CN206976994U - Suspension apparatus for support national defence cable - Google Patents
Suspension apparatus for support national defence cable Download PDFInfo
- Publication number
- CN206976994U CN206976994U CN201720601109.XU CN201720601109U CN206976994U CN 206976994 U CN206976994 U CN 206976994U CN 201720601109 U CN201720601109 U CN 201720601109U CN 206976994 U CN206976994 U CN 206976994U
- Authority
- CN
- China
- Prior art keywords
- national defence
- cable
- defence cable
- suspension
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of suspension apparatus for support national defence cable is the utility model is related to, including:The multiple supporting constructions set along national defence cable louding;The beam structure being set up on supporting construction;And the simultaneously suspension girder construction of support national defence cable is hung on beam structure, suspension girder construction is set along national defence cable separation.The utility model manually gradually excavates the earthwork of national defence cable bottom in work progress, so that national defence cable suspension, so as to prevent that national defence cable is destroyed in Excavation Process, ensure that the safety of national defence cable in beam structure.The structure that the utility model is used for the suspension apparatus of support national defence cable is simple, convenient and quick construction efficiency high, can be used in turn.
Description
Technical field
The realm of building construction is the utility model is related to, espespecially a kind of suspension apparatus for support national defence cable.
Background technology
With the continuous propulsion of Development of China's Urbanization, the quantity of urban population is on the increase, and this is to urban infrastructure construction
Higher requirement is proposed, urban construction starts to develop toward the underground space.It is but anti-electric due in many cases state can not be obtained
The drawing of cable positioning, urban central zone are often unavoidable to encounter national defence cable in underground space development process of construction.
For example during construction city foundation ditch, foundation ditch digs the deep former design buried depth for tending to exceed national defence cable, so as to by excavation of foundation pit
Afterwards, national defence cable is at vacant state positioned at the part of foundation ditch, very unstable, in this case how protectorate anti-cable
The problem of being individual urgent need to resolve.
Utility model content
A kind of the defects of the purpose of this utility model is to overcome prior art, there is provided suspention for support national defence cable
Device, how national defence cable is protected in the case of hanging after solving the problems, such as excavation of foundation pit in the prior art.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of suspension apparatus for support national defence cable, including:
The multiple supporting constructions set along national defence cable louding;
The beam structure being set up on the supporting construction;And
Be hung on the beam structure and the suspension girder construction of national defence cable described in support, the suspension girder construction along
The national defence cable separation is set.
The utility model is used for the beneficial effect of the suspension apparatus of support national defence cable:
The utility model is used for the suspension apparatus of support national defence cable by the way that beam structure branch is located at into selected support knot
On structure, by the way that national defence cable is positioned in multiple suspension girder constructions, length direction of the girder construction along beam structure will be hung
Interval is hung on beam structure, then manually gradually excavates the earthwork of national defence cable bottom, so that national defence cable suspension
In beam structure, so as to prevent that national defence cable is destroyed in Excavation Process, the safety of national defence cable ensure that.This practicality is new
The structure that type is used for the suspension apparatus of support national defence cable is simple, convenient and quick construction efficiency high, can be used in turn.
The utility model be used for support national defence cable suspension apparatus further improvement is that, the suspension girder construction is adopted
It is made of shaped steel.
The utility model be used for support national defence cable suspension apparatus further improvement is that, the suspension girder construction is set
There is through hole, wear the through hole by rope is hung on the beam structure by the suspension girder construction.
The utility model be used for support national defence cable suspension apparatus further improvement is that, the rope is provided with card
Tool, the end of the rope is fixed by the fixture.
The utility model be used for support national defence cable suspension apparatus further improvement is that, the supporting construction is branch
Fender pile.
The utility model be used for support national defence cable suspension apparatus further improvement is that, the beam structure is shellfish
Thunder frame.
Brief description of the drawings
Fig. 1 is the structural representation for the suspension apparatus that the utility model is used for support national defence cable.
Fig. 2 is Fig. 1 side view.
Fig. 3 is the front view of A in Fig. 1.
Fig. 4 is the side view of A in Fig. 1.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, it is shown that the utility model is used for the structural representation of the suspension apparatus of support national defence cable.Such as Fig. 1
Shown, the suspension apparatus that the utility model is used for support national defence cable includes:Multiple supporting constructions 10, beam structure 20 and outstanding
Suspension beam structure 30, plurality of supporting construction 10 are moved towards to set along national defence cable 40, and beam structure 20 is set up in supporting construction 10
On, suspension girder construction 30 be hung on beam structure 20 and suspension the support national defence cable 40 of girder construction 30, suspension girder construction 30 along
National defence cable separation is set.The suspension apparatus that the utility model is used for support national defence cable causes national defence cable suspension in crossbeam knot
Structure, so as to prevent that national defence cable is destroyed in Excavation Process, it ensure that the safety of national defence cable.The utility model is used to hold
Ask the structure of the suspension apparatus of national defence cable simple, convenient and quick construction efficiency high, can be used in turn.
Refering to Fig. 2, it is shown that Fig. 1 side view.Refering to Fig. 3, it is shown that A front view in Fig. 1.With reference to Fig. 1 to Fig. 3 institutes
Show, in the present embodiment, supporting construction 10 is support pile.In the work progress of excavation pit, made using the support pile at scene
For supporting construction 10, at least two support piles are selected according to the trend of national defence cable.
Beam structure 20 is Bailey bracket.Bailey bracket is to form the steelframe of certain unit, can be spliced with it and is assembled into a lot
Component, equipment.Bailey bracket is finished product, and the lease in market is convenient, and Bailey bracket uses the construction of assembling, easy to operation, while shellfish
The hiring cost of thunder frame is low.In work progress, the Bailey bracket of dimension is selected, Bailey bracket is arranged on support pile, shape
Into beam structure 20, so as to which supporting construction 10 and beam structure 20 build to form main stress system.
Stop mechanical equivalent of light excavation immediately when being dug in work progress to national defence cable 40, switch to hand digging.Determine national defence cable
40 trend, suspension girder construction 30 is placed in the bottom for excavating the national defence cable 40 exposed.Specifically, it is national defence cable 40 is vertical
In suspension girder construction 30.Multiple suspension girder constructions 30 are moved towards to be arranged at intervals along national defence cable 40.In the present embodiment,
Suspension girder construction 30 is made of shaped steel, such as using I-steel in the present embodiment.
Refering to Fig. 4, it is shown that A side view in Fig. 1.With reference to shown in Fig. 1 to Fig. 4, girder construction 30 is hung along length side
Through hole 300 is provided with to being spaced apart, the number of through hole 300 is decided according to the actual requirements.The size of through hole 300 is required to ensure rope
Rope 50 can be worn.Through hole 300 is worn by rope 50 and is hung on beam structure 20 by girder construction 30 is hung.Rope 50 is provided with
Fixture 51, pass through the end of the stationary rope 50 of fixture 51.In the present embodiment, rope 50 and fixture 51 have multiple.Rope 50
It is made of steel wire rope.
After girder construction 30 will be hung by rope 50 and is connected with beam structure 20, manually gradually by national defence cable
The 40 bottom earthwork is excavated, and allows supporting construction 10, beam structure 20 and suspension girder construction 30 to build the structure to be formed gradually complete
Stress, it is further carried out hand excavation so that national defence cable 40 is gradually hanging, so prevents from destroying in Excavation Process
National defence cable 40, it ensure that the safety of national defence cable 40.
After the completion of the underground construction stage, backfilling of earthwork is extremely backfilled to the bottom of suspension girder construction 30 in foundation ditch, progressively
National defence cable 40 is lowered into soil body surface, then progressively removes Suspenoing apparatus.
The utility model is used for having the beneficial effect that for the suspension apparatus of support national defence cable:
The utility model is used for the suspension apparatus of support national defence cable by the way that beam structure branch is located at into selected support knot
On structure, by the way that national defence cable is positioned in multiple suspension girder constructions, length direction of the girder construction along beam structure will be hung
Interval is hung on beam structure, then manually gradually excavates the earthwork of national defence cable bottom, so that national defence cable suspension
In beam structure, so as to prevent that national defence cable is destroyed in Excavation Process, the safety of national defence cable ensure that.This practicality is new
The structure that type is used for the suspension apparatus of support national defence cable is simple, convenient and quick construction efficiency high, can be used in turn.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root
Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality
New restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.
Claims (6)
- A kind of 1. suspension apparatus for support national defence cable, it is characterised in that including:The multiple supporting constructions set along national defence cable louding;The beam structure being set up on the supporting construction;AndIt is hung on the beam structure and the suspension girder construction of national defence cable described in support, the suspension girder construction is along described National defence cable separation is set.
- 2. it is used for the suspension apparatus of support national defence cable as claimed in claim 1, it is characterised in that the suspension girder construction is adopted It is made of shaped steel.
- 3. it is used for the suspension apparatus of support national defence cable as claimed in claim 2, it is characterised in that the suspension girder construction is set There is through hole, wear the through hole by rope is hung on the beam structure by the suspension girder construction.
- 4. it is used for the suspension apparatus of support national defence cable as claimed in claim 3, it is characterised in that the rope is provided with card Tool, the end of the rope is fixed by the fixture.
- 5. it is used for the suspension apparatus of support national defence cable as claimed in claim 1, it is characterised in that the supporting construction is branch Fender pile.
- 6. it is used for the suspension apparatus of support national defence cable as claimed in claim 1, it is characterised in that the beam structure is shellfish Thunder frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720601109.XU CN206976994U (en) | 2017-05-26 | 2017-05-26 | Suspension apparatus for support national defence cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720601109.XU CN206976994U (en) | 2017-05-26 | 2017-05-26 | Suspension apparatus for support national defence cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206976994U true CN206976994U (en) | 2018-02-06 |
Family
ID=61411061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720601109.XU Active CN206976994U (en) | 2017-05-26 | 2017-05-26 | Suspension apparatus for support national defence cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206976994U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109972623A (en) * | 2019-03-22 | 2019-07-05 | 陕西铁路工程职业技术学院 | A kind of construction method and device carrying out pipeline suspension using Bailey beam |
CN111021363A (en) * | 2019-12-31 | 2020-04-17 | 广东顺德电力设计院有限公司 | Method and system for protecting cable by using bailey truss |
-
2017
- 2017-05-26 CN CN201720601109.XU patent/CN206976994U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109972623A (en) * | 2019-03-22 | 2019-07-05 | 陕西铁路工程职业技术学院 | A kind of construction method and device carrying out pipeline suspension using Bailey beam |
CN111021363A (en) * | 2019-12-31 | 2020-04-17 | 广东顺德电力设计院有限公司 | Method and system for protecting cable by using bailey truss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105298507B (en) | A kind of underground pipe gallery construction method of top open cut bottom tunneler construction | |
CN106437798B (en) | A kind of preprocess method of the anchor cable group across shield driving section | |
CN102561404B (en) | Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same | |
CN110593264B (en) | Excavation construction method for underground pipeline in-situ protection long and narrow deep foundation pit | |
CN103726495B (en) | Coastal waters deep foundation pit supporting structure and construction method thereof | |
CN105155516B (en) | The method of construction drill bored concrete pile before making an overall screening underground obstacle | |
CN104775433B (en) | A kind of method of pile pulling construction | |
CN206976994U (en) | Suspension apparatus for support national defence cable | |
CN104652418A (en) | Continuous wall underground pipeline position construction method | |
CN101838988A (en) | Comprehensive construction method for extracting anchor cable | |
CN106120791B (en) | Nothing makees vertical supporting system underground structure covered back-digging construction method in advance | |
CN106703034A (en) | Construction device and construction method for pulling out piles through cooperation of rotating drilling machine and sleeve drill bit | |
CN203685192U (en) | Novel device for disassembling anchor rod in shield crossing zone | |
CN202090349U (en) | Device for removing square pile | |
CN108005659B (en) | A kind of diving excavation construction method for the construction of city vertical shaft | |
CN104047607A (en) | Construction method for lifting out shield tunneling machine under condition of envelop enclosure | |
CN206736920U (en) | A kind of internal-expansion type pipe drawing device | |
CN110541424B (en) | Method for arranging grouting embedded pipe below dam plug body impervious wall construction | |
CN209798815U (en) | It can dismantle cantilever type retaining wall to imitate sideslip prevention by force | |
CN211256952U (en) | Newly-built enclosure structure of existing basement extension | |
CN102296610B (en) | Device for removing square pile and construction method thereof | |
JP6684314B2 (en) | Bridge pier removal method | |
CN110005453A (en) | Large Underground spentnuclear fuel disposes library mechanization method of construction | |
JP2021080798A (en) | Pipeline construction method using propulsion method | |
CN204664613U (en) | Barrier device is worn under pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |