CN206969653U - An assembly line diversion mechanism - Google Patents
An assembly line diversion mechanism Download PDFInfo
- Publication number
- CN206969653U CN206969653U CN201720820661.8U CN201720820661U CN206969653U CN 206969653 U CN206969653 U CN 206969653U CN 201720820661 U CN201720820661 U CN 201720820661U CN 206969653 U CN206969653 U CN 206969653U
- Authority
- CN
- China
- Prior art keywords
- assembly line
- conveyor belt
- transmission shaft
- drainage
- conveyer belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 claims abstract description 35
- 238000009434 installation Methods 0.000 claims abstract description 12
- 239000000463 material Substances 0.000 abstract description 18
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及生产流水线设备技术领域,尤其涉及一种流水线分流机构。The utility model relates to the technical field of production assembly line equipment, in particular to an assembly line diversion mechanism.
背景技术Background technique
在自动化流水线高速发展的今天,自动化流水线得到了越来越广泛的实际应用,不仅极大地改善工人的工作环境,减轻劳动强度,而且极大地提高生产效率与产品质量。自动化流水线对于物料的分流运送大多采用机械手搬运的方式。但是由于机械手活动需要一定的空间,因此占用设备空间大,在结构框架上容易对周边的零部件造成位置的干涉影响,即需要时刻避位退让,这不仅降低生产效率,而且还对周边工作的工人造成安全隐患。Today, with the rapid development of automated assembly lines, automated assembly lines have been more and more widely used in practice, which not only greatly improves the working environment of workers, reduces labor intensity, but also greatly improves production efficiency and product quality. The automatic assembly line mostly adopts the method of manipulator handling for the distribution and transportation of materials. However, since the movement of the manipulator requires a certain amount of space, it takes up a lot of equipment space, and it is easy to interfere with the position of the surrounding parts on the structural frame, that is, it needs to be kept out of position at all times, which not only reduces production efficiency, but also affects the surrounding work. Workers pose a safety hazard.
发明内容Contents of the invention
本实用新型的目的在于针对现有技术的不足,提供一种流水线分流机构便于安装拆卸,安全可靠性高,充分利用空间以达到高效率的物料分流。The purpose of the utility model is to provide an assembly line diversion mechanism which is easy to install and disassemble, has high safety and reliability, and makes full use of space to achieve high-efficiency material diversion.
为实现上述目的,本实用新型的一种流水线分流机构,包括安装底板,所述安装底板设置有升降架,所述升降架的底部连接有顶升气缸,所述升降架的两侧平行设置有第一引流输送带和第二引流输送带,所述第一引流输送带通过第一传动轴与第二引流输送带连接,所述升降架的内侧设置有第一驱动电机,所述第一驱动电机与第一传动轴之间设置有第一传动皮带,所述安装底板的中部平行设置有第一流水线输送带与第二流水线输送带,所述第一流水线输送带通过第二传动轴与第二流水线输送带连接,所述第二传动轴的下方设置有第二驱动电机,所述第二驱动电机与第二传动轴之间设置有第二传动皮带。In order to achieve the above object, an assembly line diversion mechanism of the utility model includes a mounting base plate, the mounting base plate is provided with a lifting frame, the bottom of the lifting frame is connected with a jacking cylinder, and the two sides of the lifting frame are arranged in parallel The first drainage conveyor belt and the second drainage conveyor belt, the first drainage conveyor belt is connected with the second drainage conveyor belt through the first transmission shaft, the inner side of the lifting frame is provided with a first driving motor, and the first driving A first transmission belt is arranged between the motor and the first transmission shaft, and a first assembly line conveyor belt and a second assembly line conveyor belt are arranged in parallel in the middle of the installation base plate, and the first assembly line conveyor belt passes through the second transmission shaft and the second assembly line conveyor belt. The two assembly line conveyor belts are connected, a second driving motor is arranged under the second transmission shaft, and a second transmission belt is arranged between the second driving motor and the second transmission shaft.
优选的,所述第一引流输送带和第二引流输送带相互纵向设置,所述第一流水线输送带与第二流水线输送带相互横向设置。Preferably, the first drainage conveyor belt and the second drainage conveyor belt are arranged longitudinally to each other, and the first assembly line conveyor belt and the second assembly line conveyor belt are arranged transversely to each other.
优选的,所述升降架的外侧设置有升降滑块,所述升降滑块滑动连接于升降导轨。Preferably, a lifting slider is provided on the outside of the lifting frame, and the lifting slider is slidably connected to the lifting guide rail.
优选的,所述升降滑块与升降导轨均设置为四个。Preferably, there are four lifting sliders and four lifting guide rails.
优选的,所述顶升气缸的主体固定连接于安装底板,所述顶升气缸的气缸轴连接于升降架的底部。Preferably, the main body of the jacking cylinder is fixedly connected to the installation base plate, and the cylinder shaft of the jacking cylinder is connected to the bottom of the lifting frame.
本实用新型的有益效果:本实用新型的一种流水线分流机构,包括安装底板,所述安装底板设置有升降架,所述升降架的底部连接有顶升气缸,所述升降架的两侧平行设置有第一引流输送带和第二引流输送带,所述第一引流输送带通过第一传动轴与第二引流输送带连接,所述升降架的内侧设置有第一驱动电机,所述第一驱动电机与第一传动轴之间设置有第一传动皮带,所述安装底板的中部平行设置有第一流水线输送带与第二流水线输送带,所述第一流水线输送带通过第二传动轴与第二流水线输送带连接,所述第二传动轴的下方设置有第二驱动电机,所述第二驱动电机与第二传动轴之间设置有第二传动皮带。将流水线分流机构设置于相邻两段流水线之间起到物料分流导向作用,第一引流输送带和第二引流输送带设置于第一流水线输送带与第二流水线输送带的下方,当需要进行物料分流的时候,物料流经流水线,由第二驱动电机的驱动下在第一流水线输送带与第二流水线输送带的末端位置停下,再由顶升气缸驱动升降架升起,第一引流输送带和第二引流输送带在第一驱动电机的驱动下将物料往其他方向分流运送,代替传统式机械手复杂繁琐的分流搬运操作,极大地提高物料分流效率,降低资源消耗,而且便于安装拆卸,安全可靠性高,充分利用空间以达到高效率的物料分流。Beneficial effects of the utility model: an assembly line diversion mechanism of the utility model includes a mounting base plate, the mounting base plate is provided with a lifting frame, the bottom of the lifting frame is connected with a jacking cylinder, and the two sides of the lifting frame are parallel A first drainage conveyor belt and a second drainage conveyor belt are provided, the first drainage conveyor belt is connected with the second drainage conveyor belt through a first transmission shaft, a first driving motor is arranged inside the lifting frame, and the first drainage conveyor belt A first transmission belt is arranged between a drive motor and the first transmission shaft, and a first assembly line conveyor belt and a second assembly line conveyor belt are arranged in parallel in the middle of the installation base plate, and the first assembly line conveyor belt passes through the second transmission shaft It is connected with the second assembly line conveyor belt, a second driving motor is arranged under the second transmission shaft, and a second transmission belt is arranged between the second driving motor and the second transmission shaft. The assembly line diversion mechanism is set between the adjacent two sections of the assembly line to play the role of material diversion guide, and the first drainage conveyor belt and the second drainage conveyor belt are arranged under the first assembly line conveyor belt and the second assembly line conveyor belt. When the material is diverted, the material flows through the assembly line, driven by the second drive motor, it stops at the end position of the conveyor belt of the first assembly line and the conveyor belt of the second assembly line, and then the lifting frame is driven by the jacking cylinder to rise, and the first drainage Driven by the first drive motor, the conveyor belt and the second drainage conveyor belt will divert and transport the materials to other directions, replacing the complicated and cumbersome diversion and handling operations of traditional manipulators, greatly improving the efficiency of material diversion, reducing resource consumption, and facilitating installation and disassembly , high safety and reliability, make full use of space to achieve high-efficiency material distribution.
附图说明Description of drawings
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图2为本实用新型正面的结构示意图。Fig. 2 is a schematic structural view of the front of the utility model.
图3为本实用新型侧面的结构示意图Fig. 3 is the structural representation of the side of the utility model
附图标记包括:Reference signs include:
1——安装底板 11——第一流水线输送带 12——第二流水线输送带1——Installing the bottom plate 11——Conveyor belt of the first assembly line 12——Conveyor belt of the second assembly line
13——第二传动轴 14——第二传动皮带 2——升降架13——Second transmission shaft 14——Second transmission belt 2——Elevator
21——顶升气缸 22——第一引流输送带 23——第二引流输送带21——Jacking Cylinder 22——First Drainage Conveyor Belt 23——Second Drainage Conveyor Belt
24——第一传动轴 25——第一驱动电机 26——第一传动皮带24——the first drive shaft 25——the first drive motor 26——the first drive belt
27——升降滑块 28——升降导轨。27——lifting slider 28——lifting guide rail.
具体实施方式Detailed ways
以下结合附图对本实用新型进行详细的描述。Below in conjunction with accompanying drawing, the utility model is described in detail.
如图1至图3所示,本实用新型的一种流水线分流机构,包括安装底板1,所述安装底板1设置有升降架2,所述升降架2的底部连接有顶升气缸21,所述升降架2的两侧平行设置有第一引流输送带22和第二引流输送带23,所述第一引流输送带22通过第一传动轴24与第二引流输送带23连接,所述升降架2的内侧设置有第一驱动电机25,所述第一驱动电机25与第一传动轴24之间设置有第一传动皮带26,所述安装底板1的中部平行设置有第一流水线输送带11与第二流水线输送带12,所述第一流水线输送带11通过第二传动轴13与第二流水线输送带12连接,所述第二传动轴13的下方设置有第二驱动电机,所述第二驱动电机与第二传动轴13之间设置有第二传动皮带14。As shown in Figures 1 to 3, an assembly line diversion mechanism of the present invention includes a mounting base plate 1, and the mounting base plate 1 is provided with a lifting frame 2, and the bottom of the lifting frame 2 is connected with a jacking cylinder 21, so that Both sides of the lifting frame 2 are provided with a first drainage conveyor belt 22 and a second drainage conveyor belt 23 in parallel, the first drainage conveyor belt 22 is connected with the second drainage conveyor belt 23 through a first transmission shaft 24, and the lifting The inner side of the frame 2 is provided with a first drive motor 25, a first transmission belt 26 is provided between the first drive motor 25 and the first transmission shaft 24, and a first assembly line conveyor belt is provided in parallel in the middle of the installation base 1 11 and the second assembly line conveyor belt 12, the first assembly line conveyor belt 11 is connected with the second assembly line conveyor belt 12 through the second transmission shaft 13, a second drive motor is arranged below the second transmission shaft 13, the A second transmission belt 14 is arranged between the second driving motor and the second transmission shaft 13 .
将流水线分流机构设置于相邻两段流水线之间起到物料分流导向作用,第一引流输送带22和第二引流输送带23设置于第一流水线输送带11与第二流水线输送带12的下方,当需要进行物料分流的时候,物料流经流水线,由第二驱动电机的驱动下在第一流水线输送带11与第二流水线输送带12的末端位置停下,再由顶升气缸21驱动升降架2升起,第一引流输送带22和第二引流输送带23在第一驱动电机25的驱动下将物料往其他方向分流运送,代替传统式机械手复杂繁琐的分流搬运操作,极大地提高物料分流效率,降低资源消耗,而且便于安装拆卸,安全可靠性高,充分利用空间以达到高效率的物料分流。The assembly line diversion mechanism is set between two adjacent sections of the assembly line to play the role of material diversion guide, and the first drainage conveyor belt 22 and the second drainage conveyor belt 23 are arranged below the first assembly line conveyor belt 11 and the second assembly line conveyor belt 12 , when material diversion is required, the material flows through the assembly line and stops at the end positions of the first assembly line conveyor belt 11 and the second assembly line conveyor belt 12 driven by the second drive motor, and then driven by the jacking cylinder 21 to lift The frame 2 is raised, and the first drainage conveyor belt 22 and the second drainage conveyor belt 23 are driven by the first drive motor 25 to divert and transport the materials to other directions, replacing the complicated and cumbersome diversion and handling operations of traditional manipulators, which greatly improves the efficiency of materials. Distributing efficiency, reducing resource consumption, and easy installation and disassembly, high safety and reliability, making full use of space to achieve high-efficiency material diversion.
如图1、图2和图3所示,本实施例的第一引流输送带22和第二引流输送带23相互纵向设置,所述第一流水线输送带11与第二流水线输送带12相互横向设置。具体地,通过横向与纵向的相互交错设置,不仅运作协调性好,提高各个输送带的运转顺畅性,实现低摩擦力平稳运送物料,而且在实际应用中,物料与各个输送带的接触面更好地贴合,有效避免物料运送走偏的问题。As shown in Fig. 1, Fig. 2 and Fig. 3, the first drainage conveyor belt 22 and the second drainage conveyor belt 23 of this embodiment are vertically arranged mutually, and the first assembly line conveyor belt 11 and the second assembly line conveyor belt 12 are mutually transverse set up. Specifically, through the interlaced arrangement of the horizontal and vertical directions, not only the operation coordination is good, the smooth operation of each conveyor belt is improved, and the material is transported smoothly with low friction, but also in practical applications, the contact surface between the material and each conveyor belt is better. Good fit can effectively avoid the problem of material deviation.
如图1、图2和图3所示,本实施例的升降架2的外侧设置有升降滑块27,所述升降滑块27滑动连接于升降导轨28,所述升降滑块27与升降导轨28均设置为四个。具体地,顶升气缸21驱动升降架2做上下移动,设置于升降架2外周侧壁的升降滑块27沿着升降导轨28移动,不仅结构强度高,受力均匀,而且降低摩擦系数,移动顺畅速度快。As shown in Fig. 1, Fig. 2 and Fig. 3, the outside of lifting frame 2 of the present embodiment is provided with lifting slider 27, and described lifting slider 27 is slidably connected with lifting guide rail 28, and described lifting slider 27 and lifting guide rail 28 are set to four. Specifically, the lifting cylinder 21 drives the lifting frame 2 to move up and down, and the lifting slider 27 arranged on the outer peripheral side wall of the lifting frame 2 moves along the lifting guide rail 28, which not only has high structural strength and uniform force, but also reduces the friction coefficient and moves Smooth and fast.
如图1、图2和图3所示,本实施例的顶升气缸21的主体固定连接于安装底板1,所述顶升气缸21的气缸轴连接于升降架2的底部。具体地,这便于顶升气缸21驱动升降架2上下移动,平稳自如地运作。As shown in FIG. 1 , FIG. 2 and FIG. 3 , the main body of the jacking cylinder 21 of this embodiment is fixedly connected to the installation base 1 , and the cylinder shaft of the jacking cylinder 21 is connected to the bottom of the lifting frame 2 . Specifically, this facilitates the jacking cylinder 21 to drive the lifting frame 2 to move up and down, and to operate smoothly and freely.
综上所述可知本实用新型具有以上所述的优良特性,得以令其在使用上,增进以往技术中所未有的效能而具有实用性,成为一种极具实用价值的产品。以上内容仅为本实用新型的较佳实施例,对于本领域的普通技术人员,依据本实用新型的思想,在具体实施方式及应用范围上均会有改变之处,本说明书内容不应理解为对本实用新型的限制。To sum up, it can be known that the utility model has the above-mentioned excellent characteristics, so that it can improve the performance that is not available in the prior art in use and become practical, and become a product with great practical value. The above content is only a preferred embodiment of the present utility model. For those of ordinary skill in the art, according to the idea of the present utility model, there will be changes in the specific implementation and scope of application. The content of this specification should not be understood as Limitations on the Invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720820661.8U CN206969653U (en) | 2017-07-07 | 2017-07-07 | An assembly line diversion mechanism |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720820661.8U CN206969653U (en) | 2017-07-07 | 2017-07-07 | An assembly line diversion mechanism |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206969653U true CN206969653U (en) | 2018-02-06 |
Family
ID=61406471
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720820661.8U Expired - Fee Related CN206969653U (en) | 2017-07-07 | 2017-07-07 | An assembly line diversion mechanism |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206969653U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109625485A (en) * | 2018-12-11 | 2019-04-16 | 东莞丰卓机电设备有限公司 | Three-dimensional feeding and range hood multi-production line confluence final assembly production system |
| CN110586835A (en) * | 2019-10-23 | 2019-12-20 | 珠海格力智能装备有限公司 | Riveting equipment |
| CN110745516A (en) * | 2019-10-30 | 2020-02-04 | 苏州精濑光电有限公司 | Transmission method |
| CN110745517A (en) * | 2019-10-30 | 2020-02-04 | 苏州精濑光电有限公司 | Transmission device |
| CN114906392A (en) * | 2022-05-31 | 2022-08-16 | 苏州天准科技股份有限公司 | Unloading NG keeps in station and regular baling equipment |
-
2017
- 2017-07-07 CN CN201720820661.8U patent/CN206969653U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109625485A (en) * | 2018-12-11 | 2019-04-16 | 东莞丰卓机电设备有限公司 | Three-dimensional feeding and range hood multi-production line confluence final assembly production system |
| CN110586835A (en) * | 2019-10-23 | 2019-12-20 | 珠海格力智能装备有限公司 | Riveting equipment |
| CN110745516A (en) * | 2019-10-30 | 2020-02-04 | 苏州精濑光电有限公司 | Transmission method |
| CN110745517A (en) * | 2019-10-30 | 2020-02-04 | 苏州精濑光电有限公司 | Transmission device |
| CN114906392A (en) * | 2022-05-31 | 2022-08-16 | 苏州天准科技股份有限公司 | Unloading NG keeps in station and regular baling equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102259761B (en) | Car roof gripping and conveying device | |
| CN206580190U (en) | A kind of production line working plate circulating movement apparatus | |
| CN204777520U (en) | Novel transport structure | |
| CN103693591A (en) | Hopper lifting device | |
| CN203635851U (en) | Transferring machine | |
| CN204568787U (en) | A kind of for workpiece jacking apparatus in the pallet of flat panel workpieces manufacturing line | |
| CN207671106U (en) | An elevator and its automatic conveying line with the elevator | |
| CN206511875U (en) | A kind of shear-type elevator with conveyer belt | |
| CN208361795U (en) | A kind of lifting platform and conveying equipment | |
| CN105540249A (en) | Material carrying device | |
| CN204043408U (en) | With the straight column type elevating translational ferry bus of automatic push-pull car device | |
| CN205312560U (en) | Interfere self -adaptation cross -line lift for assembly line | |
| CN202807942U (en) | Plate conveying device | |
| CN205952971U (en) | A lift for carrying outer machine turnover board of air conditioner | |
| CN205397989U (en) | Movable escalator | |
| CN206358732U (en) | A kind of automatic transmission platform of SIP wallboards | |
| CN206705597U (en) | A kind of Double tabletop reciprocating lifting device | |
| CN104353961A (en) | Multifunctional cylinder transfer machine with lifting function | |
| CN204183175U (en) | Multifunctional lifting moves cylinder machine | |
| CN207224644U (en) | A kind of lifting gear of all steel fetus conveying robot for curing department | |
| CN204777700U (en) | Turnover mechanism is carried to aerated concrete block's layer board | |
| CN205802390U (en) | A kind of jacking translation mechanism | |
| CN206679720U (en) | Product lifting device | |
| CN202337643U (en) | Pipeline electromagnetic crane headframe | |
| CN206511874U (en) | A kind of lift adjusting apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180206 Termination date: 20190707 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |