CN207039119U - A kind of following perpendicular tee joint of crane span structure - Google Patents

A kind of following perpendicular tee joint of crane span structure Download PDF

Info

Publication number
CN207039119U
CN207039119U CN201720800050.7U CN201720800050U CN207039119U CN 207039119 U CN207039119 U CN 207039119U CN 201720800050 U CN201720800050 U CN 201720800050U CN 207039119 U CN207039119 U CN 207039119U
Authority
CN
China
Prior art keywords
threeway
main body
protective cover
bottom plate
tee joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720800050.7U
Other languages
Chinese (zh)
Inventor
刘泽军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Long Cable Bridge Frame Co Ltd
Original Assignee
Tianjin Long Cable Bridge Frame Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Long Cable Bridge Frame Co Ltd filed Critical Tianjin Long Cable Bridge Frame Co Ltd
Priority to CN201720800050.7U priority Critical patent/CN207039119U/en
Application granted granted Critical
Publication of CN207039119U publication Critical patent/CN207039119U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model discloses a kind of crane span structure with following perpendicular tee joint, including threeway main body, sagging straight line outlet and threeway bottom plate, the threeway main body includes threeway protective cover, the threeway body side is winding displacement mouth, the threeway body side winding displacement mouth is connected with threeway protective cover, the threeway main body and threeway protective cover are separate structure, and the threeway main body is connected with threeway protective cover by riveted.This practicality using positive side by opening up the design structure of plane winding displacement mouth and threeway bottom plate edge as arc-shaped edges, can ensure well will not be because of side corner or the situation of corner angle point scuffing cable during row sets cable, the effective security for ensureing cable wire routing, with the benefit for saving construction cost Elongated cable wire service life, the structure being made by the overall spray painting processing of threeway main body and overall punching press can play the effect of good antirust and deformation resistant, further add the effect of its bearing capacity and service life.

