CN207036839U - A kind of fluid pressure type concrete bleeding rate determines device - Google Patents

A kind of fluid pressure type concrete bleeding rate determines device Download PDF

Info

Publication number
CN207036839U
CN207036839U CN201721018599.7U CN201721018599U CN207036839U CN 207036839 U CN207036839 U CN 207036839U CN 201721018599 U CN201721018599 U CN 201721018599U CN 207036839 U CN207036839 U CN 207036839U
Authority
CN
China
Prior art keywords
fixedly connected
cylinder
fluid pressure
pressure type
shaft member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721018599.7U
Other languages
Chinese (zh)
Inventor
牛安魁
李凤华
王莉
杨栋梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG TIEZHENG PROJECT EXPERIMENT AND INSPECTION CENTER CO Ltd
Original Assignee
SHANDONG TIEZHENG PROJECT EXPERIMENT AND INSPECTION CENTER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG TIEZHENG PROJECT EXPERIMENT AND INSPECTION CENTER CO Ltd filed Critical SHANDONG TIEZHENG PROJECT EXPERIMENT AND INSPECTION CENTER CO Ltd
Priority to CN201721018599.7U priority Critical patent/CN207036839U/en
Application granted granted Critical
Publication of CN207036839U publication Critical patent/CN207036839U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of fluid pressure type concrete bleeding rate to determine device, including cylinder, the lower end of the cylinder is fixedly connected with the upper center of bottom plate, the both sides of the bottom plate are provided with keyhole, right side is provided with small opening in the middle part of the inwall of the cylinder, the right side middle and upper part of the cylinder is fixedly connected with the left end of casing, the lower end of first bolt column is fixedly connected with the upper middle side part of bull stick, the upper outside of the cylindrical element installs hub cap by internal thread spiral, and the upper center both sides of the hub cap are rotatably installed in the ring groove in the middle part of silk braid by turn hole.Turn clockwise rotating disk, pressing plate pushes concrete, it is more convenient to push concrete, after the water in concrete enters screen pack by small opening to be filtered, into casing, ball float moves up, set square moves up, measurement data is read by the graduation mark on riser, is calculated by the total amount of water divided by concrete, facilitates determination data.

Description

A kind of fluid pressure type concrete bleeding rate determines device
Technical field
Concrete bleeding rate determination techniques field is the utility model is related to, specially a kind of fluid pressure type concrete bleeding rate measure device.
Background technology
The ratio of mud of concrete is bigger, and the time of cement setting hardening is longer, and Free water is more, water and cement disengaging time It is longer, the easier secretion water outlet of concrete, cement setting hardening is influenceed, secreted so determining device by concrete bleeding and determining concrete Water rate is process essential in the middle part of architecture production.
But existing concrete bleeding rate measure device can not be more convenient to push concrete, while determination data can not be facilitated.
Utility model content
The purpose of this utility model is to provide a kind of fluid pressure type concrete bleeding rate measure device, to solve above-mentioned background technology The problem of middle proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of fluid pressure type concrete bleeding rate determines device, Including cylinder, the lower end of the cylinder is fixedly connected with the upper center of bottom plate, and the both sides of the bottom plate are provided with keyhole, the cylinder Inwall in the middle part of right side be provided with small opening, the right side central of the cylinder by groove fixed installation screen pack, the cylinder Right side middle and upper part is fixedly connected with the left end of casing, and the upper center of the casing passes through circular hole activity installation connecting rod, the company The lower end of extension bar is fixedly connected with the upside of ball float, and the connecting rod is movably arranged on the middle part of sleeve, in the right side of the sleeve Portion is fixedly connected with the upper left end of right angle lever member, and the upper end of the connecting rod is fixedly connected with the downside left part of cross bar, the cross bar Right-hand member be fixedly connected with the left side central portion of set square, the set square is slidably connected on the left of the front end of riser, the right side of the riser Upper lateral part is provided with graduation mark, and the lower end of the riser is fixedly connected on the right side of the upper end of transverse slat, passed through in the middle part of the lower end of the casing Apopore is slidably installed cock body, the upper center of the lower end adhesive rubber piece of the cock body, and the lower end of the sheet rubber, which is fixed, to be connected The upper end of the first bolt column is connect, first bolt column is arranged on the middle part of double right angles plate by internal thread hole spiral, described The lower end of first bolt column is fixedly connected with the upper middle side part of bull stick, and the upper outside of the cylindrical element is installed by internal thread spiral Hub cap, the upper center both sides of the hub cap are rotatably installed in the ring groove in the middle part of silk braid by turn hole, in the silk braid Portion spiral installs the second bolt column, and two-fold angular pole part is installed in the middle part of second bolt column by loose slot activity, and described the The lower end of two bolt columns is fixedly connected with the upper center of compression leg, and the lower end of the compression leg is fixedly connected with the upper end both sides of pressing plate, institute The upper end for stating silk braid is fixedly connected in the middle part of the lower end of the first spur gear, and the upper center of first spur gear is fixedly connected with first The lower end of shaft member, the top of first shaft member are rotatably installed in the inner top side of framework or so portion by round recessed, and described One spur gear engages the second spur gear, is fixedly connected with the upper end of the second shaft member in the middle part of the lower end of second spur gear, and described the Baffle plate is fixedly mounted in the bottom both sides of two shaft member, and the upper center of second spur gear is fixedly connected with the lower end of the 3rd shaft member, The upper end of 3rd shaft member is fixedly connected in the middle part of the lower end of rotating disk.
Preferably, the lower end of the right angle lever member is fixedly connected with the upper end right part of casing.
Preferably, the left end of the transverse slat is fixedly connected with the upper right end of casing.
Preferably, the upper end of double right angle plates is fixedly connected in the middle part of the lower end of casing.
Preferably, the upper center both sides of the hub cap are fixedly connected with the lower end of framework.
Preferably, the upper end of the two-fold angular pole part is fixedly connected with the inner top side on both sides of the middle of hub cap, the center of hub cap By hole be rotatablely installed the second shaft member, and the interior corresponding end of baffle plate be slidably connected hub cap middle part up and down both sides.
Preferably, the upper center of the framework is rotatablely installed the 3rd shaft member by hole.
Preferably, the pressing plate is slidably connected the inwall of cylinder.
Compared with prior art, the beneficial effects of the utility model are:The fluid pressure type concrete bleeding rate determines device, clockwise Rotary turnplate, the second bolt column is driven to move down, pressing plate pushes concrete, more convenient to push concrete, when in concrete After water enters screen pack filtering by small opening, into casing, ball float moves up, and set square moves up, and passes through riser On graduation mark read measurement data, calculated by the total amount of water divided by concrete, facilitate determination data.
Brief description of the drawings
Fig. 1 is main view cut-away illustration of the present utility model;
Fig. 2 is mplifying structure schematic diagram at a of the present utility model;
Fig. 3 is mplifying structure schematic diagram at b of the present utility model.
In figure:It is 1 cylinder, 2 bottom plates, 3 keyholes, 4 small openings, 5 screen packs, 6 casings, 7 connecting rods, 8 ball floats, 9 sleeves, 10 straight Angular pole part, 11 cross bars, 12 set squares, 13 risers, 14 graduation marks, 16 transverse slats, 17 apopores, 18 cock bodys, 19 sheet rubbers, 20 first Bolt column, 21 pairs of right angle plates, 22 bull sticks, 23 internal threads, 24 hub caps, 25 turn holes, 26 silk braids, 27 ring grooves, 28 second bolts Post, 29 loose slots, 30 two-fold angular pole parts, 31 compression legs, 32 pressing plates, 33 first spur gears, 34 first shaft member, 35 round recesseds, 36 frames Body, 37 second spur gears, 38 second shaft member, 39 baffle plates, 40 the 3rd shaft member, 41 rotating disks.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
In description of the present utility model, it is to be understood that term " longitudinal direction ", " transverse direction ", " on ", " under ", " preceding ", The orientation or position relationship of the instruction such as " rear ", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " be based on Orientation shown in the drawings or position relationship, it is for only for ease of description the utility model, rather than instruction or the dress for implying meaning Put or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to the utility model Limitation.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of fluid pressure type concrete bleeding rate determines device, bag Cylinder 1 is included, the lower end of cylinder 1 is fixedly connected with the upper center of bottom plate 2, and the both sides of bottom plate 2 are provided with keyhole 3, and convenient installation is fixed Bolt, the position of stable cylinder 1, the inwall middle part right side of cylinder 1 are provided with small opening 4, and the right side central of cylinder 1 is fixed by groove Screen pack 5 is installed, the right side middle and upper part of cylinder 1 is fixedly connected with the left end of casing 6, and the upper center of casing 6 is lived by circular hole Dynamic installation connecting rod 7, ensure that the stability that connecting rod 7 moves up and down, and the lower end of connecting rod 7 is fixedly connected with the upside of ball float 8, Connecting rod 7 is movably arranged on the middle part of sleeve 9, and the right side central of sleeve 9 is fixedly connected with the upper left end of right angle lever member 10, right angle The lower end of rod member 10 is fixedly connected with the upper end right part of casing 6, by the cooperation of sleeve 9 and connecting rod 7, further ensures connection The stability that bar 7 moves up and down, the upper end of connecting rod 7 are fixedly connected with the downside left part of cross bar 11, and the right-hand member of cross bar 11, which is fixed, to be connected The left side central portion of set square 12 is connect, set square 12 is slidably connected on the left of the front end of riser 13, and the right upper portion of riser 13, which is provided with, carves Line 14 is spent, the lower end of riser 13 is fixedly connected on the right side of the upper end of transverse slat 16, and the left end of transverse slat 16 is fixedly connected with the top right side of casing 6 End, it is slidably installed cock body 18 by apopore 17 in the middle part of the lower end of casing 6, in the upper end of the lower end adhesive rubber piece 19 of cock body 18 Portion, the lower end of sheet rubber 19 are fixedly connected with the upper end of the first bolt column 20, and the first bolt column 20 is installed by internal thread hole spiral At the middle part of double right angle plates 21, the upper end of double right angle plates 21 is fixedly connected in the middle part of the lower end of casing 6, the first bolt column 20 Lower end is fixedly connected with the upper middle side part of bull stick 22, and the upper outside of cylindrical element 1 installs hub cap 24, hub cap by the spiral of internal thread 23 24 upper center both sides are rotatably installed in by turn hole 25 in the ring groove 27 at the middle part of silk braid 26, ensure that what silk braid 26 rotated Stability, the middle spiral of silk braid 26 install the second bolt column 28, and the middle part of the second bolt column 28 is pacified by the activity of loose slot 29 Two-fold angular pole part 30 is filled, by the cooperation of loose slot 29 and two-fold angular pole part 30, ensure that what the second bolt column 28 moved up and down Stability, while prevent the second bolt column 28 from deviating from silk braid 26, the lower end of the second bolt column 28 is fixedly connected with the upper end of compression leg 31 Middle part, the lower end of compression leg 31 are fixedly connected with the upper end both sides of pressing plate 32, and pressing plate 32 is slidably connected the inwall of cylinder 1, ensure that pressure The stability and air-tightness that plate 32 coordinates with the inwall of cylinder 1, the upper end of silk braid 26 is fixedly connected in the lower end of the first spur gear 33 Portion, the upper center of the first spur gear 33 are fixedly connected with the lower end of the first shaft member 34, and the top of the first shaft member 34 passes through round recessed 35 are rotatably installed in the inner top side of framework 36 or so portion, by the first shaft member 34 and the cooperation of framework 36, ensure that first is straight The stability of gear 33, the upper center both sides of hub cap 24 are fixedly connected with the lower end of framework 36, the first spur gear 33 engagement second Spur gear 37, the external diameter of the second spur gear 37 are five times of the first spur gear 33, fixed in the middle part of the lower end of the second spur gear 37 to connect The upper end of the second shaft member 38 is connect, baffle plate 39 is fixedly mounted in the bottom both sides of the second shaft member 38, and the upper end of two-fold angular pole part 30 is fixed The inner top side on both sides of the middle of hub cap 24 is connected, hub cap 24 is rotatablely installed second shaft member 38, and baffle plate 39 centrally through hole Interior corresponding end is slidably connected the middle part both sides up and down of hub cap 24, by the cooperation of baffle plate 39 and hub cap 24, ensure that the second straight-tooth The stability that wheel 37 rotates, the upper center of the second spur gear 37 are fixedly connected with the lower end of the 3rd shaft member 40, the upper end of framework 36 Middle part is rotatablely installed the 3rd shaft member 40 by hole, further ensures the stability of the second spur gear 37 rotation, the 3rd shaft member 40 Upper end be fixedly connected in the middle part of the lower end of rotating disk 41.
The utility model is in the specific implementation:Concrete is put into cylinder 1, the bolt of hub cap 24 is arranged on cylinder 1 On the internal thread 23 in portion, turn clockwise rotating disk 41 so that and the second spur gear 37 drives the rotate counterclockwise of the first spur gear 33, the One spur gear 33 drives the rotate counterclockwise of silk braid 26, then drives the second bolt column 28 to move down, then under band dynamic pressure plate 32 Concrete is pressed, produces hydraulic effect, while concrete water rate can be further speeded up, because the diameter of the second spur gear 37 is first 33 5 times of spur gear, rotation rotating disk 41 is more laborsaving, more convenient to push concrete, when the water in concrete is entered by small opening 4 After screen pack 5 filters, into casing 6 so that ball float 8 moves up, and then causes set square 12 to move up, you can logical The graduation mark 14 crossed on riser 13 reads measurement data, is calculated by the total amount of water divided by concrete, convenient to determine number According to, while the bull stick 22 that turns clockwise so that the first bolt column 20 drives sheet rubber 19 to be rotated down movement with cock body 18, you can Discharge water, convenient measurement next time out of casing 6 by apopore 17.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (8)

1. a kind of fluid pressure type concrete bleeding rate determines device, including cylinder(1), it is characterised in that:The cylinder(1)Lower end fix Connecting bottom board(2)Upper center, the bottom plate(2)Both sides be provided with keyhole(3), the cylinder(1)Inwall in the middle part of right side Provided with small opening(4), the cylinder(1)Right side central screen pack is fixedly mounted by groove(5), the cylinder(1)The right side Side middle and upper part is fixedly connected with casing(6)Left end, the casing(6)Upper center pass through circular hole activity installation connecting rod(7), The connecting rod(7)Lower end be fixedly connected with ball float(8)Upside, the connecting rod(7)It is movably arranged on sleeve(9)In Portion, the sleeve(9)Right side central be fixedly connected with right angle lever member(10)Upper left end, the connecting rod(7)Upper end consolidate Surely cross bar is connected(11)Downside left part, the cross bar(11)Right-hand member be fixedly connected with set square(12)Left side central portion, it is described Set square(12)Be slidably connected riser(13)Front end on the left of, the riser(13)Right upper portion be provided with graduation mark(14), institute State riser(13)Lower end be fixedly connected with transverse slat(16)Upper end on the right side of, the casing(6)Lower end in the middle part of pass through apopore (17)Be slidably installed cock body(18), the cock body(18)Lower end adhesive rubber piece(19)Upper center, the sheet rubber (19)Lower end be fixedly connected with the first bolt column(20)Upper end, first bolt column(20)Installed by internal thread hole spiral In double right angle plates(21)Middle part, first bolt column(20)Lower end be fixedly connected with bull stick(22)Upper middle side part, institute State cylinder(1)Upper outside pass through internal thread(23)Spiral installs hub cap(24), the hub cap(24)Upper center both sides Pass through turn hole(25)It is rotatably installed in silk braid(26)The ring groove at middle part(27)It is interior, the silk braid(26)Middle spiral installation the Two bolt columns(28), second bolt column(28)Middle part pass through loose slot(29)Two-fold angular pole part is installed in activity(30), institute State the second bolt column(28)Lower end be fixedly connected with compression leg(31)Upper center, the compression leg(31)Lower end be fixedly connected with pressure Plate(32)Upper end both sides, the silk braid(26)Upper end be fixedly connected with the first spur gear(33)Lower end in the middle part of, described first Spur gear(33)Upper center be fixedly connected with the first shaft member(34)Lower end, first shaft member(34)Top it is recessed by circle Groove(35)It is rotatably installed in framework(36)Inner top side or so portion, first spur gear(33)Engage the second spur gear (37), second spur gear(37)Lower end in the middle part of be fixedly connected with the second shaft member(38)Upper end, second shaft member(38) Bottom both sides be fixedly mounted baffle plate(39), second spur gear(37)Upper center be fixedly connected with the 3rd shaft member(40)'s Lower end, the 3rd shaft member(40)Upper end be fixedly connected with rotating disk(41)Lower end in the middle part of.
A kind of 2. fluid pressure type concrete bleeding rate measure device according to claim 1, it is characterised in that:The right angle lever member (10)Lower end be fixedly connected with casing(6)Upper end right part.
A kind of 3. fluid pressure type concrete bleeding rate measure device according to claim 1, it is characterised in that:The transverse slat(16)'s Left end is fixedly connected with casing(6)Upper right end.
A kind of 4. fluid pressure type concrete bleeding rate measure device according to claim 1, it is characterised in that:Double right angle plates (21)Upper end be fixedly connected with casing(6)Lower end in the middle part of.
A kind of 5. fluid pressure type concrete bleeding rate measure device according to claim 1, it is characterised in that:The hub cap(24)'s Upper center both sides are fixedly connected with framework(36)Lower end.
A kind of 6. fluid pressure type concrete bleeding rate measure device according to claim 1, it is characterised in that:The two-fold angular pole part (30)Upper end be fixedly connected with hub cap(24)Inner top side on both sides of the middle, hub cap(24)Centrally through hole be rotatablely installed second Shaft member(38), and baffle plate(39)Interior corresponding end be slidably connected hub cap(24)Middle part up and down both sides.
A kind of 7. fluid pressure type concrete bleeding rate measure device according to claim 1, it is characterised in that:The framework(36)'s Upper center is rotatablely installed the 3rd shaft member by hole(40).
A kind of 8. fluid pressure type concrete bleeding rate measure device according to claim 1, it is characterised in that:The pressing plate(32)It is sliding Dynamic connection cylinder(1)Inwall.
CN201721018599.7U 2017-08-15 2017-08-15 A kind of fluid pressure type concrete bleeding rate determines device Expired - Fee Related CN207036839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721018599.7U CN207036839U (en) 2017-08-15 2017-08-15 A kind of fluid pressure type concrete bleeding rate determines device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721018599.7U CN207036839U (en) 2017-08-15 2017-08-15 A kind of fluid pressure type concrete bleeding rate determines device

