CN207035174U - A kind of intermediate deck structure of boiler back end ductwork - Google Patents

A kind of intermediate deck structure of boiler back end ductwork Download PDF

Info

Publication number
CN207035174U
CN207035174U CN201720634569.2U CN201720634569U CN207035174U CN 207035174 U CN207035174 U CN 207035174U CN 201720634569 U CN201720634569 U CN 201720634569U CN 207035174 U CN207035174 U CN 207035174U
Authority
CN
China
Prior art keywords
dividing plate
partition
central dividing
plate
back end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720634569.2U
Other languages
Chinese (zh)
Inventor
隋鹏林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HENGTAO ENERGY-SAVING ENVIRONMENT PROTECTION Co Ltd
Original Assignee
SHANDONG HENGTAO ENERGY-SAVING ENVIRONMENT PROTECTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HENGTAO ENERGY-SAVING ENVIRONMENT PROTECTION Co Ltd filed Critical SHANDONG HENGTAO ENERGY-SAVING ENVIRONMENT PROTECTION Co Ltd
Priority to CN201720634569.2U priority Critical patent/CN207035174U/en
Application granted granted Critical
Publication of CN207035174U publication Critical patent/CN207035174U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Incineration Of Waste (AREA)

Abstract

The utility model discloses a kind of intermediate deck structure of boiler back end ductwork, it belongs to boiler plant field, including central dividing plate, central dividing plate is tiltedly mounted in boiler back end ductwork, and the top of central dividing plate, which is provided with, draws flue, and the lower section of central dividing plate, which is provided with, leads back flue, boiler back end ductwork is provided with angle steel, central dividing plate is provided with connecting hole, and central dividing plate is set to slotted eye by connecting hole and angle steel bolt connection, connecting hole.Central dividing plate includes first partition, second partition, the 3rd dividing plate, first partition above second partition junction with being provided with junction steel plate, first partition and the one of dividing plate of second partition weld with junction steel plate, another piece of dividing plate does not weld with junction steel plate, the utility model structure not only ensure that the fixation of central dividing plate, additionally it is possible to avoid flue and differential expansion problem caused by central dividing plate.

Description

A kind of intermediate deck structure of boiler back end ductwork
Technical field
It the utility model is related to boiler plant field, and in particular to a kind of intermediate deck structure of boiler back end ductwork.
Background technology
Nitrogen oxides in the waste gas that boiler combustion at present is discharged mainly based on coal, during coal combustion, is main One of source of atmospheric pollution, as country continues to increase to environmental requirement dynamics, energy-saving and emission-reduction and air contaminant treatment, ultralow row It has been inexorable trend to put, and to meet requirements of the national standard, the boiler now run needs to carry out denitration transformation more.At present, domestic contrast Ripe out of stock technology has SCR, SNCR, SCR+SNCR etc., and denitration is transformed generally along with the corresponding transformation of boiler body, wherein SCR denitration is carried out generally outside stove, and this just needs to transform boiler back end ductwork, sets new flue gas to draw and lead back dress Put, different according to boiler form, leading back position can be carried out from furnace side, can also be carried out after stove.
In conventional design, it is most of it is newly-designed lead back at flue be all guard board structure light boiler setting structure, Central dividing plate is directly welded on the backplate of both sides, although can effectively fix, there is what central dividing plate can not expand to ask Topic, can cause central dividing plate to deform in operation, and severe patient can cause the extruding rupture of two side guard plates, influence boiler safety.To some Boiler, it is all that heavy type is laid bricks furnace wall structure to draw and lead back flue both sides, and central dividing plate can not be directly anchored on furnace wall, to just Often installation is made troubles.
In view of the above-mentioned problems of the prior art, the design for many years of the utility model combination association area and warp is used Test, be aided with too strong professional knowledge, there is provided a kind of intermediate deck structure of boiler back end ductwork, to overcome drawbacks described above.
The content of the invention
For the problems of in the prior art, a kind of central dividing plate of boiler back end ductwork provided by the utility model Structure, it not only ensure that the fixation of central dividing plate, additionally it is possible to avoid flue and differential expansion problem caused by central dividing plate.
To achieve these goals, the technical solution adopted in the utility model is as follows:A kind of centre of boiler back end ductwork Diaphragm structure, including central dividing plate, the central dividing plate are tiltedly mounted in boiler back end ductwork, the top of the central dividing plate Provided with flue is drawn, the lower section of the central dividing plate, which is provided with, leads back flue, and the boiler back end ductwork is provided with angle steel, in described Space bar is provided with connecting hole, and the central dividing plate is set to groove by connecting hole and the angle steel bolt connection, the connecting hole Hole.
As preferable technical scheme, the boiler back end ductwork uses furnace wall, and the angle steel passes through swollen with the furnace wall Swollen bolt connection.
As preferable technical scheme, the boiler back end ductwork uses backplate, and the angle steel welds with the backplate.
As preferable technical scheme, the central dividing plate includes first partition, second partition, the 3rd dividing plate, and described the For one dividing plate with being provided with junction steel plate above the second partition junction, the first partition and the second partition are one of Dividing plate welds with the junction steel plate, and another piece of dividing plate does not weld with the junction steel plate;
It also is provided with junction steel plate above the second partition and the 3rd dividing plate junction, the second partition and described The 3rd one of dividing plate of dividing plate welds with the junction steel plate, and another piece of dividing plate does not weld with the junction steel plate.
As preferable technical scheme, between the first partition and second partition be provided with interval, the second partition with It also is provided with being spaced between 3rd dividing plate.
The utility model is beneficial in that:
1. the utility model ensure that certain thermal expansion surplus, so as to keep away using the flute profile connecting hole on central dividing plate Exempt from Air Leakage Into Boilers, ensure that the safe operation of boiler.
It is one of to be welded by junction steel plate 2. some dividing plates of the utility model composition central dividing plate connect two-by-two Connect, another piece is not welded, and also ensure that the space that thermal expansion of the central dividing plate in another direction moves freely.
3. the utility model central dividing plate ensures its overall structural strength with boiler back end ductwork connected mode, avoid Change to boiler flue.
Brief description of the drawings
Fig. 1 is a kind of central dividing plate schematic view of the mounting position of boiler back end ductwork;
Fig. 2 is the utility model and flue is the scheme of installation of furnace wall;
The installation B that Fig. 3 is the utility model with flue is furnace wall is to schematic diagram;
Fig. 4 is the utility model and flue is the scheme of installation of backplate;
Fig. 5 is a kind of central dividing plate front view of boiler back end ductwork;
Fig. 6 is a kind of central dividing plate top view of boiler back end ductwork;
Fig. 7 is enlarged drawing at a kind of central dividing plate I of boiler back end ductwork;
Fig. 8 is enlarged drawing at the II of a kind of central dividing plate of boiler back end ductwork.
In figure:1- leads back flue, 2- central dividing plates, 3- and draws flue, 4- boiler back end ductworks, 5- expansion bolts, 6- angles Steel, 21- first partitions, 22- second partitions, the dividing plates of 23- the 3rd, 24- junction steel plates, 25- connecting holes.
Embodiment
For the ease of it will be appreciated by those skilled in the art that being further described below in conjunction with the accompanying drawings to the utility model.
As shown in figure 1, a kind of intermediate deck structure of boiler back end ductwork, including central dividing plate 2, central dividing plate 2 tilt In boiler back end ductwork 4, the top of central dividing plate 2, which is provided with, draws flue 3, and the lower section of central dividing plate 2, which is provided with, leads back cigarette Road 1, the utility model boiler back end ductwork 4 are provided with angle steel 6, as shown in Figure 2 and Figure 3, if boiler back end ductwork 4 uses furnace wall, Angle steel 6 is connected with furnace wall by expansion bolt 5;As shown in figure 4, if boiler back end ductwork 4 uses backplate, angle steel 6 and backplate Welding.
As shown in Fig. 6, Fig. 8, the utility model central dividing plate 2 is provided with connecting hole 25, and central dividing plate 2 passes through connecting hole 25 With the bolt connection of angle steel 6, connecting hole 25 is set to slotted eye, and toward during the thermal expansion of both sides, the connecting hole 25 ensure that necessarily central dividing plate 2 Thermal expansion surplus.
Specific embodiment:
As shown in figure 5, the utility model central dividing plate 2 includes first partition 21, second partition 22, the 3rd dividing plate 23, the One dividing plate 21 with being provided with junction steel plate 24 above the junction of second partition 22, first partition 21 and second partition 22 it is one of every Plate welds with junction steel plate 24, and another piece of dividing plate does not weld with junction steel plate 24, as shown in fig. 7, first partition 21 and second every Interval is provided between plate 22, first partition 21 is welded with junction steel plate 24, and second partition 22 does not weld with junction steel plate 24;
Junction steel plate 24, the dividing plate of second partition 22 and the 3rd also are provided with above second partition 22 and the junction of the 3rd dividing plate 23 23 one of dividing plates weld with junction steel plate 24, and another piece of dividing plate does not weld with junction steel plate 24, the utility model second every It also is provided with being spaced between the dividing plate 23 of plate 22 and the 3rd, second partition 22 welds with junction steel plate 24, and the 3rd dividing plate 23 is with being connected steel Plate 24 does not weld.
It should be appreciated that the purposes of these embodiments is merely to illustrate the utility model and is not intended to limit of the present utility model Protection domain.In addition, it should also be understood that, after technology contents of the present utility model have been read, those skilled in the art can be right The utility model does various change, modification and/or variation, and all these equivalent form of values equally fall within right appended by the application will Ask within the protection domain that book limited.

Claims (5)

1. a kind of intermediate deck structure of boiler back end ductwork, including central dividing plate, the central dividing plate are tiltedly mounted on boiler In back-end ductwork, the top of the central dividing plate, which is provided with, draws flue, and the lower section of the central dividing plate, which is provided with, leads back flue, and it is special Sign is:The boiler back end ductwork is provided with angle steel, and the central dividing plate is provided with connecting hole, and the central dividing plate passes through company Hole and the angle steel bolt connection are connect, the connecting hole is set to slotted eye.
A kind of 2. intermediate deck structure of boiler back end ductwork according to claim 1, it is characterised in that:The boiler tail Portion's flue uses furnace wall, and the angle steel is connected with the furnace wall by expansion bolt.
A kind of 3. intermediate deck structure of boiler back end ductwork according to claim 1, it is characterised in that:The boiler tail Portion's flue uses backplate, and the angle steel welds with the backplate.
A kind of 4. intermediate deck structure of boiler back end ductwork according to claim 1, it is characterised in that:The middle interval Plate includes first partition, second partition, the 3rd dividing plate, and the first partition is with being provided with connection above the second partition junction Steel plate, the first partition and the one of dividing plate of the second partition weld with the junction steel plate, another piece of dividing plate and institute Junction steel plate is stated not weld;
The second partition above the 3rd dividing plate junction with also being provided with junction steel plate, the second partition and the described 3rd The one of dividing plate of dividing plate welds with the junction steel plate, and another piece of dividing plate does not weld with the junction steel plate.
A kind of 5. intermediate deck structure of boiler back end ductwork according to claim 4, it is characterised in that:Described first every It is provided between plate and second partition between interval, the second partition and the 3rd dividing plate and also is provided with being spaced.
CN201720634569.2U 2017-06-02 2017-06-02 A kind of intermediate deck structure of boiler back end ductwork Expired - Fee Related CN207035174U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720634569.2U CN207035174U (en) 2017-06-02 2017-06-02 A kind of intermediate deck structure of boiler back end ductwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720634569.2U CN207035174U (en) 2017-06-02 2017-06-02 A kind of intermediate deck structure of boiler back end ductwork

Publications (1)

Publication Number Publication Date
CN207035174U true CN207035174U (en) 2018-02-23

Family

ID=61469654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720634569.2U Expired - Fee Related CN207035174U (en) 2017-06-02 2017-06-02 A kind of intermediate deck structure of boiler back end ductwork

Country Status (1)

Country Link
CN (1) CN207035174U (en)

Similar Documents

Publication Publication Date Title
ZA200806306B (en) Tube bundle heat exchanger
CN207035174U (en) A kind of intermediate deck structure of boiler back end ductwork
CN203215656U (en) Drawer-type built-in economizer structure
CN202769632U (en) A boiler support structure
CN105485705B (en) A kind of reactor frame and economizer backplate integral structure
CN201539859U (en) Connection structure of slag falling tube and once wind chamber
CN207211373U (en) A kind of simple steel I-beam column connected node
CN208267528U (en) A kind of chimney glass reinforced plastic inner cylinder only shakes device
CN204494365U (en) A kind of superheater tube screen anti-shake fixture
CN212757964U (en) Desulfurization absorption tower entry flue structure based on square gentle turn first group
CN211524308U (en) Chimney outside device of encorbelmenting
CN204717651U (en) There are two drum longitudinal room combustion type boilers of three backhauls
CN206709680U (en) A kind of Horizontal air preheater pipe and tube sheet attachment structure
CN207781349U (en) A kind of novel transformer forced air cooler support construction
CN220727337U (en) Boiler pulverized coal pipeline supporting device
CN205208590U (en) 60 pi type boiler air preheater flue gas exit structure and coal -fired unit below ten thousand grades
CN205895386U (en) Blast pipe fixed bolster and automobile before automobile
CN216046138U (en) Sheet type silencer with good stability
CN216431772U (en) Anti-blocking structure of nonmetal expansion joint of horizontal flue
CN204739606U (en) Reactor frame and economizer backplate integral structure
CN205191633U (en) Device for connecting re -heater pulverized coal boiler mid -board
CN203784914U (en) Rear heating surface sealing supporting structure and industrial exhaust gas boiler with rear heating surface sealing supporting structure
CN201843315U (en) Gusset plate for internal support connection of flue gas duct
CN201488586U (en) Ellipsoidal H-shaped finned tube heat interchanger
CN211228876U (en) Steel construction rectangular cross section roof beam-post is not aequilate oblique crossing node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223