Description

A kind of following perpendicular tee joint of crane span structure
Technical field
Cable testing bridge field is the utility model is related to, the following perpendicular tee joint of specially a kind of crane span structure.
Background technology
Cable testing bridge is divided into the structures such as slot type, pellet type and ladder-type, passes through the compositions such as support, trailing arm, installation annex, energy Enough the insides that is emitted on that cable is neat are connected to another equipment from an equipment, and do not interfere with the outside beautiful of framework See, cable testing bridge needed in cable laying operation according to the service condition of circuit carry out deflecting installation, when cable need on toward It is lower to need to use following perpendicular tee joint when being shunted to both direction, existing following perpendicular tee joint for convenience of cable laying Two kinds of structures are broadly divided into, first, being easy to penetrating for cable provided with opening in side side, second, being provided with half of shape in front Opening facilitates the laying of cable, and this first structure can cause cable table by cable scraping incoming line during threading Skin cut or draw it is disconnected lead to not use, second of structure upper end of the corner angle of front openings and opening point in cabling line The situation that cable damage can be caused to cause cable not use at angle, the following perpendicular tee joint of above two structure are all unfavorable In the laying of cable, the relative construction cost for adding cable framework, that also delays while wasting financial resources is artificial, Lose more than gain.
Utility model content
Problem to be solved in the utility model is:There is provided a kind of crane span structure following perpendicular tee joint, by with positive side The design structure of plane winding displacement mouth and threeway bottom plate edge for arc-shaped edges is opened up, can be ensured well during row sets cable The effective security for ensureing cable wire routing, will not have and save because of side corner or the situation of corner angle point scuffing cable The benefit of construction cost Elongated cable wire service life, the problem of can proposing to solve the problems mentioned in the above background technology.
To achieve the above object, the following technical scheme of the utility model offer, a kind of following perpendicular tee joint of crane span structure, including Threeway main body, sagging straight line outlet and threeway bottom plate, the threeway main body include threeway protective cover, the threeway body side For winding displacement mouth, the threeway bottom plate is located at threeway bottom part body, and the threeway bottom plate side is the first wire inlet-outlet, the threeway Bottom plate opposite side is the second wire inlet-outlet, and the threeway body side winding displacement mouth is connected with threeway protective cover, the threeway main body It is separate structure with threeway protective cover, the threeway main body is connected with threeway protective cover by riveted.
Preferably, the threeway plate outer side edge is arc-shaped edges.
Preferably, the first wire inlet-outlet side, the second wire inlet-outlet side and threeway protective cover both sides are all provided with Hole is transversely mounted, the sagging straight line outlet both sides are provided with longitudinally mounted hole.
Preferably, the threeway main body is integrally handled by spray painting.
Preferably, the threeway main body overall structure is to be stamped to form.
Compared with prior art, the beneficial effects of the utility model are:
, can be good by opening up the design structure of plane winding displacement mouth and threeway bottom plate edge as arc-shaped edges using positive side Cable will not effectively be ensured during row sets cable because of side corner or the situation of corner angle point scuffing cable by ensureing The security of laying, there is the benefit for saving construction cost Elongated cable wire service life, pass through the spray painting that threeway main body is overall The structure that processing and overall punching press are made can play the effect of good antirust and deformation resistant, further add it The effect of bearing capacity and service life.
The utility model provides a kind of following perpendicular tee joint of crane span structure, including threeway main body, sagging straight line outlet and three Logical bottom plate, the threeway main body include threeway protective cover, and the threeway body side is winding displacement mouth, and the threeway bottom plate is located at three Logical bottom part body, the threeway bottom plate side are the first wire inlet-outlet, and the threeway bottom plate opposite side is the second wire inlet-outlet, institute State threeway body side winding displacement mouth and be connected with threeway protective cover, the threeway main body and threeway protective cover are separate structure, institute Threeway main body is stated to be connected by riveted with threeway protective cover.
Further, the threeway plate outer side edge is arc-shaped edges.The program will not when there is protection row to set cable Because side corner or corner angle point scratch, effectively ensure security during cable wire routing.
Further, the first wire inlet-outlet side, the second wire inlet-outlet side and threeway protective cover both sides are equal Provided with hole is transversely mounted, the sagging straight line outlet both sides are provided with longitudinally mounted hole.The program greatly adds following hang down It is durable that the size selectivity connected between straight tee (ST.TEE) crane span structure and crane span structure makes installation more consolidate.
Further, the threeway main body integrally handles the threeway main body overall structure to be stamped to form by spray painting. The structure that the program is made by the overall spray painting processing of threeway main body and overall punching press can play good antirust and The effect of deformation resistant, further add the effect of its bearing capacity and service life.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, for ordinary skill people For member, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model threeway plate outer side borderline structure schematic diagram.
In figure:1. threeway main body, 2. sagging straight line outlets, 3. threeway bottom plates, 4. first wire inlet-outlets, 5. second disengaging Line mouth, 6. threeway protective covers, 7. outer side edges edge, 8. are transversely mounted hole, 9. winding displacement mouths, 10. longitudinally mounted holes.
Embodiment
Technological means, creation characteristic, the purpose reached and effect to realize the utility model are easy to understand, under Face combines embodiment, and the utility model is expanded on further.
As shown in Figure 1 to Figure 2, the following perpendicular tee joint of a kind of crane span structure, including threeway main body 1, the sagging straight and of line outlet 2 Threeway bottom plate 3, the threeway main body 1 include threeway protective cover 6, and the side of threeway main body 1 is winding displacement mouth 9, the threeway bottom Plate 3 is located at the bottom of threeway main body 1, and the side of threeway bottom plate 3 is the first wire inlet-outlet 4, and the opposite side of threeway bottom plate 3 is the Two wire inlet-outlets 5, the side winding displacement mouth 9 of threeway main body 1 are connected with threeway protective cover 6, and the threeway main body 1 is protected with threeway Cover 6 is separate structure, and the threeway main body 1 is connected with threeway protective cover 6 by riveted.
The following perpendicular tee joint of a kind of crane span structure of the utility model, by opening up plane winding displacement mouth and threeway bottom with positive side For edges of boards along the design structure for being arc-shaped edges, can ensure well will not be because of side corner or corner angle point during row sets cable The situation of cable is scratched, the effective security for ensureing cable wire routing, there is saving construction cost Elongated cable wire to use The benefit in life-span, the structure being made by the overall spray painting processing of threeway main body and overall punching press can play anti-well The effect of rust and deformation resistant, further add the effect of its bearing capacity and service life.
Wherein, the outer side edges of threeway bottom plate 3 are arc-shaped edges along 7.
Wherein, the side of the first wire inlet-outlet 4, the side of the second wire inlet-outlet 5 and the both sides of threeway protective cover 6 are all provided with Hole 8 is transversely mounted, the sagging straight both sides of line outlet 2 are provided with longitudinally mounted hole 10.
Wherein, the threeway main body 1 is overall is handled by spray painting.
Wherein, the overall structure of threeway main body 1 is to be stamped to form.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of following perpendicular tee joint of crane span structure, including threeway main body (1), sagging straight line outlet (2) and threeway bottom plate (3), It is characterized in that:The threeway main body (1) includes threeway protective cover (6), and threeway main body (1) side is winding displacement mouth (9), institute To state threeway bottom plate (3) and be located at threeway main body (1) bottom, threeway bottom plate (3) side is the first wire inlet-outlet (4), described three Logical bottom plate (3) opposite side is the second wire inlet-outlet (5), and threeway main body (1) the side winding displacement mouth (9) is connected with threeway protective cover (6), the threeway main body (1) and threeway protective cover (6) are separate structure, the threeway main body (1) and threeway protective cover (6) Connected by riveted.
A kind of 2. following perpendicular tee joint of crane span structure according to claim 1, it is characterised in that:The threeway bottom plate (3) is outside Side is arc-shaped edges along (7).
A kind of 3. following perpendicular tee joint of crane span structure according to claim 1, it is characterised in that:First wire inlet-outlet (4) side, the second wire inlet-outlet (5) side and threeway protective cover (6) both sides, which are equipped with, is transversely mounted hole (8), described lower vertical Wire inlet-outlet (2) both sides are provided with longitudinally mounted hole (10).
A kind of 4. following perpendicular tee joint of crane span structure according to claim 1, it is characterised in that:The threeway main body (1) is whole Body is handled by spray painting.
A kind of 5. following perpendicular tee joint of crane span structure according to claim 1, it is characterised in that:The threeway main body (1) is whole Body structure is to be stamped to form.
CN201720800050.7U 2017-07-04 2017-07-04 A kind of following perpendicular tee joint of crane span structure Expired - Fee Related CN207039119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720800050.7U CN207039119U (en) 2017-07-04 2017-07-04 A kind of following perpendicular tee joint of crane span structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720800050.7U CN207039119U (en) 2017-07-04 2017-07-04 A kind of following perpendicular tee joint of crane span structure

