CN207046887U - A kind of efficient sewage treatment installation - Google Patents

A kind of efficient sewage treatment installation Download PDF

Info

Publication number
CN207046887U
CN207046887U CN201720840638.5U CN201720840638U CN207046887U CN 207046887 U CN207046887 U CN 207046887U CN 201720840638 U CN201720840638 U CN 201720840638U CN 207046887 U CN207046887 U CN 207046887U
Authority
CN
China
Prior art keywords
pump housing
switch board
sewage disposal
table body
voltmeter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720840638.5U
Other languages
Chinese (zh)
Inventor
郭海良
王沧海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Yin (xiamen) Biotechnology Co Ltd
Original Assignee
Zhong Yin (xiamen) Biotechnology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhong Yin (xiamen) Biotechnology Co Ltd filed Critical Zhong Yin (xiamen) Biotechnology Co Ltd
Priority to CN201720840638.5U priority Critical patent/CN207046887U/en
Application granted granted Critical
Publication of CN207046887U publication Critical patent/CN207046887U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a kind of efficient sewage treatment installation, its structure includes large-scale water inlet pipe, power supply contiguous block, pump top cover, conductor wire, voltmeter, function button, outlet pipe, switch board, support frame, blow-off pipe, side power supply contiguous block, safety lock, the high-efficiency large sewage disposal pump housing, large-scale water inlet bottom of the tube and connecting as one structure at the top of pump top cover, pump cap base at the top of the high-efficiency large sewage disposal pump housing with being tightly connected;Voltmeter is made up of binding post, regulation button, voltage calibration disk, table body, indicator, binding post, regulation button bottom and table body front surface vertical connection, voltage calibration plate inlaid is on table body, with being flexibly connected inside table body, binding post is wired to inside switch board for indicator bottom.The utility model adds voltmeter, and the equipment can realize monitoring capacity to builtin voltage, ensures that equipment realizes that high-efficiency sewage is handled under the environment of safety, improves use value.

