CN207003185U - A kind of settling tank of asphalt production - Google Patents
A kind of settling tank of asphalt production Download PDFInfo
- Publication number
- CN207003185U CN207003185U CN201720747414.XU CN201720747414U CN207003185U CN 207003185 U CN207003185 U CN 207003185U CN 201720747414 U CN201720747414 U CN 201720747414U CN 207003185 U CN207003185 U CN 207003185U
- Authority
- CN
- China
- Prior art keywords
- tank body
- tank
- heating pipe
- heat
- heating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working-Up Tar And Pitch (AREA)
Abstract
It the utility model is related to asphalt production field, more particularly to a kind of settling tank of asphalt production, including tank body, first agitating device and heater, first agitating device is located at the top of tank body, the heater includes heating tank and heating pipe, the heating pipe is wrapped on the outside of tank body lower part, the heating tank is located at tank body side, the tank body upper portion side wall is additionally provided with the first feeding tube and is connected with reagent storage bin with the other end of the second feeding tube, the tank wall is connected with capstan close to apical position, the other end of the capstan is connected with air compressor.During work of the present utility model, after asphalt stock being inputted by the first charging hole into tank body, second charging aperture inputs reagent into tank body, agitating device is stirred to the asphalt stock in tank body, after heating tank heats to heating pipe, air compressor pours into air into tank body and asphalt stock is pressurizeed, and helps asphalt stock to accelerate precipitation.
Description
Technical field
Asphalt production field is the utility model is related to, more particularly to a kind of settling tank of asphalt production.
Background technology
Chinese economy is always maintained at the growth of high speed since reform and opening-up, and Construction of Highway Traffic is advanced by leaps and bounds, China
Road asphalt manufacturing enterprise has also obtained fast development, especially heavy traffic paving asphalt and modified pitch realize by without to have, by small
To big, qualitative leap from less to more, tremendous contribution is made that for China's road construction.
Nowadays Bitumen-sealed is all to have by nonpolar low molecule alkane solvent to each component in decompression residuum
It different solubility, can realize that component separates using the difference of solubility, thus can be removed from decompression residuum to pitch
The unfavorable component of property, the asphaltic products of requirement up to specification is produced, simple uses solvent precipitation, and Bitumen-sealed excessively delays
Slowly, actual demand can not be met.
Utility model content
The purpose of this utility model is in view of the shortcomings of the prior art, there is provided a kind of settling tank of asphalt production.
To solve the above problems, the utility model provides following technical scheme:
A kind of settling tank of asphalt production, including tank body, the first agitating device and heater, the first stirring dress
Setting at the top of tank body, the heater includes heating tank and heating pipe, and the heating pipe is wrapped in outside tank body lower part
Side, the heating tank are located at tank body side, and it is defeated that the heating tank is provided with water inlet, steam outlet and opposing steam flow mouth, steam
The first connecting tube is connected between outlet and the input of heating pipe, is connected between opposing steam flow mouth and the output end of heating pipe
The second connecting tube is connected to, the tank body upper portion side wall is additionally provided with first charging aperture and second charging aperture, and the first charging aperture connects
The first feeding tube is connected to, second charging aperture is connected with the second feeding tube, and the other end of the second feeding tube is connected with reagent
Storage bin, the tank wall are connected with capstan close to apical position, and the other end of the capstan is connected with air pressure
Contracting machine.
Further, the heating pipe is set on the outside of tank body lower part upwards along tank body axial screw.
Further, the heating pipe is provided with is engaged the first spliced eye with the first connecting tube and the second connecting pipe
With the second spliced eye, first spliced eye is located at the top of the second spliced eye.
Further, the heater also includes heat-transfer device, and the heat-transfer device is arranged with tank body lower part, described
Heat conduction is loaded onto to be arranged in groove provided with the upward groove of spiral, the heating pipe.
Further, the heat-transfer device is made up of metal material.
Further, the copper tubular structure of the heat-transfer device.
Further, the heater also includes heat-insulation layer, and the heat-insulation layer is set in heating pipe periphery, heating tube
Between road sandwiched and heat-transfer device and heat-insulation layer.
Further, it is provided with the second agitating device in the reagent storage bin.
Further, the tank wall is provided with and looks around window.
Further, the tank base is provided with discharge pipe provided with the tank base.
Beneficial effect:A kind of settling tank of asphalt production of the present utility model, by the first charging hole into tank body it is defeated
After entering asphalt stock, second charging aperture inputs reagent into tank body, and agitating device is stirred to the asphalt stock in tank body, added
After hot tank heats to heating pipe, air compressor pours into air into tank body and asphalt stock is pressurizeed, and helps to drip
Blue or green raw material accelerates precipitation.
Brief description of the drawings
Fig. 1 is the utility model dimensional structure diagram;
Fig. 2 is the utility model heating device and tank body connection diagram;
Fig. 3 is that the utility model heat-transfer device, heating pipe and attemperator fill installment state sectional view;
Fig. 4 is the dimensional structure diagram of the utility model heat-transfer device, heating pipe and attemperator dress;
Description of reference numerals:Tank body 1, the first feeding tube 1a, the second feeding tube 1b, capstan 1c, the first stirring
Device 2, heater 3, heating tank 3a, water inlet 3a1, heating pipe 3b, the first connecting tube 4, the second connecting tube 5, reagent storage
Deposit case 6, air compressor 7, heat-transfer device 8, heat-insulation layer 9, discharge pipe 10.
Embodiment
With reference to Figure of description and embodiment, specific embodiment of the utility model is described in further detail:
A kind of settling tank of asphalt production according to Fig. 1 to Fig. 4, including tank body 1, the first agitating device 2 and add
Thermal 3, first agitating device 2 are located at the top of tank body 1, and the heater 3 includes heating tank 3a and heating pipe 3b,
The heating pipe 3b is wrapped in the lower outside of tank body 1, and the heating tank 3a is located at the side of tank body 1, and the heating tank 3a is provided with
First is connected between water inlet 3a1, steam outlet and opposing steam flow mouth, steam outlet and heating pipe 3b input
The second connecting tube 5, the upper portion side wall of tank body 1 are connected between connecting tube 4, opposing steam flow mouth and heating pipe 3b output end
First charging aperture and second charging aperture are additionally provided with, the first charging aperture is connected with the first feeding tube 1a, and second charging aperture connects
The other end for being connected to the second feeding tube 1b, the second feeding tube 1b is connected with reagent storage bin 6, and the side wall of tank body 1 is close
Apical position is connected with capstan 1c, and the capstan 1c other end is connected with air compressor 7.
Utility model works principle:After inputting asphalt stock into tank body 1 by the first charging hole, second charging aperture to
Input reagent, agitating device are stirred to the asphalt stock in tank body 1 in tank body 1, and heating tank 3a is carried out to heating pipe 3b
After heating, air compressor 7 pours into air into tank body 1 and asphalt stock is pressurizeed, and helps asphalt stock to accelerate precipitation.
The heating pipe 3b is set in the lower outside of tank body 1 upwards along the axial screw of tank body 1, and extending heating passage makes filling
The gas entered in heating pipe 3b heats to tank body 1.
The heating pipe 3b, which is provided with, is engaged the first spliced eye and the with the first connecting tube 4 and the second connecting tube 5
Two spliced eyes, the top that first spliced eye is located at the second spliced eye make to pour into by the first connecting tube and the second connecting tube 5
Gas in heating pipe 3b remains reciprocal state.
The heater 3 also includes heat-transfer device 8, and the heat-transfer device 8 is arranged with the bottom of tank body 1, the heat conduction
Load onto and be arranged in groove provided with the upward groove of spiral, the heating pipe 3b, tank body 1 is more fully heated.
The heat-transfer device 8 is made up of metal material, and metalwork capacity of heat transmission is stronger.
The 8 copper tubular structure of heat-transfer device.
The heater 3 also includes heat-insulation layer 9, and the heat-insulation layer 9 is set in heating pipe 3b peripheries, heating pipe 3b
Between sandwiched and heat-transfer device 8 and heat-insulation layer 9, heat-insulation layer 9 is used for the heat that is come out heating pipe 3b not laterally
Conduction.
The second agitating device is provided with the reagent storage bin 6, for hybrid dose.
The side wall of tank body 1 is provided with and looks around window, for observing the precipitation of asphalt stock in tank body 1.
The bottom of tank body 1 is provided with discharge pipe 10 provided with the bottom of tank body 1, for the pitch after precipitating completely to be arranged
Go out, into next process.
It is described above, only it is preferred embodiment of the present utility model, not technical scope of the present utility model is made
Go out any restrictions, thus it is every any trickle amendment made according to the technical essence of the utility model to above example, equivalent
Change and modification, in the range of still falling within the technical solution of the utility model.
Claims (10)
- A kind of 1. settling tank of asphalt production, it is characterised in that:Including tank body (1), the first agitating device (2) and heater (3), first agitating device (2) is located at the top of tank body (1), and the heater (3) includes heating tank (3a) and heating tube Road (3b), the heating pipe (3b) are wrapped in tank body (1) lower outside, and the heating tank (3a) is located at tank body (1) side, institute State heating tank (3a) and be provided with water inlet (3a1), steam outlet and opposing steam flow mouth, steam outlet and heating pipe (3b) The first connecting pipe (4) is connected between input, is connected between opposing steam flow mouth and the output end of heating pipe (3b) Two connecting tubes (5), tank body (1) upper portion side wall are additionally provided with first charging aperture and second charging aperture, and the first charging aperture connects Be connected to the first feeding tube (1a), second charging aperture is connected with the second feeding tube (1b), the second feeding tube (1b) it is another End is connected with reagent storage bin (6), and tank body (1) side wall is connected with capstan (1c), the forcing pipe close to apical position The other end in road (1c) is connected with air compressor (7).
- A kind of 2. settling tank of asphalt production according to claim 1, it is characterised in that:Heating pipe (3b) edge Tank body (1) axial screw is set in tank body (1) lower outside upwards.
- A kind of 3. settling tank of asphalt production according to claim 2, it is characterised in that:On the heating pipe (3b) Provided with the first spliced eye and the second spliced eye is engaged with the first connecting pipe (4) and the second connecting tube (5) road, described first inserts Hole position is connect in the top of the second spliced eye.
- A kind of 4. settling tank of asphalt production according to claim 2, it is characterised in that:The heater (3) is also Including heat-transfer device (8), the heat-transfer device (8) is arranged with tank body (1) bottom, and the heat conduction is loaded onto upward provided with spiral Groove, the heating pipe (3b) are arranged in groove.
- A kind of 5. settling tank of asphalt production according to claim 4, it is characterised in that:The heat-transfer device (8) by Metal material is made.
- A kind of 6. settling tank of asphalt production according to claim 5, it is characterised in that:Heat-transfer device (8) copper Matter tubular structure.
- A kind of 7. settling tank of asphalt production according to claim 4, it is characterised in that:The heater (3) is also Including heat-insulation layer (9), the heat-insulation layer (9) is set in heating pipe (3b) periphery, heating pipe (3b) sandwiched and heat-transfer device (8) between heat-insulation layer (9).
- A kind of 8. settling tank of asphalt production according to claim 1, it is characterised in that:The reagent storage bin (6) Inside it is provided with the second agitating device.
- A kind of 9. settling tank of asphalt production according to claim 1, it is characterised in that:In tank body (1) side wall Provided with looking around window.
- A kind of 10. settling tank of asphalt production according to claim 1, it is characterised in that:Tank body (1) bottom is set There is the tank body (1) bottom to be provided with discharge pipe (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720747414.XU CN207003185U (en) | 2017-06-23 | 2017-06-23 | A kind of settling tank of asphalt production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720747414.XU CN207003185U (en) | 2017-06-23 | 2017-06-23 | A kind of settling tank of asphalt production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207003185U true CN207003185U (en) | 2018-02-13 |
Family
ID=61448462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720747414.XU Active CN207003185U (en) | 2017-06-23 | 2017-06-23 | A kind of settling tank of asphalt production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207003185U (en) |
-
2017
- 2017-06-23 CN CN201720747414.XU patent/CN207003185U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103756704B (en) | System for producing modified coal tar pitch and preparation method thereof | |
CN107794194A (en) | The horizontal distilling apparatus of one kind wine brewing and brewing device | |
CN207003185U (en) | A kind of settling tank of asphalt production | |
CN205965089U (en) | Concentrated crystallization economizer of manganese sulfate | |
CN203389347U (en) | Evaporator for concentrating and desolventizing of high-viscosity materials | |
CN214571814U (en) | Distillation plant that rapid heating up | |
CN207936499U (en) | Heat from Low-temperature Flue Gas | |
CN204602079U (en) | A kind of spinning asphalt pretreatment still | |
CN206995899U (en) | A kind of energy-efficient distillation still | |
CN206034243U (en) | Large -scale recycled asphalt jar of rapid heating up | |
CN203741272U (en) | Production system of modified pitch | |
CN206215197U (en) | A kind of easy-to-dismount reactor of axle | |
CN206971048U (en) | Can be to the flow rate of asphalt weighing device of the uniform heating of pitch | |
CN205586983U (en) | Produce production line of many color ring oxygen tree fat | |
CN206454623U (en) | Reactor heater | |
CN209026370U (en) | PPR tee tube | |
CN219117880U (en) | Asphalt heating system | |
CN205763701U (en) | Sand mold makes of the water-bath sandbox on laser 3D printer | |
CN206665385U (en) | Wax liquor incubator | |
CN201664600U (en) | Rubber asphalt heating mixed melting device | |
CN204825145U (en) | Fuse -element static mixer for spinning | |
CN218895644U (en) | Glass powder high-temperature smelting device | |
CN215210338U (en) | Hot melting box for producing crack pouring glue | |
CN205127880U (en) | Reinforced mechanism of lubricating oil mediation cauldron | |
CN204944248U (en) | A kind of oil product residual heat using device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | "change of name, title or address" |
Address after: No.5, Shihua 3rd road, Shatian Town, Dongguan City, Guangdong Province, 523981 Patentee after: Guangdong Chengtai Investment Group Co., Ltd Address before: No.3 Shihua Road, lishadao fine chemical park, humengang, Shatian Town, Dongguan City, Guangdong Province, 523981 Patentee before: GUANGDONG CHENGTAI INVESTMENT Co.,Ltd. |
|
CP03 | "change of name, title or address" |