CN207017487U - There is the strong prefabricated member of biasing hole wall for assembling steel building - Google Patents
There is the strong prefabricated member of biasing hole wall for assembling steel building Download PDFInfo
- Publication number
- CN207017487U CN207017487U CN201720926387.2U CN201720926387U CN207017487U CN 207017487 U CN207017487 U CN 207017487U CN 201720926387 U CN201720926387 U CN 201720926387U CN 207017487 U CN207017487 U CN 207017487U
- Authority
- CN
- China
- Prior art keywords
- anticracking
- steel plate
- welded
- spacing steel
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
There is a strong prefabricated member of biasing hole wall for assembling steel building, including the first structure column (G1 1) for the hole both sides that are placed in and the second structural upright (G1 2), the spacing steel plate of the first anticracking (G8) on the inside of first structure column and the second structural upright is respectively welded by intermittent weld, splits that hole is upper and lower and both ends are respectively welded in the crossbeam (G2) on first structure column and the second structural upright, are welded in by intermittent weld the spacing steel plates of the second anticracking (G9) of both sides above and below crossbeam.The utility model, which can improve assembling type steel structure building, the efficiency of assembling of hole metope, reduce the steel member installation and building wall work of job site, building wall, installation difficulty are reduced, improves the bulk strength and weight capacity of component, and system solves the problem of Cracking of steel building wall.
Description
Technical field
Structural engineering technical field is the utility model is related to, it is specially a kind of to be applied to what assembling type steel structure was built
Assembled wall body construction technical field of structures.
Background technology
In the country that ' S Steel Industry is ripe, accounting of the steel construction in building structure is generally more than 40%, and mesh
Preceding China uses the building accounting only 6% of steel construction.The high energy consumption of reinforced concrete structure, waste of resource, field labor be intensive,
The problems such as bringing great pressure to ecological environment needs China badly and world architecture industry solves.Steel construction is that preferable green is built
Product is built, anti-seismic performance is extremely superior.Steel construction is used for dwelling house system, gives full play to the characteristic of Steel Structure Industry, and it is full
The functional requirement of sufficient residential housing, it is an extremely important and urgent job.
Steel building is primarily present problems with present:(1) the steel-frame structure wall between all beams, post component on the whole
Body is rectangle, and the wall assembling to residential structure provides preferable execution conditions, but residence model is more different in nature, wall cloth
The features such as putting irregularities exists so as to limit frame structure so that frame column net is difficult to the Lateral Resistant System to form modular system
Application in residential housing, the high wall body construction of standardization level can not be more formed, steel-frame structure rigidity is relatively low in addition.
(2) current connection joints of steel structure constrains the application of small-sized steel core concrete column.Currently used connecting node is in steel
The position that post corresponds to flange of beam sets diaphragm plate, in order to facilitate the pouring of steel pipe column interior concrete, needs to set on dividing plate and is in the milk
Hole and air-vent, the diameter of grout hole are not preferably less than 150mm.In addition, in order to which the transmission of nodes domains internal force needs, grout hole is to dividing plate
Weakening can not be excessive, can not be too small which has limited the cross-sectional width of steel column, cross-sectional width is typically no less than 350~400mm.And
In steel building, excessive steel column section projection external corner can occur in the corner of each function room of house, influence room
Interior building uses function.Architectural design is wished structural elements being hidden in thickness of wall body, and this requires the steel that premises uses
Member section width control system is within 240mm.(3) although steel construction has higher industrialization attribute, with steel construction phase
Supporting wall industrialization degree is relatively low, and live wall assembly work amount is larger, and for there is the wall of diagonal brace, scene is applied
The problems such as work hardly possible, waste of material, crack treatment, is more prominent.
The content of the invention
The utility model provide it is a kind of be used for assemble steel building have biasing hole wall strong assembled structure
Part, it is therefore intended that on the premise of ensuring that steel building wall has sufficient intensity and rigidity, improve assembling type steel structure and build
The efficiency of assembling of hole metope is built, the steel member installation and building wall work of job site is reduced, reduces building wall, peace
Difficulty is filled, improves the bulk strength and weight capacity of component, and system solves the problem of Cracking of steel building wall.
The purpose of this utility model adopts the following technical scheme that realization:
There are the strong prefabricated member of biasing hole wall, including the hole both sides that are placed in for assembling steel building
First structure column and the second structural upright, be respectively welded in first structure column and the second structural upright by intermittent weld
The spacing steel plate of the first anticracking of inner side, split hole up and down and both ends be respectively welded in first structure column and the second structural upright
On crossbeam, be welded in by intermittent weld the spacing steel plate of the second anticracking of both sides above and below crossbeam, pour in hole lower and upper cross-member
On collection flitch;The first structure column, which includes two luminal perfusions being parallel to each other, dividing post, being spaced welding for concrete
In two one group first be divided between post transverse connections, the 3rd anticracking being welded in by intermittent weld on the inside of two pieces points of posts limit
Position steel plate, the spacing steel plate of the 4th anticracking being welded in by intermittent weld above and below the first transverse connection, pour in two pieces points of posts
Between the first collection material strip, the 3rd spacing steel plate of anticracking is connected with the 4th spacing steel plate of anticracking by angle welding;Second knot
Structure column, which includes two luminal perfusions being parallel to each other, be divided to that post, interval be welded between two pieces points of posts one group of concrete the
Two transverse connections, it is welded in the diagonal brace being diagonally welded between adjacent two second transverse connections, by intermittent weld
The spacing steel plate of the 3rd anticracking on the inside of two pieces points of posts, the 4th anticracking being welded in by intermittent weld above and below the second transverse connection
Spacing steel plate, the spacing steel plate of the 5th anticracking on two inclined-planes above and below diagonal brace is welded in by intermittent weld, is poured in two pieces points of posts
Between the second collection material strip, the spacing steel plate one end of the 3rd anticracking is connected with the 4th spacing steel plate of anticracking by angle welding, the other end
It is connected with the 5th spacing steel plate of anticracking by angle welding;Collect flitch up and down edge sealing light-gauge steel section both ends respectively with both sides first
The spacing steel plate of anticracking is connected by angle welding, the both ends of the spacing steel plate of the second anticracking spacing steel plate of the first anticracking with both sides respectively
Connected by angle welding.
The utility model can be used for steel construction assembled architecture to have the assembling of biasing hole wall, and the utility model is truss
Formula structure wall, the difference of hole both sides stress when being biased according to hole on wall, in hole both sides using the vertical of different structure
Post, the good combination of steel building retaining wall and framework can be achieved, ensuring that steel building wall has sufficient intensity
On the premise of rigidity, building safe enough, the efficiency of assembling of assembling type steel structure building is improved, reduces the steel structure of job site
Part is installed and building wall work, reduces building wall, installation difficulty.Used first structure column and the second structural upright
Structural strength it is high, stabilized structure is reliable, and the structural strength of especially the second structural upright is higher, makes whole element structure enough
It is solid and reliable, possess enough weight capacities, disclosure satisfy that the peak demand of existing steel building.Set anticracking is spacing
Steel plate system solves the problem of Cracking of steel building wall, and it is convex that the truss structure wall that beam column combines efficiently solves wall
The collision-damage-prevention problem at angle.
Brief description of the drawings
Fig. 1 is stereogram of the present utility model;
Fig. 2 is elevation of the present utility model;
Fig. 3 is top view of the present utility model.
Embodiment
The steel building that is used to assemble as shown in Figure 1, Figure 2, Figure 3 shows has the strong assembled structure of biasing hole wall
Part, including the first structure column G1-1 for the hole both sides that are placed in and the second structural upright G1-2, welded respectively by intermittent weld
The spacing steel plate G8 of the first anticracking on the inside of first structure column and the second structural upright is connected to, splits hole up and down and both ends are distinguished
It is welded in first structure column G1-1 and crossbeam G2 on the second structural upright G1-2, is welded in by intermittent weld on crossbeam G2
The spacing steel plate G9 of the second anticracking of lower both sides, split hole up and down pour in the collection flitch on crossbeam G2.The first structure is stood
Post, which includes two luminal perfusions being parallel to each other, has concrete G3's to be divided to post G1-1-1, interval to be welded in three between two pieces points of posts
It is the first transverse connection of root G10-1, the spacing steel plate G11 of the 3rd anticracking being welded in by intermittent weld on the inside of two pieces points of posts, logical
Cross the spacing steel plate G12 of the 4th anticracking that intermittent weld is welded in above and below the first transverse connection G10-1, pour in two pieces points of posts it
Between the first collection material strip G4-1, the spacing steel plate G11 of the 3rd anticracking is connected with the spacing steel plate G12 of the 4th anticracking by angle welding.Institute
State the second structural upright has concrete G3's to be divided to post G1-1-1, interval to be welded in two including two luminal perfusions being parallel to each other
Three second transverse connection G10-2 being divided between post, in being diagonally welded between adjacent two second transverse connection G10-2
Diagonal brace G5, be welded in by intermittent weld on the inside of two pieces points of posts the spacing steel plate G11 of the 3rd anticracking, welded by intermittent weld
The spacing steel plate G12 of the 4th anticracking in above and below the second transverse connection G10-2, it is welded in two above and below diagonal brace G5 by intermittent weld
The spacing steel plate G13 of 5th anticracking on individual inclined-plane, second poured between two pieces points of posts collect material strip G4-2, the 3rd spacing steel of anticracking
Plate G11 one end is connected with the spacing steel plate G12 of the 4th anticracking by angle welding, and the other end passes through with the spacing steel plate G13 of the 5th anticracking
Angle welding connects;First anticracking spacing steel plate G8 of the collection flitch G6 upper lower sealing edge light-gauge steel section G7 both ends respectively with both sides leads to
Angle welding connection is crossed, the spacing steel plate G8 of the first anticracking of the spacing steel plate G9 of the second anticracking both ends respectively with both sides passes through angle welding
Connection.
Collection flitch G6 of the present utility model pouring moldings when component factory produces component, component is in construction site
After rigging out, finally in first structure column G1-1 and the second structural upright G1-2 luminal perfusion concrete.This practicality is new
Type can be made into series standard part, have biasing hole (such as the door or window not being centrally located) for assembling steel building
Metope.The utility model has considered component installation, wall pours, crack treatment, wall salient angle anticollision the problems such as, ensuring
On the premise of steel building wall has sufficient intensity and rigidity, improving assembling type steel structure building has the dress of hole metope
With efficiency, the steel member installation and building wall work of job site are reduced, reduces building wall, installation difficulty, and Solutions of Systems
The certainly problem of Cracking of steel building wall.
Claims (1)
1. there is the strong prefabricated member of biasing hole wall for assembling steel building, it is characterised in that including splitting
First structure column (G1-1) and the second structural upright (G1-2) in hole both sides, it is respectively welded in first by intermittent weld
The spacing steel plate of the first anticracking (G8) on the inside of structural upright and the second structural upright, split hole up and down and both ends be respectively welded in
Crossbeam (G2) on first structure column (G1-1) and the second structural upright (G1-2), crossbeam (G2) is welded in by intermittent weld
The spacing steel plate of the second anticracking (G9) of upper and lower both sides, pour in the collection flitch (G6) on hole lower and upper cross-member (G2);Described first
Structural upright include two luminal perfusions being parallel to each other have concrete (G3) be divided to post (G1-1-1), interval be welded in two pieces points
One group of first transverse connection (G10-1) between post, the 3rd anticracking limit being welded in by intermittent weld on the inside of two pieces points of posts
Position steel plate (G11), the 4th spacing steel plate of anticracking of the first transverse connection (G10-1) up and down is welded in by intermittent weld
(G12) the first collection material strip (G4-1) between two pieces points of posts, is poured, the 3rd spacing steel plate of anticracking (G11) limits with the 4th anticracking
Position steel plate (G12) is connected by angle welding;Second structural upright, which includes two luminal perfusions being parallel to each other, concrete
(G3) be divided to post (G1-1-1), interval to be welded in one group of second transverse connection (G10-2) between two pieces points of posts, in fillet welding
It is connected to the diagonal brace (G5) between adjacent two second transverse connections (G10-2), is welded in by intermittent weld in two pieces points of posts
The 3rd spacing steel plate of anticracking (G11) of side, it is welded in by intermittent weld the second transverse connection (G10-2) up and down the 4th anti-
Split spacing steel plate (G12), the 5th spacing steel plate of anticracking on diagonal brace (G5) is welded in by intermittent weld two inclined-planes up and down
(G13) the second collection material strip (G4-2) between two pieces points of posts, is poured, the spacing steel plate of the 3rd anticracking (G11) one end is anti-with the 4th
Split spacing steel plate (G12) to connect by angle welding, the other end is connected with the 5th spacing steel plate of anticracking (G13) by angle welding;Collection
The both ends of lower sealing edge light-gauge steel section (G7) pass through angle welding with the spacing steel plate of the first anticracking (G8) on both sides respectively on flitch (G6)
Connection, the spacing steel plate of the first anticracking (G8) of the both ends of the spacing steel plate of the second anticracking (G9) respectively with both sides are connected by angle welding
Connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720926387.2U CN207017487U (en) | 2017-07-28 | 2017-07-28 | There is the strong prefabricated member of biasing hole wall for assembling steel building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720926387.2U CN207017487U (en) | 2017-07-28 | 2017-07-28 | There is the strong prefabricated member of biasing hole wall for assembling steel building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207017487U true CN207017487U (en) | 2018-02-16 |
Family
ID=61482283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720926387.2U Expired - Fee Related CN207017487U (en) | 2017-07-28 | 2017-07-28 | There is the strong prefabricated member of biasing hole wall for assembling steel building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207017487U (en) |
-
2017
- 2017-07-28 CN CN201720926387.2U patent/CN207017487U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204876059U (en) | Prefabricated assembled shaped steel concrete frame structure system | |
CN108894362B (en) | Assembled grid type thin-wall steel plate recycled concrete combined shear wall and assembling method | |
CN109083308B (en) | Anti-seismic prefabricated assembly type wall and construction method thereof | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN104196128A (en) | Insertion plate type node for connection of steel beam and flat concrete-filled steel tube column | |
CN207017483U (en) | The full precast shear wall structural system of regenerative steel skeleton | |
CN103790243A (en) | Steel-reinforced concrete cross-shaped column-steel beam connection joint | |
CN207017489U (en) | There is the reinforced prefabricated member of biasing hole wall for assembling steel building | |
CN207295986U (en) | Assembled interlocks Bailey bracket steel building | |
CN207363024U (en) | A kind of portal frame structure | |
CN103469902A (en) | Full-rigidity steel pipe concrete column connecting node | |
CN206467828U (en) | A kind of fabricated construction insulation and decoration integrated plate wall | |
CN207017487U (en) | There is the strong prefabricated member of biasing hole wall for assembling steel building | |
CN107060110A (en) | A kind of U-shaped cold-rolled forming section combination beam-Frame Joints of Concrete-Filled Steel Tube | |
CN207144228U (en) | There is the reinforced prefabricated member of hole wall placed in the middle for assembling steel building | |
CN105604194A (en) | Through angle steel type square steel tube concrete column and H-shaped steel beam connection node | |
CN207144234U (en) | There is the prefabricated member of biasing hole wall for assembling steel building | |
CN207017434U (en) | There is the prefabricated member of hole wall placed in the middle for assembling steel building | |
CN113513107B (en) | Assembled integral mortise-tenon joint multi-cavity steel plate combined shear wall and manufacturing method thereof | |
CN204850066U (en) | A link formula connected node structure outward that is used for girder steel and small bore steel core concrete column to be connected | |
CN207017478U (en) | There is the lightweight prefabricated member of hole wall placed in the middle for assembling steel building | |
CN204940524U (en) | For the L shape accentric support lattice steel pipe column compound wall of steel house | |
CN110512739B (en) | Steel-concrete-FRP combined structure and construction method thereof | |
CN207672747U (en) | Prefabricated member for assembling steel building wall | |
CN208803631U (en) | Light steel grating concrete superposed column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180216 Termination date: 20200728 |