CN207032871U - Stair connecting piece and utilize its aluminum template system - Google Patents

Stair connecting piece and utilize its aluminum template system Download PDF

Info

Publication number
CN207032871U
CN207032871U CN201720889973.4U CN201720889973U CN207032871U CN 207032871 U CN207032871 U CN 207032871U CN 201720889973 U CN201720889973 U CN 201720889973U CN 207032871 U CN207032871 U CN 207032871U
Authority
CN
China
Prior art keywords
plate
stair
aluminum alloy
alloy pattern
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720889973.4U
Other languages
Chinese (zh)
Inventor
马仁怀
林松山
仲少军
丁周庆
王恒磊
魏庆传
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong New Living Mstar Technology Ltd
Original Assignee
Shandong New Living Mstar Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong New Living Mstar Technology Ltd filed Critical Shandong New Living Mstar Technology Ltd
Priority to CN201720889973.4U priority Critical patent/CN207032871U/en
Application granted granted Critical
Publication of CN207032871U publication Critical patent/CN207032871U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model stair connecting piece and utilize its aluminum template system, stair connecting piece includes step main body, and every grade of step both sides of the main body are provided with the side plate vertical with step surface, set on side plate pin-and-hole A and it is fixed perpendicular and on set the connecting plate of pin-and-hole;Aluminum template system includes stair aluminum alloy pattern plate, the metope aluminum alloy pattern plate to be linked together by stair connecting piece.Its purpose is to provide it is a kind of it is simple in construction, cost is low, the easy to operate, aluminum template system that facilitates stair aluminum alloy pattern plate and metope aluminum alloy pattern plate to splice, the stair connecting piece and utilization of the great convenience connector are provided for construction.

Description

Stair connecting piece and utilize its aluminum template system
Technical field
The utility model is related to aluminum alloy pattern plate construction field, more particularly to it is a kind of be used for build stair stair connecting piece and Utilize its aluminum template system.
Background technology
As shown in Figure 1 and Figure 2, existing stair include the ' of bottom plate 1, the ' of riser 2 and the support backplate 5 of both sides ' with aluminum alloy pattern plate, The ' of riser 2 upper end is provided with the ' of upper junction plate 3, the ' of riser 2 lower end and the ' of bottom plate 1 one end vertical connection, the ' of bottom plate 1 other end Provided with the ' of lower connecting plate 4, the ' of lower connecting plate 4 both ends are connected with the support ' of backplate 5, and the ' of lower connecting plate 4 bottom is connected with the ' of bottom plate 1, The ' of lower connecting plate 4 is vertical structure.In work progress, the ' of lower connecting plate 4 of higher level's step with and its adjacent subordinate's step The ' of upper junction plate 3 is fixedly connected by the ' of angle bar 8, is mixed after multiple aluminum alloy pattern plates are arranged in into stair by support or supporting construction Solidifying soil pours.Pour before completing not remove aluminum alloy pattern plate, workmen also needs to transport construction equipment by upper and lower stair Deng because by the ' connections of angle bar 8, the ' of lower connecting plate 4 on the ' of bottom plate 1 is vertical again between up/down steps in existing aluminum dipping form harden structure Formula structure, so, it is upper and lower that the aluminum alloy pattern plate after casting concrete is unfavorable for workmen, when especially belongings are more, also holds Easily there is security incident, construction safety can not be ensured.Meanwhile existing stair aluminum alloy pattern plate edge is also step-like, Wu Fayu Metope aluminum alloy pattern plate splices, and great inconvenience is brought to construction.
Utility model content
The technical problems to be solved in the utility model be to provide it is a kind of it is simple in construction, cost is low, it is easy to operate, facilitate stair Aluminum alloy pattern plate provides the stair connecting piece of great convenience with the splicing of metope aluminum alloy pattern plate, for construction.
The utility model stair connecting piece, including step main body, the both sides of every grade of step of the step main body are equal Provided with the side plate vertical with step surface, pin-and-hole A is provided with the side plate, and edge vertical with the side plate is installed with the side plate The connecting plate of step main body incline direction extension, offers pin-and-hole B on the connecting plate.
The utility model stair connecting piece, wherein the side plate includes vertical rectangular slab, horizontal rectangular slab, the vertical square Two adjacent right-angle sides of shape plate are separately fixed on step surface and backboard, adjacent two right-angle sides of the horizontal rectangular slab It is connected with vertical rectangular slab and step surface.
The utility model provides a kind of aluminum template system using above-mentioned stair connecting piece again, including stair aluminum alloy pattern plate, Metope aluminum alloy pattern plate, connected between the stair aluminum alloy pattern plate, metope aluminum alloy pattern plate by the stair connecting piece.
The utility model aluminum template system, wherein the stair aluminum alloy pattern plate includes some grades of step units, every grade of step list Member includes the frame riser being vertically arranged and horizontally disposed step plate, and the frame riser of adjacent two-stage step unit is by stepping on Step plate is detachably connected, and the connected stair baffle plate in side of the frame riser, opposite side is detachably connected with the side plate, described Metope aluminum alloy pattern plate shape in a rectangular trapezoid, it includes an inclined-plane for being bonded and being detachably connected with the connecting plate.
The utility model aluminum template system, wherein pin-and-hole C is offered on four frames of the frame riser, it is described to mark time Pin-and-hole D is offered at the front and rear edges of plate, the side frame of frame riser two is connected by bayonet lock and side plate and stair baffle plate respectively Connect, the frame of the frame riser top and bottom is connected by bayonet lock with step plate.
The utility model aluminum template system, wherein being provided with supporting plate in the middle part of the frame riser, the supporting plate is vertical It is supported between the frame of the frame riser top and bottom.
The utility model aluminum template system, wherein the stair aluminum alloy pattern plate also includes the support building fixed on the ground The support of terraced aluminum alloy pattern plate and step main body.
The utility model is provided with stair connecting piece, connecting-piece structure letter between stair aluminum alloy pattern plate and metope aluminum alloy pattern plate List, processing technology is simple, cost is low, and the connection of stair aluminum alloy pattern plate and metope aluminum alloy pattern plate, stair are realized by stair connecting piece Connector also includes step height, the form fit of step, the step and stair aluminum alloy pattern plate, and the two connection after-pouring can be formed Required stair, easy to operate, convenient disassembly, stable connection, greatly facilitate construction, ensure that stair quality.Meanwhile this practicality Stair aluminum alloy pattern plate in new aluminum template system is simple in construction, and stair, mould are connected to form step by step by frame riser and step plate Plate is built quick, conveniently, does not have redundancy to reinforce or connection member between the superior and the subordinate's step, reduces construction materials, and not shadow Ring above and below workmen, eliminate construction safety hidden danger, stabilized structure after stair connection, trample and be not easy to deform, ensure that and apply Working medium amount.Further, connected between frame riser and step plate by bayonet lock, convenient disassembly, improve efficiency of construction.
It is described further below in conjunction with the accompanying drawings to the utility model stair connecting piece and using its aluminum template system.
Brief description of the drawings
Fig. 1 is the structural representation of existing stair aluminum alloy pattern plate;
Fig. 2 is the side view fragmentary, perspective view of existing stair aluminum alloy pattern plate;
Fig. 3 is the utility model stair connecting piece and the structural representation using the aluminum template system in its aluminum template system Figure;
Fig. 4 is the partial enlarged drawing at A in Fig. 3;
Fig. 5 is the utility model stair connecting piece and the structural representation using bayonet lock in its aluminum template system.
Embodiment
As shown in Figures 3 to 5, stair connecting piece of the present utility model, including step main body 1, step main body 1 it is every The side plate 12 and side plate 13 vertical with the step surface 11 of level are equipped with left and right sides of level step, is provided with side plate 12 some Individual pin-and-hole A (not shown)s, it is installed with side plate 13 vertical with the side plate 13 and along the extension of the incline direction of step main body 1 Connecting plate 14, pin-and-hole B (not shown)s are offered on connecting plate 14.Specifically, side plate 12 includes vertical rectangular slab 121, horizontal stroke To rectangular slab 122, the backboard 15 of vertical rectangular slab 121 and step is contour and two adjacent right-angle sides are separately fixed at step surface 11 with backboard 15, horizontal rectangular slab 122 and vertical rectangular slab 121 be coplanar and lateral arrangement, its adjacent two right-angle side one Be fixed on vertical rectangular slab 121, another is fixed on step surface 11, and pin-and-hole A is located on vertical rectangular slab 121, and along its Several are distributed with short transverse from top to bottom.
The preparation method of above-mentioned stair connecting piece comprises the following steps:
1. step surface 11 is horizontal positioned, backboard 15 is vertically placed perpendicular to step surface 11, by step surface 11 and backboard 15 using welding or other common fixed forms be fixed together, form several single-stage steps, certainly, step surface 11 with Backboard 15 can also integrated punching shaping, such stability is more preferable, after, be connected to several single-stage steps in turn one Rise;
2. be connected side plate 12 in the left side of every grade of step, right side is connected side plate 13, attachment with step 1., and in side plate Pin-and-hole A is opened up on vertical rectangular slab 121 in 12;
3. it is connected on side plate 13 and connecting plate 14 and opens up pin-and-hole B on connecting plate 14.
Utilize the aluminum template system of above-mentioned stair connecting piece, including stair aluminum alloy pattern plate 2, metope aluminum alloy pattern plate 3, stair aluminum alloy pattern plate 2 include some grades of step units, and every grade of step unit includes the frame riser 21 being vertically arranged and horizontally disposed step plate 22, the frame riser 21 is rectangular, including facade plate 213 and enclosing are in the frame 214 of the surrounding of facade plate 213, adjacent two-stage platform The frame riser 21 of rank unit is staggered front to back cloth and postponed to be connected by step plate 22.Specifically, four frames of frame riser 21 Pin-and-hole C211 is offered on 214, wherein, the pin-and-hole C211 and pin-and-hole A on Right Border 214 is corresponded.Before step plate 22 Rear edge offers pin-and-hole D221, and the frame 214 of the top and bottom of the frame riser 21 of adjacent two-stage step unit passes through Bayonet lock 4 is connected with step plate 22, the posterior border position of step plate 22 in the bottom of frame riser 21 of higher level's step frame 214 it Under, leading edge is located on the frame 214 at the top of frame riser 21 of subordinate's step.The frame 214 on the right side of frame riser 21 is logical Cross bayonet lock 4 to be connected with side plate 12, similarly, left border 214 is connected also by bayonet lock 4 with stair baffle plate 23.In order to strengthen stair The intensity of connector side plate 12, pin-and-hole can also be opened up on horizontal rectangular slab 122, while in step plate 22 close to horizontal rectangle One end of plate 122 sets lateral frame board, and pin-and-hole is opened up on the lateral frame board, by bayonet lock 4 by the lateral frame board and horizontal rectangular slab 122 It is connected.Bayonet lock 4, including shank 41, head 42 and banking stop 44, wherein, shank 41 is taper, and banking stop 44 is right-angled trapezium, Offer the spacing hole 411 being adapted with the shape of banking stop 44 on shank 41, banking stop 44 can be in partial insertion spacing hole 411 And the Breadth Maximum of banking stop 44 is more than the maximum diameter of hole of spacing hole 411, so that banking stop 44 can be from one end of spacing hole 411 Into clamping and retract.In use, only needing to insert shank 41 in above-mentioned each pin-and-hole, banking stop 44 is then inserted into spacing hole In 411.The fastening effect of bayonet lock 4 is good after banking stop 44 inserts spacing hole 411, during form removal, it is only necessary to by banking stop 44 from Exited in spacing hole 411, it is simple, convenient, quick.For convenience of being connected with connecting plate 14, metope aluminum alloy pattern plate 3 is rectangular Trapezoidal shape, it includes an inclined-plane 31 being bonded with connecting plate 14, be also equipped with the inclined-plane 31 with the one-to-one holes of pin-and-hole B, In use, the inclined-plane 31 is linked together with connecting plate 14 by bayonet lock 4 also referring to the above method.Preferably, it is sufficient to ensure Enough support forces, avoiding workmen from trampling causes template deformation, influences stair molding effect, and the middle part of frame riser 21 is provided with Supporting plate 212, the vertical support of supporting plate 212 is between the frame of the top and bottom of frame riser 21.Preferably, it is overall to ensure The stability of stair aluminum alloy pattern plate 2, support 5 is further fixed on to support stair aluminum alloy pattern plate 2 and step main body 1 on ground, the support 5 The various common structure that can realize stable support function can be used, is not enumerated herein.
The stair construction method of above-mentioned aluminum template system comprises the following steps:
(1) metope aluminum alloy pattern plate 3 is arranged, makes its inclined-plane 31 down and extends along stair incline direction;
(2) step main body 1 is arranged, its connecting plate 14 is bonded with the inclined-plane 31 of metope aluminum alloy pattern plate 3, and will by bayonet lock 4 The two is connected;
(3) a frame riser 21 is taken, its Right Border is connected on side plate 12 by bayonet lock 4, and at its lower frame Step plate 22 is connected by bayonet lock 4, another frame riser 21 is then connected by bayonet lock 4 below the leading edge of step plate 22, And the Right Border of the frame riser 21 is connected by bayonet lock 4 and side plate 12, the installation of steps at different levels is completed by that analogy, is made Stair aluminum alloy pattern plate 2 is connected with step main body 1;
(4) casting concrete forms stair, after concrete setting, first banking stop 44 is knocked out from spacing hole 411, is torn open Except bayonet lock 4, stair aluminum alloy pattern plate 2, step main body 1 and metope aluminum alloy pattern plate 3 are then removed.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality New scope is defined, and on the premise of the utility model design spirit is not departed from, those of ordinary skill in the art are to this The various modifications and improvement that the technical scheme of utility model is made, the protection of the utility model claims book determination all should be fallen into In the range of.

Claims (7)

1. stair connecting piece, it is characterised in that:Including step main body (1), the two of every grade of step of the step main body (1) Side is equipped with the side plate vertical with step surface (11) (12,13), and pin-and-hole A, the side plate (13) are provided with the side plate (12) On be installed with it is vertical with the side plate (13) and along step main body (1) incline direction extend connecting plate (14), the connecting plate (14) pin-and-hole B is offered on.
2. stair connecting piece according to claim 1, it is characterised in that:The side plate (12) includes vertical rectangular slab (121), horizontal rectangular slab (122), two adjacent right-angle sides of the vertical rectangular slab (121) are separately fixed at step surface (11) and on backboard (15), adjacent two right-angle sides and vertical rectangular slab (121) and the step surface of the horizontal rectangular slab (122) (11) it is connected.
3. utilize the aluminum template system of the stair connecting piece described in claim 1 or 2, including stair aluminum alloy pattern plate (2), metope aluminum dipping form Plate (3), it is characterised in that:The stair aluminum alloy pattern plate (2), metope aluminum alloy pattern plate are connected between (3) by the stair connecting piece.
4. aluminum template system according to claim 3, it is characterised in that:The stair aluminum alloy pattern plate (2) includes some grades of platforms Rank unit, every grade of step unit include the frame riser (21) and horizontally disposed step plate (22) that are vertically arranged, and adjacent two The frame riser (21) of level step unit is detachably connected by step plate (22), the connected building in side of the frame riser (21) Terraced baffle plate (23), opposite side are detachably connected with the side plate (12), the metope aluminum alloy pattern plate (3) shape in a rectangular trapezoid, and it is wrapped Include an inclined-plane (31) for being bonded and being detachably connected with the connecting plate (14).
5. aluminum template system according to claim 4, it is characterised in that:Opened on four frames of the frame riser (21) Provided with pin-and-hole C (211), pin-and-hole D (221), the frame riser (21) two are offered at the front and rear edges of the step plate (22) Side frame is connected by bayonet lock (4) with side plate (12) and stair baffle plate (23) respectively, frame riser (21) top and bottom Frame be connected by bayonet lock (4) with step plate (22).
6. aluminum template system according to claim 5, it is characterised in that:Support is provided with the middle part of the frame riser (21) Plate (212), supporting plate (212) vertical support is between the frame of frame riser (21) top and bottom.
7. aluminum template system according to claim 6, it is characterised in that:The stair aluminum alloy pattern plate (2) also includes being fixed on The support (5) of the support stair aluminum alloy pattern plate (2) and step main body (1) on ground.
CN201720889973.4U 2017-07-21 2017-07-21 Stair connecting piece and utilize its aluminum template system Withdrawn - After Issue CN207032871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720889973.4U CN207032871U (en) 2017-07-21 2017-07-21 Stair connecting piece and utilize its aluminum template system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720889973.4U CN207032871U (en) 2017-07-21 2017-07-21 Stair connecting piece and utilize its aluminum template system

