CN207017291U CN201720586946.XU CN201720586946U CN207017291U CN 207017291 U CN207017291 U CN 207017291U CN 201720586946 U CN201720586946 U CN 201720586946U CN 207017291 U CN207017291 U CN 207017291U
Authority
CN
China
Prior art keywords
fixed seat
outer fixed
block
power transmission
high voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720586946.XU
Other languages
Chinese (zh)
Inventor
廖秋婵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720586946.XU priority Critical patent/CN207017291U/en
Application granted granted Critical
Publication of CN207017291U publication Critical patent/CN207017291U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high voltage power transmission tower earthquake-proof foundation structure, including tower body and block, the lower end of the tower body is installed with baffle plate, and tower body is fixed on pedestal, the pedestal is fixed in interior fixed seat by contiguous block, the block is located at the lower section of baffle plate, the interior fixed seat is provided at both ends with block, and interior fixed seating is in outer fixed seat, the first outer beam and the second outer beam are installed between the outer fixed seat and interior fixed seat, and outer fixed seat includes the first outer fixed seat and the second outer fixed seat, the inside of the first outer fixed seat and the second outer fixed seat is provided with fixed steel bars, and first outer fixed seat be connected with the both ends of the second outer fixed seat by fixed steel bars.The high voltage power transmission tower earthquake-proof foundation structure is wrapped tower body pedestal by interior fixed seat and outer fixed seat, by the beam between pedestal and interior fixed seat and outer fixed seat, can alleviate the impulsive force of earthquake zone, anti seismic efficiency is good.

Description

A kind of high voltage power transmission tower earthquake-proof foundation structure
Technical field
Electric power tower technical field is the utility model is related to, specially a kind of high voltage power transmission tower earthquake-proof foundation structure.
Background technology
High tension electric tower is a kind of important way of China's power supply conveying, and substantial amounts of high-tension electricity is employed in transferring electricity from the west to the east project Tower, with expanding economy, the stable development of State Grid's cause, there is direct relation with China's economic development.In recent years In transmission line of electricity accident statistics, high tension electric tower is easily toppled over after by external force such as earthquake, high wind, because high tension electric tower is universal It is all higher, heavier, large area power breakdown is not only easily caused, and personal injury can be caused, have greatly dangerous Property.
Traditional anti-shock methods of existing high tension electric tower are typically to be solved with improving bearing capacity of the power transmission tower with basis in itself Certainly anti-seismic problem, and anti-seismic structure is just substantially one piece of armored concrete fixed seat, simple in construction, anti seismic efficiency is poor, practicality It is not strong.
Utility model content
The purpose of this utility model is to provide a kind of high voltage power transmission tower earthquake-proof foundation structure, to solve above-mentioned background technology It is middle to propose the problem of existing high tension electric tower anti-seismic structure overall structure is simple, and anti seismic efficiency is poor, and practicality is not strong.
To achieve the above object, the utility model provides following technical scheme:A kind of high voltage power transmission tower earthquake-proof foundation structure, Including tower body and block, the lower end of the tower body is installed with baffle plate, and tower body is fixed on pedestal, and the pedestal passes through company Connect block to be fixed in interior fixed seat, and be provided with the first internal damping pad and second and subtract between pedestal and interior fixed seat upper and lower ends Shake pad, the block are located at the lower section of baffle plate, and the interior fixed seat is provided at both ends with block, and interior fixed seating is in outer fixation In seat, the first outer beam and the second outer beam are installed between the outer fixed seat and interior fixed seat, and it is outer fixed Seat includes the first outer fixed seat and the second outer fixed seat, and the inside of the first outer fixed seat and the second outer fixed seat is respectively provided with There are fixed steel bars, and the first outer fixed seat is connected with the both ends of the second outer fixed seat by fixed steel bars.
Preferably, subtract outside the baffle plate, block, the first internal damping pad, the second internal damping pad, the first outer beam and second Shake pad shape in a ring.
Preferably, the baffle plate is skewed, and baffle plate bottom is located at the lower section of block the top.
Preferably, the first internal damping pad and the second internal damping mat thickness are equal, and outside the first outer beam and second The thickness of beam is equal.
Preferably, it there are spacing between the described first outer fixed seat and the second outer fixed seat both ends junction.
Compared with prior art, the beneficial effects of the utility model are:The high voltage power transmission tower earthquake-proof foundation structure passes through interior Fixed seat and outer fixed seat wrap tower body pedestal, and outer fixed seat is made up of reinforced concrete, stabilized structure, while outer fixed Seat is divided into two parts, and spacing is there are between two parts, when earthquake occurs, one be partially damaged after will not cause in addition One is partially damaged, and good fixing effect, effectively can prevent tower body from collapsing, by pedestal and interior fixed seat and outer fixed seat it Between beam, the impulsive force of earthquake zone can be alleviated, anti seismic efficiency is good, practical, and beam is ring-shaped, damping Scope is big, good damping effect.
Brief description of the drawings
Fig. 1 is the utility model structure schematic elevation view;
Fig. 2 is the outer fixed seat schematic top plan view of the utility model structure;
Fig. 3 is the utility model structure schematic top plan view.
In figure:1st, tower body, 2, baffle plate, 3, block, 4, pedestal, 5, contiguous block, 6, interior fixed seat, the 7, first internal damping pad, 8th, the second internal damping pad, 9, outer fixed seat, the 901, first outer fixed seat, the 902, second outer fixed seat, 903, fixed steel bars, 10, First outer beam, the 11, second outer beam.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of high voltage power transmission tower earthquake-proof foundation structure, bag Include tower body 1, baffle plate 2, block 3, pedestal 4, contiguous block 5, interior fixed seat 6, the first internal damping pad 7, the second internal damping pad 8, outer solid Reservation 9, the first outer fixed seat 901, the second outer fixed seat 902, fixed steel bars 903, the first outer 10 and second outer damping of beam Pad 11, the lower end of tower body 1 are installed with baffle plate 2, baffle plate 2, block 3, the first internal damping pad 7, the second internal damping pad 8, first Outer 10 and second outer beam 11 of beam shape in a ring, baffle plate 2 is skewed, and to be located at block 3 most upper for the bottom of baffle plate 2 The lower section at end, by baffle plate 2 and block 3 it is prevented that between the debris such as rainwater and leaf drops into interior fixed seat 6, it can prevent The internal damping pad 7 of tower body 1 and first is corroded, rational in infrastructure, and above-mentioned tower body 1 is fixed on pedestal 4, and pedestal 4 passes through connection Block 5 is fixed in interior fixed seat 6, and the first internal damping pad 7 and second is provided between pedestal 4 and the upper and lower ends of interior fixed seat 6 Internal damping pad 8, the first internal damping pad 7 and the second internal damping 8 thickness of pad are equal, and the first outer 10 and second outer beam of beam 11 thickness is equal, can so make the uniform force of each beam, so as to improve the service life of beam, makes Good with effect, block 3 is located at the lower section of baffle plate 2, and interior fixed seat 6 is provided at both ends with block 3, and interior fixed seat 6 is positioned at outer solid In reservation 9, the first outer 10 and second outer beam 11 of beam is installed between the outer fixed seat 9 and interior fixed seat 6, And outer fixed seat 9 includes the first outer 901 and second outer fixed seat 902 of fixed seat, is fixed outside the first outer fixed seat 901 and second Seat there are spacing between 902 both ends junctions, and the inside of the first outer 901 and second outer fixed seat 902 of fixed seat is provided with Fixed steel bars 903, and the first outer fixed seat 901 is connected with the both ends of the second outer fixed seat 902 by fixed steel bars 903.
Operation principle:When using the high voltage power transmission tower earthquake-proof foundation structure, a simple knot is first carried out to the device Structure understands, and when earthquake occurs, can alleviate ground by the first outer 10 and second outer beam 11 of beam in outer fixed seat 9 The impulsive force of internal fixed seat 6 is shaken, the first internal damping pad 7 and the second internal damping pad 8 in by interior fixed seat 6 can be alleviated To the impulsive force of pedestal 4, the impulsive force of earthquake would not cause too big destructive power after decaying layer by layer to pedestal 4 for earthquake, from And can prevent that tower body 1 from collapsing, here it is the operation principle of the device.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art Say, it can still be modified to the technical scheme described in foregoing embodiments, or which part technical characteristic is entered Row equivalent substitution, all within the spirit and principles of the utility model, any modification, equivalent substitution and improvements made etc., all should Within the scope of protection of the utility model.

Claims (5)

1. a kind of high voltage power transmission tower earthquake-proof foundation structure, including tower body (1) and block (3), it is characterised in that:The tower body (1) Lower end be installed with baffle plate (2), and tower body (1) is fixed on pedestal (4), and it is fixed that the pedestal (4) passes through contiguous block (5) In in interior fixed seat (6), and the first internal damping pad (7) and second are provided between pedestal (4) and interior fixed seat (6) upper and lower ends Internal damping pad (8), the block (3) are located at the lower section of baffle plate (2), and the interior fixed seat (6) is provided at both ends with block (3), And interior fixed seat (6) is located in outer fixed seat (9), and first is installed between the outer fixed seat (9) and interior fixed seat (6) Outer beam (10) and the second outer beam (11), and outer fixed seat (9) includes outside the first outer fixed seat (901) and second admittedly Reservation (902), the inside of the first outer fixed seat (901) and the second outer fixed seat (902) are provided with fixed steel bars (903), and the first outer fixed seat (901) is connected with the both ends of the second outer fixed seat (902) by fixed steel bars (903).
A kind of 2. high voltage power transmission tower earthquake-proof foundation structure according to claim 1, it is characterised in that:The baffle plate (2), gear Block (3), the first internal damping pad (7), the second internal damping pad (8), the first outer beam (10) and the second outer beam (11) are in Ring-shaped.
A kind of 3. high voltage power transmission tower earthquake-proof foundation structure according to claim 1, it is characterised in that:The baffle plate (2) is It is skewed, and baffle plate (2) bottom is located at the lower section of block (3) the top.
A kind of 4. high voltage power transmission tower earthquake-proof foundation structure according to claim 1, it is characterised in that:First internal damping Pad (7) and second internal damping pad (8) thickness is equal, and the thickness phase of the first outer beam (10) and the second outer beam (11) Deng.
A kind of 5. high voltage power transmission tower earthquake-proof foundation structure according to claim 1, it is characterised in that:It is fixed outside described first Spacing is there are between seat (901) and the second outer fixed seat (902) both ends junction.
CN201720586946.XU 2017-05-24 2017-05-24 A kind of high voltage power transmission tower earthquake-proof foundation structure Expired - Fee Related CN207017291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720586946.XU CN207017291U (en) 2017-05-24 2017-05-24 A kind of high voltage power transmission tower earthquake-proof foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720586946.XU CN207017291U (en) 2017-05-24 2017-05-24 A kind of high voltage power transmission tower earthquake-proof foundation structure

Publications (1)

Publication Number Publication Date
CN207017291U true CN207017291U (en) 2018-02-16

Family

ID=61475530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720586946.XU Expired - Fee Related CN207017291U (en) 2017-05-24 2017-05-24 A kind of high voltage power transmission tower earthquake-proof foundation structure

Country Status (1)

Country Link
CN (1) CN207017291U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067431A (en) * 2019-04-08 2019-07-30 闽江学院 A kind of antidetonation power transmission tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067431A (en) * 2019-04-08 2019-07-30 闽江学院 A kind of antidetonation power transmission tower

Similar Documents

Publication Publication Date Title
CN207144612U (en) A kind of Novel seismic-proof electric pole firm banking
CN203039614U (en) Offshore floating type solar photovoltaic generation device
CN102926946A (en) Foundation ring of wind generating set
CN106150924A (en) A kind of mixed steel tower and wind power generating set
CN207017291U (en) A kind of high voltage power transmission tower earthquake-proof foundation structure
CN202196877U (en) Connecting plate for grounding grid of power transmission line tower
CN203700948U (en) Section high pier bridge seismic isolation and reduction structure with double-layer pull cable supports
CN104295147B (en) A kind of framework being applicable to transformer station's outlet
CN206035725U (en) Mix steel tower frame and wind generating set
CN206196499U (en) A kind of photovoltaic agricultural greenhouse support
CN203160795U (en) Pitch point of tower leg of steel tube tower and capable of preventing local yielding
CN209989831U (en) Energy-consuming type offshore wind turbine pile and sleeve grouting connection structure
CN204386242U (en) For the combined type truss column of 500kV transformer station
CN207004143U (en) A kind of shockproof transmission tower
CN211776325U (en) Novel antidetonation steel pylons
CN206917382U (en) A kind of bamboo shape steel tower bracing means
CN202969569U (en) Steel structure of supercritical coal-fired power station
CN214657186U (en) Ocean current vibration damper for ocean wind power pile
CN202008924U (en) Installation form of high voltage capacitor tower of DC filter for +/- 800kv converter station
CN207994992U (en) A kind of immobilizing foundation of plane roof photovoltaic module
CN211597945U (en) Power transmission tower with foundation reinforcing device
CN205421309U (en) A umbellate form rock stock basis for transmission line engineering
CN201437646U (en) Climbing prevention device of ultra-high voltage power transmission tower and power transmission tower
CN206655213U (en) A kind of large area preventing and fixing sand fence
CN218940621U (en) Integral tubular busbar special for wind power concrete tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180216

Termination date: 20180524