Description

A kind of efficient sewage treatment installation
Technical field
The utility model is a kind of efficient sewage treatment installation, belongs to field of sewage treatment equipment.
Background technology
Sewage treating machine is that the water quality requirement for making sewage reach a certain water body of draining or reuse is purified to it Process.It is each that sewage disposal is widely used in building, agricultural, traffic, the energy, petrochemical industry, environmental protection, urban landscape, medical treatment, food and drink etc. Individual field, the daily life of common people is also come into more and more.
Prior art discloses Application No.:201620415667.2 utility model discloses a kind of high-speed centrifugal sewage Processor, including centrifugal sewage treating machine body, sealing fastening device, regulation valve member, the centrifugal sewage treating machine sheet Body bottom is provided with damping compression-resistant base, and the damping compression-resistant base is connected to left end link, the left end link top The sealing fastening device is provided with, anti-corrosion protection shell is wrapped on the outside of the sealing fastening device, the anticorrosion is protected Screw feeder is connected on the inside of shield shell, and the screw feeder right output port is closely plugged into the regulation valve member.This practicality New structure is simple, reasonable in design, easy to use, and chemicals treatment need not be added in processing procedure, and result is safe and efficient, The liquid phase of the low solid phase of water capacity and high-purity can be obtained by centrifuging operation, can not only be reduced labor intensity, be improved work Condition, and have the characteristics that to continuously run, automatic remote control, safe operation it is reliable.But prior art imperfection, the equipment can not It is enough that monitoring capacity is realized to builtin voltage, reduce use value.
Utility model content
In view of the deficienciess of the prior art, the utility model purpose is to provide a kind of efficient sewage treatment installation, with solution Certainly prior art imperfection, the equipment can not realize monitoring capacity to builtin voltage, reduce use value.
To achieve these goals, the utility model is to realize a kind of processing of high-efficiency sewage by the following technical solutions Equipment, its structure include large-scale water inlet pipe, power supply contiguous block, pump top cover, conductor wire, voltmeter, function button, outlet pipe, control Cabinet processed, support frame, blow-off pipe, side power supply contiguous block, safety lock, the high-efficiency large sewage disposal pump housing, the large-scale water inlet pipe Bottom and connecting as one structure at the top of pump top cover, the pump cap base at the top of the high-efficiency large sewage disposal pump housing with sealing Connection, the pump top cover are provided with power supply contiguous block, and the switch board is connected on power supply contiguous block by conductor wire, the height Effect down-stream processing pump housing side be equipped with switch board, and the switch board is provided with voltmeter, function button, on the switch board Equipped with safety lock, the high-efficiency large wastewater disposal pump body side surface is provided with side power supply contiguous block, at the high-efficiency large sewage Pump housing bottom is managed with being welded at the top of support frame, the blow-off pipe is arranged on high-efficiency large sewage disposal pump housing bottom, the water outlet Bottom of the tube and high-efficiency large wastewater disposal pump body side surface connecting as one structure;The voltmeter is pressed by binding post, regulation Button, voltage calibration disk, table body, indicator composition, the binding post, regulation button bottom and table body front surface vertical connection, The voltage calibration plate inlaid is on table body, and with being flexibly connected inside table body, the binding post passes through for the indicator bottom Wire is connected to inside switch board.
Further, the switch board is provided with through hole, and the through hole and function button are concentric circles.
Further, the function button is cylinder.
Further, the conductor wire side is fitted and connected with high-efficiency large wastewater disposal pump body side surface.
Further, support frame as described above is in turn connected into triangle.
Further, the outlet pipe is used for water outlet.
Further, the switch board is used to control.
The utility model adds voltmeter, and the equipment can realize monitoring capacity to builtin voltage, ensures that equipment is being pacified Realize that high-efficiency sewage is handled under full environment, improve use value.
Brief description of the drawings
By reading the detailed description made with reference to the following drawings to non-limiting example, other spies of the present utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural representation of efficient sewage treatment installation of the utility model.
Fig. 2 is the structural representation of this practical voltmeter.
In figure:Large-scale water inlet pipe -1, power supply contiguous block -2, pump top cover -3, conductor wire -4, voltmeter -5, function button -6, Outlet pipe -7, switch board -8, support frame -9, blow-off pipe -10, side power supply contiguous block -11, safety lock -12, high-efficiency large sewage Handle the pump housing -13, binding post -501, regulation button -502, voltage calibration disk -503, table body -504, indicator -505.
Embodiment
Technological means, creation characteristic, reached purpose and effect to realize the utility model are easy to understand, below With reference to embodiment, the utility model is expanded on further.
Fig. 1, Fig. 2 are referred to, the utility model provides a kind of efficient sewage treatment installation technical scheme:A kind of high-efficiency sewage Processing equipment, its structure include large-scale water inlet pipe 1, power supply contiguous block 2, pump top cover 3, conductor wire 4, voltmeter 5, function button 6, Outlet pipe 7, switch board 8, support frame 9, blow-off pipe 10, side power supply contiguous block 11, safety lock 12, high-efficiency large wastewater disposal pump Body 13, the top of the large-scale bottom of water inlet pipe 1 and pump top cover 3 connecting as one structure, the bottom of pump top cover 3 with it is efficiently big The top of the type sewage disposal pump housing 13 is tightly connected, and the pump top cover 3 is provided with power supply contiguous block 2, and the switch board 8 passes through conduction Line 4 is connected on power supply contiguous block 2, and the side of the high-efficiency large sewage disposal pump housing 13 is equipped with switch board 8, the switch board 8 Voltmeter 5, function button 6 are provided with, safety lock 12, the high-efficiency large sewage disposal pump housing 13 are housed on the switch board 8 Side is provided with side power supply contiguous block 11, and the bottom of the high-efficiency large sewage disposal pump housing 13 is welded with the top of support frame 9, described Blow-off pipe 10 is arranged on the bottom of the high-efficiency large sewage disposal pump housing 13, the bottom of outlet pipe 7 and high-efficiency large wastewater disposal pump Side the connecting as one structure of body 13;The voltmeter 5 by binding post 501, regulation button 502, voltage calibration disk 503, Table body 504, indicator 505 form, the binding post 501, the bottom of regulation button 502 and the preceding surface vertical connection of table body 504, The voltage calibration disk 503 is embedded on table body 504, and the bottom of indicator 505 is connected with the internal activity of table body 504, described Binding post 501 is wired to inside switch board 8, and the switch board 8 is provided with through hole, the through hole and function button 6 be concentric circles, and the function button 6 is cylinder, and the side of conductor wire 4 is pasted with the side of the high-efficiency large sewage disposal pump housing 13 Connection is closed, support frame as described above 9 is in turn connected into triangle, and the outlet pipe 7 is used for water outlet, and the switch board 8 is used to control.
Voltmeter 5 described in this patent be measure voltage a kind of instrument, common voltage table --- voltage meter.Symbol:V, There is a permanent magnet inside sensitive galvanometer, a coil being made up of wire of being connected between two binding posts of galvanometer, Coil is placed in the magnetic field of permanent magnet, and is connected by transmission device with the pointer of table.Most of voltmeter is all divided into two Range.Voltmeter has three binding posts, and a negative terminal, two positive terminals, the positive pole of voltmeter and the positive pole of circuit connect Connect, the negative pole connection of negative pole and circuit.Voltmeter must be in parallel with tested electrical appliance.
Carrying out in use, we need to realize the monitoring of device interior voltage by voltmeter 5, voltmeter 5 is to survey A kind of instrument of voltage is measured, the high-efficiency large sewage disposal pump housing 13 can carry out efficient quick sewage, side power supply contiguous block 11, which can help switch board 8 to realize the high-efficiency large sewage disposal pump housing 1, controls, for example, adding voltmeter, the equipment can Monitoring capacity is realized to builtin voltage, ensures that equipment realizes that high-efficiency sewage is handled under the environment of safety, improves use value.
Large-scale water inlet pipe 1 of the present utility model, power supply contiguous block 2, pump top cover 3, conductor wire 4, voltmeter 5, function button 6th, outlet pipe 7, switch board 8, support frame 9, blow-off pipe 10, side power supply contiguous block 11, safety lock 12, high-efficiency large sewage disposal The pump housing 13, binding post 501, regulation button 502, voltage calibration disk 503, table body 504, indicator 505.Part is general mark The part that quasi- part or those skilled in the art know, its structure and principle all can be learnt for this technology personnel by technical manual Or known by normal experiment method, the utility model solves the problems, such as it is prior art imperfection, and the equipment can not be internal Portion's voltage realizes monitoring capacity, reduces use value, and the utility model is combined with each other by above-mentioned part, adds voltage Table, the equipment can realize monitoring capacity to builtin voltage, ensure that equipment realizes that high-efficiency sewage is handled under the environment of safety, carry High use value, it is described in detail below:
The voltmeter 5 is by binding post 501, regulation button 502, voltage calibration disk 503, table body 504, indicator 505 Composition, the binding post 501, the bottom of regulation button 502 and the preceding surface vertical connection of table body 504, the voltage calibration disk 503 It is embedded on table body 504, the bottom of indicator 505 is connected with the internal activity of table body 504, and the binding post 501 is by leading Line is connected to inside switch board 8.
The side of first company conductor wire 4 is fitted and connected with the side of the high-efficiency large sewage disposal pump housing 13, the side of company B's conductor wire 4 Face connection parallel with the side of the high-efficiency large sewage disposal pump housing 13.
First company built-up time is 40min, using effect is good;
Company B's built-up time is 60min, it is very difficult to is used;
This practical side of conductor wire 4 is fitted and connected with the side of the high-efficiency large sewage disposal pump housing 13 in summary, usability Can be more preferable, it is worth advocating.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above, for For those skilled in the art, it is clear that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and without departing substantially from this In the case of the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the utility model is by institute Attached claim rather than described above limit, it is intended that will fall in the implication and scope of the equivalency of claim All changes are included in the utility model.Any reference in claim should not be considered as to the involved right of limitation It is required that.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms this area note technology people The other embodiment that member is appreciated that.

Claims (5)

1. a kind of efficient sewage treatment installation, its structure includes large-scale water inlet pipe (1), power supply contiguous block (2), pump top cover (3), led Electric wire (4), voltmeter (5), function button (6), outlet pipe (7), switch board (8), support frame (9), blow-off pipe (10), side electricity Source contiguous block (11), safety lock (12), the high-efficiency large sewage disposal pump housing (13), large-scale water inlet pipe (1) bottom and pump top Connecting as one structure at the top of (3) is covered, pump top cover (3) bottom at the top of the high-efficiency large sewage disposal pump housing (13) with sealing Connection, the pump top cover (3) are provided with power supply contiguous block (2), and the switch board (8) is connected to power supply by conductor wire (4) and connected Connect on block (2), it is characterised in that:
The high-efficiency large sewage disposal pump housing (13) side is equipped with switch board (8), and the switch board (8) is provided with voltmeter (5), function button (6), safety lock (12), the high-efficiency large sewage disposal pump housing (13) side are housed on the switch board (8) Face is provided with side power supply contiguous block (11), the high-efficiency large sewage disposal pump housing (13) bottom and welding at the top of support frame (9), The blow-off pipe (10) is arranged on the high-efficiency large sewage disposal pump housing (13) bottom, outlet pipe (7) bottom and high-efficiency large The sewage disposal pump housing (13) side connecting as one structure;
The voltmeter (5) is by binding post (501), regulation button (502), voltage calibration disk (503), table body (504), instruction Pin (505) forms, and the binding post (501), regulation button (502) bottom and the preceding surface vertical connection of table body (504) are described Voltage calibration disk (503) is embedded on table body (504), and indicator (505) bottom is connected with table body (504) internal activity, It is internal that the binding post (501) is wired to switch board (8).
A kind of 2. efficient sewage treatment installation according to claim 1, it is characterised in that:The switch board (8) is provided with Through hole, the through hole and function button (6) are concentric circles.
A kind of 3. efficient sewage treatment installation according to claim 1, it is characterised in that:The function button (6) is circle Cylinder.
A kind of 4. efficient sewage treatment installation according to claim 1, it is characterised in that:Conductor wire (4) side with The high-efficiency large sewage disposal pump housing (13) side is fitted and connected.
A kind of 5. efficient sewage treatment installation according to claim 1, it is characterised in that:Support frame as described above (9) connects successively It is connected into triangle.
CN201720840638.5U 2017-07-11 2017-07-11 A kind of efficient sewage treatment installation Active CN207046887U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720840638.5U CN207046887U (en) 2017-07-11 2017-07-11 A kind of efficient sewage treatment installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720840638.5U CN207046887U (en) 2017-07-11 2017-07-11 A kind of efficient sewage treatment installation

Publications (1)

Publication Number Publication Date
CN207046887U true CN207046887U (en) 2018-02-27

Family

ID=61495304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720840638.5U Active CN207046887U (en) 2017-07-11 2017-07-11 A kind of efficient sewage treatment installation

Country Status (1)

Country Link
CN (1) CN207046887U (en)

Similar Documents

Publication Publication Date Title
CN106247923B (en) The working method of earthing bar buried depth detector
CN204989301U (en) Induction type high voltage live display device that security is good
CN208818781U (en) A kind of ring network cabinet electricity leakage alarm
CN207046887U (en) A kind of efficient sewage treatment installation
CN201532417U (en) Electric quantity acquisition module
CN107589231A (en) A kind of Portable multi-index water quality detecting device
CN209540840U (en) A kind of temperature, pressure control device of small-sized electric steam generator
CN107215911A (en) A kind of efficient sewage treatment installation
CN204116621U (en) For the mechanism for monitoring whether container cup of monitoring agitator for food-making is correctly installed
CN206856753U (en) A kind of electrical test power supply stroller
CN205898215U (en) Ultrasonic flowmeter measures instrument
CN105140986A (en) Temperature detection based charging protection device of charger
CN212083530U (en) Improved high-voltage electroscope
CN211318582U (en) Transformer core with alarm indicator lamp and clamp grounding current monitoring device
CN208056185U (en) A kind of constant pressure water supply equipment
CN204241517U (en) A kind of efficiency test box
CN206819174U (en) The oil level device of electrical power distribution transformer
CN207442633U (en) A kind of kitchen and bath's energy-saving power generation energy storage device
CN207380101U (en) A kind of wall inserts needle dc voltmeter
CN208548082U (en) A kind of harbour machinery automation actual training device
CN206584026U (en) A kind of LED drive power automatic detection device
CN206832334U (en) A kind of hydraulic engineering Level monitor
CN207798731U (en) A kind of domestic carbon monoxide detection device
CN206531878U (en) A kind of circuit power frequency parameter experiment termination
CN206471286U (en) Three-phase magnetic latching relay

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant