- CN206956948U CN206956948U CN201720543034.4U CN201720543034U CN206956948U CN 206956948 U CN206956948 U CN 206956948U CN 201720543034 U CN201720543034 U CN 201720543034U CN 206956948 U CN206956948 U CN 206956948U
- Authority
- CN
- China
- Prior art keywords
- hole slot
- floor
- slot portion
- steel corbel
- location division
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
Abstract
The utility model discloses a kind of steel corbel, including steel corbel body, the upper end of steel corbel body is provided with the first steel plate, and the lower end of steel corbel body is provided with the second steel plate;The first floor is provided with steel corbel body;The first hole slot portion and the second hole slot portion are offered on steel corbel body, the first hole slot portion is disposed with the first hole slot and the second hole slot from top to bottom;Second hole slot portion is identical with the first hole slot portion structure, and the second hole slot portion is arranged on the lower section in the first hole slot portion, and the first location division is provided with below the second hole slot portion, and the first location division includes the second floor, the 3rd hole slot and the 4th hole slot set gradually from top to bottom.On the one hand the utility model, deformation or damage can be effectively placed while saving old, improves sound construction degree;On the other hand, the firmness being connected with bridge pier is improved, is not easy to loosen;On the one hand, effectively raise stability and extend service life.
Description
Technical field
It the utility model is related to a kind of steel corbel.
Background technology
On existing market, steel corbel plays vital effect architectural, and steel corbel is as in mixed structure, under beam
One piece of supporter in face, its effect is to disperse the power of beam support to pass to following load-bearing material, because a face concentrated force is too
Greatly, wall is easily damaged by pressure.On the one hand, yielding after using certain time length or damage, structure are insecure for existing steel corbel;Separately
On the one hand, be connected with bridge pier it is insecure, easily loosen, stability difference and service life it is short the defects of.
Therefore those skilled in the art are directed to developing a kind of steel corbel that can effectively increase the service life.
Utility model content
The purpose of this utility model is just to provide a kind of steel corbel that can effectively increase the service life.
The purpose of this utility model realizes that it includes a kind of steel corbel, including steel ox by such technical scheme
Leg body, the upper end of steel corbel body are provided with the first steel plate, and the lower end of steel corbel body is provided with the second steel plate;
The first floor is provided with steel corbel body, the height of the first floor is 100mm;Is offered on steel corbel body
One hole slot portion and the second hole slot portion, the height in the first hole slot portion is 200mm;First hole slot portion is disposed with first from top to bottom
Hole slot and the second hole slot;The external diameter of first hole slot and the second hole slot is 80mm;
Second hole slot portion is identical with the first hole slot portion structure, and the second hole slot portion is arranged on the lower section in the first hole slot portion, and second
Spacing between hole slot portion and the first hole slot portion is 565mm;
The first location division is provided with below second hole slot portion, the spacing between the first location division and the second hole slot portion is
235mm, the total height of the first location division is 515mm;First location division include set gradually from top to bottom the second floor, the 3rd
Hole slot and the 4th hole slot;The height of second floor is 200mm;The external diameter of 3rd hole slot is 195mm;The external diameter of 4th hole slot is
80mm;Spacing between 4th hole slot and the 3rd hole slot is 40mm;
The second location division is provided with below first location division, the spacing of the second location division and the first location division is 235mm;
The total height of second location division is 370mm;Second location division is disposed with trislab and the 5th hole slot from top to bottom;3rd
The height of floor is 20mm, and the external diameter of the 5th hole slot is 170mm;
The 4th floor is provided with steel corbel body, the 4th floor is between the second location division and the second steel plate;4th
Spacing between floor and the second location division is 480mm, and the thickness of the 4th floor is 100mm;
The thickness of first steel plate and the second steel plate is 15mm;The whole height of steel corbel body is 3030mm.
For the ease of being lifted to steel corbel, two suspension ring are provided between the second hole slot portion and the first hole slot portion, two
Individual suspension ring are symmetrical arranged.
In order to further improve sound construction degree, preferably, the first floor includes first set gradually from left to right
Secondary floor, the second secondary floor, the 3rd secondary floor and fourth officer floor;First secondary floor, the second secondary floor, the 3rd secondary floor and
Fourth officer floor is parallel to each other, and the outer wall spacing of the first secondary floor and steel corbel body is 10mm, the first secondary floor and the second secondary rib
Spacing between plate is 136mm;Spacing between second secondary floor and the 3rd secondary floor is 20mm;3rd secondary floor and fourth officer
Spacing between floor is 136mm;The spacing of fourth officer floor and steel corbel body opposite side outer wall is 10mm;4th floor with
First rib structure is identical.
Preferably, the first steel plate is fixed with the second steel plate by the both ends welded with steel corbel body.
In order to meet the sluicing requirement of steel corbel, delivery port is offered on the second steel plate.
By adopting the above-described technical solution, the utility model has the following advantages:On the one hand the utility model, is saving
Deformation or damage can be effectively placed while about old, improves sound construction degree;On the other hand, improve and connect with bridge pier
The firmness connect, it is not easy to loosen;On the one hand, effectively raise stability and extend service life.
Other advantages, target and feature of the present utility model will be explained in the following description to a certain extent
State, and to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, or
Person can be instructed from practice of the present utility model.Target of the present utility model and other advantages can be said by following
Bright book and claims are realized and obtained.
Brief description of the drawings
Brief description of the drawings of the present utility model is as follows.
Fig. 1 is the structural representation of the embodiment of the utility model one.
Fig. 2 is the left view structural representation in Fig. 1.
Fig. 3 is the partial enlargement structural representation at A in Fig. 2.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1:
For below figure 1 to shown in Fig. 3, a kind of steel corbel, including steel corbel body 1, the upper end of steel corbel body 1 are provided with
One steel plate 2, the lower end of steel corbel body 1 are provided with the second steel plate 3;
The first floor 4 is provided with steel corbel body 1, the height h1 of the first floor 4 is 100mm;Opened on steel corbel body 1
Provided with the first hole slot portion 5 and the second hole slot portion 6, the height h2 in the first hole slot portion 5 is 200mm;First hole slot portion 5 from top to bottom according to
It is secondary to be provided with the first hole slot 7 and the second hole slot 8;The equal d1 of external diameter of first hole slot 7 and the second hole slot 8 is 80mm;
Second hole slot portion 6 is identical with the structure of the first hole slot portion 5, and the second hole slot portion 6 is arranged on the lower section in the first hole slot portion 5,
Distance s 1 between second hole slot portion 6 and the first hole slot portion 5 are 565mm;
The lower section of second hole slot portion 6 is provided with the first location division 9, the distance s 2 between the first location division 9 and the second hole slot portion 6
For 235mm, the total height h3 of the first location division 9 is 515mm;First location division 9 includes the second rib set gradually from top to bottom
Plate 10, the 3rd hole slot 11 and the 4th hole slot 12;The height h4 of second floor 10 is 200mm;The outside diameter d 2 of 3rd hole slot 11 is
195mm;The outside diameter d 3 of 4th hole slot 12 is 80mm;Distance s 3 between 4th hole slot 12 and the 3rd hole slot 11 are 40mm;
The lower section of first location division 9 is provided with the distance s 4 of the second location division 13, the second location division 13 and the first location division 9
For 235mm;The total height h5 of second location division 13 is 370mm;Second location division 13 is disposed with trislab from top to bottom
14 and the 5th hole slot 15;The height h6 of trislab 14 is 20mm, and the outside diameter d 4 of the 5th hole slot 15 is 170mm;
Be provided with the 4th floor 16 on steel corbel body 1, the 4th floor 16 be located at the second location division 13 and the second steel plate 3 it
Between;Distance s 5 between 4th floor 16 and the second location division 13 are 480mm, and the thickness h 8 of the 4th floor 16 is 100mm;First
The thickness of the steel plate 3 of steel plate 2 and second is 15mm;The whole height h7 of steel corbel body 1 is 3030mm.Second hole slot portion 6 with
Two suspension ring 17 are provided between first hole slot portion 5, two suspension ring 17 are symmetrical arranged.In the present embodiment, the first steel plate 2 and second
Steel plate 3 is fixed by the both ends welded with steel corbel body 1, and offers delivery port on the second steel plate 3.
Embodiment 2:
For below figure 1 to shown in Fig. 3, a kind of steel corbel, including steel corbel body 1, the upper end of steel corbel body 1 are provided with
One steel plate 2, the lower end of steel corbel body 1 are provided with the second steel plate 3;
The first floor 4 is provided with steel corbel body 1, the height h1 of the first floor 4 is 100mm;Opened on steel corbel body 1
Provided with the first hole slot portion 5 and the second hole slot portion 6, the height h2 in the first hole slot portion 5 is 200mm;First hole slot portion 5 from top to bottom according to
It is secondary to be provided with the first hole slot 7 and the second hole slot 8;The equal d1 of external diameter of first hole slot 7 and the second hole slot 8 is 80mm;
Second hole slot portion 6 is identical with the structure of the first hole slot portion 5, and the second hole slot portion 6 is arranged on the lower section in the first hole slot portion 5,
Distance s 1 between second hole slot portion 6 and the first hole slot portion 5 are 565mm;
The lower section of second hole slot portion 6 is provided with the first location division 9, the distance s 2 between the first location division 9 and the second hole slot portion 6
For 235mm, the total height h3 of the first location division 9 is 515mm;First location division 9 includes the second rib set gradually from top to bottom
Plate 10, the 3rd hole slot 11 and the 4th hole slot 12;The height h4 of second floor 10 is 200mm;The outside diameter d 2 of 3rd hole slot 11 is
195mm;The outside diameter d 3 of 4th hole slot 12 is 80mm;Distance s 3 between 4th hole slot 12 and the 3rd hole slot 11 are 40mm;
The lower section of first location division 9 is provided with the distance s 4 of the second location division 13, the second location division 13 and the first location division 9
For 235mm;The total height h5 of second location division 13 is 370mm;Second location division 13 is disposed with trislab from top to bottom
14 and the 5th hole slot 15;The height h6 of trislab 14 is 20mm, and the outside diameter d 4 of the 5th hole slot 15 is 170mm;
Be provided with the 4th floor 16 on steel corbel body 1, the 4th floor 16 be located at the second location division 13 and the second steel plate 3 it
Between;Distance s 5 between 4th floor 16 and the second location division 13 are 480mm, and the thickness h 8 of the 4th floor 16 is 100mm;First
The thickness of the steel plate 3 of steel plate 2 and second is 15mm;The whole height h7 of steel corbel body 1 is 3030mm.Second hole slot portion 6 with
Two suspension ring 17 are provided between first hole slot portion 5, two suspension ring 17 are symmetrical arranged.In the present embodiment, the first steel plate 2 and second
Steel plate 3 is fixed by the both ends welded with steel corbel body 1, and offers delivery port on the second steel plate 3.
In the present embodiment, the first floor 4 include set gradually from left to right the first secondary floor 4a, the second secondary floor 4b,
3rd secondary floor 4c and fourth officer floor 4d;First secondary floor 4a, the second secondary floor, the 3rd secondary floor 4c and fourth officer floor 4d
It is parallel to each other, the outer wall distance s 6 of the first secondary floor 4a and steel corbel body 1 are 10mm, the first secondary secondary floors of floor 4a and second
Distance s 7 between 4b are 136mm;Distance s 8 between the second secondary secondary floor 4c of floor 4b and the 3rd are 20mm;3rd secondary floor
Distance s 9 between 4c and fourth officer floor 4d are 136mm;Fourth officer floor 4d and the opposite side outer wall of steel corbel body 1 spacing
S10 is 10mm;4th floor 16 is identical with the structure of the first floor 4.
In the utility model, embodiment 2 is optimal case, is originally that utility model passes through in the setting of steel corbel body 1 first
Floor 4, the first hole slot portion 5, the second hole slot portion 6, the first location division 9, the second location division 13 and the 4th floor 16, pass through first
Floor 4, the first hole slot portion 5, the second hole slot portion 6, the first location division 9, size and the position of the second location division 13 and the 4th floor 16
Cooperation between putting, the connection between hole position realization and bridge pier is opened up on steel corbel body 1, while reduce cost and raising
The firm intensity of steel corbel body 1, particularly when setting up across the bridge in mountain valley, the height of bridge pier can gradually increase, this
Increasing the service life and improving the beneficial effects such as stability for utility model will be more notable.Such as any in the utility model
Size is changed, then the firmness in the utility model will lower significantly.
The utility model is fixed by each hole slot with bridge pier, and the present apparatus can not only be saved by the setting to hole slot
Material, and can effectively improve the firmness of this structure, the slotted eye opened up in the utility model on steel corbel body 1 and sets
The bars position correlation ratio put is particularly significant, and such as the position or size of either component are changed, then will be to the knot
The firmness of structure is had an impact, and firmness is improved while material is saved so as to realize.
Finally illustrate, above example is only unrestricted to illustrate the technical solution of the utility model, although ginseng
The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this
The technical scheme of utility model is modified or equivalent substitution, and without departing from the objective and scope of the technical program, it all should
Cover among right of the present utility model.
Claims (5)
1. a kind of steel corbel, including steel corbel body (1), it is characterized in that:The upper end of the steel corbel body (1) is provided with first
Steel plate (2), the lower end of the steel corbel body (1) are provided with the second steel plate (3);
The first floor (4) is provided with the steel corbel body (1), first floor (4) is located under first steel plate (2)
Side, the height (h1) of first floor (4) is 100mm;Offered on the steel corbel body (1) the first hole slot portion (5) and
Second hole slot portion (6), the height (h2) of the first hole slot portion (5) is 200mm;The first hole slot portion (5) is included from up to
Under be disposed with the first hole slot (7) and the second hole slot (8);The external diameter of first hole slot (7) and second hole slot (8) is equal
(d1) it is 80mm;
The second hole slot portion (6) is identical with the first hole slot portion (5) structure, and the second hole slot portion (6) is arranged on described
The lower section in the first hole slot portion (5), the spacing (s1) between the second hole slot portion (6) and the first hole slot portion (5) are
565mm;
The first location division (9), first location division (9) and second hole slot are provided with below the second hole slot portion (6)
Spacing (s2) between portion (6) is 235mm, and the total height (h3) of first location division (9) is 515mm;First positioning
Portion (9) includes the second floor (10), the 3rd hole slot (11) and the 4th hole slot (12) set gradually from top to bottom;Second rib
The height (h4) of plate (10) is 200mm;The external diameter (d2) of 3rd hole slot (11) is 195mm;4th hole slot (12)
External diameter (d3) is 80mm;Spacing (s3) between 4th hole slot (12) and the 3rd hole slot (11) is 40mm;
The second location division (13), second location division (13) and described first are provided with below first location division (9)
The spacing (s4) of location division (9) is 235mm;The total height (h5) of second location division (13) is 370mm;Second positioning
Portion (13) is disposed with trislab (14) and the 5th hole slot (15) from top to bottom;The height (h6) of the trislab (14)
For 20mm, the external diameter (d4) of the 5th hole slot (15) is 170mm;
The 4th floor (16) is provided with the steel corbel body (1), the 4th floor (16) is located at second location division
(13) between second steel plate (3);Spacing (s5) between 4th floor (16) and second location division (13)
For 480mm, the thickness (h8) of the 4th floor (16) is 100mm;
The thickness of first steel plate (2) and second steel plate (3) is 15mm;The overall height of the steel corbel body (1)
It is 3030mm to spend (h7).
2. steel corbel as claimed in claim 1, it is characterized in that:The second hole slot portion (6) and the first hole slot portion
(5) two suspension ring (17) are provided between, described two suspension ring (17) are symmetrical arranged.
3. steel corbel as claimed in claim 1, it is characterized in that:First floor (4) includes what is set gradually from left to right
First secondary floor (4a), the second secondary floor (4b), the 3rd secondary floor (4c) and fourth officer floor (4d);The first secondary floor
(4a), the second secondary floor, the 3rd secondary floor (4c) and fourth officer floor (4d) are parallel to each other, the first secondary floor (4a) and institute
The outer wall spacing (s6) for stating steel corbel body (1) is 10mm, the first secondary floor (4a) and the described second secondary floor (4b) it
Between spacing (s7) be 136mm;Spacing (s8) between the second secondary floor (4b) and the 3rd secondary floor (4c) is
20mm;Spacing (s9) between the 3rd secondary floor (4c) and the fourth officer floor (4d) is 136mm;The fourth officer rib
The spacing (s10) of plate (4d) and steel corbel body (1) the opposite side outer wall is 10mm;4th floor (16) and described the
One floor (4) structure is identical.
4. steel corbel as claimed in claim 1, it is characterized in that:First steel plate (2) passes through with second steel plate (3)
Weld and fixed with the both ends of the steel corbel body (1).
5. the steel corbel as described in Claims 1-4 is any, it is characterized in that:Delivery port is offered on second steel plate (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720543034.4U CN206956948U (en) | 2017-05-12 | 2017-05-12 | Steel corbel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720543034.4U CN206956948U (en) | 2017-05-12 | 2017-05-12 | Steel corbel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206956948U true CN206956948U (en) | 2018-02-02 |
Family
ID=61375990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720543034.4U Active CN206956948U (en) | 2017-05-12 | 2017-05-12 | Steel corbel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206956948U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108747095A (en) * | 2018-04-24 | 2018-11-06 | 杭州电子科技大学 | A kind of feeding device and its charging method of hexagonal bracket mouth steel node weld |
-
2017
- 2017-05-12 CN CN201720543034.4U patent/CN206956948U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108747095A (en) * | 2018-04-24 | 2018-11-06 | 杭州电子科技大学 | A kind of feeding device and its charging method of hexagonal bracket mouth steel node weld |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX336672B (en) | Modular composite utility pole. | |
CN103132506B (en) | Bored pile double-deck Reinforced Hoop reinforcing cage processing and fabricating method | |
CN206956948U (en) | Steel corbel | |
CN206289743U (en) | Connecting device for connecting modular steel frames | |
CN205314586U (en) | Prefabricated element slings | |
CN205686999U (en) | A kind of conveyor belt with wave baffle board at its edge | |
CN205990589U (en) | Large-tonnage rotator construction ball pivot | |
CN207485012U (en) | A kind of I-steel raw bamboo flooring bearing | |
CN207110116U (en) | A kind of Shock-proof for building brick | |
CN204401876U (en) | A kind of lightweight closed-in construction antidetonation partition board | |
CN208404290U (en) | A kind of platen of aluminium alloy bathroom cabinet | |
CN202323675U (en) | Closed U-shaped stiffening rib for anti-fatigue cracks of steel bridge | |
CN209308284U (en) | A kind of reinforcing steel bar connecting device | |
CN207003265U (en) | New road bridge formwork support meanss | |
CN203667806U (en) | Lifting tool for transformer bushings | |
CN208363270U (en) | A kind of lossless aperture prefabricated component | |
CN206070611U (en) | The cap ned of connection bucket and oil cylinder of small arm | |
CN205597654U (en) | Collapsible bowl utensil | |
CN208401270U (en) | A kind of substation secondary device prefabricated cabin understructure | |
CN201818091U (en) | Reinforcing structure of open water pool | |
CN204298702U (en) | The vertical lifting tool of track plates | |
CN208150809U (en) | A kind of tower crane base connecting joint | |
CN206956914U (en) | New Landscape Architectural Design pond | |
CN207700983U (en) | Glass door installation structure | |
CN207673464U (en) | A kind of cylinder jacket water shutoff circle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |