CN206972262U - A kind of tunnel Central drain formwork for placing - Google Patents
A kind of tunnel Central drain formwork for placing Download PDFInfo
- Publication number
- CN206972262U CN206972262U CN201720912825.XU CN201720912825U CN206972262U CN 206972262 U CN206972262 U CN 206972262U CN 201720912825 U CN201720912825 U CN 201720912825U CN 206972262 U CN206972262 U CN 206972262U
- Authority
- CN
- China
- Prior art keywords
- side form
- formwork
- placing
- screw mandrel
- central drain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
It the utility model is related to formwork for placing technical field, especially a kind of tunnel Central drain formwork for placing, including bed die, first side form and the second side form, first side form and the second side form are rotatably connected on bed die both sides respectively, uniform welding has some A-frames along its length on bed die, some A-frame tops are welded with contiguous block, the both sides of contiguous block are equipped with the first journal stirrup, the first screw mandrel is rotatably connected on first journal stirrup, the one end of first screw mandrel away from the first journal stirrup is threaded with regulation pipe, the position that the inner side of first side form and the second side form corresponds to A-frame is equipped with some second journal stirrups, the second screw mandrel is rotatably connected on some second journal stirrups, threaded one end of second screw mandrel away from the second journal stirrup is connected in regulation pipe.The utility model is simple in construction, adjusts efficient and convenient, strong applicability.
Description
Technical field
It the utility model is related to formwork for placing technical field, more particularly to a kind of tunnel Central drain formwork for placing.
Background technology
At present, with the continuous development of China's economy, the construction of road is the premise guarantee of economic development, in road construction
During, tunnel construction is inevitable construction link, and in tunnel construction, the construction of Central drain is particularly important, in
Edema with the heart involved ditch is completed generally by formwork for placing, and Central drain formwork for placing is all split-type structural, and splicing completion pours, and
Traditional Central drain formwork for placing is fixed structure, it is impossible to pours various sizes of Central drain, uses cumbersome.
Utility model content
It in order to solve to exist in the prior art Central drain formwork for placing is fixed structure that the purpose of this utility model, which is, is poured
Build the shortcomings that Central drain size is single, and a kind of tunnel Central drain formwork for placing proposed.
To achieve these goals, the utility model employs following technical scheme:
Design a kind of tunnel Central drain formwork for placing, including bed die, the first side form and the second side form, first side form
It is rotatably connected on respectively on the bed die both sides with the second side form, uniform welding has some three along its length on the bed die
Angle support, some A-frame tops are welded with contiguous block, and the both sides of the contiguous block are equipped with the first journal stirrup, described
The first screw mandrel is rotatably connected on first journal stirrup, the one end of first screw mandrel away from first journal stirrup is threaded with
Regulation pipe, the regulation pipe are female thread structure;The inner side of first side form and the second side form corresponds to the A-frame
Position is equipped with some second journal stirrups, and the second screw mandrel is rotatably connected on some second journal stirrups, and second screw mandrel is remote
Threaded one end from second journal stirrup is connected in the regulation pipe.
Preferably, the contiguous block is welded with hanger.
Preferably, the both ends of the bed die, the first side form and the second side form are equipped with pad, and the pad is rubber blanket,
And it is hollow-core construction.
Preferably, it is welded with connection sheet on the inside of the both ends of first side form and the second side form, in the connection sheet
Offer connecting hole.
The utility model proposes a kind of tunnel Central drain formwork for placing, beneficial effect is:In the utility model
Two rotatable sides are touched adjusts subtended angle size by adjusting pipe, effectively adjusts out the Central drain that section is different structure, makes it
Central drain formwork for placing can adjust out the Central drain stay in place form of needs according to tunnel construction field requirement, simple in construction,
Adjust efficient and convenient, strong applicability.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of tunnel Central drain formwork for placing structural representation;
Fig. 2 be the utility model proposes a kind of tunnel Central drain formwork for placing overlooking the structure diagram.
In figure:Bed die 1, the first side form 2, the second side form 3, A-frame 4, contiguous block 5, hanger 6, the first screw mandrel 7, regulation
Pipe 8, the second screw mandrel 9, the first journal stirrup 10, pad 11, the second journal stirrup 12, connection sheet 13.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-2, a kind of tunnel Central drain formwork for placing, including bed die 1, the first side form 2 and the second side form 3, the
One side form 2 and the second side form 3 are rotatably connected on the both sides of bed die 1 respectively, the rotation connection of the first side form 2 and the second side form 3, tunnel
Road edema with the heart involved ditch formwork for placing can be by adjusting the first side form 2 and the subtended angle size of the second side form 3 and bed die 1, to obtain in difference
The sectional dimension of edema with the heart involved ditch, make its applicability stronger, uniform welding has some A-frames 4 along its length on bed die 1, if
The dry top of A-frame 4 is welded with contiguous block 5, and contiguous block 5 is welded with hanger 6, and the structure of A-frame 4 is more stable,
The active force that it bears is stronger, hanging when hanger 6 is easy for installation and removal.
The both sides of contiguous block 5 are equipped with the first journal stirrup 10, are rotatably connected to the first screw mandrel 7 on the first journal stirrup 10, and first
The one end of screw mandrel 7 away from the first journal stirrup 10 is threaded with regulation pipe 8, and regulation pipe 8 is female thread structure, the He of the first side form 2
The position that the inner side of second side form 3 corresponds to A-frame 4 is equipped with some second journal stirrups 12, is rotated on some second journal stirrups 12
The second screw mandrel 9 is connected with, threaded one end of second screw mandrel 9 away from the second journal stirrup 12 is connected in regulation pipe 8, and regulation pipe 8 is realized
The adjustment of first side form 2 and the subtended angle size of the second side form 3, different directions rotation regulating pipe 8 are located at the inside of regulation pipe 8 the
One end of one screw mandrel 7 and the second screw mandrel 9 is collapsed or remote, it is achieved thereby that regulation pipe 8 to the first side form 2 and the second side form 3 not
With the quick regulation of subtended angle.
The both ends of first side form 2 and the second side form 3 are equipped with pad 11, and pad 11 is rubber blanket, and is hollow-core construction, the
Connection sheet 13 is welded with the inside of the both ends of one side form 2 and the second side form 3, connecting hole, pad 11 are offered in connection sheet 13
Realize the compactness of two adjacent tunnel Central drain formwork for placing docking, and by connection sheet 13 by two adjacent tunnel centers
Ditch formwork for placing, which is locked, to link together.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (4)
1. a kind of tunnel Central drain formwork for placing, including bed die (1), the first side form (2) and the second side form (3), its feature exist
In first side form (2) and the second side form (3) are rotatably connected on the bed die (1) both sides respectively, on the bed die (1)
Uniform welding has some A-frames (4) along its length, and some A-frame (4) tops are welded with contiguous block
(5), the both sides of the contiguous block (5) are equipped with the first journal stirrup (10), and first is rotatably connected on first journal stirrup (10)
Screw mandrel (7), the one end of first screw mandrel (7) away from first journal stirrup (10) are threaded with regulation pipe (8), the tune
Section pipe (8) is female thread structure;First side form (2) corresponds to the position of the A-frame (4) with the inner side of the second side form (3)
Put and be equipped with some second journal stirrups (12), be rotatably connected to the second screw mandrel (9) on some second journal stirrups (12), described
Threaded one end of two screw mandrels (9) away from second journal stirrup (12) is connected in the regulation pipe (8).
2. a kind of tunnel Central drain formwork for placing according to claim 1, it is characterised in that the contiguous block (5) is equal
It is welded with hanger (6).
3. a kind of tunnel Central drain formwork for placing according to claim 1, it is characterised in that the bed die (1), first
The both ends of side form (2) and the second side form (3) are equipped with pad (11), and the pad (11) is rubber blanket, and is hollow-core construction.
A kind of 4. tunnel Central drain formwork for placing according to claim 1, it is characterised in that first side form (2)
Connection sheet (13) is welded with the inside of the both ends of the second side form (3), connecting hole is offered on the connection sheet (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720912825.XU CN206972262U (en) | 2017-07-26 | 2017-07-26 | A kind of tunnel Central drain formwork for placing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720912825.XU CN206972262U (en) | 2017-07-26 | 2017-07-26 | A kind of tunnel Central drain formwork for placing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206972262U true CN206972262U (en) | 2018-02-06 |
Family
ID=61397590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720912825.XU Expired - Fee Related CN206972262U (en) | 2017-07-26 | 2017-07-26 | A kind of tunnel Central drain formwork for placing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206972262U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881888A (en) * | 2019-03-19 | 2019-06-14 | 中国建筑第八工程局有限公司 | Regularization, which can have enough to meet the need, early tears gutter mold open |
-
2017
- 2017-07-26 CN CN201720912825.XU patent/CN206972262U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881888A (en) * | 2019-03-19 | 2019-06-14 | 中国建筑第八工程局有限公司 | Regularization, which can have enough to meet the need, early tears gutter mold open |
CN109881888B (en) * | 2019-03-19 | 2021-04-06 | 中国建筑第八工程局有限公司 | Regularization can have enough to meet need early escape canal mould of tearing open |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205713080U (en) | A design mould for making dual shear force wall in expansion joint department | |
CN207633756U (en) | A kind of angle and the adjustable building internal corner template of length | |
CN207647157U (en) | A kind of wall-attached frame of adjustable size and distance | |
CN206360363U (en) | A kind of aluminum alloy pattern plate bracing device | |
CN206972262U (en) | A kind of tunnel Central drain formwork for placing | |
CN206801028U (en) | A kind of building template supporting construction | |
CN206495511U (en) | A kind of wall support frame for building | |
CN204450819U (en) | Template retractor device | |
CN206667066U (en) | A kind of concrete bridge flange of beam construction template system | |
CN206646808U (en) | A kind of tiltedly template bed die supporting member | |
CN207672559U (en) | Steel tube frame | |
CN207212369U (en) | A kind of adjustable clamp of tunnel inverted arch waterstop | |
CN201250512Y (en) | Loose-leaf type internal corner template | |
CN209040535U (en) | A kind of adjustable building template of cambered surface | |
CN204919263U (en) | Leading support is used to cement concrete pavement dowel steel | |
CN203547141U (en) | Template diagonal bracing device | |
CN206753052U (en) | A kind of civil engineering building template link | |
CN206395738U (en) | Tower crane cab seat | |
CN206733265U (en) | A kind of U-shaped beam internal model hydraulic pressure folds mobile device | |
CN201065763Y (en) | Arc construction template | |
CN206829613U (en) | A kind of prefabricated ring beam template of construction | |
CN217786840U (en) | Special support for metal corrugated pipe leakage resistance test | |
CN209620549U (en) | A kind of reinforced concrete floor slab Novel barricade Construction of Supporting device | |
CN206360349U (en) | A kind of bracing means of concrete structure templates for expansion joints | |
CN202174632U (en) | Device for supporting end mold of box girder template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180206 Termination date: 20190726 |