Publications (1)

Publication Number Publication Date
CN207036839U true CN207036839U (en) 2018-02-23

Family

ID=61487806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721018599.7U Expired - Fee Related CN207036839U (en) 2017-08-15 2017-08-15 A kind of fluid pressure type concrete bleeding rate determines device

Country Status (1)

Country Link
CN (1) CN207036839U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108918836A (en) * 2018-07-17 2018-11-30 高国杰 Concrete test block Pressure-flow study test device
CN110068653A (en) * 2019-03-29 2019-07-30 太原理工大学 A kind of test device and test method of paste filling material bleeding performance

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108918836A (en) * 2018-07-17 2018-11-30 高国杰 Concrete test block Pressure-flow study test device
CN108918836B (en) * 2018-07-17 2020-11-03 高国杰 Concrete test block pressure bleeding testing device
CN110068653A (en) * 2019-03-29 2019-07-30 太原理工大学 A kind of test device and test method of paste filling material bleeding performance

Similar Documents

Publication Publication Date Title
CN207036839U (en) A kind of fluid pressure type concrete bleeding rate determines device
CN108316319B (en) Traffic Engineering Construction slope protection device
CN203475448U (en) Road slope protection device
CN107386769A (en) It is a kind of to prevent because of the electric pole that ground extrudes and swings
CN206785378U (en) Pile foundation boring machine
CN103174393B (en) A kind of boring and coring device
CN207512726U (en) A kind of hydraulic engineering foundation pile
CN106823981A (en) A kind of novel quantitative drug taking device
CN208430762U (en) A kind of modified scaffold for building
CN209343643U (en) A kind of test model of miniature pile group reinforcing side slope
CN208016569U (en) A kind of municipal administration afforestation band flowers and plants watering device
CN207096191U (en) A kind of performance liquid chromatographic column
CN203117005U (en) PRB (Permeable Reactive Barrier) casing well
CN209725479U (en) A kind of water pipeline support connection structure for hydraulic engineering
CN107901364A (en) Urea-formaldehyde moulding powder feed injection system
CN209372585U (en) A kind of novel Bearing Capacity in Soil of Foundation Bed test device
CN209228601U (en) A kind of pump with adjustment height pedestal
CN107823960A (en) A kind of agricultural irrigation spiral-flow type desanding Multistage filtering device
CN209293856U (en) A kind of coal mine roadway safety detection device
CN106472473A (en) A kind of novel quantitative drug taking device
CN207443808U (en) A kind of Rhizoma Gastrodiae plantation irrigation device
CN207008928U (en) A kind of high school physicses class experiment with falling objects apparatus for demonstrating
CN205586868U (en) Multifunctional metering tank
CN209693405U (en) A kind of digging apparatus for ornamental plant plant
CN202745762U (en) Mining wind and water three-joint quick conversion valve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20200815