CN206975089U - Batch meter intelligent monitoring device and the batch meter with intelligent monitoring device - Google Patents
Batch meter intelligent monitoring device and the batch meter with intelligent monitoring device Download PDFInfo
- Publication number
- CN206975089U CN206975089U CN201720978577.9U CN201720978577U CN206975089U CN 206975089 U CN206975089 U CN 206975089U CN 201720978577 U CN201720978577 U CN 201720978577U CN 206975089 U CN206975089 U CN 206975089U
- Authority
- CN
- China
- Prior art keywords
- batch meter
- monitoring device
- power supply
- intelligent monitoring
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model patent discloses a kind of batch meter intelligent monitoring device and the batch meter with intelligent monitoring device, including the electric energy meter being connected by acquisition terminal with electric power system, it is characterised in that:The metering intelligent monitoring device also includes being arranged on the monitoring probe by electric energy meter and the intellectual monitoring module being connected on monitoring probe, the intellectual monitoring module is connected to electric power system by 220V AC powers, power supply backstage monitoring system is connected with the intellectual monitoring module, the monitoring abnormal information of intellectual monitoring module is passed to power utility check personnel by the power supply backstage monitoring system, remind inspector's timely processing, state's net loss of supply is avoided or reduced, can effectively prevent or hit the electricity stealing of unauthorized person.
Description
Technical field
The utility model patent is related to technical field of security and protection, especially a kind of to be directed to the intelligence that batch meter is anti-electricity-theft in power distribution cabinet
Can monitoring device and the batch meter with intelligent monitoring device.
Background technology
Electric energy is the main energy that every profession and trade uses.With the development of national economy, the generated energy in China is increasing,
Occupy sizable proportion in the production cost of enterprise, be typically fitted with electric energy meter on the circuit of user, so as to
Reasonable fee, because ammeter box and batch meter usage amount are huge, distribution is wide, and dispersiveness is big, and ammeter box lacks special messenger's prison in addition
Pipe, so as to cause criminal to make a desperate move, illegal stealing, the method for their stealings is all that gauge table is juggled things, and causes to count
Scale does not turn or slow-speed, to reach the purpose for stealing electric energy, in the stealing case that this Ji Nian power supply station cracks, and illegal user Duo Cai
Several stealing mode short-circuit methods, decompression method, shunting, change and be required for opening batch meter than method etc., also there are a few methods
Without unpacking, implement illegal electricity stealing.
Occur to prevent this illegal activities for stealing electric energy, typically all electric energy meter be arranged in anti-theft electricity meter box,
Criminal can not be touched gauge table, then some criminals can carry out stealing by other means, similar to strong
The mode of magnetic disturbance causes electric energy meter not turn or slow-speed, equally can also reach the purpose of stealing, and it will typically install the prepayment of meter
Expense case observation window is broken or close, strong magnet is pressed close into meter front or the back side, its principle is the magnetic flux using permanent magnet to electricity
Small-sized transformer in minor electric energy meter magnetizes, and causes transformer magnetic to satisfy, so that transformer induced less than electric current or sense in table
Induced current is less than actual current, reaches stealing purpose.The method convenient material drawing, the strong magnet used are conventional in ore dressing plant, and
And dismounting can only be completed with several seconds during stealing, convenient disassembly, cause electricity stolen substantially without metering, state's net electric power system
Lose huge.
Utility model content
For the problems of the prior art, the purpose of this utility model be to provide for a kind of batch meter intelligent monitoring device and
Batch meter with intelligent monitoring device, the batch meter intelligent monitoring device effectively can be monitored report to high-intensity magnetic field electricity stealing
Characteristic alert, that batch meter the combination high-intensity magnetic field stealing with intelligent monitoring device is alarmed, and carry out on hardware configuration perfect, make
Batch meter is not easy to be opened by stranger, prevents the generation of destructive electricity stealing.
In order to achieve the above object, the technical solution of the utility model is:
A kind of batch meter intelligent monitoring device, including the electric energy meter being connected by acquisition terminal with electric power system, its feature
It is:The metering intelligent monitoring device also includes being arranged on the monitoring probe by electric energy meter and the intelligence being connected on monitoring probe
Monitoring modular, the intellectual monitoring module are connected to electric power system by 220V AC powers, connected in the intellectual monitoring module
Power supply backstage monitoring system is connected to, the monitoring abnormal information of intellectual monitoring module is passed to electricity consumption by the power supply backstage monitoring system
Inspector.
