CN206957572U - Electric power computer room plant maintenance platform - Google Patents

Electric power computer room plant maintenance platform Download PDF

Info

Publication number
CN206957572U
CN206957572U CN201720905399.7U CN201720905399U CN206957572U CN 206957572 U CN206957572 U CN 206957572U CN 201720905399 U CN201720905399 U CN 201720905399U CN 206957572 U CN206957572 U CN 206957572U
Authority
CN
China
Prior art keywords
table face
support plate
oblique support
lug
movably connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720905399.7U
Other languages
Chinese (zh)
Inventor
肖振华
钟志萍
徐星
向恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingxiang Power Supply Branch State Grid Jiangxi Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Pingxiang Power Supply Branch State Grid Jiangxi Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingxiang Power Supply Branch State Grid Jiangxi Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Pingxiang Power Supply Branch State Grid Jiangxi Electric Power Co Ltd
Priority to CN201720905399.7U priority Critical patent/CN206957572U/en
Application granted granted Critical
Publication of CN206957572U publication Critical patent/CN206957572U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses electric power computer room plant maintenance platform, it includes upper table face, lower table face and support meanss, support meanss include supported rod erecting and oblique support plate, supported rod erecting both ends are movably connected with upper table face and lower table face respectively, lower table face one end has lower lug, upper table face has upper lug, oblique support plate lower end is movably connected with lower table face, oblique support plate upper end is movably connected by upper pin and upper lug, brace is provided with the inside of oblique support plate, interval is relatively set with bearing on brace, spring is provided with bearing, pedal is movably set with spring.The utility model in platform due to being provided with pedal, workmen can also stand on pedal, also it can be sitting on platform and the machinery equipment of rack eminence is safeguarded, need to be sitting on the ground or stand for a long time to carry out maintenance work so as to avoid workmen under the conditions of prior art, the muscle power of workmen is saved, so as to improve operating efficiency.

Description

Electric power computer room plant maintenance platform
Technical field
A kind of electric power computer room plant maintenance platform is the utility model is related to, especially integrated operation and the plant maintenance work of ascending a height The electric power computer room plant maintenance platform of industry integration.
Background technology
Automatic machine room equipment refers mainly to all operational outfits in automatic machine room, including computer equipment, the network equipment, Placement devices, the major class of communication equipment four, quantity is relatively more, is respectively arranged in each screen cabinet of computer room.It may be said that calculator room equipment It is whole information system " maincenter ", importance is self-evident.Therefore, the maintenance and management of calculator room equipment is Automation Specialty people The very important routine work of member is, it is necessary to which professional has higher technical capability.This work mainly includes at present Installation and debugging and maintenance of calculator room equipment software and hardware etc..However, under prior art conditions, in the equipment of the comprehensive computer room of automation When being installed or maintenance work, come with some shortcomings:
First, workmen is in work progress, it is often necessary to installed or Task of Debugging in enclosure top, it is existing Under technical conditions, professional carries out maintenance process trouble, takes long.Simultaneously as the instrument do not fixed puts ground Point, job site tool article is caused arbitrarily to be placed on floor, it appears it is disorderly and unsystematic, also it is unfavorable for the instrument after construction and receives Pick up.
Second, automate the communication equipments such as the server, router, interchanger of comprehensive computer room and be frequently necessary to be accessed simultaneously And safeguard, traditional maintaining method needs to prepare notebook computer, patchcord, netting twine, power line, mouse etc., expends time length, Operating efficiency is not high, and attendant usually needs to be sitting on the ground or stood and carries out maintenance work when operating, when so long Between operation easily cause that attendant is uncomfortable, further have impact on the operating efficiency of calculator room equipment maintenance work.In addition, When carrying out upkeep operation to the machinery equipment of enclosure top, due to insufficient height, also needing to increase instrument using other to start Operation, bigger influence can be also produced to operating efficiency.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of integrated ascend a height operation and plant maintenance operation integration Plant maintenance platform truck, not only can with conveniently moving, and can when carrying out plant maintenance operation simultaneously carry out work of ascending a height Industry.
In order to solve the above technical problems, electric power computer room plant maintenance platform of the present utility model include upper table face, under Work top and support meanss, upper table face bottom are provided with instrument bucket, and lower table face bottom is connected with fixed pulley And deflecting roller, the support meanss include supported rod erecting and oblique support plate, handrail, handrail one end are provided with the oblique support plate Be fixed on upper table face, the other end and oblique support plate are movably connected, supported rod erecting both ends respectively with upper table face and under Work top is movably connected, and lower table face one end has lower lug, and upper table face has upper lug, and oblique support plate lower end leads to Cross clamping plate, lower bearing pin and lower lug and lower table face is movably connected, oblique support plate upper end passes through upper pin and upper lug activity It is connected, brace is provided with the inside of the oblique support plate, interval is relatively set with bearing on the brace, is provided with the bearing Spring, pedal is movably set with the spring.
, can collecting apparatus dimension in instrument bucket due to being provided with instrument bucket and pulley on platform after such structure The instrument commonly used during shield, pulley can then drive maintenance platform to move so that tool article is arbitrarily put under the conditions of prior art Put, rambling phenomenon no longer occurs.Further, since being provided with pedal in platform, workmen can also stand on pedal, Also it can be sitting on platform and the machinery equipment of rack eminence is safeguarded, be needed so as to avoid workmen under the conditions of prior art To be sitting on the ground or stand for a long time and carry out maintenance work, the muscle power of workmen be saved, so as to improve operating efficiency.
Brief description of the drawings
Fig. 1 is main structure diagram of the present utility model,
Fig. 2 is Fig. 1 A-A cross section structure diagrams,
Fig. 3 is left view structural representation of the present utility model,
Fig. 4 is X-X structure enlargement diagrams in Fig. 3.
In figure, 1, brace 2, clamping plate 3, oblique support plate 4, pedal 5, handrail 6, upper table face 7, under Bearing pin 8, deflecting roller 9, fixed pulley 10, lower table face 11, supported rod erecting 12, instrument bucket 13, upper pin 14th, upper lug 15, spring 16, bearing 17, lower lug 18, support set.
Embodiment
In Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the electric power computer room plant maintenance platform includes upper table face 6, lower table Face 10 and support meanss, the support meanss include oblique support plate 3, supported rod erecting 11, and the supported rod erecting 11 passes through upper pin 13 are movably connected with upper table face 6, and upper and lower work top is made of carbon steel, and supported rod erecting is made of A3 blank pipes, The lower work table top and support meanss can form a right-angled trapezium, and the lower section of upper table face 6 is provided with work Tool bucket 12, upper table face one end is provided with handrail 5, and upper table face both sides monoblock type has upper lug 14, the one end of handrail 5 Activity is inserted into upper lug 14, and lower end is movably arranged on the upper end of oblique support plate 3, oblique support plate upper end upper pin and upper work Upper lug on table top is movably connected, and lower table face bottom is provided with a pair of deflecting rollers 8 and a pair of fixed pulleys 9, described Oblique support plate 3 is movably connected by clamping plate 2 with lower table face 10 and connect, and the one end of clamping plate 2 is weldingly connected with oblique support plate lower end, separately One end lower bearing pin 7 is movably connected with the lower lug 17 on lower table face, and lower lug is between two clamping plates, in oblique support plate Side is provided with brace 1, is spaced and fixes on the brace(Welding)Bearing 16 is provided with, support set is preferably provided between bearing 18, spring 15 is provided with the bearing on upper strata, pedal 4 is movably set with spring, brace lower end passes through bearing, support set Contacted with spring with ground, the pedal 4 is made using anti-skidding flower rust Steel material, upper table face and lower table face one end It is connected with supported rod erecting 11, supported rod erecting upper end is movably connected with upper pin and upper table face, the lower pin in supported rod erecting lower end Axle is movably connected with lower table face, when workmen needs to ascend a height, steps on pedal, spring can play the work of buffering With.
Embodiment of above is only to illustrate the technical solution of the utility model and unrestricted, although with reference to specific embodiment The utility model is described in detail, it will be understood by those within the art that, can be to skill of the present utility model Art scheme is modified or equivalent substitution, and without departing from the spirit and scope of technical solutions of the utility model, it all should cover In protective scope of the claims of the present utility model.

Claims (2)

1. electric power computer room plant maintenance platform, it is characterized in that, it includes upper table face(6), lower table face(10)And support Device, upper table face bottom are provided with instrument bucket(12), lower table face bottom is connected with fixed pulley(9)And deflecting roller (8), the support meanss include supported rod erecting(11)And oblique support plate(3), handrail is provided with the oblique support plate(5), help Hand one end is movably fixed on upper table face, the other end and oblique support plate upper end are movably connected, supported rod erecting both ends respectively with Upper table face and lower table face are movably connected, and lower table face one end has lower lug(17), upper table face has upper Lug(14), oblique support plate lower end passes through clamping plate(2), lower bearing pin(7)It is movably connected with lower lug with lower table face, bearing diagonal Plate upper end passes through upper pin(13)It is movably connected with upper lug, brace is provided with the inside of the oblique support plate(1), on the brace Interval is relatively set with bearing(16), spring is provided with the bearing(15), pedal is movably set with the spring(4).
2. electric power computer room plant maintenance platform according to claim 1, it is characterized in that:Support is provided between the bearing Set(18).
CN201720905399.7U 2017-07-25 2017-07-25 Electric power computer room plant maintenance platform Expired - Fee Related CN206957572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720905399.7U CN206957572U (en) 2017-07-25 2017-07-25 Electric power computer room plant maintenance platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720905399.7U CN206957572U (en) 2017-07-25 2017-07-25 Electric power computer room plant maintenance platform

Publications (1)

Publication Number Publication Date
CN206957572U true CN206957572U (en) 2018-02-02

Family

ID=61381866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720905399.7U Expired - Fee Related CN206957572U (en) 2017-07-25 2017-07-25 Electric power computer room plant maintenance platform

Country Status (1)

Country Link
CN (1) CN206957572U (en)

Similar Documents

Publication Publication Date Title
CN202107491U (en) Working hydraulic lifting platform
CN103821356A (en) Construction equipment and system of elevator shaft shear wall
CN201303220Y (en) Mobile installation cart of electric disc cabinet
CN206957572U (en) Electric power computer room plant maintenance platform
CN203818129U (en) Front axle maintenance tray for loader
CN206376854U (en) Well testing operating platform
CN204822149U (en) Vertical alignment retaining device
CN203473395U (en) Special placing rack for construction site pipeline
CN205687500U (en) Architectural electricity construction lowering or hoisting gear
CN214659069U (en) Strutting arrangement is used in building engineering construction
CN104444389A (en) Double-station copper rod receiving device
CN204780605U (en) Prestressed anchorage cable machine of reeving
CN203846779U (en) Construction equipment for shear wall of shaft body of elevator and system
CN206976945U (en) Cable synchronizing conveyer Combined fixing device
CN208850816U (en) A kind of computer equipment auxiliary device for moving
CN207294008U (en) Safety moving frame for electric panel cabinet installation
CN208718350U (en) Inner guide type elevating scaffold attached wall support base
CN206680091U (en) A kind of large-scale transport hoist
CN204179792U (en) Hydro-generator lower frame inspection platform
CN206389785U (en) A kind of mushroom plucks ladder
CN205934959U (en) Punching production line multilayer combo boxes puts up basis
CN205892526U (en) Hoist and mount platform of spinning corridor equipment
CN205290907U (en) Device is put to deflector roll
CN211733591U (en) Hoisting and fixing device for bridge construction
CN107673291A (en) A kind of high-altitude conveying arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

Termination date: 20180725

CF01 Termination of patent right due to non-payment of annual fee