CN206955442U CN201720692729.9U CN201720692729U CN206955442U CN 206955442 U CN206955442 U CN 206955442U CN 201720692729 U CN201720692729 U CN 201720692729U CN 206955442 U CN206955442 U CN 206955442U
Authority
CN
China
Prior art keywords
level board
hoist cable
suspension ring
hook
building industrialization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720692729.9U
Other languages
Chinese (zh)
Inventor
林光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Minghuang Building Materials Technology Co Ltd
Original Assignee
Shaoxing Minghuang Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Minghuang Building Materials Technology Co Ltd filed Critical Shaoxing Minghuang Building Materials Technology Co Ltd
Priority to CN201720692729.9U priority Critical patent/CN206955442U/en
Application granted granted Critical
Publication of CN206955442U publication Critical patent/CN206955442U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of building industrialization assembling construction multifunctional hanging tool, including standby hoist cable and hoist cable;Level board is provided among the spreader body, and is provided with before and after level board centre at link two;It is provided with before and after at left and right sides of the level board bottom at connection rope six, and connects rope bottom and be mounted on suspension hook;Protection network is installed outside the level board, and hook is mounted on everywhere at the top and bottom of protection network;The level board center top is provided with connection strop three, and is connected and be connected at the top of strop with suspension ring bottom;The suspension ring crown center is connected with hoist cable, and standby hoist cable is provided with left and right sides of hoist cable with being connected at the top of suspension ring.The setting of the standby hoist cable of the utility model, be advantageous to the security performance of spreader body, can enable standby hoist cable when running into the excessive weight of weight is reinforced, and standby hoist cable plays a protective role when hoist cable is surprisingly broken, and the weight for preventing from having sling drops.

Description

A kind of building industrialization assembling construction multifunctional hanging tool
Technical field
It the utility model is related to building kit technical field, more particularly to a kind of more work(of building industrialization assembling construction Can suspender.
Background technology
Building industrialization is the concept occurred with western industrial revolution, and the industrial revolution allows shipbuilding, automobile production efficiency significantly Lifting, with the new architecture movement that Europe is risen, prefabrication, site machinery assembling are carried out, has gradually formed building industrialization Initial theoretical blank, its Basic Ways are building standardization, component and fitting production plant, mechanization of building operation and organization and administration It is scientific, and progressively use the new results of modern science and technology.
The inventors discovered that existing product is the hook structure of a rope one, fracture accident easily occurs, function is more single, And can not be born for the larger piece hoist cable of hanging object of weight, hoist cable can not be increased temporarily, influence the progress of construction.
Then, the present inventor in view of this, adhere to the relevant industries for many years it is abundant design and develop and the warp of actual fabrication Test, improvement study for existing structure and missing, there is provided a kind of more hooks of more ropes, with safeguard function, can convert and hang The building industrialization assembling construction multifunctional hanging tool of rope and suspension hook quantity, to reach the mesh for having more more practical value 's.
Utility model content
The purpose of this utility model is to provide a kind of building industrialization assembling construction multifunctional hanging tool, to solve the above-mentioned back of the body The function that is itd is proposed in scape technology is more single, can not adjust the problem of hoist cable and suspension hook.
The purpose and effect of the utility model building industrialization assembling construction multifunctional hanging tool, by technological means in detail below Reached:
A kind of building industrialization assembling construction multifunctional hanging tool, wherein, building industrialization assembling construction multifunctional hanging tool Include:
Spreader body, hook, protection network, suspension hook, connection rope, level board, link, connection strop, suspension ring, standby hoist cable And hoist cable;
Level board is provided among the spreader body, and is provided with before and after level board centre at link two;The water It is provided with before and after at left and right sides of flat plate bottom at connection rope six, and connects rope bottom and be mounted on suspension hook;The level Protection network is installed outside plate, and hook is mounted on everywhere at the top and bottom of protection network;The level board center top installation Have at connection strop three, and connect and be connected at the top of strop with suspension ring bottom;The suspension ring crown center is connected with hoist cable, and hangs Standby hoist cable is provided with left and right sides of rope with being connected at the top of suspension ring.
Further, the suspension ring are circular configuration, and suspension ring offer mounting hole.
Further, the level board regular prism structure, and level board left and right ends are provided with fillet, are opened before and after level board Provided with through hole.
Further, the suspension hook and hook are provided with safeties.
Further, opening is offered in front of the protection network, and is open by linking up with closure or openness.
With existing structure in comparison, the utility model has the following advantages that:
1. the setting of the standby hoist cable of the utility model, be advantageous to the security performance of spreader body, it is excessive running into weight Standby hoist cable can be enabled during weight to be reinforced, and when hoist cable is surprisingly broken, standby hoist cable plays a protective role, and prevents The weight sling drops.
2. the setting of the utility model level board, is advantageous to uniform force, ensure the stability of spreader body, convenient connection The installation of rope, the connection rope and suspension hook of the installation of level board lower section can carry out free collocation, suitable for of different shapes heavy Thing.
3. the setting of the utility model protection network, be advantageous to prevent from dropping, during for slinging more scattered weight, prevent Dropped in the way sling, protection network is provided with hook, and protection network is provided with opening and is easy for installation and removal.
Brief description of the drawings
Fig. 1 is the utility model main structure diagram;
Fig. 2 is the utility model overlooking the structure diagram;
Fig. 3 is the utility model horizontal panel structures schematic diagram;
Fig. 4 is the utility model suspension ring structural representation;
Fig. 5 is the utility model protecting screen structure schematic diagram.
In figure:1st, spreader body, 2, hook, 3, protection network, 4, suspension hook, 5, connection rope, 6, level board, 7, link, 8, Connect strop, 9, suspension ring, 10, standby hoist cable, 11, hoist cable.
Embodiment
Below, embodiment of the present utility model is will be explained in, the example is shown in the accompanying drawings and the description below.Although will The utility model is described with reference to exemplary embodiment, it is to be understood that the description does not really want the utility model to be limited to this to show The embodiment of example property.On the contrary, the utility model will not only cover the exemplary embodiment, but also cover various replacements, Change, equivalent and other embodiment, it can be included in spirit of the present utility model and the model that appended claims are limited In enclosing.
Referring to Fig. 1 to accompanying drawing 5, a kind of building industrialization assembling construction multifunctional hanging tool, include:
Spreader body 1, hook 2, protection network 3, suspension hook 4, connection rope 5, level board 6, link 7, connection strop 8, suspension ring 9th, standby hoist cable 10 and hoist cable 11;
Level board 6 is provided among spreader body 1, and is provided with before and after the centre of level board 6 at 7 liang of link;Level board 6 It is provided with before and after at left and right sides of bottom at connection rope 5 six, and connects the bottom of rope 5 and be mounted on suspension hook 4;Outside level board 6 Portion is provided with protection network 3, and the top and bottom of protection network 3 are mounted on hook 2 everywhere;The center top of level board 6 is provided with company Connect at strop 8 three, and connect the top of strop 8 and be connected with the bottom of suspension ring 9;The crown center of suspension ring 9 is connected with hoist cable 11, and hoist cable 11 left and right sides are provided with standby hoist cable 10 and are connected with the top of suspension ring 9.
The preferred embodiment of building industrialization assembling construction multifunctional hanging tool as described above, wherein, suspension ring 9 are circle Structure, and suspension ring 9 offer mounting hole, convenient installation and dissipation of ferees, make spreader body 1 more firm;
The preferred embodiment of building industrialization assembling construction multifunctional hanging tool as described above, wherein, 6 positive rib of level board Rod structure, and the left and right ends of level board 6 are provided with fillet, offer through hole before and after level board 6, facilitate uniform force, ensure to hang Have the stability of body 1, the convenient installation for connecting rope 5;
The preferred embodiment of building industrialization assembling construction multifunctional hanging tool as described above, wherein, suspension hook 4 and hook 2 are provided with safeties, prevent that de- mouth accident occurs when in use, improve the security performance of spreader body 1;
The preferred embodiment of building industrialization assembling construction multifunctional hanging tool as described above, wherein, the front of protection network 3 Opening is offered, and is open by linking up with 2 closure or openness, facilitates the installation and removal of protection network 3.
The operation principle of the present embodiment:
When using building industrialization assembling construction multifunctional hanging tool, spreader body 1 is arranged on tower crane first, will Spreader body 1 is placed on the top of weight, and the position of slinging that the suspension hook 4 of the bottom of level board 6 installation is arranged on to weight is consolidated Fixed, level board 6 ensures the stability of spreader body 1, the convenient installation for connecting rope 5, the connection rope of the lower section of level board 6 installation 5 and suspension hook 4 can carry out free collocation, suitable for weight of different shapes.Protection network 3 is arranged on outside level board 6, weight Inside protection network 3, the hook 2 that protection network 3 is installed is fixed, when protection network 3 is for slinging more scattered weight, prevented Only dropped in the way sling.Protection network 3 is provided with hook 2, and protection network 3 is provided with opening and is easy for installation and removal.Prepare Startup tower crane is finished to be sling, when slinging, standby hoist cable 10 is in the state of relative relaxation and enabled at any time, Standby hoist cable 10 is advantageous to the security performance of spreader body 1, and can enable standby hoist cable 10 when running into the excessive weight of weight enters Row is reinforced, and when the unexpected fracture of hoist cable 11, standby hoist cable 10 plays a protective role, and the weight for preventing from having sling drops.
It should be noted that the standardized element that uses of the utility model can commercially, shaped piece according to Specification and accompanying drawing record can carry out customized, and the specific connected mode of each part is using ripe in the prior art Bolt, rivet, the conventional meanses such as welding, machinery, part and equipment are using in the prior art, conventional model, inventor It will not be described in detail herein.
In summary, although the utility model is described in detail with reference to the foregoing embodiments, for this area For technical staff, it can still modify to the technical scheme described in foregoing embodiments, or to which part Technical characteristic carries out equivalent substitution, all within the spirit and principles of the utility model, any modification for being made, equivalent substitution, Improve etc., it should be included within the scope of protection of the utility model.

Claims (5)

  1. A kind of 1. building industrialization assembling construction multifunctional hanging tool, it is characterised in that:Described building industrialization assembling construction is more Function suspender includes:Spreader body, hook, protection network, suspension hook, connection rope, level board, link, connection strop, suspension ring, Standby hoist cable and hoist cable;Level board is provided among the spreader body, and is provided with before and after level board centre at link two; It is provided with before and after at left and right sides of the level board bottom at connection rope six, and connects rope bottom and be mounted on suspension hook;Institute State and protection network is installed outside level board, and hook is mounted on everywhere at the top and bottom of protection network;Pushed up among the level board Portion is provided with connection strop three, and is connected and be connected at the top of strop with suspension ring bottom;The suspension ring crown center, which is connected with, to be hung Rope, and standby hoist cable is provided with left and right sides of hoist cable with being connected at the top of suspension ring.
  2. 2. building industrialization assembling construction multifunctional hanging tool according to claim 1, it is characterised in that:The suspension ring are circle Shape structure, and suspension ring offer mounting hole.
  3. 3. building industrialization assembling construction multifunctional hanging tool according to claim 1, it is characterised in that:The level board is just Prism structure, and level board left and right ends are provided with fillet, and through hole is offered before and after level board.
  4. 4. building industrialization assembling construction multifunctional hanging tool according to claim 1, it is characterised in that:The suspension hook and extension Hook is provided with safeties.
  5. 5. building industrialization assembling construction multifunctional hanging tool according to claim 1, it is characterised in that:Before the protection network Side offers opening, and is open by linking up with closure or openness.
CN201720692729.9U 2017-06-15 2017-06-15 A kind of building industrialization assembling construction multifunctional hanging tool Expired - Fee Related CN206955442U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720692729.9U CN206955442U (en) 2017-06-15 2017-06-15 A kind of building industrialization assembling construction multifunctional hanging tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720692729.9U CN206955442U (en) 2017-06-15 2017-06-15 A kind of building industrialization assembling construction multifunctional hanging tool

Publications (1)

Publication Number Publication Date
CN206955442U true CN206955442U (en) 2018-02-02

Family

ID=61379281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720692729.9U Expired - Fee Related CN206955442U (en) 2017-06-15 2017-06-15 A kind of building industrialization assembling construction multifunctional hanging tool

Country Status (1)

Country Link
CN (1) CN206955442U (en)

Similar Documents

Publication Publication Date Title
CN204960269U (en) Integral pylon
CN211007588U (en) Positive hoist device that hangs of inserted lift scaffold
CN203922433U (en) The top cover suspender of water turbine overflowing component
CN206955442U (en) A kind of building industrialization assembling construction multifunctional hanging tool
CN208200044U (en) Roof truss lifts suspender easy to disassemble
CN205099299U (en) Basket is hoisted to safety of outer wall construction
CN203624822U (en) Marine hanging beam with variable stay bar crotch
CN201942426U (en) C-shaped hanging hook capable of preventing unhooking
CN205677527U (en) A kind of high-building construction multifunctional safe hanging ladder
CN206375552U (en) Inner steel cylinder of chimney hanger
CN204848075U (en) Wire rope is with novel device and electric block
CN202029999U (en) Helicopter hanger
CN201587796U (en) Lifting tool of main shaft bearing end cover of wind generator
CN203255869U (en) Six-claw chain rotatable lifting appliance
CN209352424U (en) A kind of hoisting prefabricated part of embedded small hoisting ring group
CN108502700A (en) Engine rooms of wind power generators suspender
CN205709483U (en) Automatically-unhooked hanger
CN203048400U (en) 800 ton lifting lug special for lifting drill floor module
CN207276087U (en) A kind of boom structure for building loop wheel machine
CN208532021U (en) A kind of anti-rope tripping gear of lifting equipment suspension hook
CN202380995U (en) Split type lifting hook
CN207142688U (en) A kind of boom hoisting of pot superstructure
CN214611124U (en) Hoist for construction
CN103640958A (en) Balance chain and locked-type lifting hook of tower crane
CN205820827U (en) A kind of inspection platform for grab bucket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

Termination date: 20180615

CF01 Termination of patent right due to non-payment of annual fee