CN207019683U - The detachable square settlement observation point of combination - Google Patents
The detachable square settlement observation point of combination Download PDFInfo
- Publication number
- CN207019683U CN207019683U CN201720302896.8U CN201720302896U CN207019683U CN 207019683 U CN207019683 U CN 207019683U CN 201720302896 U CN201720302896 U CN 201720302896U CN 207019683 U CN207019683 U CN 207019683U
- Authority
- CN
- China
- Prior art keywords
- detachable
- pullover
- observation
- square
- observation point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
It the utility model is related to concrete pouring quality control, more particularly to a kind of concreting settlement observation point.The detachable square settlement observation point of combination, it includes:It includes embedded sleeve barrel and detachable observation pullover:The embedded sleeve barrel is horizontally disposed and is welded and fixed with structure reinforcing bars, and detachable square observation pullover is made up of detachable screw and square observation pullover, and embedded sleeve barrel is consistent with detachable observation pullover absolute altitude.Collision when the utility model can avoid form removable to settlement observation point, protection former material will not produce deformation;Improve the accuracy of measurement data.
Description
Technical field
It the utility model is related to concrete pouring quality control, more particularly to a kind of concreting settlement observation point.
Background technology
When carrying out settlement observation point construction using traditional handicraft, component position in concreting easily produces inclined
From;After concreting, form removable is more difficult, is easily damaged raw material;Settlement observation point construction is carried out using traditional handicraft
When, settlement observation point component contacts with levelling rod for cambered surface, reduces the accuracy of settlement observation point measurement data.
The content of the invention
A kind of the defects of the utility model is intended to overcome prior art, there is provided detachable square settlement observation point of combination.
Collision when the utility model can avoid form removable to settlement observation point, protection former material will not produce deformation;Improve measurement
The accuracy of data.
What the present utility model was realized in:The detachable square settlement observation point of combination, it includes embedded sleeve barrel
With detachable observation pullover:The embedded sleeve barrel is horizontally disposed and is welded and fixed with structure reinforcing bars, detachable square observation
Pullover is made up of detachable screw and square observation pullover, and embedded sleeve barrel is consistent with detachable observation pullover absolute altitude.
The utility model is in concreting, it is only necessary to pre-buried settlement observation point sleeve, it is possible to increase settlement observation point
The accuracy of pre-buried position;During using detachable combination square settlement observation point construction, to heavy when can avoid form removable
The collision of observation station is dropped, and protection former material will not produce deformation;During settlement observation point construction square using detachable combination, sedimentation
Observation station component contacts with levelling rod for horizontal plane, and increase levelling rod bases oneself upon face, improves the accuracy of measurement data.This practicality
Novel operating is simple, strong applicability, flexible construction the features such as;
The recycling rate of waterused of material can be increased, save material cost;The proportion of goods damageds of template can be reduced;The later stage is reduced to apply
Work process, save cost of labor.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 the utility model floor map;
Fig. 2 is the utility model elevational schematic view.
Embodiment
As depicted in figs. 1 and 2:The detachable square settlement observation point of combination, it includes 1 detachable observation of embedded sleeve barrel
Pullover 2:The embedded sleeve barrel is horizontally disposed and is welded and fixed with structure reinforcing bars, and detachable square observation pullover is by detachable
Screw and square observation pullover composition, embedded sleeve barrel are consistent with detachable observation pullover absolute altitude.
Claims (1)
1. the detachable square settlement observation point of combination, it is characterised in that it includes embedded sleeve barrel and detachable observation pullover:
The embedded sleeve barrel is horizontally disposed and is welded and fixed with structure reinforcing bars, detachable square observation pullover by detachable screw with
Square observation pullover composition, embedded sleeve barrel are consistent with detachable observation pullover absolute altitude.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720302896.8U CN207019683U (en) | 2017-03-27 | 2017-03-27 | The detachable square settlement observation point of combination |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720302896.8U CN207019683U (en) | 2017-03-27 | 2017-03-27 | The detachable square settlement observation point of combination |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207019683U true CN207019683U (en) | 2018-02-16 |
Family
ID=61460509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720302896.8U Active CN207019683U (en) | 2017-03-27 | 2017-03-27 | The detachable square settlement observation point of combination |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207019683U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109357660A (en) * | 2018-11-22 | 2019-02-19 | 国网天津市电力公司 | Building drawing and pulling type settlement observation method |
-
2017
- 2017-03-27 CN CN201720302896.8U patent/CN207019683U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109357660A (en) * | 2018-11-22 | 2019-02-19 | 国网天津市电力公司 | Building drawing and pulling type settlement observation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207019683U (en) | The detachable square settlement observation point of combination | |
CN105133487A (en) | Combined type bridge temporary support and construction method for rapidly building continuous beams by virtue of same | |
CN203867082U (en) | Negative moment reinforcement protective layer control tripod | |
CN203947743U (en) | Wall surface mortar strikes off trowelling machine exclusive guideway system | |
CN203069118U (en) | Casting thickness measuring device for concrete cast-in-place slab | |
CN103806650B (en) | A kind of steel column mould form of construction work | |
CN106223960A (en) | High ferro major long tunnel inverted arch moves integrally mould bases construction | |
CN202744907U (en) | Concrete leveling, paste lifting and elevation control integrated device for bed plates | |
CN104085048B (en) | A kind of concrete mixer adds proportioner | |
CN204645667U (en) | A kind of reinforcement assembling mold for pier columns | |
CN203957124U (en) | A kind of concrete mixer adds proportioner | |
CN207923064U (en) | A kind of easy device detecting concrete floor slab construction thickness and flatness | |
CN204850478U (en) | Controlling means is pour to concrete floor thickness | |
CN203879014U (en) | Cast-in-situ concrete floor thickness control device | |
CN203755682U (en) | Secondary pouring form board constructing structure for small opening of concrete structure floor slab | |
CN205153543U (en) | Simple and easy template reinforcing apparatus | |
CN205035732U (en) | Interim support of combined type bridge | |
CN202710368U (en) | Mould for impermeable concrete specimens | |
CN204418666U (en) | A kind of building site is with there being side wall stair template | |
CN103899075B (en) | Construction ruler and construction method for recycling mortar and calibrating plaster layer construction datum | |
CN207775674U (en) | Concrete road surface channel steel mould plate supporting device | |
CN205822733U (en) | A kind of wall-surface screeding robot | |
CN202491303U (en) | Concrete mixer | |
CN207499463U (en) | A kind of cast-in-place concrete floor elevation control device | |
CN203452350U (en) | Scraper and spatula system for achieving scraping and trowelling integral forming of wall space mortar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |