CN207020924U - Construction building site propaganda board - Google Patents

Construction building site propaganda board Download PDF

Info

Publication number
CN207020924U
CN207020924U CN201720690615.0U CN201720690615U CN207020924U CN 207020924 U CN207020924 U CN 207020924U CN 201720690615 U CN201720690615 U CN 201720690615U CN 207020924 U CN207020924 U CN 207020924U
Authority
CN
China
Prior art keywords
pedestal
propaganda board
fixedly connected
board body
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720690615.0U
Other languages
Chinese (zh)
Inventor
胡二永
王艳民
狄亭
刘磊
谢宇翔
于胜波
张俊伟
陈海亮
李鹏飞
隗义辉
杨振伟
周成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chang Fuqiang
Henan Jinxu Building Materials Technology Co Ltd
Shao Wentong
Yao Junqing
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720690615.0U priority Critical patent/CN207020924U/en
Application granted granted Critical
Publication of CN207020924U publication Critical patent/CN207020924U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Finishing Walls (AREA)

Abstract

Construction building site propaganda board, including ceiling, two hounds, propaganda board body and the pedestal poured using armored concrete, pedestal internal upper part are embedded with two horizontally disposed connecting bolts, and connecting bolt rear end protrudes from base interior side surface;Propaganda board body is vertically disposed at front side at the top of pedestal, front side is embedded with two prelocalization being arranged in vertical posts in pedestal, prelocalization post upper end protrudes from pedestal, the bottom of propaganda board body trailing flank is vertically fixedly connected with locating sleeve, prelocalization post is plugged in locating sleeve, is connected between propaganda board body upper back and connecting bolt by described hound;Ceiling is fixedly connected on propaganda board bodies top, and ceiling lower surface is provided with illuminating lamp.The utility model is simple in construction, easy for installation, stability is strong, and wind resistance is good, and can be repeated several times use, and the pedestal that armored concrete pours is simple and easy for building enterprise, and cost is not also high.

Description

Construction building site propaganda board
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of construction building site propaganda board.
Background technology
Construction building site is an interim, special occasion, and it is dangerous alert that scene uses poster form to carry out Show and enterprises propagandist can not cause the enough attention and concern of personnel, also easily scraped by wind, being caught in the rain causes the publicity time short; Confided a technological secret in Special complex technology job site using papery or it is oral explain and publicise cause workmen firmly to remember, And efficiency is low, ineffective.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided a kind of the effect of publicity is good, security reliability By force, can repeatedly use, construction building site propaganda board.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:Construction building site propaganda board, bag Ceiling, two hounds, propaganda board body and the pedestal poured using armored concrete are included, pedestal is set on the ground And be in rectangular shape, pedestal internal upper part is embedded with two horizontally disposed connecting bolts, connecting bolt rear end protrusion In base interior side surface;
Propaganda board body is vertically disposed at front side at the top of pedestal, and front side is embedded with two vertically in pedestal The prelocalization post of setting, prelocalization post upper end protrude from pedestal, and pedestal is stretched out in prelocalization post lower end, and prelocalization post lower end is sharply pricked Enter subsurface, the bottom of propaganda board body trailing flank is vertically fixedly connected with locating sleeve, and prelocalization post is plugged in fixed In the sleeve pipe of position, propaganda board body rear side surface top is fixedly connected with fixed plate, and the upper end of hound is fixedly connected with connection Plate, the lower end of hound are fixedly connected with lower connecting plate, and upper junction plate and fixed plate correspondence are simultaneously connected by fastening bolt, Be provided with mounting hole on lower connecting plate, connecting bolt it is inner through mounting hole and by clamp nut by lower connecting plate and pedestal marquis Side top pressure contact;
Ceiling is fixedly connected on propaganda board bodies top, and ceiling lower surface is provided with the illumination on front side of propaganda board body Lamp.
Rear side is embedded with two rear locating dowels being arranged in vertical in pedestal, and rear locating dowel upper end is located in pedestal, Pedestal is stretched out in locating dowel lower end afterwards, and rear locating dowel lower end sharply penetrates subsurface.
Some first reinforcements being embedded in pedestal are fixedly connected with the middle part of prelocalization post, connecting bolt outer end is fixed Be connected with some second reinforcements being embedded in pedestal, prelocalization post top be fixedly connected be embedded in it is some in pedestal The reinforcement of root the 3rd.
Propaganda board body includes rectangular frame and publicity board, horizontally disposed in rectangular frame to have two cross bars, square The vertical pole of connection, described fixation will be reinforced by being vertically provided with shape framework between cross bar and framework and two cross bars Plate leading flank is fixedly connected with the trailing flank of a cross bar on top, and publicity board is arranged in rectangular frame, is divided on rear side of publicity board It is not fixedly connected with cross bar and vertical pole leading flank.
Five support frames are fixedly uniformly arranged with left-right direction at the top of rectangular frame, and ceiling is placed on support frame and is in Low dip is set after preceding height, is fixedly connected between support frame and ceiling by screw.
Using above-mentioned technical proposal, the utility model pours pedestal, base on the ground of construction site using armored concrete The prelocalization post and rear locating dowel lower end set in seat penetrates ground, pedestal is had extremely strong stability.
Propaganda board body is arranged on pedestal, and locating sleeve coordinates with the grafting of prelocalization post, limits propaganda board body in base Position on seat, and will advertise that column body support is firm using hound.
Hound top and bottom are respectively adopted bolted removably and will advertise that column body is connected as with pedestal One, wind resistance is improved, and be easy to dismount, make the components such as ceiling, propaganda board body, hound, locating sleeve can be multiple Reuse;The volume of other pedestal is little, can also be transported to the reuse of other building sites.
First reinforcement, the second reinforcement and the 3rd reinforcement can ensure that prelocalization post, connecting bolt and rear locating dowel jail Connected as one by ground and pedestal.
Propaganda board body uses tower structure, is easy to processing and installation, and ceiling is detachably connected by screw with support frame Connect, ceiling reuses after can also dismantling.Illuminating lamp contributes to viewing publicity board, and play a part of street lamp at night.
In summary, the utility model is simple in construction, easy for installation, stability is strong, and wind resistance is good, and can be repeated several times Use, the pedestal that armored concrete pours is simple and easy for building enterprise, and cost is not also high.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 right view.
Embodiment
As depicted in figs. 1 and 2, construction building site of the present utility model propaganda board, including 1, two hound of ceiling 2nd, propaganda board body 3 and the pedestal 4 poured using armored concrete, pedestal 4 are arranged on ground 5 and are in cuboid Shape, the internal upper part of pedestal 4 are embedded with two horizontally disposed connecting bolts 6, and the rear end of connecting bolt 6 is protruded from pedestal 4 Side;
Propaganda board body 3 is vertically disposed at the top of pedestal 4 front side, and front side is embedded with two along vertical in pedestal 4 The prelocalization post 7 that direction is set, the upper end of prelocalization post 7 protrude from pedestal 4, and pedestal 4, prelocalization post 7 are stretched out in the lower end of prelocalization post 7 Lower end is sharply penetrated under ground 5, and the bottom of the trailing flank of propaganda board body 3 is vertically fixedly connected with locating sleeve 8, preceding fixed Position post 7 is plugged in locating sleeve 8, and the rear side surface top of propaganda board body 3 is fixedly connected with fixed plate 9, the upper end of hound 2 Be fixedly connected with upper junction plate 10, the lower end of hound 2 is fixedly connected with lower connecting plate 11, upper junction plate 10 with before fixed plate 9 Correspond to and connected by fastening bolt 12 afterwards, mounting hole is provided with lower connecting plate 11, connecting bolt 6 is inner to pass through mounting hole simultaneously Lower connecting plate 11 is contacted with the marquis side top pressure of pedestal 4 by clamp nut 24;
Ceiling 1 is fixedly connected on the top of propaganda board body 3, and the lower surface of ceiling 1 is provided with positioned at the front side of propaganda board body 3 Illuminating lamp 13.
Rear side is embedded with two rear locating dowels 14 being arranged in vertical in pedestal 4, and the rear upper end of locating dowel 14 is located at base In seat 4, pedestal 4 is stretched out in the rear lower end of locating dowel 14, and the rear lower end of locating dowel 14 is sharply penetrated under ground 5.
The middle part of prelocalization post 7 is fixedly connected with some first reinforcements 15 being embedded in pedestal 4, outside connecting bolt 6 End is fixedly connected with some second reinforcements 16 being embedded in pedestal 4, and the top of prelocalization post 7, which is fixedly connected with, is embedded in base Some 3rd reinforcements 17 in seat 4.
Propaganda board body 3 includes rectangular frame 18 and publicity board 19, horizontally disposed in rectangular frame 18 to have two Cross bar 20, connection will be reinforced by being vertically provided with rectangular frame 18 between cross bar 20 and framework and two cross bars 20 Vertical pole 21, the described leading flank of fixed plate 9 are fixedly connected with the trailing flank of a cross bar 20 on top, and publicity board 19 is arranged on square In shape framework 18, the rear side of publicity board 19 is fixedly connected with cross bar 20 and the leading flank of vertical pole 21 respectively.
The top of rectangular frame 18 is fixedly uniformly arranged with five support frames 22 in left-right direction, and ceiling 1 is placed on support frame Set on 22 and in low dip after preceding height, be fixedly connected between support frame 22 and ceiling 1 by screw 23.
The utility model pours pedestal 4 on the ground 5 of construction site using armored concrete, and it is preceding fixed to be set in pedestal 4 Position post 7 and the lower end of rear locating dowel 14 penetrate ground 5, pedestal 4 is had extremely strong stability.
Propaganda board body 3 is arranged on pedestal 4, and locating sleeve 8 coordinates with the grafting of prelocalization post 7, limits propaganda board body 3 Position on pedestal 4, and it is firm to use hound 2 to will advertise that column body 3 supports.
The top and bottom of hound 2 are respectively adopted bolted removably and will advertise that column body 3 is connected with pedestal 4 It is integrated, improves wind resistance, and be easy to dismount, makes the components such as ceiling 1, propaganda board body 3, hound 2, locating sleeve 8 It can repeatedly use;The volume of other pedestal 4 is little, can also be transported to the reuse of other building sites.
First reinforcement 15, the second reinforcement 16 and the 3rd reinforcement 17 can ensure that prelocalization post 7, connecting bolt 6 and after Locating dowel 14 securely connects as one with pedestal 4.
Propaganda board body 3 uses tower structure, is easy to processing and installation, and ceiling 1 can by screw 23 and support frame 22 Dismantling connection, ceiling 1 reuse after can also dismantling.Illuminating lamp 13 contributes to viewing publicity board 19, and play street lamp at night Effect.
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc. Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality With the protection domain of new technique scheme.

Claims (5)

1. construction building site propaganda board, it is characterised in that:Including ceiling, two hounds, propaganda board body and use The pedestal that armored concrete pours, pedestal are set on the ground and be in rectangular shape, and pedestal internal upper part is embedded with two Horizontally disposed connecting bolt, connecting bolt rear end protrude from base interior side surface;
Propaganda board body is vertically disposed at front side at the top of pedestal, and the interior front side of pedestal is embedded with two and is arranged in vertical Prelocalization post, prelocalization post upper end protrudes from pedestal, and pedestal is stretched out in prelocalization post lower end, and prelocalization post lower end sharply penetrates ground Under face, the bottom of propaganda board body trailing flank is vertically fixedly connected with locating sleeve, and prelocalization post is plugged in positioning sleeve In pipe, propaganda board body rear side surface top is fixedly connected with fixed plate, and the upper end of hound is fixedly connected with upper junction plate, tiltedly The lower end of strut is fixedly connected with lower connecting plate, and upper junction plate and fixed plate correspondence are simultaneously connected, lower company by fastening bolt Be provided with mounting hole on fishplate bar, connecting bolt it is inner through mounting hole and by clamp nut by lower connecting plate and pedestal marquis side Top pressure contacts;
Ceiling is fixedly connected on propaganda board bodies top, and ceiling lower surface is provided with the illuminating lamp on front side of propaganda board body.
2. construction building site according to claim 1 propaganda board, it is characterised in that:Rear side is embedded with two in pedestal The rear locating dowel being arranged in vertical, rear locating dowel upper end are located in pedestal, and pedestal, rear locating dowel are stretched out in rear locating dowel lower end Lower end sharply penetrates subsurface.
3. construction building site according to claim 2 propaganda board, it is characterised in that:It is fixedly connected in the middle part of prelocalization post There are some first reinforcements being embedded in pedestal, connecting bolt outer end is fixedly connected with some be embedded in pedestal Two reinforcements, prelocalization post top are fixedly connected with some 3rd reinforcements being embedded in pedestal.
4. construction building site according to claim 1 propaganda board, it is characterised in that:Propaganda board body includes rectangle frame Frame and publicity board, it is horizontally disposed in rectangular frame to have two cross bars, vertically it is provided with horizontal stroke in rectangular frame The vertical pole of connection is reinforced between bar and framework and two cross bars, after a cross bar on described fixed plate leading flank and top Side is fixedly connected, and publicity board is arranged in rectangular frame, is fixedly connected respectively with cross bar and vertical pole leading flank on rear side of publicity board.
5. construction building site according to claim 4 propaganda board, it is characterised in that:Along right and left at the top of rectangular frame To five support frames are fixedly uniformly arranged with, ceiling is placed on support frame and set in low dip after preceding height, support frame and top It is fixedly connected between canopy by screw.
CN201720690615.0U 2017-06-14 2017-06-14 Construction building site propaganda board Active CN207020924U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720690615.0U CN207020924U (en) 2017-06-14 2017-06-14 Construction building site propaganda board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720690615.0U CN207020924U (en) 2017-06-14 2017-06-14 Construction building site propaganda board

Publications (1)

Publication Number Publication Date
CN207020924U true CN207020924U (en) 2018-02-16

Family

ID=61486012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720690615.0U Active CN207020924U (en) 2017-06-14 2017-06-14 Construction building site propaganda board

Country Status (1)

Country Link
CN (1) CN207020924U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577198A (en) * 2018-11-07 2019-04-05 同济大学 Fastener Fabricated platform awning skeleton suitable for section assembling construction bridges
CN111081174A (en) * 2020-03-03 2020-04-28 山东理工职业学院 Steel structure billboard and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577198A (en) * 2018-11-07 2019-04-05 同济大学 Fastener Fabricated platform awning skeleton suitable for section assembling construction bridges
CN109577198B (en) * 2018-11-07 2021-05-11 同济大学 Fastener assembled canopy skeleton suitable for construction bridge is assembled to festival section
CN111081174A (en) * 2020-03-03 2020-04-28 山东理工职业学院 Steel structure billboard and construction method
CN111081174B (en) * 2020-03-03 2021-09-24 山东理工职业学院 Steel structure billboard and construction method

Similar Documents

Publication Publication Date Title
CN207020924U (en) Construction building site propaganda board
CN104533135A (en) Rail device capable of being rapidly installed and detached
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN203296470U (en) Finalization fence
CN211081084U (en) Tool type pole holding safety protection device
CN210530504U (en) Multifunctional protective railing for construction site
CN207568333U (en) A kind of economic and environment-friendly, repeatable assembled steel enclosing and enclosing component
CN211736673U (en) Prefabricated assembled type temporary building combined enclosing wall
CN203755798U (en) Grid fence
CN207053000U (en) Construction distribution box protector
CN207828948U (en) Curtain-type hinders sand-protecting barrier
CN209990237U (en) Isolation guardrail convenient to mount and dismount
CN207812355U (en) A kind of urban road and traffic engineering protective fence
CN204920453U (en) Modular enclose fender
CN206530144U (en) Translation component building fencing device for construction
CN206941473U (en) A kind of solar advertisement identifies pedestrian guardrail
CN207245045U (en) A kind of fence stairwell protection network
CN111335255A (en) Flood control plate sealing strip
CN202559840U (en) Temporary fence structure
CN205896588U (en) Display screen mounting bracket
CN206110015U (en) Limit for height frame of protection bridge
CN210049685U (en) Garden railing stand column
CN219605029U (en) Isolation device for building construction
EP2660800A1 (en) Road sign and the method for producing the same
CN214942430U (en) Novel template support for building engineering construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190107

Address after: 452375 Jinrong Garment Creative Park, South Side of Miqi Avenue, Quliang Town, Xinmi City, Zhengzhou City, Henan Province

Co-patentee after: Chang Fuqiang

Patentee after: Henan Jinxu Building Materials Technology Co., Ltd.

Co-patentee after: Yao Junqing

Co-patentee after: Shao Wentong

Address before: 450000 2, 903, Xinyuan, Xinyuan, intersection of Longhai Road and Qingfeng street, 27 District, Zhengzhou, Henan.

Patentee before: Zhou Chengjun

TR01 Transfer of patent right