CN206971323U - It is a kind of that there is the layer sewerage system of building two for blocking early warning and being easy to dredging - Google Patents
It is a kind of that there is the layer sewerage system of building two for blocking early warning and being easy to dredging Download PDFInfo
- Publication number
- CN206971323U CN206971323U CN201720907157.1U CN201720907157U CN206971323U CN 206971323 U CN206971323 U CN 206971323U CN 201720907157 U CN201720907157 U CN 201720907157U CN 206971323 U CN206971323 U CN 206971323U
- Authority
- CN
- China
- Prior art keywords
- dredging
- drainage
- pipe
- early warning
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
本实用新型公开了一种具有堵塞预警且便于疏通的建筑二层排水系统,包括排水立管和与其连接的排水横管,在排水横管上设有靠近外墙内侧的45°三通Ⅰ,在45°三通Ⅰ上连接有倾斜设置的45°排水管Ⅰ,45°排水管Ⅰ通过135°拐头Ⅰ与溢水立管连接,溢水立管通过90°三通与溢水横管和检查疏通管连接,溢水横管通过依次连接的135°拐头Ⅱ、45°排水管Ⅱ和45°三通Ⅱ与排水立管连接,45°三通Ⅱ设置在排水立管上,检查疏通管穿越外墙,且在外端设有检查疏通口,在溢水立管上连接有报警器的探测装置,报警器的警报装置设置在物业管理办公室和二楼住户内。本实用新型在管道发生堵塞时能够提前预警,且方便疏通。
The utility model discloses a building two-floor drainage system with early warning of blockage and easy dredging, which comprises a drainage vertical pipe and a horizontal drainage pipe connected thereto. The horizontal drainage pipe is provided with a 45° tee I close to the inner side of the outer wall. The 45° tee Ⅰ is connected with a slanted 45° drainage pipe Ⅰ, and the 45° drainage pipe Ⅰ is connected to the overflow riser through the 135° turning head Ⅰ, and the overflow riser is connected to the overflow horizontal pipe through the 90° tee and inspection dredging The overflow horizontal pipe is connected to the drainage standpipe through the sequentially connected 135° turning head II, 45° drainage pipe II and 45° tee II, and the 45° tee II is set on the drainage standpipe. There is an inspection and dredging opening at the outer end, and an alarm detection device is connected to the overflow riser. The alarm device is installed in the property management office and the residents on the second floor. The utility model can give an early warning when the pipeline is blocked, and is convenient for dredging.
Description
技术领域technical field
本发明属于建筑排水技术领域,特别是一种有预警提示并便于及时疏通的排水系统。The invention belongs to the technical field of building drainage, in particular to a drainage system with early warning prompts and convenient for timely dredging.
背景技术Background technique
在我国已建成的建筑及当今正在设计和建造的建筑中始终存在着一大缺陷,就是下水道使用过程中的堵塞问题。由于该隐患的存在,造成了很多住户的财产损失,同时带来了脏、臭、污染、邻里纠纷等诸多扰民的烦恼事。为此,在现今的建筑设计中,将一层的排水进行了单独设置,二层及以上设计为另一排水系统,从而解决了一层下水经常堵塞的问题。但在现实生活中,建筑的二层出现了大量的堵塞、甚至出现了污水从地漏、恭桶、浴缸、水池等下水口溢出,四处跑冒无法控制的现象,不但二层地面被泡,随着污水的渗漏,造成一层顶棚、墙面装修及地面浸泡等更严重事件,由此产生的民事纠纷层出不穷。究其原因,是排水系统存在不适于使用的系统缺陷,急需一种对排水管道堵塞有预警提示、便于及时疏通、健全合理的排水系统。从而彻底解决我国现存的、即将建成的、具有严重排水系统缺陷的建筑问题。There is always a major defect in the buildings that have been built in my country and the buildings that are being designed and built today, and that is the problem of blockage in the use of sewers. Due to the existence of this hidden danger, property loss of many residents has been caused, and at the same time, it has brought many disturbing troubles such as dirty, smelly, pollution, and neighbor disputes. For this reason, in today's architectural design, the drainage of the first floor is set separately, and the second floor and above are designed as another drainage system, thus solving the problem of frequent blockage of the water on the first floor. But in real life, there are a lot of blockages on the second floor of the building, and even sewage overflows from floor drains, buckets, bathtubs, pools and other drains, and it runs around uncontrollably. With the leakage of sewage, more serious incidents such as a layer of ceiling, wall decoration and ground immersion were caused, and the resulting civil disputes emerged in endlessly. Trace it to its cause, be that drainage system exists the systematic defect that is not suitable for use, be badly in need of a kind of drainage pipe clogging to have early-warning prompt, be convenient to dredging in time, sound and reasonable drainage system. So as to completely solve the existing construction problems in our country, which are about to be built, and have serious drainage system defects.
发明内容Contents of the invention
本实用新型为解决公知技术中存在的技术问题而提供一种具有堵塞预警且便于疏通的建筑二层排水系统,该系统在管道发生堵塞时能够提前预警,且方便疏通。In order to solve the technical problems in the known technology, the utility model provides a building second-floor drainage system with blockage warning and easy dredging. The system can give early warning when the pipeline is blocked and is easy to dredge.
本实用新型为解决公知技术中存在的技术问题所采取的技术方案是:一种具有堵塞预警且便于疏通的建筑二层排水系统,包括排水立管和与其连接的排水横管,在所述排水横管上设有靠近外墙内侧的45°三通Ⅰ,在所述45°三通Ⅰ上连接有倾斜设置的45°排水管Ⅰ,所述45°排水管Ⅰ通过135°拐头Ⅰ与溢水立管连接,所述溢水立管通过90°三通与溢水横管和检查疏通管连接,所述溢水横管通过依次连接的135°拐头Ⅱ、45°排水管Ⅱ和45°三通Ⅱ与所述排水立管连接,所述45°三通Ⅱ设置在所述排水立管上,所述检查疏通管穿越外墙,且在外端设有检查疏通口,在所述溢水立管上连接有报警器的探测装置,所述报警器的警报装置设置在物业管理办公室和二楼住户内。The technical solution adopted by the utility model to solve the technical problems existing in the known technology is: a building two-story drainage system with blockage early warning and easy to dredge, including a drainage standpipe and a drainage horizontal pipe connected thereto. The horizontal pipe is provided with a 45° tee I close to the inner side of the outer wall, and a 45° drain pipe I is connected to the 45° tee I, which is arranged obliquely. The 45° drain pipe I passes through the 135° corner I and The overflow riser is connected, the overflow riser is connected with the overflow horizontal pipe and the inspection and dredging pipe through the 90° tee, and the overflow horizontal pipe is connected in sequence through the 135° turning head II, the 45° drain pipe II and the 45° tee II is connected to the drainage standpipe, the 45° tee II is set on the drainage riser, the inspection and dredging pipe passes through the outer wall, and an inspection and dredging port is provided at the outer end. The detection device of the alarm is connected, and the alarm device of the alarm is arranged in the property management office and the residents on the second floor.
在所述检查疏通口的下方设有室外挑板,所述室外挑板固定在外墙上。An outdoor pick-up board is arranged below the inspection dredging opening, and the outdoor pick-up board is fixed on the outer wall.
所述溢水立管、所述90°三通、所述溢水横管、所述检查疏通管、所述135°拐头Ⅱ和所述45°排水管Ⅱ隐藏在隔断墙中。The overflow standpipe, the 90° tee, the overflow horizontal pipe, the inspection and dredging pipe, the 135° corner II and the 45° drainage pipe II are hidden in the partition wall.
所述排水立管和所述排水横管通过135°拐头Ⅲ、45°排水管Ⅲ和135°拐头Ⅳ连接,所述排水立管、所述135°拐头Ⅲ、所述45°排水管Ⅲ、所述135°拐头Ⅳ和所述排水横管依次连接。The drainage standpipe and the drainage horizontal pipe are connected through the 135° turning head III, the 45° drainage pipe III and the 135° turning head IV, the drainage riser, the 135° turning head III, and the 45° drainage pipe Pipe III, the 135° turning head IV and the horizontal drainage pipe are connected in sequence.
本实用新型具有的优点和积极效果是:通过在现行常规的排水系统中加设溢水横管、连接报警器的溢水立管形成排水环路以及设置穿出外墙的检查疏通管等结构,形成了堵塞预警、疏通方便的排水系统,能够防跑冒、易疏通;创新了建筑排水系统的疏通方式,疏通时能够避免进入居民家中、杜绝对室内造成污染;在管道发生堵塞时能够提前预警,堵塞早期可排出部分污水,避免污水从室内地漏流出,彻底解决由于排水管路堵塞造成的邻里纠纷。The utility model has the advantages and positive effects: by adding overflow horizontal pipes in the current conventional drainage system, overflow vertical pipes connected to the alarm to form a drainage loop, and setting inspection and dredging pipes passing through the outer wall, etc., forming A drainage system with early warning of blockage and convenient dredging, which can prevent running and leaking and is easy to dredge; innovates the dredging method of the building drainage system, which can avoid entering residents' homes and prevent indoor pollution when dredging; early warning can be given when the pipeline is blocked, In the early stage of blockage, part of the sewage can be discharged, preventing sewage from flowing out from the indoor floor drain, and completely solving the neighborhood disputes caused by the blockage of the drainage pipe.
附图说明Description of drawings
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图中:1、排水立管;2-1、45°排水管Ⅰ;2-2、45°排水管Ⅱ;2-3、45°排水管Ⅲ;3、排水横管;4、溢水立管;5、溢水横管;6、90°三通;7-1、45°三通Ⅰ;7-2、45°三通Ⅱ;8-1、135°拐头Ⅰ;8-2、135°拐头Ⅱ;8-3、135°拐头Ⅲ;8-4、135°拐头Ⅳ;9、检查疏通口;10、室外挑板;11、检查疏通管;12、外墙;13、一层地面;14、室外地面;15、二层楼板。In the figure: 1. Drainage standpipe; 2-1, 45°drainage pipe I; 2-2, 45°drainage pipe II; 2-3, 45°drainage pipe III; 3. Drainage horizontal pipe; 4. Overflow riser ;5, overflow horizontal pipe; 6, 90° tee; 7-1, 45° tee Ⅰ; 7-2, 45° tee Ⅱ; 8-1, 135° turning head Ⅰ; 8-2, 135° Turn head Ⅱ; 8-3, 135° turn head Ⅲ; 8-4, 135° turn head Ⅳ; 9. Check the dredging opening; 10. Outdoor pick plate; 11. Check the dredging pipe; 1st floor ground; 14, outdoor ground; 15, second floor floor.
具体实施方式detailed description
为能进一步了解本实用新型的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:In order to further understand the invention content, characteristics and effects of the present utility model, the following examples are given, and detailed descriptions are as follows in conjunction with the accompanying drawings:
请参阅图1,一种具有堵塞预警且便于疏通的建筑二层排水系统,包括排水立管1和与其连接的排水横管3,所述排水立管1穿越二层楼板15和一层地面13,所述排水横管3位于室外地面14之下,在所述排水横管3上设有靠近外墙内侧的45°三通Ⅰ7-1,在所述45°三通Ⅰ7-1上连接有倾斜设置的45°排水管Ⅰ2-1,所述45°排水管Ⅰ2-1通过135°拐头Ⅰ8-1与溢水立管4连接,所述溢水立管4通过90°三通6与溢水横管5和检查疏通管11连接,所述溢水横管5依次通过135°拐头Ⅱ8-2、45°排水管Ⅱ2-2和45°三通Ⅱ7-2与所述排水立管1连接,所述45°三通Ⅱ7-2设置在所述排水立管1上,所述检查疏通管11穿越外墙12,在外端设有检查疏通口9,在所述溢水立管4上连接有报警器的探测装置,所述报警器的警报装置设置在物业管理办公室和二楼住户内。Please refer to Fig. 1, a second-floor drainage system with clogging warning and easy to dredge, including a drainage riser 1 and a drainage horizontal pipe 3 connected thereto, and the drainage riser 1 passes through the second-floor floor 15 and the first-floor ground 13 , the drainage horizontal pipe 3 is located under the outdoor ground 14, a 45° tee I7-1 close to the inner side of the outer wall is provided on the drainage horizontal pipe 3, and a 45° tee I7-1 is connected to The 45° drainpipe Ⅰ2-1 is installed obliquely. The 45°drainpipe I2-1 is connected to the overflow riser 4 through the 135° turn head I8-1. The overflow riser 4 is connected to the overflow horizontal pipe 6 through the 90° tee 6 The pipe 5 is connected to the inspection and dredging pipe 11, and the overflow horizontal pipe 5 is connected to the drainage standpipe 1 through the 135° turning head II 8-2, the 45° drain pipe II 2-2 and the 45° tee II 7-2 in sequence. The 45° tee II 7-2 is set on the drainage standpipe 1, the inspection and dredging pipe 11 passes through the outer wall 12, and an inspection and dredging port 9 is provided at the outer end, and an alarm is connected to the overflow riser 4 The detection device, the alarm device of the alarm is set in the property management office and the residents on the second floor.
在本实施例中,在所述检查疏通口9的下方设有室外挑板10,以方便管道疏通人员将疏通机安置在室外挑板10上进行疏通作业,所述室外挑板10固定在外墙12上。为了少占建筑空间并使室内装修更加美化,将所述溢水立管4、所述90°三通6、所述溢水横管5、所述检查疏通管11、所述135°拐头Ⅱ8-2和所述45°排水管Ⅱ2-2隐藏在隔断墙中。在本实施例中,所述排水立管1和所述排水横管3通过135°拐头Ⅲ8-3、45°排水管Ⅲ2-3和135°拐头Ⅳ8-4连接,所述排水立管1、所述135°拐头Ⅲ8-3、所述45°排水管Ⅲ2-3、所述135°拐头Ⅳ8-4和所述排水横管3依次连接,这种连接结构不容易堵塞,且便于疏通。In this embodiment, an outdoor pick-up plate 10 is provided below the inspection and dredging opening 9 to facilitate the dredging personnel to place the dredge machine on the outdoor pick-up plate 10 for dredging operation, and the outdoor pick-up plate 10 is fixed on the outer wall 12 on. In order to take up less building space and make the interior decoration more beautified, the overflow riser 4, the 90° tee 6, the overflow horizontal pipe 5, the inspection and dredging pipe 11, and the 135° turning head II 8- 2 and the 45° drainage pipe II 2-2 are hidden in the partition wall. In this embodiment, the drainage vertical pipe 1 and the horizontal drainage pipe 3 are connected by 135° turning head III 8-3, 45° drainage pipe III 2-3 and 135° turning head IV 8-4. 1. The 135° turning head III 8-3, the 45° drainage pipe III 2-3, the 135° turning head IV 8-4 and the drainage horizontal pipe 3 are sequentially connected. This connection structure is not easy to be blocked, and Easy to dredge.
本实用新型的工作原理:Working principle of the utility model:
当排水横管3位于45°三通Ⅰ7-1远离外墙侧的A段堵塞时,随着水位的上升,污水通过溢水横管5、溢水立管4的回路排出。此时,连接报警器的溢水立管4给物业和二楼住户同时报警,警告管道已经堵塞,请及时疏通。When the drainage horizontal pipe 3 is located at the 45° tee I7-1 and the section A away from the outer wall side is blocked, as the water level rises, the sewage is discharged through the circuit of the overflow horizontal pipe 5 and the overflow riser 4. Now, connect the overflow riser 4 of the alarm to the property and the residents on the second floor to report to the police simultaneously, and the warning pipeline has been blocked, please dredge it in time.
当排水横管3位于45°三通Ⅰ7-1靠近外墙侧的B段堵塞时,随着水位的上升,污水到达溢水立管4的设定高度,进入报警器探测装置的监测区域,报警器产生报警信号,给物业和二楼住户及时报警,警告管道已经堵塞,请马上疏通。When the drainage horizontal pipe 3 is blocked at section B near the outer wall side of the 45° tee Ⅰ7-1, as the water level rises, the sewage reaches the set height of the overflow riser 4, enters the monitoring area of the alarm detection device, and alarms The alarm signal is generated by the device, and the property and the residents on the second floor are called in time to warn that the pipeline is blocked, please unblock it immediately.
管道疏通人员在进行管道疏通时,将疏通机安置在室外挑板10上进行疏通作业,疏通钢软管通过溢水横管5及45°排水管Ⅱ2-2,能够非常顺畅地进入管线,对排水管进行疏通作业。When the pipeline dredging personnel are dredging the pipeline, they place the dredging machine on the outdoor pick plate 10 for dredging operation. The dredging steel hose can enter the pipeline very smoothly through the overflow horizontal pipe 5 and the 45° drain pipe II 2-2. Pipe for dredging work.
尽管上面结合附图对本实用新型的优选实施例进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨和权利要求所保护的范围的情况下,还可以做出很多形式,这些均属于本实用新型的保护范围之内。Although the preferred embodiment of the utility model has been described above in conjunction with the accompanying drawings, the utility model is not limited to the above-mentioned specific implementation, and the above-mentioned specific implementation is only illustrative and not restrictive. Under the enlightenment of the utility model, those skilled in the art can also make many forms without departing from the purpose of the utility model and the protection scope of the claims, and these all belong to the protection scope of the utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720907157.1U CN206971323U (en) | 2017-07-25 | 2017-07-25 | It is a kind of that there is the layer sewerage system of building two for blocking early warning and being easy to dredging |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720907157.1U CN206971323U (en) | 2017-07-25 | 2017-07-25 | It is a kind of that there is the layer sewerage system of building two for blocking early warning and being easy to dredging |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206971323U true CN206971323U (en) | 2018-02-06 |
Family
ID=61397115
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720907157.1U Expired - Fee Related CN206971323U (en) | 2017-07-25 | 2017-07-25 | It is a kind of that there is the layer sewerage system of building two for blocking early warning and being easy to dredging |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206971323U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117536303A (en) * | 2023-12-29 | 2024-02-09 | 深圳市新星联合管道有限公司 | Building drainage pipeline blocks up overflow alarm system and prevents blockking up overflow ware |
-
2017
- 2017-07-25 CN CN201720907157.1U patent/CN206971323U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117536303A (en) * | 2023-12-29 | 2024-02-09 | 深圳市新星联合管道有限公司 | Building drainage pipeline blocks up overflow alarm system and prevents blockking up overflow ware |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106836285B (en) | A monitoring and waterproof structure of underground pipe gallery based on building information | |
| CN110258728B (en) | A flat tube front floor drain type non-drop floor same-floor drainage system | |
| CN101550701B (en) | Method and facilities for dealing with local water gushing in foundation pit | |
| CN204298933U (en) | A kind of integrated modular co-layer draining linkage | |
| CN205259329U (en) | Water draining inspection well | |
| CN2797460Y (en) | Complementary pipe network end water storing device | |
| CN206971323U (en) | It is a kind of that there is the layer sewerage system of building two for blocking early warning and being easy to dredging | |
| CN112081192A (en) | Cut-off device, cut-off system and cut-off method for vertical pipe | |
| CN209837243U (en) | Basement drainage system in smart city | |
| CN201581490U (en) | Automatic sewage lifting equipment with oil separator | |
| CN218713613U (en) | Building life drainage riser with overflow function | |
| CN207812619U (en) | Drainpipe secondary protection structure | |
| CN203821558U (en) | Back-flowing-proof decompression well | |
| CN202850531U (en) | Pool overflow and emptying structure | |
| CN208949919U (en) | A kind of inspection socket tube coupling that city integrated piping lane internal drainage pipeline uses | |
| CN117307971A (en) | Automatic monitoring system for blocking and water leakage of residential public drainage vertical pipe | |
| CN208152205U (en) | A kind of interior same-layer floor drain | |
| CN206646546U (en) | One kind is based on architecture information underground pipe gallery monitoring waterproof construction | |
| CN104727422A (en) | Processing system used for conducting multi-system distributaries on refuse landfill | |
| CN211922853U (en) | Serial-type deodorant sewage pipes in bathroom | |
| CN112127455B (en) | A manhole cover ventilation type vacuum manhole | |
| CN217027360U (en) | Pre-buried formula drainage collector of ventilating | |
| CN211341109U (en) | Intelligent automatic shunting sewage intercepting system | |
| CN203669075U (en) | Rain sewage draining system convenient to detect and maintain | |
| CN205907715U (en) | Be applied to utility tunnel's rain, sewer manhole |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP02 | Change in the address of a patent holder |
Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University Patentee after: Tianjin University Research Institute of Architectrual Design & Urban Planning Address before: 300073 Tianjin City, Nankai District Anshan West Road No. 192 Patentee before: Tianjin University Research Institute of Architectrual Design & Urban Planning |
|
| CP02 | Change in the address of a patent holder | ||
| CP02 | Change in the address of a patent holder |
Address after: 300073 Tianjin City, Nankai District Anshan West Road No. 192 Patentee after: Tianjin University Research Institute of Architectrual Design & Urban Planning Address before: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University Patentee before: Tianjin University Research Institute of Architectrual Design & Urban Planning |
|
| CP02 | Change in the address of a patent holder | ||
| CP03 | Change of name, title or address |
Address after: 300073 Tianda architectural creative building (Science Park), No.192 Anshan West Road, Nankai District, Tianjin Patentee after: Tianjin University architectural design and Planning Research Institute Co.,Ltd. Address before: No.192 Anshan West Road, Nankai District, Tianjin 300073 Patentee before: TIANJIN University RESEARCH INSTITUTE OF ARCHITECTRUAL DESIGN & URBAN PLANNING |
|
| CP03 | Change of name, title or address | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180206 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |