CN206976101U CN201720931860.6U CN201720931860U CN206976101U CN 206976101 U CN206976101 U CN 206976101U CN 201720931860 U CN201720931860 U CN 201720931860U CN 206976101 U CN206976101 U CN 206976101U
Authority
CN
China
Prior art keywords
arrester
formal dress
direction board
housing
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720931860.6U
Other languages
Chinese (zh)
Inventor
白岩涛
于文虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI WUSONG ELECTRICAL INDUSTRIAL Co Ltd
Original Assignee
SHANGHAI WUSONG ELECTRICAL INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI WUSONG ELECTRICAL INDUSTRIAL Co Ltd filed Critical SHANGHAI WUSONG ELECTRICAL INDUSTRIAL Co Ltd
Priority to CN201720931860.6U priority Critical patent/CN206976101U/en
Application granted granted Critical
Publication of CN206976101U publication Critical patent/CN206976101U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Thermistors And Varistors (AREA)

Abstract

The utility model provides a kind of three-phase formal dress arrester, and the three-phase formal dress arrester includes:Housing;Insulator, the insulator are connected to the case top;Electric conductor, the electric conductor are arranged on the enclosure interior, and the electric conductor connects the insulator;Ground terminal, on the housing, the ground terminal is electrically connected with the electric conductor for the ground terminal connection;Charge valve, the charge valve connection is on the housing;Monitor device on-line, the on-line monitoring device connection is on the housing.The beneficial effects of the utility model:The on-line monitoring device of setting can measure electric current, voltage and resistance data in real time, keep safe to use, the insulation effect of insulator is good, the conductive effect of electric conductor is good, and the stability of three-phase formal dress arrester is preferable, small volume, simple in construction, maintenance cost is low, and insulation effect is preferable.

Description

A kind of three-phase formal dress arrester
Technical field
It the utility model is related to lightning arrester technical field, more particularly to a kind of three-phase formal dress arrester.
Background technology
Arrester is protection system, such as power transmission network, is gone out in the functional fault due to thunderbolt or other subsystems When existing over-pressed, arrester exports this overvoltage towards ground connection direction, and thus protects the miscellaneous part of power transmission network.
The main Types of arrester have tube type arrester, valve-type arrester and Zinc-Oxide Arrester etc..Each type is taken shelter from the thunder The main operational principle of device is different, but their work is substantially identical, is provided to protect the communications cable and leads to Believe that equipment is without prejudice.
Current existing arrester stability is general, and volume is larger, complicated, and maintenance cost is high, and insulation effect is general.
Utility model content
For problems of the prior art, it is preferable that the utility model provides a kind of stability, small volume, structure Simply, maintenance cost is low, the preferable three-phase formal dress arrester of insulation effect.
The utility model adopts the following technical scheme that:
A kind of three-phase formal dress arrester, the three-phase formal dress arrester include:
Housing;
Insulator, the insulator are connected to the case top;
Electric conductor, the electric conductor are arranged on the enclosure interior, and the electric conductor connects the insulator;
Ground terminal, on the housing, the ground terminal electrically connects with the electric conductor for the ground terminal connection Connect;
Charge valve, the charge valve connection is on the housing;
Monitor device on-line, the on-line monitoring device connection is on the housing.
Preferably, the three-phase formal dress arrester also includes:
Explosion-protection equipment, on the housing, the on-line monitoring device and the explosion-protection equipment distinguish position for the explosion-proof connection In the housing both sides.
Preferably, the three-phase formal dress arrester also includes:
Suspension ring, the suspension ring connection is on the housing.
Preferably, the three-phase formal dress arrester also includes:
Accessory tank shell, the accessory tank shell is below the on-line monitoring device, the accessory tank shell Connection is on the housing.
Preferably, the on-line monitoring device includes A phases monitor, B phases monitor and C phase monitors.
Preferably, the three-phase formal dress arrester also includes:
First direction board, first direction board have the first instruction pattern of a default correspondence A phases monitor, First direction board is located at below the A phases monitor, and first direction board is connected on the accessory tank shell;
Second direction board, second direction board have the second instruction pattern of a default correspondence B phases monitor, Second direction board is located at below the B phases monitor, and second direction board is connected on the accessory tank shell;
3rd direction board, the 3rd direction board have the 3rd instruction pattern of a default correspondence C phases monitor, 3rd direction board is located at below the C phases monitor, and the 3rd direction board is connected on the accessory tank shell.
Preferably, the three-phase formal dress arrester also includes:
4th direction board, the 4th direction board have the 4th instruction of a default correspondence three-phase formal dress arrester Pattern, the 4th direction board are connected on the accessory tank shell.
Preferably, the mode that the insulator is connected through a screw thread connects on the housing.
The beneficial effects of the utility model are:The on-line monitoring device of setting can measure electric current, voltage and resistance in real time Data, keep safe to use, the insulation effect of insulator is good, and the conductive effect of electric conductor is good, the stabilization of three-phase formal dress arrester Preferable, the small volume of property, simple in construction, maintenance cost is low, and insulation effect is preferable.
Brief description of the drawings
Fig. 1 is the front view of three-phase formal dress arrester in a kind of preferred embodiment of the present utility model;
Fig. 2 is the side view of three-phase formal dress arrester in a kind of preferred embodiment of the present utility model;
Fig. 3 is one of top view of three-phase formal dress arrester in a kind of preferred embodiment of the present utility model;
Fig. 4 is in a kind of preferred embodiment of the present utility model the two of the top view of three-phase formal dress arrester;
Fig. 5 is in a kind of preferred embodiment of the present utility model the three of the top view of three-phase formal dress arrester;
Fig. 6 is in a kind of preferred embodiment of the present utility model the four of the top view of three-phase formal dress arrester;
Fig. 7 is the structural representation of charge valve in a kind of preferred embodiment of the present utility model;
Fig. 8 is the structural representation of ground terminal in a kind of preferred embodiment of the present utility model
Embodiment
It should be noted that in the case where not conflicting, following technical proposals, can be mutually combined between technical characteristic.
Specific embodiment of the present utility model is further described below in conjunction with the accompanying drawings:
As shown in figures 1-8, a kind of three-phase formal dress arrester, above-mentioned three-phase formal dress arrester include:
Housing 12;
Insulator 1, above-mentioned insulator 1 are connected to the above-mentioned top of housing 12;
Electric conductor, above-mentioned electric conductor are arranged on inside above-mentioned housing 12, and above-mentioned electric conductor connects above-mentioned insulator 1;
Ground terminal 5, above-mentioned ground terminal 5 are connected on above-mentioned housing 12, above-mentioned ground terminal 5 and above-mentioned electric conductor electricity Property connection;
Charge valve 2, above-mentioned charge valve 2 are connected on above-mentioned housing 12;
Monitor device 3 on-line, above-mentioned on-line monitoring device 3 is connected on above-mentioned housing 12.
In the present embodiment, the protection feature of the three-phase formal dress arrester in the present invention is greatly improved, suitable for phase The gas insulation opening and closing arrangement, the transformer etc. that are arranged in power station, electric substation etc. are protected for abnormal voltage.Due to Using sulfur hexafluoride gas as dielectric, it can realize in the same manner as other switchgears and significantly minimize, Thus, very big effect is achieved in setting area diminution of substation facilities etc. etc..
Each part dimension of three-phase formal dress arrester can adjust according to being actually needed, wherein, the on-line monitoring device 3 of setting can Measurement electric current, voltage and resistance data in real time, keep safe to use, the insulation effect of insulator 1 is good, the conductive effect of electric conductor Fruit is good, and the stability of three-phase formal dress arrester is preferable, and small volume is simple in construction, and maintenance cost is low, and insulation effect is preferable.
In preferred embodiment, above-mentioned three-phase formal dress arrester also includes:
Explosion-protection equipment 6, it is above-mentioned it is explosion-proof be connected on above-mentioned housing 12, above-mentioned on-line monitoring device 3 and above-mentioned explosion-protection equipment 6 divide Not Wei Yu the above-mentioned both sides of housing 12, explosion-protection equipment 6 has good explosion-proof performance.
In preferred embodiment, above-mentioned three-phase formal dress arrester also includes:
Suspension ring 7, above-mentioned suspension ring 7 are connected on above-mentioned housing 12, and suspension ring 7 are easily installed.
In preferred embodiment, above-mentioned three-phase formal dress arrester also includes:
Housing accessory tank shell 4, above-mentioned housing accessory tank shell 4 is positioned at the above-mentioned lower section of on-line monitoring device 3, above-mentioned shell Body accessory tank shell 4 is connected on above-mentioned housing 12, and housing accessory tank shell 4 coordinates with on-line monitoring device 3.
In preferred embodiment, above-mentioned on-line monitoring device 3 includes A phases monitor (A in Fig. 3-6), B phases monitor (figure B in 3-6) and C phase monitors Fig. 3-6 in C).
In preferred embodiment, above-mentioned three-phase formal dress arrester also includes:
First direction board 8, above-mentioned first direction board 8 have the first instruction figure of a default above-mentioned A phases monitor of correspondence Case, above-mentioned first direction board 8 are located at below above-mentioned A phases monitor, and above-mentioned first direction board 8 is connected to above-mentioned housing accessory case On housing 4;
Second direction board 9, above-mentioned second direction board 9 have the second instruction figure of a default above-mentioned B phases monitor of correspondence Case, above-mentioned second direction board 9 are located at below above-mentioned B phases monitor, and above-mentioned second direction board 9 is connected to above-mentioned housing accessory case On housing 4;
3rd direction board 10, above-mentioned 3rd direction board 10 have the 3rd instruction of a default above-mentioned C phases monitor of correspondence Pattern, above-mentioned 3rd direction board 10 are located at below above-mentioned C phases monitor, and it is attached that above-mentioned 3rd direction board 10 is connected to above-mentioned housing On product tank shell 4.
In the present embodiment, arrester phase sequence and on-line monitoring device corresponding relation are as shown in the table:
L1, L2, L3 are respectively three on-line monitoring devices.
In preferred embodiment, above-mentioned three-phase formal dress arrester also includes:
4th direction board 11, above-mentioned 4th direction board 11 have the 4th of a default above-mentioned three-phase formal dress arrester of correspondence Pattern is indicated, above-mentioned 4th direction board 11 is connected on above-mentioned housing accessory tank shell 4, and the 4th direction board 11 is nameplate.
In preferred embodiment, the mode that above-mentioned insulator 1 is connected through a screw thread is connected on above-mentioned housing 12, specifically may be used Realized by multiple 12-M16 screw rods.
In preferred embodiment, the air valve connection dimension of charge valve 2 is as shown in fig. 7, size such as Fig. 8 institutes of ground terminal 5 Show.
By explanation and accompanying drawing, the exemplary embodiments of the specific structure of embodiment are given, it is new based on this practicality Type spirit, can also make other conversions.Although above-mentioned utility model proposes existing preferred embodiment, however, these contents It is not intended as limiting to.
For a person skilled in the art, after reading described above, various changes and modifications undoubtedly will be evident. Therefore, appended claims should regard the whole variations and modifications for covering true intention and scope of the present utility model as. Any and all scope and content of equal value, are all considered as still belonging to intention of the present utility model and model in Claims scope In enclosing.

Claims (8)

1. a kind of three-phase formal dress arrester, it is characterised in that the three-phase formal dress arrester includes:
Housing;
Insulator, the insulator are connected to the case top;
Electric conductor, the electric conductor are arranged on the enclosure interior, and the electric conductor connects the insulator;
Ground terminal, on the housing, the ground terminal is electrically connected with the electric conductor for the ground terminal connection;
Charge valve, the charge valve connection is on the housing;
Monitor device on-line, the on-line monitoring device connection is on the housing.
2. three-phase formal dress arrester according to claim 1, it is characterised in that the three-phase formal dress arrester also includes:
Explosion-protection equipment, on the housing, the on-line monitoring device and the explosion-protection equipment are located at institute respectively for the explosion-proof connection State housing both sides.
3. three-phase formal dress arrester according to claim 1, it is characterised in that the three-phase formal dress arrester also includes:
Suspension ring, the suspension ring connection is on the housing.
4. three-phase formal dress arrester according to claim 1, it is characterised in that the three-phase formal dress arrester also includes:
Accessory tank shell, the accessory tank shell is below the on-line monitoring device, the accessory tank shell connection On the housing.
5. three-phase formal dress arrester according to claim 4, it is characterised in that the on-line monitoring device monitors including A phases Device, B phases monitor and C phase monitors.
6. three-phase formal dress arrester according to claim 5, it is characterised in that the three-phase formal dress arrester also includes:
First direction board, first direction board has the first instruction pattern of a default correspondence A phases monitor, described First direction board is located at below the A phases monitor, and first direction board is connected on the accessory tank shell;
Second direction board, second direction board has the second instruction pattern of a default correspondence B phases monitor, described Second direction board is located at below the B phases monitor, and second direction board is connected on the accessory tank shell;
3rd direction board, the 3rd direction board has the 3rd instruction pattern of a default correspondence C phases monitor, described 3rd direction board is located at below the C phases monitor, and the 3rd direction board is connected on the accessory tank shell.
7. three-phase formal dress arrester according to claim 4, it is characterised in that the three-phase formal dress arrester also includes:
4th direction board, the 4th direction board have the 4th instruction figure of a default correspondence three-phase formal dress arrester Case, the 4th direction board are connected on the accessory tank shell.
8. three-phase formal dress arrester according to claim 1, it is characterised in that the side that the insulator is connected through a screw thread Formula connects on the housing.
CN201720931860.6U 2017-07-28 2017-07-28 A kind of three-phase formal dress arrester Expired - Fee Related CN206976101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720931860.6U CN206976101U (en) 2017-07-28 2017-07-28 A kind of three-phase formal dress arrester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720931860.6U CN206976101U (en) 2017-07-28 2017-07-28 A kind of three-phase formal dress arrester

Publications (1)

Publication Number Publication Date
CN206976101U true CN206976101U (en) 2018-02-06

Family

ID=61397770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720931860.6U Expired - Fee Related CN206976101U (en) 2017-07-28 2017-07-28 A kind of three-phase formal dress arrester

Country Status (1)

Country Link
CN (1) CN206976101U (en)

Similar Documents

Publication Publication Date Title
EP3823115A1 (en) Gas-insulated metal enclosed neutral point complete-set device
CA2898791C (en) Measuring system for continuously monitoring a high-voltage bushing
CN206976101U (en) A kind of three-phase formal dress arrester
Moraes et al. Assessment of the electromagnetic coupling between lines of different voltages sharing the same structures
EP2805344B1 (en) A sensing device for low-, medium- or high voltage switching devices
CN208401544U (en) A kind of over-voltage protector of energy-absorbing cumulative
Das Surges transferred through transformers
CN113341267B (en) Safety analysis method for transformation of neutral point grounding mode of power distribution network
RU2640315C1 (en) Adjustable capacitive sensor of high voltage
CN111431158B (en) Overvoltage combined suppression system and device of vacuum circuit breaker
CN209086373U (en) TXLR type effectively earthed system direct current decoupling device
CN205029338U (en) Transformer neutral point gas insulated switchgear
CN206481054U (en) Three phase combination overvoltage protector
RU145149U1 (en) ELECTRICAL MOUNTING BOX FOR SWITCHING THE POWER CABLE SCREEN COVERED BY THE INSULATED SHELL
CN206685784U (en) Small intelligent transformer
CN112332119A (en) Portable earthing device of power equipment
CN205945048U (en) Three -phase combined type over -voltage protector
Kang et al. Study on the characteristics of the potential rise of shell under VFTO in the GIS pumped storage power station
CN220830187U (en) Single-phase capacity-regulating combined transformer
Cheng et al. Study on Rise of Transient Ground Potential Caused by Switching and Closing Operation in 330kV GIS Substation
CN205231295U (en) High voltage insulation protective wire for load switch
Hardi et al. Modeling of transient caused by lightning strike at Nias high voltage substation using ATP-EMTP case study
CN203800460U (en) Transformer arrester combined handcart
CN208508359U (en) A kind of gas-filling cabinet
CN209784449U (en) device for three-phase and single-phase capacitive tests

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20210728

CF01 Termination of patent right due to non-payment of annual fee