CN207006062U - A kind of floating on water surface mechanism - Google Patents

A kind of floating on water surface mechanism Download PDF

Info

Publication number
CN207006062U
CN207006062U CN201720881722.1U CN201720881722U CN207006062U CN 207006062 U CN207006062 U CN 207006062U CN 201720881722 U CN201720881722 U CN 201720881722U CN 207006062 U CN207006062 U CN 207006062U
Authority
CN
China
Prior art keywords
air bag
cavity
floating
opening
water surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720881722.1U
Other languages
Chinese (zh)
Inventor
陈小华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Dengcai Text Brigade Development Co Ltd
Original Assignee
Shenzhen Dengcai Text Brigade Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Dengcai Text Brigade Development Co Ltd filed Critical Shenzhen Dengcai Text Brigade Development Co Ltd
Priority to CN201720881722.1U priority Critical patent/CN207006062U/en
Application granted granted Critical
Publication of CN207006062U publication Critical patent/CN207006062U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Aeration Devices For Treatment Of Activated Polluted Sludge (AREA)

Abstract

The utility model belongs to lantern flotation technique field, specifically proposes a kind of floating on water surface mechanism, including the first air bag, reaction chamber and installing plate, the first cavity, the second cavity and air bag groove are provided with the reaction chamber;The first cavity bottom is provided with water inlet, and chute is provided with the first cavity, and kickboard is slidably connected on chute, and the kickboard is provided with mobile column, active elemental metals are housed at the top of mobile column;Second cavity is built with clear water, second cavity bottom is provided with the opening of cylinder, the piston for occlusion of openings is combined with opening, the second air bag of unaerated is placed with the air bag groove, second air bag is provided with inflation inlet, air bag groove bottom is provided with the through hole communicated with the second cavity, the inflation inlet of air bag communicates through through hole with the second cavity, compared with prior art, because the second air bag understands hydrogen make-up in real time, therefore the second air bag can be always maintained at buoyancy, ensure stable when lantern can be long swim in water.

Description

A kind of floating on water surface mechanism
Technical field
Lantern flotation technique field is the utility model is related to, is concretely related to a kind of floating on water surface mechanism.
Background technology
Lantern, " festive lantern " is called, is initiated by a kind of Traditional Folk artifacts of China, it is with spreading folks of china Lantern Festival reward lamp custom is connected closely.The Western Han Dynastry is started from according to textual criticism Lantern Festival reward lamp, is contained in Tang of Sui, Ming and Qing is particularly in fashion.Shanghai Lantern Festival appreciates Lamp custom, it is bright it is great control, that the local chronicle held is repaiied between year in Jiajin Year is all on the books.Fall lamp from lamp on the lunar calendar first month of the lunar year 13,18,15 yuan Night lantern climax the most is moving.The annual Dragon Boat Festival and the Mid-autumn Festival, Shanghai prosperity business street is also festive lantern Gao Xi, and lantern fair is flourishing.Lantern From moulding point, there are personage, scenery with hills and waters, birds and flowers, dragon and phoenix, worm for fishing, beast, birds, in addition also have that specializes in that people admire to walk Barn lantern.
Current lantern is viewed and admired most of enjoyment and can be all placed in water to increase, and these lantern is swum in the water surface On, with water movement, for example some animals shaped lantern, people can set some ball floats, profit in the bottom of these lantern Lantern is swum on lake surface with the buoyancy of ball float, because ball float can be produced extruding in water by buoyancy, ball float gradually by To buoyancy can slowly diminish, if long-time use lantern if be likely to topple in lake, influence the effect of lantern, can not It is stable when making lantern long to swim on the water surface.
Utility model content
Therefore the utility model proposes a kind of floating on water surface mechanism, for solve current lantern can not be long when stable floating On the water surface the problem of.
What the technical solution of the utility model was realized in:A kind of floating on water surface mechanism, including the first air bag, reaction chamber And installing plate, first air bag are arranged on reaction chamber bottom, the installing plate is located at the top of reaction chamber;The reaction chamber is under It is supreme to be provided with the first cavity, the second cavity and air bag groove successively;The first cavity bottom is provided with water inlet, in the first cavity Provided with chute, kickboard is slidably connected on chute, the kickboard is provided with mobile column, active elemental gold is housed at the top of mobile column Category;For second cavity built with clear water, the second cavity bottom is provided with the opening of cylinder, is combined with opening and is opened for blocking The piston of mouth, the mobile column are located at the underface of opening, and the height of mobile column is more than the depth of opening;In the air bag groove The second air bag of unaerated is placed with, the second air bag is provided with inflation inlet, induced-draught fan, the top of the second air bag are provided with inflation inlet Be fixed on air bag groove, air bag groove bottom is provided with the through hole communicated with the second cavity, the inflation inlet of air bag through through hole with Second cavity communicates.
First by lantern installation on a mounting board, then the first air bag is full of to the first airbag aeration using charge gun Gas, next just lantern is put into water, due to there is the support of the buoyancy of the first air bag, now lantern will not sink, when by one After the section time, the buoyancy of the first air bag is reduced gradually, and reaction chamber slowly sinks to be contacted with the water surface, and part lake water is from water inlet stream Entering the first cavity, the water in the first cavity gradually increases to be contacted with kickboard, and kickboard is moved up by the buoyancy of lake water, so that Mobile column is also moved upwards, and mobile column gradually pushes the piston in opening open close to opening, final mobile column, opening in there is no Piston is closed, and mobile column enters the second cavity through opening.
Due to being equipped with active elemental metals at the top of mobile column, therefore as mobile column enters the second cavity, elemental metals It will contact and react with water and produce gas, make because gas can gentlier move up, while in the suction of induced-draught fan Under, the gas in the second cavity quickly enters the inflation inlet of the second air bag, and the second air bag is inflated, and the second air bag is filled It is full, air bag groove can be stretched out full of the second air bag expansion after gas, the second air bag contacts with the water surface, because the second air bag in real time can Make-up gas, therefore the second air bag can be always maintained at buoyancy, ensure stable when lantern can be long swim in water
Further, the end of the inflation inlet is provided with air intake duct, and air intake duct is in funnel type.
The air intake duct of funnel type increases the contact area of air intake duct and gas, can be with when induced-draught fan starts air draught Increase wind speed, be quickly full of the second air bag.
Further, the reacting part of the choking portion of the mobile column including lower section and top, the diameter of section of choking portion with The diameter of section of opening is identical, and reacting part is built with active elemental metals.
As mobile column moves closer to be open, mobile column can be with the piston contact in opening, finally holding with mobile column Continuous movement pushes piston open out of opening, and the choking portion of mobile column blocks opening, avoids gas from being spilt from opening, improves gas Utilization rate.
Further, the water inlet is located at the same side of the first cavity with chute.
As long as lake water enters the first cavity, kickboard will be moved rapidly to close to the position of opening by buoyancy, improved anti- The promptness answered, avoids lantern from being toppled on lake surface.
Further, the active elemental metals are SODIUM METAL.SODIUM METAL and water reaction generation hydrogen, hydrogen is to environment It is harmless, avoid polluting lake water.
Further, the piston is T-shaped piston or funnel type piston.What can be closed is more complete, has avoided water Directly the first cavity is flowed into from opening.
Further, first cavity and the second cavity surface are provided with chamber door, and chamber door is provided with handle.When by reaction chamber When being put into lake, chamber door is shut off, makes whole reaction chamber more attractive in appearance, increases the sight of lantern.
By above disclosure, the beneficial effects of the utility model are:
By setting the first cavity, the second cavity and air bag groove in the utility model, using active elemental metals with The mode of water reaction generation gas, real-time make-up gas can be realized to the second air bag, ensures that the gas in the second air bag will not Reduce, the second air bag is always maintained at buoyancy, support lantern is stable always to be swum on the water surface, and uses induced-draught fan can be with The quick gas that absorbs is to the second airbag aeration, so as to ensure that the second air bag can be quick when the buoyancy that the first air bag is subject to declines Expansion, the buoyancy of the first air bag reduction is compensated, provide dual buoyancy support for the lantern of floating, improve lantern and floated on the water surface Stability.
Brief description of the drawings
Fig. 1 is a kind of structural representation of floating on water surface mechanism embodiment of the utility model;
Fig. 2 is a kind of sectional view of floating on water surface mechanism embodiment of the utility model;
Fig. 3 is the partial enlarged drawing of A in the utility model Fig. 2.
Reference is as follows:
First air bag 10, reaction chamber 20, the first cavity 21, kickboard 211, chute 212, mobile column 213, the second cavity 22, T Type piston 221, air bag groove 23, the second air bag 231, air intake duct 232, inflation inlet 233, chamber door 24, handle 241, installing plate 30.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As depicted in figs. 1 and 2, a kind of floating on water surface mechanism, including the first air bag 10, reaction chamber 20 and installing plate 30, the One air bag 10 is arranged on the bottom of reaction chamber 20, and installing plate 30 is located at the top of reaction chamber 20, and installing plate 30 is used to install lantern, reacted It is provided with case 20 and is provided with the first cavity 21, the second cavity 22 and air bag groove 23 successively from bottom to up, the first cavity 21 and second Chamber door 24 is hinged with cavity 22, the right side of chamber door 24 is provided with into water integrally formed with handle 241, the left lower of the first cavity 21 Mouthful, chute 212 is installed on left side wall in the first cavity 21, slidably connects kickboard 211 on chute 212, one in kickboard 211 Form mobile column 213;For second cavity 22 built with clear water, the bottom of the second cavity 22 is provided with the opening of cylinder, matches somebody with somebody in opening The T-shaped piston 221 having for occlusion of openings is closed, mobile column 213 is located at the underface of opening and the cross-sectional diameter of mobile column 213 For 5cm, the cross-sectional diameter of opening is 5cm;The second air bag 231 of unaerated, the second air bag 231 are placed with air bag groove 23 Top be fixed on the surface of air bag groove 23, the bottom of air bag groove 23 is provided with the through hole communicated with the second cavity 22, and air bag fills Gas port 233 passes through through hole, and induced-draught fan is provided with inflation inlet 233, and the bottom of inflation inlet 233 is provided with air intake duct 232, air intake duct 232 in funnel type.
As shown in figure 3, the choking portion of mobile column 213 including lower section and the reacting part of top, reacting part built with SODIUM METAL, The height of choking portion is 10cm, and the depth of opening is 8cm.
During specific works, lantern is arranged on installing plate 30 first, then inflated using charge gun to the first air bag 10, First air bag 10 is full of gas, next just lantern is put into water, due to having the support of the buoyancy of the first air bag 10, now lantern It will not sink, when after a while, the buoyancy of the first air bag 10 is reduced gradually, and reaction chamber 20 slowly sinks to connecing with the water surface Touch, water of the part lake water out of water inlet the first cavity 21 of inflow, the first cavity 21 gradually increases to be contacted with kickboard 211, kickboard 211 are moved up by the buoyancy of lake water, so that the also motion upwards of mobile column 213, because mobile column 213 is being located at opening just The cross-sectional diameter of lower section and mobile column 213 is 5cm, and the cross-sectional diameter of opening is 5cm, therefore as mobile column 213 is gradual Close to opening, mobile column 213 can contact with the T-shaped piston 221 in opening, finally will be T-shaped with the lasting movement of mobile column 213 Piston 221 is pushed open out of opening, and the choking portion of mobile column 213 blocks opening, and reactive site is in the second cavity 22, reacting part Clear water reaction in interior SODIUM METAL and the second cavity 22, generates hydrogen.
Induced-draught fan work in aspiration channel, caused hydrogen in the second cavity 22 is sucked into aspiration channel, through inflation inlet 233 Into the second air bag 231, SODIUM METAL endlessly produces hydrogen with clear water reaction, the second air bag 231 is full of, after gas The second air bag 231 expansion can stretch out air bag groove 23, the second air bag 231 contacts with the water surface, because the second air bag 231 in real time can Hydrogen make-up, therefore the second air bag 231 can be always maintained at buoyancy, ensure stable when lantern can be long swim in water.
Finally illustrate, above example is only unrestricted to illustrate the technical solution of the utility model, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent substitution, without departing from the objective and model of technical solutions of the utility model Enclose, it all should cover among right of the present utility model.

Claims (7)

  1. A kind of 1. floating on water surface mechanism, it is characterised in that:Including the first air bag, reaction chamber and installing plate, the first air bag peace Mounted in reaction chamber bottom, the installing plate is located at the top of reaction chamber;The reaction chamber is provided with the first cavity, successively from bottom to up Two cavitys and air bag groove;
    The first cavity bottom is provided with water inlet, and chute is provided with the first cavity, and kickboard is slidably connected on chute, described floating Plate is provided with mobile column, and active elemental metals are housed at the top of mobile column;
    For second cavity built with clear water, the second cavity bottom is provided with the opening of cylinder, is combined with opening for blocking The piston of opening, the mobile column are located at the underface of opening, and the height of mobile column is more than the depth of opening;
    The second air bag of unaerated is placed with the air bag groove, the second air bag is provided with inflation inlet, is provided with and inhales in inflation inlet Blower fan, it is fixed on air bag groove at the top of the second air bag, air bag groove bottom is provided with the through hole communicated with the second cavity, air bag Inflation inlet communicated through through hole with the second cavity.
  2. A kind of 2. floating on water surface mechanism according to claim 1, it is characterised in that:The end of the inflation inlet is provided with air-breathing Pipe, air intake duct is in funnel type.
  3. A kind of 3. floating on water surface mechanism according to claim 1, it is characterised in that:The mobile column includes the blocking of lower section Portion and the reacting part of top, the diameter of section of choking portion is identical with the diameter of section of opening, and reacting part is built with active simple substance Metal.
  4. A kind of 4. floating on water surface mechanism according to claim 1, it is characterised in that:The water inlet is located at first with chute The same side of cavity.
  5. A kind of 5. floating on water surface mechanism according to claim 1, it is characterised in that:The active elemental metals are simple substance Sodium.
  6. A kind of 6. floating on water surface mechanism according to claim 1, it is characterised in that:The piston is T-shaped piston or funnel Type piston.
  7. A kind of 7. floating on water surface mechanism according to claim 1, it is characterised in that:First cavity and the second cavity table Face is provided with chamber door, and chamber door is provided with handle.
CN201720881722.1U 2017-07-20 2017-07-20 A kind of floating on water surface mechanism Active CN207006062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720881722.1U CN207006062U (en) 2017-07-20 2017-07-20 A kind of floating on water surface mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720881722.1U CN207006062U (en) 2017-07-20 2017-07-20 A kind of floating on water surface mechanism

Publications (1)

Publication Number Publication Date
CN207006062U true CN207006062U (en) 2018-02-13

Family

ID=61455300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720881722.1U Active CN207006062U (en) 2017-07-20 2017-07-20 A kind of floating on water surface mechanism

Country Status (1)

Country Link
CN (1) CN207006062U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360481A (en) * 2018-03-06 2018-08-03 陈兴帅 Polybag refuse collector in a kind of water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360481A (en) * 2018-03-06 2018-08-03 陈兴帅 Polybag refuse collector in a kind of water

Similar Documents

Publication Publication Date Title
CN207006062U (en) A kind of floating on water surface mechanism
CN206184669U (en) Floating -type ultrasonic atomizer
CN205671200U (en) A kind of novel environment-friendly raises pig house
CN109006639B (en) Fish tank structure capable of simulating natural climate
CN202272160U (en) Oxygen supply lifesaving swimwear
CN206138754U (en) Toy device of bathing
CN210777475U (en) Weather phenomenon simulation device
CN205755809U (en) A kind of roof planting pond
CN209294852U (en) A kind of household portable external application lamp
CN209331985U (en) A kind of respirator and dish-washing machine for dish-washing machine
CN201571407U (en) Air purifying and humidifying aquarium
CN2157058Y (en) Mountains-and-waters potted landscape for imitation of natural landscape
CN200971164Y (en) Improved structure of schorkel
CN2514883Y (en) Opening-closing type soap-bubble toy gun
CN2446256Y (en) Water flowing window
CN207831223U (en) A kind of various light show device of Driven by Solar Energy
CN204699405U (en) Sound-light toy system used by a kind of drinking-water
CN108842714A (en) A kind of waterfront ecological tourist sight facility
CN212671326U (en) Happy wind pressure on water makes unrestrained device
CN205299808U (en) Portable humidifier
CN208960244U (en) A kind of fish tank function fountain
CN204762400U (en) Rechargeable desk -top atomizing flowerpot that throws light on
CN209191574U (en) A kind of aqueous culture ecoscape collection point " fairy maiden's waterfall, welcome rainbow " device
CN204762401U (en) Desk -top atomizing flowerpot throws light on
CN103120823A (en) Oxygen uptake terminal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant