CN207020272U - Solar cell testing lines device - Google Patents

Solar cell testing lines device Download PDF

Info

Publication number
CN207020272U
CN207020272U CN201720802935.0U CN201720802935U CN207020272U CN 207020272 U CN207020272 U CN 207020272U CN 201720802935 U CN201720802935 U CN 201720802935U CN 207020272 U CN207020272 U CN 207020272U
Authority
CN
China
Prior art keywords
connector
cable
unit
interface
current pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720802935.0U
Other languages
Chinese (zh)
Inventor
李康
刁海南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI CAMA OPTOELECTRONIC EQUIPMENT CO Ltd
Original Assignee
SHANGHAI CAMA OPTOELECTRONIC EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CAMA OPTOELECTRONIC EQUIPMENT CO Ltd filed Critical SHANGHAI CAMA OPTOELECTRONIC EQUIPMENT CO Ltd
Priority to CN201720802935.0U priority Critical patent/CN207020272U/en
Application granted granted Critical
Publication of CN207020272U publication Critical patent/CN207020272U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Individual Semiconductor Devices (AREA)

Abstract

Solar cell testing lines device, at least two groups of solar panels 1 and at least two group storage batteries 2 are connected respectively to photovoltaic controller 3, simultaneously, connector 4 is connected by photovoltaic controller 3, industrial computer 5 is integrally connected by connector 4 again, high voltage testing device 6, high-clear display 7 and testing lines unit 8 are installed on integral industrial computer 5.Realize the automation of cable on-line checking, automatic decision product type to be measured, without operating personnel, sporadically current state is watched whether in controlled range in scene, and test system is adjusted, the characteristics of cable model to be tested is more are adapted to, real-time display, record simultaneously preserve data, facilitate operating personnel to observe product current state, the workload of operating personnel is reduced, improves testing efficiency.

Description

Solar cell testing lines device
Technical field
It the utility model is related to battery line production auxiliary detection technique, the especially solar cell in photovoltaic apparatus equipment Testing lines device.
Background technology
Generally the wiring system for connecting photovoltaic module and inverter will not be considered as critical component, still, failing to adopting With the private cable of application of solar energy, it will have influence on the service life of whole system.
Solar cables are a kind of beam crossover link cables, and rated temperature is 120 DEG C, can be resisted in corresponding device Extreme climate environment and it is subjected to mechanical shock.According to international standard IEC216, solar cables, in outdoor environment, it is used Life-span is 8 times of rubber cable, is 32 times of PVC cables.These cables and part not only have optimal weather resistance, resistance to purple Outside line and ozone attack, and can bear larger range of temperature change (such as:From -40 DEG C to 125 DEG C).In solar energy It is necessary in system using special solar cable and part.
For photovoltaic application, the material that open air uses should be according to ultraviolet, ozone, dramatic temperature change and chemical erosion Depending on situation.Low-grade material is used under this kind of environmental stress, cable cover(ing) will be caused frangible, or even cable insulation can be decomposed Layer.All these situations all can directly increase cable system loss, while the risk that cable short circuit occurs can also increase, Cong Zhongchang Phase sees that the possibility that fire or personnel's injury occurs is also higher.
In fact, during installation and maintenance, cable can connect up on the sharp edge of roof structure, while cable must bear to press Power, bending, tension force, it is stretched across load and brute force attack.If cable cover(ing) insufficient strength, cable insulation will be by It is badly damaged, so as to influence the service life of whole cable, or cause short circuit, fire and personnel to injure going out for the problems such as dangerous It is existing.
The characteristic of photovoltaic cable is determined by its cable special isolation material and protective cover material, and we term it crosslinking PE, warp Cross after irradiation accelerator irradiation, the molecular structure of CABLE MATERIALS can change, so as to provide the performance of its aspect.Resistance to mechanical In fact, during installation and maintenance, cable can connect up load on the sharp edge of roof structure, at the same cable must bear pressure, Bending, tension force, it is stretched across load and brute force attack.If cable cover(ing) insufficient strength, cable insulation will be by tight Damage again, so as to influence the service life of whole cable, or cause short circuit, fire and personnel to injure going out for the problems such as dangerous It is existing.
Conductor wire core D.C. resistance is not more than 5.09 Ω/km during 20 DEG C of finished cable.Finished cable (20m) is in (20 ± 5) Do not puncture through 5min voltage tests (exchange 6.5kV or direct current 15kV) after time 1h is immersed in DEG C water.The long 5m of sample, is put into (85 ± 2) (240 ± 2) h in the distilled water containing 3% sodium chloride (NaCl) DEG C, expose the surface 30cm at both ends.It is between core and water plus straight Flow 0.9kV voltages (conductor wire core connects positive pole, and water connects negative pole).Inundate Voltage Experiment is carried out after taking out sample, test voltage is friendship Flow 1kV, it is desirable to do not puncture.Insulaion resistance is not less than 1014 Ω cm during 20 DEG C of finished cable, insulated electro during 90 DEG C of finished cable Resistance is not less than 1011 Ω cm.Finished cable jacket surface resistance should be not less than 109 Ω.Apparatus for Pressure at high-temp (GB/ T2951.31-2008);Temperature (140 ± 3) DEG C, time 240min, k=0.6, depth of cup are no more than insulation and sheath total thickness The 50% of degree.And carry out AC6.5kV, 5min voltage test, it is desirable to do not puncture.Sample is in 90 DEG C of temperature, relative humidity 85% 1000h is placed under environment, is cooled to after room temperature compared with before experiment, tensile strength change≤- 30%, the change of elongation at break Rate≤- 30%.Acid and alkali-resistance solution trial (GB/T 2951.21-2008), two groups of samples are dipped in the grass that concentration is 45g/L respectively In acid solution and the sodium hydroxide solution that concentration is 40g/L, temperature is 23 DEG C, time 168h, and compared with soaking before solution, tension is strong Spend rate of change≤± 30%, elongation at break >=100%.Low-temperature impact test (8.5 in GB/T 2951.14-2008) will Ask, -40 DEG C of chilling temperature, time 16h, quality of dropping hammer 1000g, impact block quality 200g, height of drop 100mm, surface should not There is eyesight visible crack.Low temperature bend test (8.2 in GB/T 2951.14-2008) requirement, chilling temperature (- 40 ± 2) DEG C, Time 16h, 4~5 times of a diameter of outside diameter of cable of coupon, around 3~4 circles, jacket surface should not have eyesight visible crack after experiment.
Due to no special test equipment, at present, solar cables test implementation method is with light tight test box, tune The system that meter, illumination photometer, solar modules tester and solar battery sheet test fixture are formed is pressed to be tested.Test Process steps content is complicated, cumbersome, and test job is less efficient.
Utility model content
The purpose of this utility model is to provide solar cell testing lines device, design specialized equipment, and system is realized too Positive energy battery cable test integration and autgmentability.
The purpose of this utility model will be realized by following technical measures:Including solar panels 1, battery 2, photovoltaic control Device 3, connector 4, integral industrial computer 5, high voltage testing device 6, high-clear display 7 and testing lines unit 8 processed;At least two groups of sun Can plate 1 and at least two group storage batteries 2 are connected respectively to photovoltaic controller 3, meanwhile, connector 4 is connected by photovoltaic controller 3, then Industrial computer 5 is integrally connected by connector 4, high voltage testing device 6, high-clear display 7 and testing lines are installed on integral industrial computer 5 Unit 8.
Especially, the Ω of the test resistance of testing lines unit 8≤2;Monolithic solar panel 1 power 155W, voltage 18V, Electric current 8.6A, 8 pieces of quantity, connected mode, 4 strings 2 are simultaneously;The specification 12V200AH of monolithic battery 2,6 pieces of quantity, connected mode 3 and 2 String.
Especially, integral industrial computer 5 is arranged in technical grade draw-bar box.
Especially, overload flow safety guard is installed on testing lines unit 8.
Especially, testing lines unit 8 includes line footpath tester, high-frequency spark testing machine, concavo-convex defect detection instrument, metering Device, PLC control unit, communication protocol converter and audible-visual annunciator, high-frequency spark testing machine, concavo-convex defect detection instrument, Line footpath tester, meter-measuring device connect PLC control unit, PLC control unit connecting communication protocol converter and acousto-optic respectively Alarm, communication protocol converter are integrally connected industrial computer 5.
Especially, testing lines unit 8 includes circuit board, the PLD and connector being installed on circuit board Group, connector group include the first connector and the second connector for connection cables both ends, and PLD includes inspection Module and storage module are surveyed, storage module is stored with the pin number, pin positions relation and corresponding different cables of different cables Pin number and pin positions relation model data, detection module be used for detect cable current pin number and work as front tube Placement of foot relation, and corresponding current pin number is found out from storage module according to current pin number and current pin position relationship And current pin position relationship model data and be shown on high-clear display 7.Wherein, detect module include detection unit, Comparing unit and control unit, the detection unit be used for the current pin number for detecting cable between two connector and Current pin position relationship, the comparing unit be used for according to the current pin number and the current pin position relationship from The storage module finds out the model data of the corresponding current pin number and the current pin position relationship, and by described in Model data is sent to described control unit, and described control unit is used to control is shown in display device by the model data On.First connector connects power supply by first resistor, and second connector is grounded by second resistance, and the detection unit is also The first voltage value of the first resistor is flowed through for detection and flows through the second voltage value of the second resistance, and the control is single Member is used to calculate the impedance value of the cable and by the impedance by the first voltage value and the second voltage value Value is shown on the display device.Detection unit is additionally operable to detect the third voltage value at the cable both ends, and the control is single Member is used to judge the cable when the third voltage value is not zero for on-state, and for being in the third voltage value Judge the cable for off state when zero.The first interface for connecting first connector and connection institute are installed on circuit board The second interface of display device is stated, the first interface and the second interface connect the PLD, institute respectively State first voltage value and the second voltage value is sent to the detection unit by the first interface, the impedance value passes through The second interface is sent to the display device;First interface is analog-digital converter port.The company of being provided with circuit board The first interface of first connector is connect, the first interface connects the PLD, the current pin Several and described current pin position relationship is sent to the detection module by the first interface.First interface is universal input Output port.PLD is CPLD or field programmable gate array.
The advantages of the utility model and effect:Realize the automation of cable on-line checking, automatic decision product type to be measured, Without operating personnel, sporadically current state is watched whether in controlled range in scene, and test system is adjusted, and fits The characteristics of answering cable model to be tested more, real-time display, record simultaneously preserve data, facilitate operating personnel to observe the current shape of product State, the workload of operating personnel is reduced, improve testing efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment 1.
Reference includes:
Solar panel 1, battery 2, photovoltaic controller 3, connector 4, integral industrial computer 5, high voltage testing device 6, height Clear display 7, testing lines unit 8.
Embodiment
The utility model principle is, is used for connecting solar battery array component and testing lines unit with private cable;Line Cable test unit is according to conducting of the instruction to solar battery array component cable and insulation memory test, and by test result original number According to output to industrial computer.
The utility model includes:Solar panels 1, battery 2, photovoltaic controller 3, connector 4, integral industrial computer 5, high pressure Tester 6, high-clear display 7 and testing lines unit 8.
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1:As shown in Figure 1, at least two groups of solar panels 1 and at least two group storage batteries 2 are connected respectively to photovoltaic Controller 3, meanwhile, connector 4 is connected by photovoltaic controller 3, then industrial computer 5 is integrally connected by connector 4, in integral industrial computer High voltage testing device 6, high-clear display 7 and testing lines unit 8 are installed on 5.
In foregoing, the Ω of the test resistance of testing lines unit 8≤2, using external ripe accurate mature technology;Temperature calibration will Ask high, using 4 line methods of testing.
In foregoing, integral industrial computer 5 is arranged in technical grade draw-bar box.