Publications (1)

Publication Number Publication Date
CN207032871U true CN207032871U (en) 2018-02-23

Family

ID=61465192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720889973.4U Withdrawn - After Issue CN207032871U (en) 2017-07-21 2017-07-21 Stair connecting piece and utilize its aluminum template system

Country Status (1)

Country Link
CN (1) CN207032871U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165286A (en) * 2017-07-21 2017-09-15 山东新活新材料科技有限公司 Stair connecting piece, preparation method and utilize its aluminum template system, stair construction method
CN111576865A (en) * 2020-05-28 2020-08-25 晟通科技集团有限公司 Inclined wall plate

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165286A (en) * 2017-07-21 2017-09-15 山东新活新材料科技有限公司 Stair connecting piece, preparation method and utilize its aluminum template system, stair construction method
CN107165286B (en) * 2017-07-21 2024-02-09 山东新活新材料科技有限公司 Stair connecting piece, manufacturing method, aluminum template system using stair connecting piece and stair construction method
CN111576865A (en) * 2020-05-28 2020-08-25 晟通科技集团有限公司 Inclined wall plate

Similar Documents

Publication Publication Date Title
CN107165286A (en) Stair connecting piece, preparation method and utilize its aluminum template system, stair construction method
CN201221198Y (en) Aluminum alloy formwork system
CN207032871U (en) Stair connecting piece and utilize its aluminum template system
CN211313477U (en) Post-cast cantilever plate's triangular supports template structure
CN207194446U (en) Aluminum alloy mould plate keel structure
CN206903122U (en) A kind of stone material dry suspending assembly buckle
CN105178192B (en) Adjustable binder and pier stud integrated construction technique and application specific form
CN2923899Y (en) Building formboard
CN208310302U (en) A kind of new reinforcing steel bar processing protection canopy
CN205875738U (en) Early dismounting formwork system
CN206034888U (en) Combination formula scaffold frame of new generation that board position is adjustable and have super high security performance of standing
CN205976477U (en) Formula of sinking bathroom hangs mould device
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN105715042B (en) Tool-type building drop panel assembly and its construction method
CN209779605U (en) Improve Larsen steel sheet pile workability's guide subassembly
CN206815375U (en) A kind of casing backform
CN206233532U (en) Operating platform
CN211057733U (en) Big template legless supporting structure
CN206015491U (en) A kind of curb stone mould
CN214462546U (en) Aluminum mould passes material mouth to pour and uses brace mould
CN216948373U (en) Slope collapse prevention supporting device
CN217226001U (en) Road bridge construction template connection structure
CN216967766U (en) Stirrup rack
CN216031585U (en) Prefabricated box girder pedestal convenient for turnover
CN218406420U (en) Scaffold backing board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180223

Effective date of abandoning: 20240209

AV01 Patent right actively abandoned

Granted publication date: 20180223

Effective date of abandoning: 20240209