Publications (1)

Publication Number Publication Date
CN207039119U true CN207039119U (en) 2018-02-23

Family

ID=61466763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720800050.7U Expired - Fee Related CN207039119U (en) 2017-07-04 2017-07-04 A kind of following perpendicular tee joint of crane span structure

Country Status (1)

Country Link
CN (1) CN207039119U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112615317A (en) * 2020-12-08 2021-04-06 临沂金良不锈钢制品有限公司 Novel bend tee bend structure is turned over to gang line groove
CN114268062A (en) * 2022-03-02 2022-04-01 徐州以勒电器科技有限公司 Assembled cable bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112615317A (en) * 2020-12-08 2021-04-06 临沂金良不锈钢制品有限公司 Novel bend tee bend structure is turned over to gang line groove
CN112615317B (en) * 2020-12-08 2022-03-01 临沂金良不锈钢制品有限公司 Novel bend tee bend structure is turned over to gang line groove
CN114268062A (en) * 2022-03-02 2022-04-01 徐州以勒电器科技有限公司 Assembled cable bridge

Similar Documents

Publication Publication Date Title
CN207039119U (en) A kind of following perpendicular tee joint of crane span structure
CN204065502U (en) A kind of GPZ
CN105830560B (en) A kind of handrail backplate
CN207200181U (en) A kind of fire-type crane span structure
CN207398766U (en) A kind of horizontal four-way of cable testing bridge
CN209626862U (en) It is a kind of with cable anti-scratch and the cable testing bridge that is easy to install and remove
CN206743281U (en) A kind of safety computer network router
CN209030358U (en) A kind of installation fixed structure of router
CN207651962U (en) A kind of aluminium alloy chute fastener
CN207098343U (en) Distribution box back box and distribution box
CN206099195U (en) Pallet type cable bridge stand
CN206433303U (en) Electrical equipment distribution crane span structure
CN207251097U (en) Rapid different lines under floor
CN201731172U (en) Reinforced cable bridge frame
CN206504103U (en) A kind of steel grating platform
CN206490387U (en) A kind of attachment means of cable testing bridge
CN207048261U (en) A kind of PVC corner protectors
CN205873237U (en) Multi -point discharging ware discharge apparatus
CN206878396U (en) Cabling is buckled with double flute position bail
CN204578926U (en) Water-proof type engine room control cabinet
CN207129819U (en) Anti-off board in hall door
CN208938214U (en) A kind of automatic teller machine money supporting plate mold
CN203560594U (en) Vertical equal-diameter upper left bend for pallet type bridge rack
CN208815713U (en) A kind of antiseismic structure wall body construction
CN207119472U (en) The conductive rectification frid of electric cleaner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20190704

CF01 Termination of patent right due to non-payment of annual fee