In foregoing, overload flow safety guard is installed, for protecting solar panel 1 on testing lines unit 8 Upper electronic component, overload flow safety guard multi-stage protection, first, ceiling voltage is set on hardware, second, software supervision Ceiling voltage, once voltage alarm, automatic interrupt test.
In foregoing, monolithic solar panel 1 power 155W, voltage 18V, electric current 8.6A, 8 pieces of quantity, connected mode, 4 String 2 is simultaneously;The specification 12V200AH of monolithic battery 2,6 pieces of quantity, connected mode 3 and 2 strings.
In foregoing, testing lines unit 8 includes line footpath tester, high-frequency spark testing machine, concavo-convex defect detection instrument, metering Device, PLC control unit, communication protocol converter and audible-visual annunciator, high-frequency spark testing machine, concavo-convex defect detection instrument, Line footpath tester, meter-measuring device connect PLC control unit, PLC control unit connecting communication protocol converter and acousto-optic respectively Alarm, communication protocol converter are integrally connected industrial computer 5.
In foregoing, testing lines unit 8 includes circuit board, the PLD and connector being installed on circuit board Group, connector group include the first connector and the second connector for connection cables both ends, and PLD includes inspection Module and storage module are surveyed, storage module is stored with the pin number, pin positions relation and corresponding different cables of different cables Pin number and pin positions relation model data, detection module be used for detect cable current pin number and work as front tube Placement of foot relation, and corresponding current pin number is found out from storage module according to current pin number and current pin position relationship And current pin position relationship model data and be shown on high-clear display 7.Wherein, detect module include detection unit, Comparing unit and control unit, the detection unit be used for the current pin number for detecting cable between two connector and Current pin position relationship, the comparing unit be used for according to the current pin number and the current pin position relationship from The storage module finds out the model data of the corresponding current pin number and the current pin position relationship, and by described in Model data is sent to described control unit, and described control unit is used to control is shown in display device by the model data On.First connector connects power supply by first resistor, and second connector is grounded by second resistance, and the detection unit is also The first voltage value of the first resistor is flowed through for detection and flows through the second voltage value of the second resistance, and the control is single Member is used to calculate the impedance value of the cable and by the impedance by the first voltage value and the second voltage value Value is shown on the display device.Detection unit is additionally operable to detect the third voltage value at the cable both ends, and the control is single Member is used to judge the cable when the third voltage value is not zero for on-state, and for being in the third voltage value Judge the cable for off state when zero.The first interface for connecting first connector and connection institute are installed on circuit board The second interface of display device is stated, the first interface and the second interface connect the PLD, institute respectively State first voltage value and the second voltage value is sent to the detection unit by the first interface, the impedance value passes through The second interface is sent to the display device;First interface is analog-digital converter port.The company of being provided with circuit board The first interface of first connector is connect, the first interface connects the PLD, the current pin Several and described current pin position relationship is sent to the detection module by the first interface.First interface is universal input Output port.PLD is CPLD or field programmable gate array.
In the present embodiment, integral industrial computer 5 is installed corresponding test special-purpose software and mainly sent out to testing lines unit Go out dependent instruction, receive test data, generation form, store and output test result.
At work, test connected mode is that solar panel 1 is tested by cable connection cables to be measured to the present embodiment Unit 8, further, testing lines unit 8 are connected to integral industrial computer 5 and then connect output equipment.
Testing procedure includes:
1) 1 gust of component of solar panel and testing lines unit 8 are connected by client cables;
2) specific test and measure software is opened;
3) required according to user after test assignment is set, automatic configuration parameter;
4) start to test, high voltage testing device 6, high-clear display 7 and the automatic data collection test result of testing lines unit 8, Alarm, generation form and storage;
5) report output.It is sent to integral industrial computer 5.
Test parameter includes:
A) test point:128 points, 1024 points can be expanded in units of 128 points.
B) low voltage experiment:2 lines, voltage highest 4V, electric current 3 μ A~6mA, 0.1 Ω of resistance~100k Ω ± 1%, 100k Ω ~5M Ω ± 10%;4 lines, resistance highest 4V, electric current 1mA~1A, the Ω of resistance 0.001~Ω of 10 Ω ± 2% ± 0.001;Element Test, diode:Silicon, LED, germanium, breakdown reverse voltage>4V, 0.1 Ω of resistance~100k Ω ± 1% ± 0.1 Ω, 100k Ω~ Whether 5M Ω ± 10%, the μ F ± 10% ± 0.02nF of electric capacity 5nF~100, checking twisted-pair feeder pairing are correct.
C) Hi-pot test;1) insulation impedance is tested, voltage 50~1500VDC ± 5% ± 5V;Resistance 5M Ω~1000M Ω ± 10%.
2) voltage-withstand test;Voltage 50~1500VDC ± 5% ± 5V, current limit 0.1mA~1.5mA;Each network is maximum Electric capacity 150nF@300VDC, 90nF@500VDC, 45nF@1000VDC, 30nF@1500VDC, 9.5nF@1000VAC.
It will be apparent to those skilled in the art that production can be combined according to the technical solution of the utility model and inventive concept Be actually needed and make other and be altered or modified accordingly, and these change and adjustment should all belong to disclosed in the utility model Scope.

Claims (7)

1. solar cell testing lines device, including solar panels 1, battery 2, photovoltaic controller 3, connector 4, integral work Control machine 5, high voltage testing device 6, high-clear display 7 and testing lines unit 8;Characterized in that, at least two groups of solar panels 1 and extremely Few two group storage batteries 2 are connected respectively to photovoltaic controller 3, meanwhile, connector 4 is connected by photovoltaic controller 3, then by connector 4 Industrial computer 5 is integrally connected, high voltage testing device 6, high-clear display 7 and testing lines unit 8 are installed on integral industrial computer 5.
2. solar cell testing lines device as claimed in claim 1, it is characterised in that testing lines unit 8 tests electricity Hinder≤2 Ω;Monolithic solar panel 1 power 155W, voltage 18V, electric current 8.6A, 8 pieces of quantity, connected mode, 4 strings 2 are simultaneously;It is single The specification 12V200AH of block battery 2,6 pieces of quantity, connected mode 3 and 2 strings.
3. solar cell testing lines device as claimed in claim 1, it is characterised in that integral industrial computer 5 is arranged on work In industry level draw-bar box.
4. solar cell testing lines device as claimed in claim 1, it is characterised in that installed on testing lines unit 8 Overload flow safety guard.
5. solar cell testing lines device as claimed in claim 1, it is characterised in that testing lines unit 8 includes line Footpath tester, high-frequency spark testing machine, concavo-convex defect detection instrument, meter-measuring device, PLC control unit, communication protocol converter with And audible-visual annunciator, high-frequency spark testing machine, concavo-convex defect detection instrument, line footpath tester, meter-measuring device connect PLC controls respectively Unit, PLC control unit connecting communication protocol converter and audible-visual annunciator, communication protocol converter are integrally connected industrial computer 5。
6. solar cell testing lines device as claimed in claim 1, it is characterised in that testing lines unit 8 includes electricity Road plate, the PLD being installed on circuit board and connector group, connector group are included for connection cables both ends First connector and the second connector, PLD include detection module and storage module, and storage module is stored with not With the model number of the pin number of cable, the pin number of pin positions relation and corresponding different cables and pin positions relation Be used to detecting the current pin number and current pin position relationship of cable according to, detection module, and according to current pin number and Current pin position relationship from storage module find out corresponding current pin number and current pin position relationship model data and It is shown on high-clear display 7.
7. solar cell testing lines device as claimed in claim 6, it is characterised in that it is single that detection module includes detection Member, comparing unit and control unit, the detection unit are used for the current pin for detecting the cable between two connector Number and current pin position relationship, the comparing unit are used to be closed according to the current pin number and the current pin position It is the model data that the corresponding current pin number and the current pin position relationship are found out from the storage module, and will The model data sends to described control unit, described control unit and the model data is shown in into display for control and set It is standby upper;First connector connects power supply by first resistor, and second connector is grounded by second resistance, the detection unit Detection is additionally operable to flow through the first voltage value of the first resistor and flow through the second voltage value of the second resistance, the control Unit is used to calculate the impedance value of the cable and by the resistance by the first voltage value and the second voltage value Anti- value is shown on the display device;Detection unit is additionally operable to detect the third voltage value at the cable both ends, the control Unit is used to judge the cable when the third voltage value is not zero for on-state, and in the third voltage value It is off state that the cable is judged when being zero;The first interface for connecting first connector and connection are installed on circuit board The second interface of the display device, the first interface and the second interface connect the PLD respectively, The first voltage value and the second voltage value are sent to the detection unit by the first interface, and the impedance value leads to Cross the second interface and be sent to the display device;First interface is analog-digital converter port;It is provided with circuit board The first interface of first connector is connected, the first interface connects the PLD, the current pin Number and the current pin position relationship are sent to the detection module by the first interface;First interface is general defeated Enter output port;PLD is CPLD or field programmable gate array.
CN201720802935.0U 2017-07-04 2017-07-04 Solar cell testing lines device Expired - Fee Related CN207020272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720802935.0U CN207020272U (en) 2017-07-04 2017-07-04 Solar cell testing lines device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720802935.0U CN207020272U (en) 2017-07-04 2017-07-04 Solar cell testing lines device

Publications (1)

Publication Number Publication Date
CN207020272U true CN207020272U (en) 2018-02-16

Family

ID=61483583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720802935.0U Expired - Fee Related CN207020272U (en) 2017-07-04 2017-07-04 Solar cell testing lines device

Country Status (1)

Country Link
CN (1) CN207020272U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112230166A (en) * 2020-03-31 2021-01-15 蜂巢能源科技有限公司 Module harness on-off test device and method and module offline test system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112230166A (en) * 2020-03-31 2021-01-15 蜂巢能源科技有限公司 Module harness on-off test device and method and module offline test system

Similar Documents

Publication Publication Date Title
CN101408579B (en) Oil paper insulated electrothermic aging test and local discharge integrated detection device of transformer
CN201788265U (en) Tester for battery protection board
CN206975183U (en) A kind of motor insulation condition diagnosis device
CN105510786B (en) A kind of high-tension cable typical defect simulation test platform
CN1786721A (en) On line detecting system with double Y connection wire power capacitor set
CN112557847A (en) Polypropylene cable composite aging test device and method
CN207020272U (en) Solar cell testing lines device
CN102542881B (en) Cable fault simulator and cable fault simulation system
CN103852411A (en) Method for evaluating running aging of thermal shrinkage insulating material
CN206756989U (en) A kind of arrester detecting device
CN115389874A (en) Electrical cabinet insulation performance online detection method
CN106093664A (en) Electric car conduction charging measurement system
CN212031607U (en) Test device for accelerated life test
CN204085742U (en) A kind of temperature acquisition loop tester
CN205280889U (en) High tension cable typical case defect emulation test platform
CN212301751U (en) Quick detection device of anti electrical tree ability of crosslinked polyethylene cable
CN206259096U (en) A kind of high voltage debugging mock-up
CN207067323U (en) Insulating point that solar panel is pressure-resistant examines frock
WO2023003242A1 (en) Battery fire prevention and diagnosis system
CN217332802U (en) Cable calibration instrument
CN204256108U (en) Vehicle wiring High-Voltage Insulation pick-up unit
CN204256107U (en) Wire harness High-Voltage Insulation pick-up unit
CN110927626A (en) Automatic master station prototype system for identifying topology of medium and low voltage power distribution network
CN209912203U (en) Automatic real device of instructing of meteorological station simulation
CN109270401A (en) A kind of experimental rig and test method for the secondary ray examination in Current Voltage circuit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180216