CN207004020U - A kind of through-flooring pipeline sealing hole template and hardened system structure - Google Patents

A kind of through-flooring pipeline sealing hole template and hardened system structure Download PDF

Info

Publication number
CN207004020U
CN207004020U CN201720918184.9U CN201720918184U CN207004020U CN 207004020 U CN207004020 U CN 207004020U CN 201720918184 U CN201720918184 U CN 201720918184U CN 207004020 U CN207004020 U CN 207004020U
Authority
CN
China
Prior art keywords
mould template
pipe collar
template
mould
top surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720918184.9U
Other languages
Chinese (zh)
Inventor
郭建东
孙毅
钟成新
李鹏
王丽梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201720918184.9U priority Critical patent/CN207004020U/en
Application granted granted Critical
Publication of CN207004020U publication Critical patent/CN207004020U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of through-flooring pipeline sealing hole template and hardened system structure, including the pipe collar for cuff on the standpipe through floor slab pipeline hole, cuff hangs mould template on the standpipe above pipe collar, it is described hang mould template and by two block structure identicals point hang mould template and abut each other to be fixedly linked form, described pipe collar outer wall and hang mould template bottom wall between diagonally uniform intervals be connected with multiple flower basket bolt groups.The utility model structure hangs mould template with supporting pipe collar each independently, to hang and carry flexible sealing component in mould template, and installation personnel operating space is big, hangs mould template by adjustment and supports the adjustable bolt between pipe collar, and guarantee is hung mould template and contacted with floor slab bottoms tightly.

Description

A kind of through-flooring pipeline sealing hole template and hardened system structure
Technical field
It the utility model is related to and be applied to public building and residential project sealing hole template and hardened system structure, especially It is related to through-flooring pipeline sealing hole template and hardened system structure.
Background technology
With increase of the building to corollary systems such as intellectuality, comfortableization, hommization and green energy conservations, each specialty in building Pipeline is more and more, and the floor slab preformed hole mouth or rear hole-opening vertically installed for pipeline are also more and more, it is well known that are building There is pipeline hole just to need to carry out later concrete closure in construction.
It is mostly that wooden template adds iron wire to hang mould in the conventional template system of floor concrete closure, its shortcoming one is week Rate of rotation is low, and peace tears inconvenience open;Second, hang mould contacted with cast-in-situ floor plate bottom it is not tight, hang mould installation it is insecure, easily cause pipe root and mix Solidifying soil is uneven unreal, and perception and waterproof effect are all very poor;Third, hanging after mould cuts off with iron wire, rust is easily returned in the exposed termination of iron wire, Post-processing difficulty is big, influences decorative effect.
Existing way is:It is provided with using 2 semicircle pipe collars and at the top of pipe collar the horizontal mould for being connected thereto and being integrated Plate is shaper, effectively solves most of shortcoming that conventional plank adds iron wire, but through practical application and to special , the defects of following also be present in the analysis of sharp technology:One is because pipe collar and pipe plugging template are integral, and shape Hang mould to install from concrete floor bottom has been completed again, the tightness degree of template and floor slab bottoms is all by pipe collar installation position Decision is put, and pipe collar position easily can not be effectively adjusted, and cause to hang what presence between template and concrete floor must have Theoretical gap;The second is template and floor more using sponge bar or rubber strip, it is necessary to secondary installing and sponge bar or rubber strip are more It is low for disposable consumption turnover rate, waste and produce garbage environment pollution;Thirdly abut floor bottom and pipeline when hanging mould installation Root, lack operating space, human users' inconvenience.
The content of the invention
The purpose of this utility model is overcome the deficiencies in the prior art, provides a kind of through-flooring pipeline sealing hole mould Plate and hardened system structure, the arrangement works efficiency high, installation personnel operating space are big, are hung by adjustment between mould template and pipe collar Adjustable bolt, guarantee hangs mould template and contacted with floor slab bottoms tightly.
A kind of through-flooring pipeline sealing hole template and hardened system structure of the present utility model, including exist for cuff Pipe collar through on the standpipe at floor slab pipeline hole, described pipe collar abut each other the group that is fixedly linked by two semicircle pipe collars Into cuff hangs mould template on the standpipe above described pipe collar, and described mould template of hanging is hung by two block structure identicals point Mould template abuts each other the composition that is fixedly linked, described pipe collar outer wall and hang mould template bottom wall between diagonally uniformly between Every being connected with multiple flower basket bolt groups, each flower basket bolt group include the bottom pull bar that bottom is hinged and connected with pipe collar and on Distinguish with hanging the top pull bar that the bottom wall of mould template is hinged and connected, the top of described bottom pull bar with the bottom of top pull bar in portion It is threadedly coupled with the both ends of bolt adjusting rod, annular groove is provided with the upper portion side wall of the described interstitial hole for hanging mould template, The inner elastic rubber strip become placed against with standing tube outer wall is installed in described annular groove, in described mould template of hanging Top surface is provided with top surface groove, and top surface elastic rubber strip is embedded with described top surface groove, described top surface elastic rubber strip with Soffit, which compresses, to be set, and closure coagulation has been poured between described standpipe and the floor slab pipeline hole hung on mould template top surface Soil, two fixed card slots are respectively arranged with two ends of a semicircle pipe collar, at two of another semicircle pipe collar End is respectively arranged with two connecting bolts, and each connecting bolt is respectively inserted in a fixed card slot being correspondingly arranged and led to Cross nut to fix, be divided to two ends for hanging mould template to be respectively arranged with a fixed card slot at one piece, mould mould is hung at another piece point Two ends of plate are respectively arranged with a connecting bolt, and each connecting bolt is respectively inserted in a fixing card being correspondingly arranged Fixed in groove and by nut.
The utility model structure hangs mould template with supporting pipe collar each independent, hangs and elastic packing structure is carried in mould template Part, installation personnel operating space is big, hangs mould template by adjustment and supports the adjustable bolt between pipe collar, and mould template and building are hung in guarantee The contact of plate bottom is tight.This structure operation is convenient, full-featured, operating efficiency is high, Survival Rate is good, can be assembled on ground, Top uses, and cost is low, it is firmly tight, easy for installation to have enough to meet the need efficiency high, formwork, saves artificial and material.
Brief description of the drawings
Fig. 1 is the structural representation of through-flooring pipeline sealing hole template of the present utility model and hardened system structure;
Fig. 2 is the vertical cut-away view of the structure shown in Fig. 1;
Fig. 3 is the top view of the structure shown in Fig. 1.
Embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in drawings, a kind of through-flooring pipeline sealing hole template and hardened system structure of the present utility model, bag Include the pipe collar on the standpipe 3 through floor slab pipeline hole 13 for cuff, described pipe collar by two semicircle pipe collar 2-1, 2-2 abuts each other the composition that is fixedly linked, and cuff hangs mould template on the standpipe 3 above described pipe collar, and described hangs mould mould Plate, which by two block structure identicals point hangs mould template 1-1,1-2 and abuts each other to be fixedly linked, to be formed, described pipe collar outer wall with Hang between the bottom wall of mould template that diagonally uniform intervals are connected with multiple flower basket bolt groups, each flower basket bolt group includes bottom The bottom pull bar 8-1 being hinged and connected with pipe collar and top are described with hanging the top pull bar 8-2 that the bottom wall of mould template is hinged and connected Bottom pull bar 8-1 top be threadedly coupled with both ends of the top pull bar 8-2 bottom respectively with bolt adjusting rod 7, described The interstitial hole for hanging mould template upper portion side wall on be provided with annular groove, be provided with described annular groove with outside standpipe 3 The inner elastic rubber strip 9 that wall becomes placed against, top surface groove is provided with the described top surface for hanging mould template, it is recessed in described top surface Groove is embedded with top surface elastic rubber strip 10, and described top surface elastic rubber strip 10 is compressed with the bottom surface of floor 11 and set.Described Hang and poured blocking concrete 12 between the standpipe on mould template top surface and floor slab pipeline hole 13.
Two fixed card slots 5 are respectively arranged with two ends of a semicircle pipe collar, in another semicircle pipe collar Two ends be respectively arranged with two connecting bolts 4, each connecting bolt 4 is respectively inserted in a fixing card being correspondingly arranged Fixed in groove 5 and by nut 6.Preferable described nut 6 uses wing nut.
It is divided to two ends for hanging mould template to be respectively arranged with a fixed card slot 5 at one piece, mould template is hung at another piece point Two ends be respectively arranged with a connecting bolt 4, each connecting bolt 4 is respectively inserted in a fixing card being correspondingly arranged Fixed in groove 5 and by nut 6.
A kind of through-flooring pipeline sealing hole template and hardened system structure installation method, comprise the following steps:
(1) assemble through-flooring pipeline sealing hole template and hang mould apparatus, including diagonally uniform intervals connect for assembling Pipe collar outer wall and hang mould template bottom wall between multiple flower basket bolt groups, the assembling process of each flower basket bolt group is such as Under:By be hinged and connected with pipe collar outer wall bottom pull bar 8-1 top and be hinged and connected with hanging mould template bottom wall one Top pull bar 8-2 bottom is threadedly coupled with the both ends of a bolt adjusting rod 7;Described pipe collar is by two semicircle pipe collar 2- 1st, 2-2 is firmly connected to each other composition, hangs mould template-setup above described pipe collar, and described hangs mould template by two block structure phases With point hang mould template 1-1,1-2 and abut each other the composition that is fixedly linked, the described centre for hanging mould template is provided with interstitial hole, Annular groove is provided with the upper portion side wall of the described interstitial hole for hanging mould template, inner side is installed in described annular groove Elastic rubber strip 9, two fixed card slots 5 are respectively arranged with two ends of a semicircle pipe collar, it is semicircle at another Two ends of pipe collar are respectively arranged with two connecting bolts 4, are divided to two ends for hanging mould template to be respectively arranged with one at one piece Individual fixed card slot 5, it is divided to two ends for hanging mould template to be respectively arranged with a connecting bolt 4 at another piece;
(2) it will form to hang two pieces points of mould template and hang mould template and be respectively fitted over through on the standpipe 3 at floor slab pipeline hole 13, And one piece of point of each connecting bolt 4 hung in mould template is respectively inserted in another piece point and hangs consolidating of being correspondingly arranged in mould template Determine to fix in neck 5 and by nut 6.Then two semicircle pipe collars for forming pipe collar are respectively fitted on standpipe 3, then by one Each connecting bolt 4 on individual semicircle pipe collar is respectively inserted in the fixed card slot 5 being correspondingly arranged on another semicircle pipe collar It is interior and fixed by nut 6, it is connected as an entirety temporarily so as to which mould template, pipe collar and standpipe 3 will be hung.Described in preferable Nut 6 uses wing nut.
(3) mould template and pipe collar are hung along the described upward sliding of standpipe 3, make to hang mould template roof and be adjacent to the bottom wall of floor 11, Then the nut 6 of connecting pipe hoop is tightened, described semicircle steel pipe hoop 2-1 and 2-2 is held tightly with through-flooring standpipe 3;
(4) rotate counterclockwise flower basket bolt adjusting rod 7, makes to hang mould template top surface and is further contacted with the bottom wall of floor 11 sternly It is close, while the top surface elastic rubber strip 10 inlayed by hanging in mould template top surface groove compresses elasticity caused by the bottom wall of floor 11 and become Shape, ensure that the poling road hole 13 between described standpipe 3 and floor 11 will not running pulp when pouring blocking concrete 12;
(5) the described nut 6 for hanging mould template connection is tightened, makes described inner elastic rubber strip 9 and the outer wall of standpipe 3 It is adjacent to, guarantee will not be along the described running pulp of through-flooring standpipe 3 when pouring blocking concrete 12;
(6) blocking concrete 12 is poured in poling road hole 13, after conserving blocking concrete 12 to design requirement intensity, The nut 6 that mould template is hung in connection is unclamped, turn clockwise described flower basket bolt adjusting rod 7, described dividing is hung mould template 1-1 and 1-2 departs from floor 11, and unclamping the nut 6 of connecting pipe hoop disengages two pipe collars, and tearing open for modular system structure is hung in completion Remove.
The utility model is not directed to partly same as the prior art or can realized using prior art.
Using a kind of through-flooring pipeline sealing hole template of the utility model and hardened system structure construction, install and tear open Division operation is simple, and structure carries mortar leakage prevention running pulp structure, reduces operation sequence, and and can ensures construction quality.

Claims (1)

1. a kind of through-flooring pipeline sealing hole template and hardened system structure, it is characterised in that:Including being worn for cuff The pipe collar crossed on the standpipe at floor slab pipeline hole, described pipe collar are abutted each other to be fixedly linked and formed by two semicircle pipe collars, Cuff hangs mould template on the standpipe above described pipe collar, and described mould template of hanging hangs mould mould by two block structure identicals point Plate abuts each other the composition that is fixedly linked, described pipe collar outer wall and hang mould template bottom wall between diagonally uniform intervals connect Be connected to multiple flower basket bolt groups, each flower basket bolt group include the bottom pull bar that bottom and pipe collar be hinged and connected and top with Hang the top pull bar that the bottom wall of mould template is hinged and connected, the top of described bottom pull bar and the bottom of top pull bar respectively with spiral shell The both ends threaded connection of bolt adjusting rod, is provided with annular groove, in institute in the upper portion side wall of the described interstitial hole for hanging mould template The inner elastic rubber strip become placed against with standing tube outer wall is installed, in the described top surface for hanging mould template in the annular groove stated Top surface groove is provided with, top surface elastic rubber strip, described top surface elastic rubber strip and floor are embedded with described top surface groove Bottom surface, which compresses, to be set, and blocking concrete has been poured between described standpipe and the floor slab pipeline hole hung on mould template top surface, Two fixed card slots are respectively arranged with two ends of a semicircle pipe collar, in two ends of another semicircle pipe collar Two connecting bolts are respectively arranged with, each connecting bolt is respectively inserted in a fixed card slot being correspondingly arranged and passes through spiral shell Mother is fixed, is divided to two ends for hanging mould template to be respectively arranged with a fixed card slot at one piece, mould template is hung at another piece point Two ends are respectively arranged with a connecting bolt, and each connecting bolt is respectively inserted in a fixed card slot being correspondingly arranged And fixed by nut.
CN201720918184.9U 2017-07-26 2017-07-26 A kind of through-flooring pipeline sealing hole template and hardened system structure Active CN207004020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720918184.9U CN207004020U (en) 2017-07-26 2017-07-26 A kind of through-flooring pipeline sealing hole template and hardened system structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720918184.9U CN207004020U (en) 2017-07-26 2017-07-26 A kind of through-flooring pipeline sealing hole template and hardened system structure

Publications (1)

Publication Number Publication Date
CN207004020U true CN207004020U (en) 2018-02-13

Family

ID=61456128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720918184.9U Active CN207004020U (en) 2017-07-26 2017-07-26 A kind of through-flooring pipeline sealing hole template and hardened system structure

Country Status (1)

Country Link
CN (1) CN207004020U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622657A (en) * 2021-08-31 2021-11-09 中国第十八冶金建设有限公司 Plugging construction method for pipeline hanging hole
CN113622656A (en) * 2021-08-31 2021-11-09 中国第十八冶金建设有限公司 Pipeline hangs hole shutoff template strutting arrangement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622657A (en) * 2021-08-31 2021-11-09 中国第十八冶金建设有限公司 Plugging construction method for pipeline hanging hole
CN113622656A (en) * 2021-08-31 2021-11-09 中国第十八冶金建设有限公司 Pipeline hangs hole shutoff template strutting arrangement
CN113622656B (en) * 2021-08-31 2023-09-08 中国第十八冶金建设有限公司 Pipeline hangs hole shutoff template strutting arrangement
CN113622657B (en) * 2021-08-31 2023-09-08 中国第十八冶金建设有限公司 Plugging construction method for pipeline hanging hole

Similar Documents

Publication Publication Date Title
CN107246147A (en) A kind of method of vertical duct sealing hole
CN109322505A (en) A kind of roofing reserved opening concrete plugging device and preparation method thereof
CN104947719B (en) The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN207004020U (en) A kind of through-flooring pipeline sealing hole template and hardened system structure
CN110103326A (en) A kind of prefabricated panel pylon preformed hole and device for hoisting
CN209163492U (en) The adjustable vertical bar structure that stretches is positioned for concrete floor reserving hole
CN205653902U (en) Floor entrance to a cave block structure
CN201539071U (en) Detachable floor tile
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN205296846U (en) Automatic maintenance of equipment of whole steel mould concrete of truss -like
CN204982672U (en) Bridge bent cap die block anti -leakage device
CN210834584U (en) Automatic pressurization concrete impermeability instrument
CN208981770U (en) One kind hanging mold device
CN204266571U (en) A kind of builder's jack i iron pre-embedded device
CN105587053B (en) A kind of industrialization house wall bottom grouting construction method
CN205804949U (en) A kind of sealing reversed beam model sheetinstallat fixing device
CN201891262U (en) Embedded casing pipe for drainage pipeline crossing floor slab
CN209129413U (en) A kind of roofing reserved opening concrete plugging device
CN209129372U (en) A kind of reserved opening tool-type hangs mold device
CN108222233A (en) A kind of rain inlet structure and its construction method for being used to build sponge city
CN209179482U (en) A kind of anti-bank reinforcement tools of clean room concrete
CN209428413U (en) A kind of overmolded formula pier shaft automatic spray curing system
CN208497270U (en) A kind of roofing finished product flashing mold
CN202530518U (en) Embedded device at sewer line in toilet
CN207739280U (en) Communication pipeline member and the communication well for using the communication pipeline member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20180914

Granted publication date: 20180213

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20190618

Granted publication date: 20180213

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20210415

Granted publication date: 20180213

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20240109

Granted publication date: 20180213