Utility model content
Present invention design and invention difficult point simultaneously do not lie in the brand-new conduit assembly with medicament inlet of setting.
Present invention is conceived and invention difficult point is:Less transformation is carried out to existing conduit assembly, i.e., by existing pipe
The limitation of the structure of road component, it becomes possible in the increase setting medicament inlet on existing conduit assembly.
The problem of the purpose of this utility model is to overcome prior art to exist, there is provided conduit assembly and its elbow and
Chemical plant installations with the conduit assembly, the conduit assembly have the advantages of being easy to low transformation, improvement cost, downtime.
To achieve these goals, the utility model first aspect provides a kind of conduit assembly, and the conduit assembly includes:
First pipeline and second pipe;First flange and second flange, the first flange are connected with the first end of first pipeline,
The second flange is connected with the first end of the second pipe;Two the first elbows, the first end of each first elbow
Surface construction is flange face, and each first elbow has runner, and the first of the runner is opened in the first end face
On, the second of the runner is opened on the side face of first elbow, the first end face of first elbow with
The first flange is connected, and the first end face of another first elbow is connected with the second flange;3rd pipeline and
Four pipelines, the first end of the 3rd pipeline are connected with the second opening of first elbow, and the of the 4th pipeline
One end is connected with the second opening of the first elbow another described, wherein in the 3rd pipeline and the 4th pipeline at least
One is provided with medicament inlet;And valve, the import of the valve and one in the 3rd pipeline and the 4th pipeline
The second individual end is connected, outlet and another the second end phase in the 3rd pipeline and the 4th pipeline of the valve
Even.
According to the conduit assembly of the utility model embodiment by setting two be connected with first flange and second flange
First elbow, i.e., two the first elbows are set in former valvular opening position, so as to set the 3rd pipeline of extraction and the
Four pipelines, medicament inlet is set to install on valve and at least one in the 3rd pipeline and the 4th pipeline.
Thus during increase sets medicament inlet, not only without in original pipeline (the first pipeline and second
Pipeline) on be open and welded operation, and without be purged to original pipeline and replacement operator.In addition, medicament is noted
Manufacture, inspection, the experiment of entrance can be carried out in job shop, so as to reduce the time of device shut-down, to save into
Originally, increase economic benefit.
Therefore, according to the conduit assembly of the utility model embodiment have be easy to transformation, improvement cost is low, downtime is short
The advantages of, without being open and being welded operation on original pipeline, without original pipeline being purged and being replaced behaviour
Make.
Preferably, the runner of each first elbow is L-shaped.
Preferably, the first end face of first elbow is connected by multiple studding bolts with the first flange,
The first end face of another first elbow is connected by multiple studding bolts with the second flange.
Preferably, the first end of the 3rd pipeline is welded on the side face of first elbow, the 4th pipe
The first end in road is welded on the side face of another first elbow.
Preferably, each in the 3rd pipeline and the 4th pipeline includes lower horizontal segment, vertical section and upper water
Flat section, the second opening of the first end of the lower horizontal segment and first elbow are connected, the lower end of the vertical section with it is described
Second end of lower horizontal segment is connected, and the upper end of the vertical section is connected with the first end of the upper horizontal segment, wherein the valve
Import be connected with second end of one in the upper horizontal segment of the 3rd pipeline and the upper horizontal segment of the 4th pipeline, institute
State the outlet of valve and another second in the upper horizontal segment of the 3rd pipeline and the upper horizontal segment of the 4th pipeline
End is connected.
Preferably, the conduit assembly further comprises:Medicament ascending pipe;Threeway, the first end of the threeway with it is described
The upper end of the vertical section of 3rd pipeline is connected, the second end of the threeway and the first end phase of the upper horizontal segment of the 3rd pipeline
Even, the 3rd end of the threeway is connected with the lower end of the medicament ascending pipe;With the second elbow, the first end of second elbow
It is connected with the upper end of the vertical section of the 4th pipeline, the second end of second elbow and the upper horizontal segment of the 4th pipeline
First end be connected.
Preferably, the lower horizontal segment and the upper horizontal segment are into predetermined angular.
Preferably, the predetermined angular be more than or equal to 15 degree and be less than etc. 30 degree.
The utility model second aspect provides elbow, and the first end face of the elbow is configured to flange face, the elbow tool
Have runner, the first of the runner is opened in the first end face, the second of the runner be opened in it is described curved
On the side face of head.
The function of elbow and flange is integrated with according to elbow of the present utility model.
The utility model third aspect provides chemical plant installations, and the chemical plant installations is included according to the utility model first aspect
Described conduit assembly.
Embodiment
Embodiment of the present utility model is described below in detail, the example of the embodiment is shown in the drawings.Below by
The embodiment being described with reference to the drawings is exemplary, it is intended to for explaining the utility model, and it is not intended that new to this practicality
The limitation of type.
Present invention design and invention difficult point simultaneously do not lie in the brand-new conduit assembly with medicament inlet of setting.
Present invention is conceived and invention difficult point is:Less transformation is carried out to existing conduit assembly, i.e., by existing pipe
The limitation of the structure of road component, it becomes possible in the increase setting medicament inlet on existing conduit assembly.
Below with reference to the accompanying drawings conduit assembly 10 according to the utility model embodiment is described.As Figure 1-Figure 5, according to this
The conduit assembly 10 of utility model embodiment includes the first pipeline 111, second pipe 112, first flange 121, second flange
122nd, two the first elbows 130, the 3rd pipeline 140a, the 4th pipeline 140b and valve 150.
First flange 121 is connected with the first end of the first pipeline 111, second flange 122 and the first end of second pipe 112
It is connected.The first end face 131 of each first elbow 130 is configured to flange face, and each first elbow 130 has runner 132, runner
132 the first opening 1321 is opened in the first end face 131 of the first elbow 130, and the second opening 1322 of runner 132 is opened in
On the side face 133 of first elbow 130.The first end face 131 of one the first elbow 130 is connected with first flange 121, and another
The first end face 131 of one elbow 130 is connected with second flange 122.In other words, first elbow 130 and the phase of first flange 121
Even, another first elbow 130 is connected with second flange 122.
3rd pipeline 140a first end is connected with the second opening 1322 of first elbow 130, the 4th pipeline 140b
The second opening 1322 of first end and another the first elbow 130 be connected.Wherein, the 3rd pipeline 140a and the 4th pipeline 140b
In at least one be provided with medicament inlet.The import of valve 150 and one in the 3rd pipeline 140a and the 4th pipeline 140b
The second individual end is connected, outlet and another the second end phase in the 3rd pipeline 140a and the 4th pipeline 140b of valve 150
Even.
Existing conduit assembly includes the first pipeline 111, second pipe 112, first flange 121, second flange 122 and valve
Door 150, the both ends of valve 150 are provided with flange, two flanges of valve 150 respectively with first flange 121 and the phase of second flange 122
Even.
When in increase setting medicament inlet on existing conduit assembly, existing conduit assembly can be changed
Make, to obtain the conduit assembly 10 according to the utility model embodiment.Specifically, can be by valve 150 from first flange
121 and second flange 122 on disassemble, then make the first end face 131 (flange face) of first elbow 130 and the first method
Orchid 121 is connected and the first end face 131 (flange face) of another the first elbow 130 is connected with second flange 122.Then, will
3rd pipeline 140a be connected on the side face 133 of first elbow 130 and by the 4th pipeline 140b be connected to another first
On the side face 133 of elbow 130, to make the 3rd pipeline 140a be connected with the runner 132 of first elbow 130 and to make the 4th
Pipeline 140b connects with the runner 132 of another the first elbow 130.Finally, manage the pipeline 140a of valve 150 and the 3rd and the 4th
Road 140b is connected.
Thus, material can flow successively through the first pipeline 111, first flange 121, the first elbows 130, the 3rd pipelines
140a, valve 150, the 4th pipeline 140b, another first elbow 130, second flange 122 and second pipe 112.In addition, thing
The flow direction of material can also be opposite with above-mentioned flow direction.
Existing elbow is totally different from according to the first elbow 130 of the conduit assembly 10 of the utility model embodiment.Tool
For body, the first elbow 130 has flange face, i.e., the first end face 131 of the first elbow 130 is flange face, and existing elbow
All do not have flange face.Therefore, the first elbow 130 can also be considered as the flange with nonlinear runner.Existing method
Blue runner is all linear, i.e., the runner of existing flange is all axially extending along its.That is, the first elbow 130 collects
Into the function of elbow and flange.Thus two the first elbows 130 are equivalent to existing two elbows and two valves, and two
Total installation length of first elbow 130 is less than the length of the valve of identical nominal diameter, so as in the length of a valve
Two the first elbows 130 of interior installation.
According to the conduit assembly 10 of the utility model embodiment by setting and first flange 121 and the phase of second flange 122
Two the first elbows 130 even, i.e., two the first elbows 130 are set in former valvular opening position, drawn so as to set
The 3rd pipeline 140a and the 4th pipeline 140b, to install valve 150 and in the 3rd pipeline 140a and the 4th pipeline 140b
It is at least one it is upper setting medicament inlet.
Thus during increase sets medicament inlet, not only without in original pipeline (the first pipeline 111 and the
Two pipelines 112) on be open and welded operation, and without be purged to original pipeline and replacement operator.In addition, medicine
Manufacture, inspection, the experiment of agent inlet can be carried out in job shop, so as to reduce the time of device shut-down, to save
About cost, increase economic benefit.
Therefore, had according to the conduit assembly 10 of the utility model embodiment be easy to transformation, improvement cost is low, downtime
The advantages that short, without being open and being welded operation on original pipeline, without original pipeline is purged and replaced
Operation.
As Figure 1-Figure 5, in some embodiments of the utility model, conduit assembly 10 can include the first pipeline
111st, second pipe 112, first flange 121, second flange 122, two the first elbows 130, the 3rd pipeline 140a, the 4th pipelines
140b and valve 150.
First flange 121 can be by known methods with the first pipeline 111 first end be connected, second flange 122
First end that can be by known methods with second pipe 112 is connected.
As shown in figure 4, the first end face 131 of first elbow 130 can pass through multiple methods of studding bolt 170 and first
Orchid 121 is connected, and the first end face 131 of another the first elbow 130 can pass through multiple studding bolts 170 and second flange 122
It is connected.In other words, first elbow 130 can be connected by multiple studding bolts 170 with first flange 121, and another
One elbow 130 can be connected by multiple studding bolts 170 with second flange 122.
Preferably, multiple studding bolts 170 can be along the circumference of first elbow 130 and the circumference of first flange 121
Equally spacedly set.It is possible thereby to first elbow 130 and first flange 121 are installed together more securely.It is multiple
Studding bolt 170 can equally spacedly be set along the circumference of another the first elbow 130 and the circumference of second flange 122.Thus
Another first elbow 130 and second flange 122 can be installed together more securely.
First opening 1321 of runner 132 is opened in the first end face 131 of the first elbow 130.One the first elbow 130
The first opening of runner 132 1321 can be connected by first flange 121 with the first pipeline 111, another first elbow 130
The first opening of runner 132 1321 can be connected by second flange 122 with second pipe 112.
As shown in Figure 4 and Figure 5, the runner 132 of each first elbow 130 can be L-shaped.That is, each first is curved
First 130 runner 132 can include the axially extending axial direction part along the first elbow 130 and the radial direction along the first elbow 130
Radially extending section, the axial direction part is connected with the radial section.It is possible thereby to make the structure of the first elbow 130 more reasonable.
Second opening 1322 of runner 132 is opened on the side face 133 of the first elbow 130.At one of the present utility model
In embodiment, the 3rd pipeline 140a first end can be welded on the side face 133 (periphery wall) of first elbow 130, the
Four pipeline 140b first end can be welded on the side face 133 (periphery wall) of another the first elbow 130.Wherein, one
Second opening 1322 of one elbow 130 can be positioned at the of the inner side of the 3rd pipeline 140a first ends or the 3rd pipeline 140a
One end can be connected with the edge of the second opening 1322 of first elbow 130, the second opening of another the first elbow 130
1322 can positioned at the inner side of the 4th pipeline 140b first end or the 4th pipeline 140b first end can with another the
The edge of second opening 1322 of one elbow 130 is connected.
As shown in Figure 1-Figure 3, in some examples of the present utility model, the 3rd pipeline 140a can include lower horizontal segment
141a, vertical section 142a and upper horizontal segment 143a.Lower horizontal segment 141a first end can be with the second of first elbow 130
Opening 1322 is connected, and vertical section 142a lower end can be connected with lower horizontal segment 141a the second end, vertical section 142a upper end
It can be connected with upper horizontal segment 143a first end.
4th pipeline 140b can include lower horizontal segment 141b, vertical section 142b and upper horizontal segment 143b.Lower horizontal segment
141b first end can be connected with the second of another the first elbow 130 the opening 1322, and vertical section 142b lower end can be with
Lower horizontal segment 141b the second end is connected, and vertical section 142b upper end can be connected with upper horizontal segment 143b first end.
Wherein, the import of valve 150 and the 3rd pipeline 140a upper horizontal segment 143a and the 4th pipeline 140b upper level
Second end of one in section 143b is connected, outlet and the pipes of the 3rd pipeline 140a upper horizontal segment 143a and the 4th of valve 150
Another the second end in road 140b upper horizontal segment 143b is connected.It is possible thereby to make the structure more adduction of conduit assembly 10
Reason.
3rd pipeline 140a lower horizontal segment 141a, vertical section 142a and upper horizontal segment 143a's and the 4th pipeline 140b
Medicament inlet can be provided with least one in lower horizontal segment 141b, vertical section 142b and upper horizontal segment 143b.
As shown in figure 1, in an example of the present utility model, conduit assembly 10 may further include medicament ascending pipe
161st, the elbow 163 of threeway 162 and second.The first end of threeway 162 can be with the 3rd pipeline 140a vertical section 142a upper end
It is connected, the second end of threeway 162 can be connected with the 3rd pipeline 140a upper horizontal segment 143a first end, and the of threeway 162
Three ends can be connected with the lower end of medicament ascending pipe 161.The first end of second elbow 163 can be vertical with the 4th pipeline 140b
Section 142b upper end is connected, and the second end of the second elbow 163 can be with the 4th pipeline 140b upper horizontal segment 143b first end
It is connected.It is possible thereby to make the structure of conduit assembly 10 more reasonable.
Preferably, switch valve can be provided with medicament ascending pipe 161.
In a specific example of the present utility model, the 3rd pipeline 140a lower horizontal segment 141a and the 3rd pipeline 140a
Upper horizontal segment 143a can be into predetermined angular, the 4th pipeline 140b lower horizontal segment 141b and the 4th pipeline 140b upper level
Section 143b can also be into the predetermined angular.It is possible thereby to make the structure of conduit assembly 10 more reasonable.
That is, the 3rd pipeline 140a lower horizontal segment 141a and the 4th pipeline 140b lower horizontal segment 141b can position
In on same straight line, the 3rd pipeline 140a upper horizontal segment 143a and the 4th pipeline 140b upper horizontal segment 143b can also be located at
On same straight line.Wherein, the 3rd pipeline 140a lower horizontal segment 141a can be not parallel to the 3rd pipeline 140a upper horizontal segment
143a, the 4th pipeline 140b lower horizontal segment 141b can also be not parallel to the 4th pipeline 140b upper horizontal segment 143b.
Preferably, the predetermined angular can be more than or equal to 15 degree and be less than etc. 30 degree.It is possible thereby to make conduit assembly 10
Structure is more reasonable.
The utility model additionally provides chemical plant installations.Included according to the chemical plant installations of the utility model embodiment according to this reality
With the conduit assembly 10 of new above-described embodiment.
Had according to the chemical plant installations of the utility model embodiment be easy to transformation, that improvement cost is low, downtime is short etc. is excellent
Point, without being open and being welded operation on original pipeline, without being purged to original pipeline and replacement operator.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width
Degree ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " suitable
The orientation or position relationship of the instruction such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumference " are based on orientation shown in the drawings
Or position relationship, be for only for ease of description the utility model and simplify and describe, rather than instruction or imply signified device or
Element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to limit of the present utility model
System.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance
Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or
Implicitly include at least one this feature.In description of the present utility model, " multiple " are meant that at least two, such as two
It is individual, three etc., unless otherwise specifically defined.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be
Mechanically connect or electrically connect or can communicate each other;Can be joined directly together, the indirect phase of intermediary can also be passed through
Even, can be two element internals connection or two elements interaction relationship, limited unless otherwise clear and definite.For this
For the those of ordinary skill in field, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
In the utility model, unless otherwise clearly defined and limited, fisrt feature is "above" or "below" second feature
Can be that the first and second features directly contact, or the first and second features pass through intermediary mediate contact.Moreover, first is special
Sign second feature " on ", " top " and " above " can be fisrt feature directly over second feature or oblique upper, or only
Represent that fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be with
Be fisrt feature immediately below second feature or obliquely downward, or be merely representative of fisrt feature level height and be less than second feature.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description
Point is contained at least one embodiment or example of the present utility model.In this manual, to the schematic table of above-mentioned term
State and be necessarily directed to identical embodiment or example.Moreover, specific features, structure, material or the feature of description can be with
Combined in an appropriate manner in any one or more embodiments or example.In addition, in the case of not conflicting, this area
Technical staff the different embodiments or example and the feature of different embodiments or example described in this specification can be entered
Row combines and combination.
Although embodiment of the present utility model has been shown and described above, it is to be understood that above-described embodiment is
Exemplary, it is impossible to it is interpreted as to limitation of the present utility model, one of ordinary skill in the art is in the scope of the utility model
It is interior above-described embodiment to be changed, changed, replaced and modification.