CN206965882U - A kind of construction site waste material recovery device - Google Patents

A kind of construction site waste material recovery device Download PDF

Info

Publication number
CN206965882U
CN206965882U CN201720449429.8U CN201720449429U CN206965882U CN 206965882 U CN206965882 U CN 206965882U CN 201720449429 U CN201720449429 U CN 201720449429U CN 206965882 U CN206965882 U CN 206965882U
Authority
CN
China
Prior art keywords
cylinder
broken
gear
recovery device
waste material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720449429.8U
Other languages
Chinese (zh)
Inventor
刘玉云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jin Run construction engineering corporation, Ltd of Shenzhen
Original Assignee
刘玉云
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘玉云 filed Critical 刘玉云
Priority to CN201720449429.8U priority Critical patent/CN206965882U/en
Application granted granted Critical
Publication of CN206965882U publication Critical patent/CN206965882U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction site waste material recovery device,Including crushing cylinder,It is provided with the upside of broken cylinder into funnel,Feeding cylinder is provided with the upside of loading hopper,Left end is provided with feed hopper on the upside of feeding cylinder,Feeding mechanism is provided with inside feeding cylinder,Feeding mechanism includes feed worm and the screw rod blade being arranged on feed worm outer wall,Feed worm left end and motor connection,The utility model construction site waste material recovery device,Automatic feed can be realized,Construction waste is precut in fill process,Good cutting effect,Efficiency high,Two broken gears and crushing teeth carry out precrushing to fertilizer,Construction waste after broken is crushed by two grinding gear engagements,Good crushing effect,Efficiency high,Particle after crushing can be screened and collected,Improve operating efficiency,The water that shower nozzle sprays on the one hand being capable of dedusting,On the other hand inside can be crushed,Disintegrating mechanism carries out cooling down.

Description

A kind of construction site waste material recovery device
Technical field
A kind of construction machinery equipment is the utility model is related to, specifically a kind of construction site waste material recovery device.
Background technology
Architectural engineering, refer to by the construction to all kinds of building constructions and its affiliated facility and the circuit supporting with it, pipeline, The engineering entity that the installation activity of equipment is formed.Wherein " building construction ", which refers to, top cover, beam column, wall, basis and can Inner space is formed, meets people's production, lives, learns, the engineering of public activity needs.Architectural engineering is for newly-built, reconstruction Or enlarging building construction and auxiliary construction facility carried out planning, prospecting, design and construction, every technical staff such as completion Work and the engineering entity completed and the circuit supporting with it, the installing engineering of pipeline, equipment.Also various houses, building are referred to Construction engineering, also known as building operation amount.The dynamic material of the necessary emerging work of this part investment, could be realized by construction activities.Building Rubbish refers to that construction, unit in charge of construction or individual are built, laid or removed to all kinds of buildings, structures, pipe network etc., repaired During caused dregs, spoir, rejected material, mud and other discarded objects.Many waste materials can be produced in architectural engineering, are not had at present There is the equipment that can effectively handle construction waste.
Utility model content
The purpose of this utility model is to provide a kind of construction site waste material recovery device, to solve above-mentioned background technology The problem of middle proposition.
To achieve the above object, the utility model provides following technical scheme:
A kind of construction site waste material recovery device, including broken cylinder, the broken cylinder upside are provided with into funnel, charging Feeding cylinder is provided with the upside of funnel, left end is provided with feed hopper on the upside of feeding cylinder, and feeding mechanism, feeding mechanism are provided with inside feeding cylinder Including feed worm and the screw rod blade being arranged on feed worm outer wall, feed worm left end and motor connection, in feeding cylinder One section to keep right is provided with pre-cutting mechanism, and it is recessed that pre-cutting mechanism is included in symmetrically arranged four hemisphericals on charging drum outer wall Groove, the rolling cut rotating shaft for being arranged on hemispherical groove center and the rolling blade being arranged on rolling cut rotating shaft outer wall, under feeding cylinder The discharging opening of side right-hand member is connected by tremie pipe with loading hopper, is connected with crushing chamber on the downside of the broken cylinder, is crushed cylinder and powder Noise reduction layer is covered with broken cavity outer wall, several crushing teeths is uniformly provided with broken cylinder inwall, crushes on the left of cylinder inside center Be provided with provided with driven broken gear, on the right side of driven broken gear and actively crush gear, driven broken gear with actively crush gear Engagement connection, actively crushes gear and is connected by first rotating shaft with the first electric rotating machine on the right side of broken cylinder, crushes on cylinder inside Side level is provided with water inlet pipe, and one section of downside outer wall that water inlet pipe is located inside broken cylinder is provided with five shower nozzles, the broken cylinder Downside is provided with pulverization cylinder, crushes cylinder bottom by discharging opening with being connected inside pulverization cylinder, pulverization cylinder upper inside or so is provided with First grinding gear and the second grinding gear, leave crushing gap between the first grinding gear and the second grinding gear, and described One grinding gear and the intermeshing of the second grinding gear are set, and the second grinding gear right-hand member connects drive cylinder by connecting rod, The first screen cloth is all correspondingly provided with the downside of first grinding gear and the second grinding gear, two the first screen slopes are fixed on pulverization cylinder On inwall, the second screen cloth is provided with the downside of the first screen cloth, the position that the second screen cloth left and right ends are corresponded at left and right sides of pulverization cylinder is all set There is coarse fodder discharge nozzle, pulverization cylinder bottom is provided with fines discharge nozzle, vibrating motor is additionally provided with the outer wall of pulverization cylinder left side.
As further program of the utility model:The groove upper wall is arc.
As further program of the utility model:The direction of rotation of the rolling blade and the direction of rotation of feed worm Conversely.
As further program of the utility model:The material of the noise reduction layer is sound-proof damping felt.
As further program of the utility model:The water inlet pipe left end is provided with water valve.
As the utility model further scheme:Second screen cloth is shaped as inverted v-shaped.
Compared with prior art, the beneficial effects of the utility model are:In the device course of work, motor work drives charging Mechanism work will be cut in the feeding cutting machine of construction waste consistent, realize automatic feed, without artificial loading, Operating efficiency is improved, it also avoid caused blocking in fill process, in fill process, can be entered in advance in construction waste Tentatively cut before entering cutting machine, the construction waste to diminish after cutting, which enters in cutting machine, to be cut, effective to improve Operating efficiency, reduces the live load of device, avoids overwork, extend the service life of device in addition;Build Waste material to be built by loading hopper to be entered inside broken cylinder, the first electric rotating machine is driven by first rotating shaft and actively crushes pinion rotation, Actively crush gear, driven broken gear and crushing teeth and precrushing is carried out to construction waste, crushing effect is good, improves rear continued powder Broken effect and efficiency, cold water enters in water inlet pipe down to be sprayed by shower nozzle, is on the one hand carried out dedusting to pulverizer inside, is reduced Dust pollution, on the other hand the broken gear to inside and the disintegrating mechanism of downside cool down, avoid for a long time Hot operation influences the service life of gear;Construction waste after broken falls, the first grinding gear and the second crushing tooth Wheel engagement rotation crushes to construction waste, and gear engagement crushes good crushing effect, working stability, and drive cylinder and drives the Two grinding gears, which move left and right, can adjust the size that gap is crushed between the first grinding gear and the second grinding gear, so as to right Construction waste dynamics size after crushing is controlled, and construction waste after crushing falls, vibrating motor work, the first screen cloth and Second screen cloth carries out vibration screening to construction waste, and fines is fallen by screen cloth and discharged by fines discharge nozzle, and coarse fodder is gone out by coarse fodder Expects pipe is discharged, and is realized screening and the collection to coarse fodder and fines, is improved operating efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of construction site waste material recovery device.
Fig. 2 is the structural representation of pre-cutting mechanism in the waste material recovery device of construction site.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1-2, in the utility model embodiment, a kind of construction site waste material recovery device, including broken cylinder 1, the broken upside of cylinder 1 is provided with is provided with feeding cylinder 24 into funnel 2, the upside of loading hopper 2, and the upside left end of feeding cylinder 24 is provided with Feed hopper 25, is provided with feeding mechanism 26 inside feeding cylinder 24, and feeding mechanism 26 includes feed worm and is arranged on feed worm Screw rod blade on outer wall, feed worm left end are connected with motor 27, and pre-cut cutting mill is provided with one section that feeding cylinder 24 is kept right Structure 28, pre-cutting mechanism 28 are included in symmetrically arranged four hemispherical grooves 281 on the outer wall of feeding cylinder 24, are arranged on hemispherical The rolling cut rotating shaft 282 at the center of groove 281 and the rolling blade 283 being arranged on the outer wall of rolling cut rotating shaft 282, the groove 281 Upper wall is arc, and the direction of rotation of the rolling blade 283 and the direction of rotation of feed worm are on the contrary, the downside right-hand member of feeding cylinder 24 Discharging opening be connected by tremie pipe 29 with loading hopper 2, in the device course of work, motor 27 work drive the work of feeding mechanism 26 Work will be cut in the feeding cutting machine of construction waste consistent, is realized automatic feed, without artificial loading, is improved Operating efficiency, caused blocking in fill process is it also avoid, in fill process, can enter in advance in construction waste and cut Tentatively cut before machine, the construction waste to diminish after cutting, which enters in cutting machine, to be cut, and effectively raises work Efficiency, the live load of device is reduced in addition, avoid overwork, extend the service life of device;It is described broken The downside of cylinder 1 is connected with crushing chamber 3, and noise reduction layer 4, the material of the noise reduction layer 4 are covered with broken cylinder 1 and the outer wall of crushing chamber 3 For sound-proof damping felt, crush and be uniformly provided with several crushing teeths 5 on the inwall of cylinder 1, crush and driven break is provided with the left of the inside center of cylinder 1 Broken gear 6, the driven broken right side of gear 6, which is provided with, actively crushes gear 7, and driven broken gear 6 connects with the engagement of gear 7 is actively crushed Connect, actively crush gear 7 and be connected by first rotating shaft 8 with first electric rotating machine 9 on the broken right side of cylinder 1, crush the upper inside of cylinder 1 Level is provided with water inlet pipe 11, and water inlet pipe 11 is located at outer wall on the downside of one section inside broken cylinder 1 and is provided with five shower nozzles 12, it is described enter The left end of water pipe 11 is provided with water valve, and construction waste is entered inside broken cylinder 1 by loading hopper 2, and the first electric rotating machine 9 passes through first turn The drive of axle 8 actively crushes gear 7 and rotated, and actively crushes gear 7, driven broken gear 6 and crushing teeth 5 and construction waste is carried out in advance Broken, crushing effect is good, improves the effect and efficiency subsequently crushed, and cold water enters in water inlet pipe 11 down to be sprayed by shower nozzle 12 Go out, dedusting on the one hand is carried out to pulverizer inside, reduces dust pollution, on the other hand the broken gear to inside and downside Disintegrating mechanism cools down, and avoiding long-time hot operation influences the service life of gear;The downside of broken cylinder 1 is set There is pulverization cylinder 14, crush the bottom of cylinder 1 by discharging opening 10 with being connected inside pulverization cylinder 14, upper inside of pulverization cylinder 14 or so is set There are the first grinding gear 15 and the second grinding gear 16, left between the first grinding gear 15 and the second grinding gear 16 between crushing Gap, the grinding gear 16 of the first grinding gear 15 and second intermeshing are set, and the right-hand member of the second grinding gear 16 passes through connection Bar connects drive cylinder 17, and the first grinding gear 15 and the downside of the second grinding gear 16 are all correspondingly provided with the first screen cloth 18, two First screen cloth 18 is tilted and is fixed on the inwall of pulverization cylinder 14, and the downside of the first screen cloth 18 is provided with the second screen cloth 19, second screen cloth 19 are shaped as inverted v-shaped, and the position of the corresponding left and right ends of second screen cloth 19 in the left and right sides of pulverization cylinder 14 is designed with coarse fodder discharging Pipe 21, the bottom of pulverization cylinder 14 are provided with fines discharge nozzle 22, vibrating motor 20 are additionally provided with the left side outer wall of pulverization cylinder 14, by broken Construction waste afterwards falls, and the first grinding gear 15 and the engagement rotation of the second grinding gear 16 crush to construction waste, tooth Wheel engagement crushes good crushing effect, working stability, and drive cylinder 17 and drives the second grinding gear 16 to move left and right and can adjust The size in gap is crushed between first grinding gear 15 and the second grinding gear 16, so as to the construction waste great efforts after crushing Small to be controlled, the construction waste after crushing falls, and vibrating motor 20 works, and the first screen cloth 18 and the second screen cloth 19 are useless to building Material carries out vibration screening, and fines is fallen by screen cloth and discharged by fines discharge nozzle 22, and coarse fodder is discharged by coarse fodder discharge nozzle 21, realizes Screening and collection to coarse fodder and fines, improves operating efficiency;The utility model construction site waste material recovery device, energy Automatic feed is enough realized, construction waste is precut in fill process, good cutting effect, efficiency high, two crushing teeths Wheel and crushing teeth carry out precrushing to fertilizer, and the construction waste after crushing is crushed by two grinding gears engagements, crushes effect Fruit is good, efficiency high, the particle after crushing can be screened and collected, and improves operating efficiency, the side of water one that shower nozzle sprays Face can dedusting, on the other hand can carry out cooling down to the broken of inside, disintegrating mechanism.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (6)

1. a kind of construction site waste material recovery device, including broken cylinder, it is characterised in that be provided with pan feeding on the upside of the broken cylinder Funnel, loading hopper upside are provided with feeding cylinder, and left end is provided with feed hopper on the upside of feeding cylinder, and charger is provided with inside feeding cylinder Structure, feeding mechanism include feed worm and the screw rod blade being arranged on feed worm outer wall, and feed worm left end connects with motor Connect, pre-cutting mechanism is provided with one section that feeding cylinder is kept right, pre-cutting mechanism is included in symmetrically arranged on charging drum outer wall Four hemispherical grooves, the rolling cut rotating shaft for being arranged on hemispherical groove center and the chopper being arranged on rolling cut rotating shaft outer wall Piece, the discharging opening of feeding cylinder downside right-hand member are connected by tremie pipe with loading hopper, and crushing chamber is connected with the downside of the broken cylinder, Noise reduction layer is covered with broken cylinder and crushing cavity outer wall, several crushing teeths is uniformly provided with broken cylinder inwall, crushes in cylinder Portion's center left is provided with driven broken gear, is provided with the right side of driven broken gear and actively crushes gear, driven broken gear and master Dynamic broken gear engagement connection, actively crushes gear and is connected by first rotating shaft with the first electric rotating machine on the right side of broken cylinder, broken Broken cylinder upper inside is horizontal to be provided with water inlet pipe, and one section of downside outer wall that water inlet pipe is located inside broken cylinder is provided with five shower nozzles, Pulverization cylinder is provided with the downside of the broken cylinder, cylinder bottom is crushed by discharging opening with being connected inside pulverization cylinder, on pulverization cylinder inside Side or so is provided with the first grinding gear and the second grinding gear, is left between the first grinding gear and the second grinding gear between crushing Gap, the first grinding gear and the second grinding gear intermeshing are set, and the second grinding gear right-hand member is connected by connecting rod The first screen cloth is all correspondingly provided with the downside of drive cylinder, the first grinding gear and the second grinding gear, two the first screen slopes are consolidated It is scheduled on pulverization cylinder inwall, the second screen cloth is provided with the downside of the first screen cloth, the second screen cloth left and right ends are corresponded at left and right sides of pulverization cylinder Position be designed with coarse fodder discharge nozzle, pulverization cylinder bottom is provided with fines discharge nozzle, and vibration electricity is additionally provided with outer wall on the left of pulverization cylinder Machine.
2. construction site waste material recovery device according to claim 1, it is characterised in that the groove upper wall is arc Shape.
3. construction site waste material recovery device according to claim 1, it is characterised in that the rotation of the rolling blade Direction is opposite with the direction of rotation of feed worm.
4. construction site waste material recovery device according to claim 1, it is characterised in that the material of the noise reduction layer is Sound-proof damping felt.
5. construction site waste material recovery device according to claim 1, it is characterised in that the water inlet pipe left end is provided with Water valve.
6. construction site waste material recovery device according to claim 1, it is characterised in that the shape of second screen cloth For inverted v-shaped.
CN201720449429.8U 2017-04-26 2017-04-26 A kind of construction site waste material recovery device Expired - Fee Related CN206965882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720449429.8U CN206965882U (en) 2017-04-26 2017-04-26 A kind of construction site waste material recovery device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720449429.8U CN206965882U (en) 2017-04-26 2017-04-26 A kind of construction site waste material recovery device

Publications (1)

Publication Number Publication Date
CN206965882U true CN206965882U (en) 2018-02-06

Family

ID=61412283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720449429.8U Expired - Fee Related CN206965882U (en) 2017-04-26 2017-04-26 A kind of construction site waste material recovery device

Country Status (1)

Country Link
CN (1) CN206965882U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108834465A (en) * 2018-09-10 2018-11-20 张振洋 A kind of saline and alkaline rice field fertility modification method
CN109331925A (en) * 2018-11-12 2019-02-15 东莞理工学院 A kind of building waste recycling pretreating device
CN109569407A (en) * 2019-01-02 2019-04-05 安徽得赢新材料科技有限公司 A kind of waste lithium cell agitating device
CN109590068A (en) * 2018-12-26 2019-04-09 贵州大学 A kind of mining efficient dustproof formula grinding device
CN110013904A (en) * 2019-04-16 2019-07-16 广东职业技术学院 A kind of ceramic glaze production crushing and screening equipment
CN110433935A (en) * 2019-08-01 2019-11-12 王顺来 A kind of food processing crushing processor
CN112056240A (en) * 2020-09-16 2020-12-11 沙群 Aquaculture is with cultured equipment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108834465A (en) * 2018-09-10 2018-11-20 张振洋 A kind of saline and alkaline rice field fertility modification method
CN108834465B (en) * 2018-09-10 2021-04-30 黑龙江万丰德肥料有限公司 Saline-alkali rice field fertility improvement method
CN109331925A (en) * 2018-11-12 2019-02-15 东莞理工学院 A kind of building waste recycling pretreating device
CN109590068A (en) * 2018-12-26 2019-04-09 贵州大学 A kind of mining efficient dustproof formula grinding device
CN109569407A (en) * 2019-01-02 2019-04-05 安徽得赢新材料科技有限公司 A kind of waste lithium cell agitating device
CN109569407B (en) * 2019-01-02 2021-08-06 安徽得赢新材料科技有限公司 Old and useless lithium cell agitating unit
CN110013904A (en) * 2019-04-16 2019-07-16 广东职业技术学院 A kind of ceramic glaze production crushing and screening equipment
CN110433935A (en) * 2019-08-01 2019-11-12 王顺来 A kind of food processing crushing processor
CN112056240A (en) * 2020-09-16 2020-12-11 沙群 Aquaculture is with cultured equipment

Similar Documents

Publication Publication Date Title
CN206965882U (en) A kind of construction site waste material recovery device
CN106902961A (en) A kind of construction site waste material recovery device
CN205379926U (en) Waste recovery device for building
CN205833335U (en) Automatization's pulverizer with precomminution mechanism
CN206008949U (en) A kind of environmental protection ore disintegrating apparatus
CN205628211U (en) Building waste sorting recovery processing integrated device
CN209174033U (en) A kind of building waste environmental protection cleaning grinding device
CN206444710U (en) Environment-friendly type building decoration refuse disposal installation
CN107837932A (en) A kind of building rubbish treatment device with preprocessing function
CN206688826U (en) A kind of cement milling station
CN208711887U (en) Grinding device is used in a kind of recycling of lithium battery
CN208612556U (en) A kind of shockproof crusher
CN202700563U (en) Screening four-tooth roller crushing integrated machine
CN212681159U (en) Civil engineering building material automatic grinder
CN210700315U (en) Raw material crushing device for manufacturing glass fiber board
CN106040395A (en) Coal crushing and anti-blocking device
CN206731768U (en) A kind of construction site refuse disposal installation
CN211026545U (en) Multifunctional sand screening device for building
CN208512712U (en) A kind of automation soil screening plant
CN111068820A (en) Environment improvement waste material shredding device
CN206372934U (en) A kind of pulverizer of attrition crushing
CN107812580A (en) A kind of garbage pulverator for purification of air
CN211838373U (en) Iron tailing grinding device
CN213669496U (en) Chinese herbal medicine superfine grinding device
CN210474190U (en) Rubbing crusher with noise control function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180605

Address after: 518040 Guangdong Shenzhen Futian District Binhe Road and Xiangmi Lake Road intersection Tianan Innovation Technology Square (two issue) west seat 1203

Patentee after: Jin Run construction engineering corporation, Ltd of Shenzhen

Address before: 323903 Hongxing street, Wenxi Town, Qingtian County, Lishui, Zhejiang, 95

Patentee before: Liu Yuyun

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20190426

CF01 Termination of patent right due to non-payment of annual fee