form paver
CN207047667U (en) Novel bridge construction paver
CN208884916U (en) Equipment room step paving structure
CN205296756U (en) Auxiliary device that tiling was used
CN211772643U (en) Road bridge municipal road surface asphalt paving car
CN203879028U (en) Slurry laying machine
CN207032897U (en) A kind of brick wall cement quickly lays instrument
CN203700956U (en) Anti-collision wall formwork assembly
CN212927100U (en) Portable mortar bed board
CN206289977U (en) A kind of section bar for building structure concreting
CN210857868U (en) Ground heating base plate
CN208996446U (en) A kind of column mould strengthening frame structure
CN204590550U (en) Nail and rake type wood floor bolck cement bonded sand bed course chipping darby
CN205000221U (en) Under put formula slipform paver road surface slipform mould
CN208815920U (en) A kind of perps mortar laying apparatus built for construction
CN207062713U (en) Novel road engineering template support meanss
CN215629111U (en) Temporary quick-building paving road for road traffic construction
CN115749290A (en) Construction method and device for controlling flatness of concrete surface at root of column wall
CN207032811U (en) A kind of small area ground patch block instrument
CN210857851U (en) Floor heating assembly
CN206336864U (en) A kind of Novel elevator car control handwheel
CN204781788U (en) Connecting piece with adjustable integration wallboard keeps warm
CN207988452U (en) A kind of equipment for controlling walltile edge patch and filleting precision
CN203776785U (en) Waterproof bottom tray of unit bathroom
CN105040559B (en) Road surface slip form mold of underneath type slip form paver

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180601

Address after: 100000 room 1001, Xin Ding building, 9, hang Feng Road, Fengtai Science City, Fengtai District, Beijing.

Patentee after: Ni Xiaoyan

Address before: 066000 Wen Yu Road, seaport area, Qinhuangdao, Hebei Province, No. 8

Patentee before: Hebei College of Building Material Vocational Technology

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

Termination date: 20180803