Further, the device also includes a stand-by power supply, and the stand-by power supply is connected to intelligence by stand-by power supply inverter
On energy monitoring modular, standby electricity is provided for intellectual monitoring module and monitoring probe.
Further, it is connected with the stand-by power supply for emergent lighting unit.
Further, the stand-by power supply is connected in electric power system, and it is charged by electric power system.
Further, the stand-by power supply is Ni-MH battery group.
Further, user's on/off switch switch gate is provided with cabinet door, is easy to user to be paid the fees by the on/off switch switch gate
Pusher lock power transmission.
Further, integrated protection display screen is provided with the chamber door of batch meter.
A kind of batch meter with intelligent monitoring device is claimed in the utility model simultaneously, it is characterised in that the batch meter
Including batch meter intelligent monitoring device as described above, wherein, the batch meter is placed in power distribution cabinet, and is separated with hyperbaric chamber,
Form and electrification display are provided with the chamber door of batch meter, and measuring room door lock is provided with chamber door opening.
Further, be provided with door lock of power distribution cabinet in the cabinet door of the power distribution cabinet, cabinet door with respect to cabinet on the inside of power distribution cabinet at
It is provided with access control.
Compared with prior art, metering intelligent monitoring device provided by the utility model and the meter with intelligent monitoring device
The technical scheme content of measuring tank is unusual, and it is designed specifically for strong magnetic disturbance stealing situation, is set near electric energy meter strong
Magnetic field induction is popped one's head in, and the high-intensity magnetic field information monitored is passed into follow-up power supply backstage monitoring by intellectual monitoring module and is
System, by powering, backstage monitoring system gives stealing information transmission to power utility check personnel, reminds inspector's timely processing, avoid or
State's net loss of supply is reduced, intellectual monitoring module therein is key, a direct power supply is needed in its monitoring process, in order to ensure it
Power supply reliability, it is not powered only with electric power system, while be provided with stand-by power supply, can not power or go out in electric power system
When now powering wrong, the stand-by power supply automatically switches, and standby electricity is passed into intellectual monitoring by stand-by power supply inverter
Module, ensure that intellectual monitoring module is powered all the time.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Accompanying drawing 1 is the monitoring principle structural representation of this batch meter intelligent monitoring device;
Accompanying drawing 2 is the structural representation of this batch meter with intelligent monitoring device.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment one:
As shown in figure 1, a kind of batch meter intelligent monitoring device, including the electric energy being connected by acquisition terminal with electric power system
Table, acquisition terminal herein are used as middle allowance platform, electric energy meter are connected into state's net electric power system, then passes through the same of metering
When, electricity is conveyed to the electrical equipment of follow-up electricity consumer.Only by acquisition terminal, the electric energy meter being used for can just be connected into power supply
System, power purchase use, electric energy meter be used as among measuring equipment, for monitoring the power consumption of user, and then reasonable fee, it is existing not
Method molecule destroys measuring equipment using mechanical means or non-contact type mechanical means, it is not measured or is measured less, so as to
Underpay expense or do not pay the fees, such as the form using the strong magnetic disturbance of physics, you can the accurate metering effect of interference electric energy meter is realized,
As described in background technology, strong magnetic disturbance principle is that the small-sized transformer in electronic electric energy meter is filled using the magnetic flux of permanent magnet
Magnetic, cause transformer magnetic to satisfy, so that transformer induced in table be less than actual current less than electric current or induced-current, reach stealing
Purpose.The purpose of the present embodiment is to be to prevent criminal's stealing by the way of above-mentioned strong magnetic disturbance, and its concrete scheme is:
The metering intelligent monitoring device also includes being arranged on the monitoring probe by electric energy meter and the intellectual monitoring being connected on monitoring probe
Module, the intellectual monitoring module are connected to electric power system by 220V AC powers, are connected with the intellectual monitoring module
The monitoring abnormal information of intellectual monitoring module is passed to power utility check by power supply backstage monitoring system, the power supply backstage monitoring system
Personnel, when electric energy meter nearby strong magnetic disturbance occurs, when reaching the degree for influenceing normally to measure, monitoring probe can monitor the strong magnetic
, and monitoring information is passed to the power supply backstage monitoring system being connected in intellectual monitoring module by intellectual monitoring module,
By powering, backstage monitoring system gives high-intensity magnetic field stealing information transmission to power utility check personnel, and power utility check personnel receive stealing letter
After breath, in-situ processing is rushed in time, reduces or reduce state's net loss of supply.
Intellectual monitoring module in the present embodiment is to be connected to electric power system by 220V AC powers, if circuit connects
The purpose for by artificial destruction or other accidental damages, intellectual monitoring module unpowered device, just not having monitoring is connect, in order to avoid
This occurrence of, the device also include a stand-by power supply, and the stand-by power supply is connected to intelligent prison by stand-by power supply inverter
Survey in module, standby electricity is provided for intellectual monitoring module and monitoring probe, after normal externally fed is broken, the stand-by power supply
Automatically switch the pattern of intellectual monitoring module for power supply in place, after being handled by stand-by power supply inverter, is carried for intellectual monitoring module
For required power supply, it is ensured that electric energy meter that is to say user during electricity consumption in operation process, and the intellectual monitoring module is in one
The state directly monitored.
As the Optimal improvements of the present embodiment, it can be connected with stand-by power supply for emergent lighting unit, be easy to rob
Repair or maintenance personal is rushed to repair or repaired by lighting unit in the case of out of power, it is of course also possible to be connected again on stand-by power supply
One charging plug, it is easy to maintenance personal to be charged for oneself mobile phone or other electrical equipments, ensures normal working report and work
Make communication exchange.Stand-by power supply in the present embodiment is general common cell structure, preferably Ni-MH battery group, certainly, also may be used
To be other lead accumulators, lithium battery etc., all to be that by its charging, storing up electricity, discharging function, the stand-by power supply connects
Onto electric power system, it is charged by electric power system not timing, it is ensured that its electricity is sufficient.
Embodiment two:
As shown in Figure 2, a kind of batch meter with intelligent monitoring device is present embodiments provided, including such as embodiment one
Shown in batch meter intelligent monitoring device, the technical scheme content on batch meter intelligent monitoring device refers to embodiment
One, it will not be repeated here, for embodiment one, its solution details content is the present embodiment:Batch meter 2 is placed in distribution
In cabinet 1, and separated with hyperbaric chamber 3, it is therefore prevented that interfere, form 8 and electrification display 9 are provided with the chamber door of batch meter 2,
It is easy to check electric energy meter working order in case in the case of not opening the chamber door of batch meter 2, the powered shape of the display of electrification display 9
State.Metering box door lock 7 is provided with chamber door opening, can be on the basis of the overall safeguard structure of power distribution cabinet 1, further directed to metering
Case 2 protects, and improves the situation for preventing mechanical damage mode stealing.Door lock of power distribution cabinet 6, cabinet are provided with the cabinet door 5 of power distribution cabinet 1
Access control 4 is provided with the relative inner side cabinet of power distribution cabinet 1 of door 5;Door lock of power distribution cabinet 6 is made as first of protection, access control 4
Protected for second, metering box door lock 7 further increases the feelings for preventing mechanical damage mode stealing as the 3rd protection
Condition, user's on/off switch switch gate 21 is provided with cabinet door 5, be easy to user to be paid the fees pusher lock power transmission by the on/off switch switch gate,
And integrated protection display screen 20 is provided with the chamber door of batch meter 2, for showing working condition and monitoring shape in batch meter 2
State..
It is understood that above with respect to specific descriptions of the present utility model, it is merely to illustrate the utility model and is not
The technical scheme described by the utility model embodiment is limited to, it will be understood by those within the art that, still can be with
The utility model is modified or equivalent substitution, to reach identical technique effect;As long as satisfaction uses needs, all in this reality
Within new protection domain.
Claims (8)
1. a kind of batch meter intelligent monitoring device, including the electric energy meter being connected by acquisition terminal with electric power system, its feature exist
In:The metering intelligent monitoring device also includes being arranged on the monitoring probe by electric energy meter and the intelligence prison being connected on monitoring probe
Module is surveyed, the intellectual monitoring module is connected to electric power system by 220V AC powers, connected in the intellectual monitoring module
There is power supply backstage monitoring system, the monitoring information of intellectual monitoring module is passed to power utility check people by the power supply backstage monitoring system
Member.
A kind of 2. batch meter intelligent monitoring device according to claim 1, it is characterised in that:It is standby that the device also includes one
Power supply, the stand-by power supply are connected in intellectual monitoring module by stand-by power supply inverter, are that intellectual monitoring module and monitoring are visited
Head provides standby electricity.
A kind of 3. batch meter intelligent monitoring device according to claim 2, it is characterised in that:Connected on the stand-by power supply
Have for emergent lighting unit.
A kind of 4. batch meter intelligent monitoring device according to claim 2, it is characterised in that:The stand-by power supply is connected to
In electric power system, it is charged by electric power system.
A kind of 5. batch meter intelligent monitoring device according to any one of claim 2-4, it is characterised in that:It is described standby
Power supply is Ni-MH battery group.
A kind of 6. batch meter with intelligent monitoring device, it is characterised in that:The batch meter is included as any in claim 1-5
Batch meter intelligent monitoring device described in, wherein, the batch meter is placed in power distribution cabinet, and is separated with hyperbaric chamber, batch meter
Chamber door on be provided with form and electrification display, and measuring room door lock is provided with chamber door opening.
A kind of 7. batch meter with intelligent monitoring device according to claim 6, it is characterised in that:The power distribution cabinet
It is provided with door lock of power distribution cabinet in cabinet door, cabinet door at cabinet on the inside of power distribution cabinet with respect to being provided with access control.
A kind of 8. batch meter with intelligent monitoring device according to claim 7, it is characterised in that:It is provided with cabinet door
User's on/off switch switch gate, integrated protection display screen is provided with the chamber door of batch meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720978577.9U CN206975089U (en) | 2017-08-07 | 2017-08-07 | Batch meter intelligent monitoring device and the batch meter with intelligent monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720978577.9U CN206975089U (en) | 2017-08-07 | 2017-08-07 | Batch meter intelligent monitoring device and the batch meter with intelligent monitoring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206975089U true CN206975089U (en) | 2018-02-06 |
Family
ID=61394219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720978577.9U Expired - Fee Related CN206975089U (en) | 2017-08-07 | 2017-08-07 | Batch meter intelligent monitoring device and the batch meter with intelligent monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206975089U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111600223A (en) * | 2020-06-08 | 2020-08-28 | 南京工程学院 | High-protection type electric energy storage device for photovoltaic power grid and control method |
-
2017
- 2017-08-07 CN CN201720978577.9U patent/CN206975089U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111600223A (en) * | 2020-06-08 | 2020-08-28 | 南京工程学院 | High-protection type electric energy storage device for photovoltaic power grid and control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202372551U (en) | Electric larceny preventing intelligent remote check device | |
CN203616367U (en) | An anti-electricity-stealing metering cabinet | |
CN205302517U (en) | Illegal alarm device that opens of electric power measurement cabinet theftproof | |
CN105182032B (en) | Electricity meter box intelligent management system | |
Depuru et al. | A conceptual design using harmonics to reduce pilfering of electricity | |
CN109813960B (en) | Intelligent kilowatt-hour meter and monitoring system based on thing networking electricity larceny prevention | |
CN203084039U (en) | Monitor against electricity stealing behavior | |
CN207884176U (en) | A kind of pre-casing type transforming station | |
CN201966497U (en) | Multifunctional low-voltage measuring tank | |
CN206609933U (en) | A kind of low pressure uniline short circuit and disconnection detection device | |
CN105319417A (en) | Electricity larceny prevention intelligent device | |
CN206975089U (en) | Batch meter intelligent monitoring device and the batch meter with intelligent monitoring device | |
CN201518040U (en) | Electricity monitoring apparatus | |
CN106706984A (en) | Electricity stealing prevention monitoring system used for ammeter | |
CN202093105U (en) | Intelligent electrical multi-functional monitoring management device | |
CN211263563U (en) | Take positioning alarm function's strapping table case | |
CN206311646U (en) | A kind of Multifunctional reverse stealing alarming protector | |
CN109975733A (en) | Electromagnetic current transducer secondary circuit safety monitoring assembly | |
CN209821282U (en) | Watt-hour meter for preventing non-contact electricity stealing | |
CN205039622U (en) | Remote intelligent protection metrological control device | |
CN204203317U (en) | Anti-electricity-theft intelligent apparatus | |
CN203691059U (en) | Box type transformer station intelligent monitor | |
CN207074258U (en) | Monitor the device of communication base station and electric power power supply state | |
CN209460873U (en) | A kind of electric power prepaid control device | |
CN101026660A (en) | Mobile phone prepaid fee power management terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180206 Termination date: 20210807 |