CN206986698U - One kind chooses arm overhead bridge structure greatly - Google Patents

One kind chooses arm overhead bridge structure greatly Download PDF

Info

Publication number
CN206986698U
CN206986698U CN201720097231.8U CN201720097231U CN206986698U CN 206986698 U CN206986698 U CN 206986698U CN 201720097231 U CN201720097231 U CN 201720097231U CN 206986698 U CN206986698 U CN 206986698U
Authority
CN
China
Prior art keywords
bridge
arm
main body
floor
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720097231.8U
Other languages
Chinese (zh)
Inventor
陈冠华
林志滔
马耕
陈驰
李萍
曹有新
陈蕾君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou planning and Design Institute Group Co.,Ltd.
Original Assignee
Fuzhou Planning Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Planning Design and Research Institute filed Critical Fuzhou Planning Design and Research Institute
Priority to CN201720097231.8U priority Critical patent/CN206986698U/en
Application granted granted Critical
Publication of CN206986698U publication Critical patent/CN206986698U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

It the utility model is related to one kind and choose arm overhead bridge structure greatly, the bridge includes being located at the bridge main body at middle part and chooses arm positioned at bridge main body both sides, choose arm bottom and be spaced and choose the floor that arm and bridge main body are connected as a single entity along bridge length direction, multiple chambers are arranged at intervals with along bridge width direction inside bridge main body.The utility model chooses greatly arm overhead bridge structure, and that there is box beam to choose arm is big, chamber is wide, the features such as bearing spacing is small, on the basis of structure stress is met, avoid broad flange beam from using transverse prestress, greatly simplify construction technology, meet aesthetic requirements while ensureing safe again, space under bridge is fully saved on the premise of bridge lateral stability and security is ensured, beneficial to vehicle pass-through, the traffic pressure in alleviation city city.

Description

One kind chooses arm overhead bridge structure greatly
Technical field
It the utility model is related to one kind and choose arm overhead bridge structure greatly.
Background technology
In order to solve the traffic pressure in city, urban viaduct is in urban infrastructure using more prevalent, city height Build bridge for Regional Road Network to optimize and improve and have laid a good foundation, the also development to city and social economy has important work With for the concrete box girder cantilever of conventional overhead bridge when that need to increase boom width because load limits, structure cantilever root is thick Degree need to increase bigger, cause space under bridge small, be unfavorable for vehicle pass-through, meanwhile, the degree of disturbing of cantilever end is also larger, loses smooth-going The comfort level of driving;Box beam need to laterally increase transverse prestress, and difficulty of construction is very big.
Utility model content
In view of this, the purpose of this utility model is to provide that a kind of structure is novel, and good big of stability chooses arm elevated bridge Structure.
The utility model is realized using following scheme:A kind of to choose arm overhead bridge structure greatly, the bridge is included in being located at The bridge main body in portion and choose arm positioned at bridge main body both sides, choose arm bottom be spaced and chosen along bridge length direction arm and The floor that bridge main body is connected as a single entity, multiple chambers are arranged at intervals with along bridge width direction inside bridge main body.
The hook portion chosen arm outer side edges and bent downwards along having, hook portion are internally provided with drainpipe, and floor bottom is set There is the drip on the inside of hook portion, the floor is wedge structure, and floor small end is headed on the inside of hook portion, and the big end of floor heads on bridge Beam body side.
Further, the arm width of choosing is 540cm, and the floor thickness is 50cm, the center between adjacent two floor Away from for 300 ~ 400cm.
Further, the arm of choosing includes thickness by the small trapezoidal portion of interior gradual change outward and the flat part of consistency of thickness, trapezoidal Portion's width is 200cm, and be connected with the bridge main body thickness at end of trapezoidal portion is 50cm, and the thickness at the end that is connected with flat part is 20cm, flat part thickness are 20cm, and the hook portion is located at flat part outer side edges edge.
Further, chamber sidepiece offers air vent, and chamber bottom is provided with spilled water hole, chamber bottom and adjacent two It is provided with web between chamber and enters manhole for what people passed through.
Further, the bridge floor of the bridge is the low slope structure in middle high both sides, and the both sides gradient is 2%.
Compared with prior art, the utility model has the advantages that:The utility model chooses greatly arm elevated bridge knot There is structure box beam to choose the features such as arm is big, and chamber is wide, and bearing spacing is small, is adjusted to two-way Slab element stress, is meeting structure stress On the basis of, avoid broad flange beam from using transverse prestress, greatly simplify construction technology, meet U.S. while ensureing safe again Sight demand, space under bridge is fully saved on the premise of bridge lateral stability and security is ensured, beneficial to vehicle pass-through, alleviated The traffic pressure in city city, while the degree of disturbing of cantilever end is also smaller, ensures the comfort level of smooth-going driving.
For the purpose of this utility model, technical scheme and advantage is more clearly understood, specific embodiment will be passed through below And relevant drawings, the utility model is described in further detail.
Brief description of the drawings
Fig. 1 is the utility model embodiment transverse cross-sectional view;
Fig. 2 is the utility model embodiment top view;
Label declaration in figure:1- bridge main bodies, 2- choose arm, 3- floors, 4- chambers, 5- hook portions, 6- drainpipes, 7- and dripped The trapezoidal portion of groove, 8-, 9- flat parts, 10- air vents, 11- spilled water holes, 12- enter manhole.
Embodiment
As shown in Figure 1 and 2, a kind of to choose arm overhead bridge structure greatly, the bridge includes the He of bridge main body 1 positioned at middle part Arm 2 is chosen positioned at the both sides of bridge main body 1, chooses that arm bottom has been spaced and chosen arm 2 along bridge length direction and bridge main body 1 connects The floor 3 being integrated, multiple chambers 4, the utility model overpass are arranged at intervals with along bridge width direction inside bridge main body 1 There is girder construction box beam to choose the features such as arm is big, and chamber is wide, and bearing spacing is small, is adjusted to two-way Slab element stress, is meeting structure On the basis of stress, avoid broad flange beam from using transverse prestress, greatly simplify construction technology, it is again full while ensureing safe Sufficient aesthetic requirements, space under bridge is fully saved on the premise of bridge lateral stability and security is ensured, beneficial to vehicle pass-through, Alleviate the traffic pressure in city city, while the degree of disturbing of cantilever end is also smaller, ensures the comfort level of smooth-going driving.
The hook portion 5 chosen the outer side edges of arm 2 and bent downwards along having, hook portion are internally provided with drainpipe 6, the bottom of floor 3 The drip 7 positioned at the inner side of hook portion 5 is provided with, the floor 3 is wedge structure, and floor small end heads on the inner side of hook portion 5, and floor is big Hold and head on the sidepiece of bridge main body 1, the ponding on bridge floor is drained by drainpipe, and the rainwater to be flowed down along floor lower edge reaches drop It will be dripped after tank 7, prevent from flowing on bridge main body or bridge pier.
In the present embodiment, the width of arm 2 of choosing is 540cm, and the thickness of floor 3 is 50cm, between adjacent two floor 3 Centre-to-centre spacing be 300 ~ 400cm.
In the present embodiment, the arm of choosing includes thickness by the small trapezoidal portion 8 of interior gradual change outward and the flat part of consistency of thickness 9, the trapezoidal width of portion 8 is 200cm, and be connected with the bridge main body thickness at end of trapezoidal portion is 50cm, and be connected end with flat part Thickness is 20cm, and flat part thickness is 20cm, and the hook portion 5 is located at the outer side edges edge of flat part 9.
In the present embodiment, the sidepiece of chamber 4 offers air vent 10, and the bottom of chamber 4 is provided with spilled water hole 11, drainage effect It is good, it is provided with the web between chamber bottom and adjacent two chamber and enters manhole 12 for what people passed through, is easy to personnel to enter Safeguard.
In the present embodiment, the bridge floor of the bridge is the low slope structure in middle high both sides, and the both sides gradient is 2%, in favor of draining.
Above-listed preferred embodiment, the purpose of this utility model, technical scheme and advantage are further described, It should be understood that and the foregoing is only preferred embodiment of the present utility model, it is all not to limit the utility model Within the spirit and principles of the utility model, any modification, equivalent substitution and improvements made etc., this practicality should be included in Within new protection domain.

Claims (3)

1. one kind chooses arm overhead bridge structure greatly, it is characterised in that:The bridge includes being located at the bridge main body at middle part and is located at Arm is chosen in bridge main body both sides, chooses that arm bottom is spaced and chosen arm along bridge length direction and bridge main body is connected as a single entity Floor, multiple chambers are arranged at intervals with along bridge width direction inside bridge main body;It is described choose arm outer side edges along have be turned under The hook portion of folding, hook portion are internally provided with drainpipe, and floor bottom is provided with the drip on the inside of hook portion, and the floor is wedge Shape structure, floor small end are headed on the inside of hook portion, and the big end of floor heads on bridge main body sidepiece;Chamber sidepiece offers air vent, case Room bottom is provided with spilled water hole, is provided with the web between chamber bottom and adjacent two chamber and enters people for what people passed through Hole;The bridge floor of the bridge is the low slope structure in middle high both sides, and the both sides gradient is 2%.
2. according to claim 1 choose arm overhead bridge structure greatly, it is characterised in that:The arm width of choosing is 540cm, institute It is 50cm to state floor thickness, and the centre-to-centre spacing between adjacent two floor is 300 ~ 400cm.
3. according to claim 2 choose arm overhead bridge structure greatly, it is characterised in that:It is described choose arm include thickness from it is interior toward The small trapezoidal portion of outer gradual change and the flat part of consistency of thickness, trapezoidal portion's width are 200cm, and trapezoidal portion is connected end with bridge main body Thickness is 50cm, and the thickness at the end that is connected with flat part is 20cm, and flat part thickness is 20cm, and the hook portion is located at outside flat part Side edge.
CN201720097231.8U 2017-01-25 2017-01-25 One kind chooses arm overhead bridge structure greatly Active CN206986698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720097231.8U CN206986698U (en) 2017-01-25 2017-01-25 One kind chooses arm overhead bridge structure greatly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720097231.8U CN206986698U (en) 2017-01-25 2017-01-25 One kind chooses arm overhead bridge structure greatly

Publications (1)

Publication Number Publication Date
CN206986698U true CN206986698U (en) 2018-02-09

Family

ID=61421942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720097231.8U Active CN206986698U (en) 2017-01-25 2017-01-25 One kind chooses arm overhead bridge structure greatly

Country Status (1)

Country Link
CN (1) CN206986698U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481843A (en) * 2021-07-19 2021-10-08 上海市政工程设计研究总院(集团)有限公司 Box bridge outlet structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481843A (en) * 2021-07-19 2021-10-08 上海市政工程设计研究总院(集团)有限公司 Box bridge outlet structure

Similar Documents

Publication Publication Date Title
CN103410082B (en) Double-layer bridge floor cable-stayed bridge
CN201835220U (en) City viaduct structure
CN206986698U (en) One kind chooses arm overhead bridge structure greatly
CN103074846B (en) A kind of lateral bearing system beam bridge
CN202181504U (en) Box beam
CN201722594U (en) Extradosed railway cable-stayed bridge
CN206971274U (en) A kind of motor vehicle and non-motor vehicle and the river-crossing tunnel section arrangement deposited
CN200999345Y (en) Water storage draining board
CN209493781U (en) A kind of pavement structure of high intensity
CN205223837U (en) Y shape pier of belted steel pull rod
CN201459594U (en) Superhigh hollow pier of bridge adopting long-connection and large-span continuous structure
CN207638306U (en) Cable duct embedded bracket
CN206457734U (en) A kind of double layer reinforced concrete box culvert
CN206591417U (en) A kind of only floating system cable stayed bridge structure of post wide cut rachis face half
CN204491392U (en) A kind of Longspan Bridge
CN201762640U (en) Paving brick
CN213772886U (en) Concrete flat opening pipe gallery and pedestrian bridge structure
CN213389686U (en) Vase pier capping beam structure
CN211368249U (en) High infiltration town road structure
CN202626818U (en) Low-speed and medium-speed magnetic suspension linear track beam
CN203260980U (en) Anti-ponding cable trench and cover plate thereof
CN209686149U (en) Tiny fragments of stone, coal, etc. plate is kept off on a kind of novel bridge
CN208280414U (en) A kind of steel skeleton hollow pre-fabricated panels
CN106869486A (en) The reinforcement type building for possessing illumination and drain function builds frame pedal
CN207193749U (en) The sedimentation crack structure at expansion joint and subsiding crack staggered place in a kind of old bridge widening

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 350003 No.1, Gaoxin Avenue, high tech Zone, Minhou County, Fuzhou City, Fujian Province

Patentee after: Fuzhou planning and Design Institute Group Co.,Ltd.

Address before: 350003 No.1, Gaoxin Avenue, high tech Zone, Minhou County, Fuzhou City, Fujian Province

Patentee before: FUZHOU PLANNING DESIGN & Research Institute

CP01 Change in the name or title of a patent holder