CN206955126U - Deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production - Google Patents

Deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production Download PDF

Info

Publication number
CN206955126U
CN206955126U CN201720472119.8U CN201720472119U CN206955126U CN 206955126 U CN206955126 U CN 206955126U CN 201720472119 U CN201720472119 U CN 201720472119U CN 206955126 U CN206955126 U CN 206955126U
Authority
CN
China
Prior art keywords
delivery pipe
pipe
neck
spray
conveyer structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720472119.8U
Other languages
Chinese (zh)
Inventor
魏振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dengfeng Xinxin Agricultural Materials Co Ltd
Original Assignee
Dengfeng Xinxin Agricultural Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dengfeng Xinxin Agricultural Materials Co Ltd filed Critical Dengfeng Xinxin Agricultural Materials Co Ltd
Priority to CN201720472119.8U priority Critical patent/CN206955126U/en
Application granted granted Critical
Publication of CN206955126U publication Critical patent/CN206955126U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The utility model discloses a kind of soil conditioner production deduster dust discharge cinder conveyer structure, including cinder conveyer structure and spraying mechanism, it is provided with above the delivery pipe of cinder conveyer structure one end low compared with horizontal line into dirt pipe, lower section and is provided with discharge outlet, enter dirt pipe connection deduster dust-exhausting port, the output axis connection spiral transferring material bar of motor, the blade of spiral conveying bar contacts with the bottom of delivery pipe, and the blade of spiral conveying bar and the top of delivery pipe have gap;Axially evenly distributed row screw, delivery pipe offer sewage draining exit below one end high compared with horizontal line at the top of delivery pipe;Described spraying mechanism includes sparge pipe and multiple shower nozzles in delivery pipe, shower nozzle and sparge pipe grafting, the top connection water source of sparge pipe, the endcapped of sparge pipe.The utility model carries out watering processing while defeated dust is arranged so that the dust of discharge is in slurry condition, prevents airborne dust, pollution-free to air ambient, simple in construction, easy to maintenance, easy to use.

Description

Deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production
Technical field
Soil conditioner production equipment technology is the utility model is related to, more particularly to a kind of production of soil conditioner is used Deduster dust discharge cinder conveyer structure.
Background technology
It is made after production being compounded by multinomial nutrient raw material and acid-base modifier of soil conditioner, after compounding Raw material, which passes through in drying machine, to be dried, and afterwards, is sent into automatic packaging machine and is packed, vanning storage.Meanwhile drying machine also connects Cyclone dust collectors and pulsaire collector are connected to, caused ash air in production process are handled, i.e. system tail gas enters Enter cyclone dust collectors and pulse filter deduster carries out dedusting recovery, finally, clean tail gas is discharged into air.
But cyclone dust collectors and pulse filter deduster after dedusting is carried out, it is necessary to by a large amount of dusts of filtering by The dust-exhausting port discharge of deduster, during discharge, generally require artificial take and fill grey bag or stroller and carry out receipts dress, defeated Send, change not in time, dust will be spilt over outside to be filled outside grey bag or stroller, has a strong impact on the air quality of working environment, harm Staff's health.
Utility model content
The purpose of this utility model is to provide a kind of soil conditioner production deduster dust discharge cinder conveyer structure, is arranging defeated ash While dirt, watering processing is carried out so that the dust of discharge is in slurry condition, prevents airborne dust, structure pollution-free to air ambient Simply, it is easy to maintenance, it is easy to use.
The technical solution adopted in the utility model is:
Deduster dust discharge cinder conveyer structure, including cinder conveyer structure and spraying mechanism are used in a kind of soil conditioner production, described Cinder conveyer structure includes delivery pipe, the spiral conveying bar and motor in delivery pipe that relative level line is obliquely installed, delivery pipe Be provided with above one end low compared with horizontal line into dirt pipe, lower section and be provided with discharge outlet, entered dirt pipe and connect deduster dust-exhausting port, motor it is defeated Spiral conveying bar in shaft connecting conveying pipe, the blade of spiral conveying bar contact with the bottom of delivery pipe, spiral conveying bar The top of blade and delivery pipe has gap;The axial evenly distributed row screw in the top of delivery pipe, delivery pipe is compared with horizontal line height One end below offer sewage draining exit;Described spraying mechanism includes sparge pipe and multiple shower nozzles in delivery pipe, shower nozzle Sparge pipe is evenly arranged in sparge pipe grafting, the top connection water source of sparge pipe, the endcapped of sparge pipe, multiple shower nozzles On, and a shower nozzle corresponds to the screw that delivery pipe is provided with and set.
The position that described sparge pipe corresponds to shower nozzle is intubated provided with draining.
Described shower nozzle includes mounting flange, both ends penetrating hollow cylinder shape spray neck and flared head body, and spray neck is worn It is located in the centre bore of mounting flange, mounting flange and screw Matching installation;Spray the small-bore of the lower end connector body of neck End;The end face at the heavy caliber end of head body is provided with inner circular spray water belt and outer ring spray water belt, inner circular spray water belt and outer ring Multiple spray orifices are uniformly provided with spray water belt, within circular spray water belt upwardly extend with spray neck top connect to form main jet water channel, A plurality of branch water spray road is evenly distributed with along the circumferencial direction of main jet water channel, main jet water channel connects with every branch water spray road, every Branch water spray road connects with outer ring spray water belt.
Described spray neck includes upper connection neck and lower mounting neck, upper connection neck and the lower stepped connection of mounting neck, upper company The end difference for connecing neck and lower mounting neck is provided with seal washer, is connected in draining intubation insertion in neck, and draining intubation bottom with it is close Seal washer contacts.
Cotton filter is provided with the discharge outlet.
The utility model utilize delivery pipe, motor and spiral conveying bar in delivery pipe in cinder conveyer structure will by except The dust that dirt device emits is conveyed, when carrying out defeated grey, the dust that is emitted by the dust-exhausting port of deduster, by entering dirt Pipe enters in delivery pipe, motor work, drives spiral conveying bar to rotate, and during rotation, drives dust to convey to the left, While conveying, spraying mechanism is opened, current are sprayed by flared head body, sprayed water using spraying mechanism, in the mistake of injection Cheng Zhong, constantly conveying dust, dust are sprinkled water in delivery pipe by shower nozzle from left to right, reduce airborne dust, meanwhile, dust is entered Row precipitation mixed processing so that delivery pipe is slurry condition when being discharged at right-hand member sewage draining exit, in this way, would not be made in discharge Into airborne dust, air will not be polluted, can be outer through being drained into after cotton filter from discharge outlet if hypervolia in delivery pipe Boundary.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the vertical sectional view of shower nozzle of the present utility model;
Fig. 3 is shower nozzle horizontal cross of the present utility model.
Embodiment
As shown in figure 1, the utility model includes cinder conveyer structure and spraying mechanism, described cinder conveyer structure includes relative level The delivery pipe 1 that line is obliquely installed, the spiral conveying bar 2 in delivery pipe 1 and motor 3, delivery pipe 1 hand over the low one end of horizontal line Top is provided with into dirt pipe 4, lower section and is provided with discharge outlet 61, enters dirt pipe 4 and connects deduster dust-exhausting port 5, the output shaft connection position of motor 3 In the spiral conveying bar 2 in delivery pipe 1, the blade of spiral conveying bar 2 contacts with the bottom of delivery pipe 1, the leaf of spiral conveying bar 2 Piece and the top of delivery pipe 1 have gap.
The axial evenly distributed row screw in the top of delivery pipe 1, the row of offering below the one end high compared with horizontal line of delivery pipe 1 Dirty mouth 6.
Described spraying mechanism includes sparge pipe 7 and multiple shower nozzles, and the position of the corresponding shower nozzle of sparge pipe 7 is intubated provided with draining 8, shower nozzle and sparge pipe 7 pull and push connection, the top connection water source of sparge pipe 7, the endcapped of sparge pipe 7, and multiple shower nozzles are uniform It is arranged on sparge pipe 7, and a shower nozzle corresponds to the screw that delivery pipe 1 is provided with and set.
As shown in Figures 2 and 3, described shower nozzle includes penetrating hollow cylinder shape spray neck 10 and in mounting flange 9, both ends Flared head body 11, spray neck 10 are located in the centre bore of mounting flange 9, mounting flange 9 and screw Matching installation;Spray neck The small-caliber end of 10 lower end connector body 11;The end face at the heavy caliber end of head body 11 is provided with inner circular spray water belt 12 and outer shroud Multiple spray orifices 14 are uniformly provided with shape spray water belt 13, inner circular spray water belt 12 and outer ring spray water belt 13, within circular spray water belt 12 upwardly extend with spray neck 10 top connect to form main jet water channel 15, be evenly distributed with along the circumferencial direction of main jet water channel 15 more Bar branch water spray road 16, main jet water channel 15 connect with every branch water spray road 16, every branch water spray road 16 and outer ring spray water belt 13 Connection.Described spray neck 10 includes upper connection neck 10-1 and lower mounting neck 10-2, and upper connection neck 10-1 and lower mounting neck 10-2 are in Stepped connection, upper connection neck 10-1 and lower mounting neck 10-2 end difference are provided with seal washer 17, connect in the insertion of draining intubation 8 Connect in neck 10-1, and draining is intubated 8 bottoms and contacted with seal washer 17.
Illustrate operation principle of the present utility model below in conjunction with the accompanying drawings:
During normal use, firstly, it is necessary to be installed, spray neck 10 bottom right is located in the center of mounting flange 9 upwards In hole, the screw thread of the periphery of mounting flange 9 and the screw Matching installation in delivery pipe 1 are recycled, due to flared head body 11 Diameter is more than the diameter of spray neck 10, it is necessary to match installation with the screw in delivery pipe 1, so, mounting flange 9 is devised, On the one hand meet that flared head body 11 is directly reached in delivery pipe 1, on the other hand solve installation question.Now, shower nozzle with it is defeated The connection of pipe 1 is sent to finish.And then the draining intubation 8 for being provided with the spray neck 10 of each shower nozzle with the position of 7 corresponding shower nozzle of sparge pipe Grafting is carried out, grafting installation, dismantles more convenient, recycling seal washer 17, in order to prevent water from overflowing, draining is intubated 8 bottoms End contacts with seal washer 17, reaches the purpose of waterproof, preparation finishes.
When carrying out defeated grey, the dust that is emitted by the dust-exhausting port 5 of deduster, entered by entering dirt pipe 4 in delivery pipe 1, Motor 3 works, and drives spiral conveying bar 2 to rotate, and during rotation, drives dust to convey to the left, while conveying, opens Spraying mechanism is opened, current are sprayed by flared head body 11, because the end of sparge pipe 7 is closing, so, due to the work of hydraulic pressure With so that current are sprayed out by multiple shower nozzles.Wherein, what current initially entered is spray neck 10, enters back into the He of main jet water channel 15 A plurality of branch is sprayed water road 16, on the end face at the heavy caliber end for reaching head body 11, then the He of inner circular spray water belt 12 being provided with by end face Outer ring spray water belt 13 ejects.The center of inner circular spray water belt 12 overlaps with spraying the center line of neck 10, outer ring spray water belt 13 center of circle overlaps with the center of circle of inner circular spray water belt 12.By the way of central-injection and outer shroud injection, on the one hand it can save Pressure is sprayed in about water consumption, on the other hand increase so that injection is stronger, places and blocks, and the dust of absorption is also more.Due to Upper connection neck 10-1 and lower mounting neck 10-2 end difference is provided with seal washer 17, so, shower nozzle can seal with sparge pipe 7 to be connected Connect, keep one's end up, ensure there is enough hydraulic pressure when using.
During injection, delivery pipe 1 from left to right constantly in delivery pipe 1 with shower nozzle sprinkle water by conveying dust, dust Mixed, not only reduce airborne dust, meanwhile, dust is subjected to precipitation mixed processing so that delivery pipe 1 is at right-hand member sewage draining exit 6 It is slurry condition during discharge, in this way, airborne dust would not be caused in discharge, air will not be polluted.If water mistake in delivery pipe 1 It is more, the external world can be drained into from discharge outlet 61 through after cotton filter.

Claims (5)

1. deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production, it is characterised in that:Including cinder conveyer structure and spraying machine Structure, described cinder conveyer structure include delivery pipe, the spiral conveying bar and electricity in delivery pipe that relative level line is obliquely installed Machine, the delivery pipe one end top low compared with horizontal line, which is provided with into dirt pipe, lower section, is provided with discharge outlet, enters the connection deduster dust discharge of dirt pipe Mouthful, the spiral conveying bar in the output shaft connecting conveying pipe of motor, the blade of spiral conveying bar contacts with the bottom of delivery pipe, spiral shell Revolving the blade of conveying bar and the top of delivery pipe has gap;The axial evenly distributed row screw in the top of delivery pipe, delivery pipe Sewage draining exit is offered below one end high compared with horizontal line;Described spraying mechanism includes sparge pipe and multiple in delivery pipe Shower nozzle, shower nozzle and sparge pipe grafting, the top connection water source of sparge pipe, the endcapped of sparge pipe, multiple shower nozzles are evenly distributed On sparge pipe, and a shower nozzle corresponds to the screw that delivery pipe is provided with and set.
2. deduster dust discharge cinder conveyer structure is used in soil conditioner production according to claim 1, it is characterised in that:Described The position that sparge pipe corresponds to shower nozzle is intubated provided with draining.
3. deduster dust discharge cinder conveyer structure is used in soil conditioner production according to claim 2, it is characterised in that:Described Shower nozzle includes mounting flange, both ends penetrating hollow cylinder shape spray neck and flared head body, and spray neck is located in mounting flange Centre bore in, mounting flange and screw Matching installation;Spray the small-caliber end of the lower end connector body of neck;The heavy caliber of head body The end face at end is provided with inner circular spray water belt and outer ring spray water belt, is uniformly provided with inner circular spray water belt and outer ring spray water belt Multiple spray orifices, within circular spray water belt upwardly extend with spray neck top connect to form main jet water channel, along the circumference of main jet water channel Direction is evenly distributed with a plurality of branch water spray road, and main jet water channel connects with every branch water spray road, every branch water spray road and outer ring Spray water belt connects.
4. deduster dust discharge cinder conveyer structure is used in soil conditioner production according to claim 3, it is characterised in that:Described Spraying neck includes upper connection neck and lower mounting neck, upper connection neck and the lower stepped connection of mounting neck, upper connection neck and lower mounting neck End difference be provided with seal washer, connected in draining intubation insertion in neck, and draining intubation bottom contacts with seal washer.
5. deduster dust discharge cinder conveyer structure is used in soil conditioner production according to claim 1, it is characterised in that:The row Cotton filter is provided with the mouth of a river.
CN201720472119.8U 2017-05-02 2017-05-02 Deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production Expired - Fee Related CN206955126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720472119.8U CN206955126U (en) 2017-05-02 2017-05-02 Deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720472119.8U CN206955126U (en) 2017-05-02 2017-05-02 Deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production

Publications (1)

Publication Number Publication Date
CN206955126U true CN206955126U (en) 2018-02-02

Family

ID=61373997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720472119.8U Expired - Fee Related CN206955126U (en) 2017-05-02 2017-05-02 Deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production

Country Status (1)

Country Link
CN (1) CN206955126U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113955164A (en) * 2021-10-11 2022-01-21 湖南中联重科应急装备有限公司 Modular earth packaging equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113955164A (en) * 2021-10-11 2022-01-21 湖南中联重科应急装备有限公司 Modular earth packaging equipment

Similar Documents

Publication Publication Date Title
CN101862572B (en) Horizontal type turbulent ball packing filter device
CN207048810U (en) Fully-mechanized mining working exhausting and spraying combined type device for reducing dust
CN209109244U (en) A kind of roll squeezer dust pelletizing system
CN115365277A (en) Mechanical production equipment
CN108579221A (en) A kind of automatically cleaning macromolecule air filter
CN108453083A (en) A kind of Chinese medicine circulating water wash medicine device for medicine
CN206955126U (en) Deduster dust discharge cinder conveyer structure is used in a kind of soil conditioner production
CN206634786U (en) A kind of blanking belt head spray dust-arrest cover
CN209714612U (en) A kind of powdery paints water spray dust-removing recovery device
CN207111162U (en) A kind of coal fully mechanized workface dust pelletizing system
CN207111084U (en) A kind of coal fully mechanized workface dust falling system
CN211687478U (en) Defeated coal transfer point presses down dirt system
CN206045741U (en) A kind of wash mill of phosphoric acid extraction tail gas
CN101091859A (en) Environmental protection type water deduster
CN107985967A (en) A kind of mine conveyer for screening coal dust
CN208853416U (en) A kind of clear blowing-out cleaning device of universal tobacco drum equipment
CN207774197U (en) It can work at night and screen the mine conveyer of coal dust
CN203954812U (en) Rotary wind type hydro powered twin-stage automatic cleaning screen filter
CN107189824B (en) A kind of efficient ash handling equipment of polynary gasification furnace exit gas and technique
CN208247168U (en) A kind of concrete mixing plant automatic flushing device
CN210434197U (en) Modified plastics filling masterbatch compounding workshop dust collector
CN205892001U (en) Automatic cleaning device of transmission band
CN207838578U (en) A kind of self-stripping system of water-bath type dust cleaner
CN208437309U (en) A kind of fiber lapper lace curtaining on-line cleaning device
CN220834738U (en) Dust collector for colliery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202