CN206947549U - A kind of cable clamping apparatus and the Wind turbines including the device - Google Patents

A kind of cable clamping apparatus and the Wind turbines including the device Download PDF

Info

Publication number
CN206947549U
CN206947549U CN201720678044.9U CN201720678044U CN206947549U CN 206947549 U CN206947549 U CN 206947549U CN 201720678044 U CN201720678044 U CN 201720678044U CN 206947549 U CN206947549 U CN 206947549U
Authority
CN
China
Prior art keywords
cable
clamping
wind turbines
clamping apparatus
equipotential link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720678044.9U
Other languages
Chinese (zh)
Inventor
王峰
潘磊
汪正军
刘金鹿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian United Power Technology Co Ltd
Original Assignee
Guodian United Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian United Power Technology Co Ltd filed Critical Guodian United Power Technology Co Ltd
Priority to CN201720678044.9U priority Critical patent/CN206947549U/en
Application granted granted Critical
Publication of CN206947549U publication Critical patent/CN206947549U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a kind of cable clamping apparatus, including the two clamping units connected by metal guide rod, the clamping unit is included with the endless metal folder and the fastener for opening to be tightened for not closing opening, the endless metal folder is connected with metal guide rod, and the inwall of endless metal folder is provided with several prickers towards center, the pricker is realized in the presence of fastener and cable sheath is punctured.The invention also discloses a kind of Wind turbines including the device, and several described cable clamping apparatus are arranged at the equipotential link point inside wind turbine cabin and tower, for forming multiple spot equipotential link.The utility model realizes the equipotential link for the cable being respectively engaged with two clamping units by being provided with the clamping unit of pricker, smart structural design, and use is easy to operate.The equipotential link of whole Wind turbines is realized by the cable clamping apparatus, reduces or eliminates because voltage difference and common mode disturbances caused by resistance difference.

Description

A kind of cable clamping apparatus and the Wind turbines including the device
Technical field
The utility model is related to Wind turbines equipotential link technical field, more particularly to a kind of cable clamping apparatus and Wind turbines including the device.
Background technology
At present, in the design of wind power generating set, the design of earthed system is more and more important, its validity and reliability meeting Considerable influence is produced to the reliability of the electrical system of wind power generating set.The earthed system of current Wind turbines is mostly using remittance The earthing mode that copper bar and downlead combine is flowed to realize.
But under this earthing mode, due to the distance of earth point and confluence copper bar not etc. so as to cause different earth points and Grounding resistance between confluence copper bar has difference, while has certain pressure difference between downlead and Wind turbines tower.Especially It is during working as inductive load startup stage big in Wind turbines and Wind turbines by thunderbolt, due to the electricity between earth point Resistance difference can cause voltage counterattack or common mode disturbances.
As can be seen here, above-mentioned existing Wind turbines earthed system is upper with using in structure, method, it is clear that has still suffered from not Just with defect, and urgently it is further improved.How a kind of new cable clamping apparatus and wind including the device are founded Group of motors, make its reduce or eliminate equipotential link in caused by resistance difference voltage difference and common mode disturbances.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of cable clamping apparatus simple in construction, easy to use, Achieve the equipotential link between two cables.
In order to solve the above technical problems, the utility model provides a kind of cable clamping apparatus, including connected by metal guide rod Two clamping units, the clamping unit include with do not close opening endless metal folder and for by it is described opening tighten Fastener, endless metal folder is connected with the metal guide rod, and the inwall that the endless metal presss from both sides is provided with several Towards the pricker at center, the pricker is realized in the presence of the fastener and cable sheath is punctured.
As a kind of improvement of the present utility model, the both ends of the endless metal folder opening are respectively arranged with adpting flange, The fastener realizes the deflation to the opening by the adpting flange.
Further improve, the fastener is fastening bolt.
Further improve, the endless metal folder outside is provided with insulating sheath.
The utility model also provides a kind of Wind turbines for including above-mentioned cable clamping apparatus, several described described electricity Cable clamping apparatus is arranged at the equipotential link point inside the wind turbine cabin and tower,
Wherein, for the cable clamping apparatus being arranged on inside the wind turbine cabin, one clamping unit The earth cable drawn for clamping by electric component in the Wind turbines and mechanical part, its another clamping unit are used for The equipotential link cable that clamping is connected with the mainframe of the Wind turbines, in the presence of the clamping unit fastener, It is grounded cable and equipotential link cable and the equipotential link of mainframe;
For the cable clamping apparatus being arranged on inside the Wind turbines tower, one clamping unit is used to block The downlead drawn by the mainframe is connect, its another clamping unit is used for what clamping was connected with the tower of the Wind turbines Equipotential link cable, in the presence of the clamping unit fastener, realize downlead and equipotential link cable and tower The equipotential link of cylinder;
The downlead bottom is connected with grounded screen.
After such design, the utility model at least has advantages below:
1st, the utility model cable clamping apparatus does not close the endless metal folder of opening by setting, and in the metal clip Inwall be provided with several prickers towards center, cause the pricker to be realized in the presence of fastener to cable sheath Puncture, and the cable in two clamping units is respectively engaged with by connection of the metal guide rod to two metal clips, realization Equipotential link, smart structural design, use are easy to operate.
2nd, the utility model Wind turbines inside its cabin and tower by setting the cable clamping apparatus, and passes through this Cable clamping apparatus realizes the equipotential link of electric component and mechanical part in cabin, between downlead and tower etc. electricity Position connection, forms class M type equipotential link systems.On the one hand machine can be reduced or eliminated in the Wind turbines equipotential link system The resistance that cabin part etc. is located by connecting is poor, reduces or eliminates in equipotential link because voltage difference caused by resistance difference, disappears simultaneously Except tower and downlead are because common mode disturbances caused by resistance difference, eliminating equipotential link influences wind power generating set stabilization The hidden danger of operation.
Brief description of the drawings
Above-mentioned is only the general introduction of technical solutions of the utility model, in order to better understand technology hand of the present utility model Section, below in conjunction with accompanying drawing, the utility model is described in further detail with embodiment.
Fig. 1 is the dimensional structure diagram of the utility model cable clamping apparatus clamping cable.
Fig. 2 is the front view of the utility model cable clamping apparatus clamping cable.
Fig. 3 be in Fig. 2 C-C to structure sectional view.
Fig. 4 is Fig. 2 longitudinal sectional view.
Fig. 5 is the structural representation of the utility model Wind turbines earthed system.
Fig. 6 is the use state diagram of cable clamping apparatus in the utility model Wind turbines earthed system.
Embodiment
Referring to the drawings shown in 1-4, the present embodiment cable clamping apparatus, including the two clamping lists connected by metal guide rod 4 Member, the clamping unit are included with the endless metal folder 6 and the fastener 5 for the opening to be tightened for not closing opening.The ring Shape metal clip 6 is connected with the metal guide rod 4, and the inwall of endless metal folder 6 is provided with several prickers 7 towards center. So when equal clamping cable in two clamping units, while fastener 5 locks opening, the pricker 7 punctures cable 1 Crust 2, so as to realize the reliable contacts of metal clip and cable conductor, then the connection by metal guide rod, realize two cables Equipotential link.
Preferred embodiment is that the both ends of the opening of endless metal folder 6 are respectively arranged with adpting flange, and the fastener 5 passes through The adpting flange realizes the deflation to the opening.The fastener is fastening bolt, not only acts as the effect for puncturing cable sheath, Have the function that anti-cable loosens simultaneously.The clamping unit is adaptable to the cable of different line footpaths in the present embodiment.
In order to prevent the electric leakage of the cable clamping apparatus, the outside of endless metal folder 6 is provided with insulating sheath 3, to pacify The safety of operating personnel is protected when filling cable.
When the present embodiment cable clamping apparatus is used for Wind turbines, the equipotential inside the wind turbine cabin and tower Several cable clamping apparatus are set at tie point, to form multiple spot equipotential link system.
Wherein, it is used for for the cable clamping apparatus being arranged on inside the wind turbine cabin, one clamping unit The earth cable that clamping is drawn by electric component in the Wind turbines and mechanical part, its another clamping unit be used for clamping with The equipotential link cable of the mainframe connection of the Wind turbines, in the presence of the clamping unit fastener, is grounded electricity Cable and equipotential link cable and the equipotential link of mainframe.
For the cable clamping apparatus being arranged on inside the Wind turbines tower, one clamping unit be used for clamping by The downlead that the mainframe is drawn, its another clamping unit are used for the equipotential that clamping is connected with the tower of the Wind turbines and connected Wiring cable, in the presence of the clamping unit fastener, realize downlead and equipotential link cable and the equipotential of tower Connection.
The downlead bottom is connected with grounded screen, then forms Wind turbines multiple spot equipotential link system, realizes whole The equipotential link of wind power generating set.
The utility model overcomes the position difference of each electric component and mechanical part in Wind turbines, using structure letter Single cable clamping apparatus realizes that each electric component and mechanical part are connected with mainframe recently, eliminates because resistance difference is made Into common mode disturbances.Referring to the drawings shown in 5 and 6, its specific Equipotential connection method is as follows:
1) first determine Wind turbines mainframe on institute it is in need progress equipotential link electric component and Machinery Ministry The quantity of part and position;
2) line footpath and length of Wind turbines mainframe equipotential downlead are determined, while determines the tower of Wind turbines tower Hop count;
3) according to the position of the electric component and mechanical part, the position of its each self-corresponding electrical grounding point is determined, And it is determined that need to ensure the length and line footpath of every equipotential link cable during equipotential link point, it is determined that equipotential connect Place and Wind turbines tower section junction, install the cable clamping apparatus.
4) earth cable that the electric component and mechanical part are drawn is connected to the one of corresponding cable clamping apparatus In individual clamping unit and lock, and clamping one is not less than 50mm in another clamping unit of the cable clamping apparatus2's Equipotential link cable, the other end of the equipotential connection cables are connected with Wind turbines mainframe;And
The downlead that the mainframe is drawn is connected in a clamping unit of corresponding cable clamping apparatus and locked Tightly, clamping one is not less than 50mm- and in another clamping unit of the cable insulation displacement connector2Equipotential link cable, should The other end of equipotential link cable is connected with tower adpting flange.
5) bottom of the downlead is connected with grounded screen, after the completion of connection, measures the electricity between tower section and downlead Resistance, resistance value should be less than 50 milliohms.
It is described above, only it is preferred embodiment of the present utility model, not the utility model is made any formal Limitation, those skilled in the art make a little simple modification, equivalent variations or modification using the technology contents of the disclosure above, Fall in the scope of protection of the utility model.

Claims (5)

1. a kind of cable clamping apparatus, it is characterised in that including the two clamping units connected by metal guide rod, the clamping list Member is included with the endless metal folder and the fastener for the opening to be tightened for not closing opening, endless metal folder with The metal guide rod connection, and the inwall of endless metal folder is provided with several prickers towards center, the pricker exists Realized in the presence of the fastener and cable sheath is punctured.
2. cable clamping apparatus according to claim 1, it is characterised in that the both ends difference of the endless metal folder opening Adpting flange is provided with, the fastener realizes the deflation to the opening by the adpting flange.
3. cable clamping apparatus according to claim 1, it is characterised in that the fastener is fastening bolt.
4. according to the cable clamping apparatus described in claim any one of 1-3, it is characterised in that the endless metal folder outside is set It is equipped with insulating sheath.
A kind of 5. Wind turbines of the cable clamping apparatus including described in claim any one of 1-4, it is characterised in that several The cable clamping apparatus is arranged at the equipotential link point inside the wind turbine cabin and tower,
Wherein, it is used for for the cable clamping apparatus being arranged on inside the wind turbine cabin, one clamping unit The earth cable that clamping is drawn by electric component in the Wind turbines and mechanical part, its another clamping unit are used for clamping The equipotential link cable being connected with the mainframe of the Wind turbines, in the presence of the clamping unit fastener, realize Earth cable and equipotential link cable and the equipotential link of mainframe;
For the cable clamping apparatus being arranged on inside the Wind turbines tower, one clamping unit be used for clamping by The downlead that the mainframe is drawn, its another clamping unit wait electricity for what clamping was connected with the tower of the Wind turbines Position connection cables, in the presence of the clamping unit fastener, realize downlead and equipotential link cable and tower Equipotential link;
The downlead bottom is connected with grounded screen.
CN201720678044.9U 2017-06-12 2017-06-12 A kind of cable clamping apparatus and the Wind turbines including the device Active CN206947549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720678044.9U CN206947549U (en) 2017-06-12 2017-06-12 A kind of cable clamping apparatus and the Wind turbines including the device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720678044.9U CN206947549U (en) 2017-06-12 2017-06-12 A kind of cable clamping apparatus and the Wind turbines including the device

Publications (1)

Publication Number Publication Date
CN206947549U true CN206947549U (en) 2018-01-30

Family

ID=61364043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720678044.9U Active CN206947549U (en) 2017-06-12 2017-06-12 A kind of cable clamping apparatus and the Wind turbines including the device

Country Status (1)

Country Link
CN (1) CN206947549U (en)

Similar Documents

Publication Publication Date Title
CN104391221A (en) Fault phase selection method utilizing phase current gradient sums
CN206211061U (en) A kind of telescopic grounding wire device
CN103532160B (en) Analysis method for researching improving effect of grid structure on mutual influences of alternating current and direct current at receiving end
CN109342822A (en) Tower Impulse Grounding Resistance detection method and device
CN206947549U (en) A kind of cable clamping apparatus and the Wind turbines including the device
CN107086378A (en) A kind of cable clamping apparatus and the Wind turbines including the device
CN107201994B (en) A kind of Wind turbines Equipotential connection method and system
CN204679586U (en) A kind of grounding net of transformer substation corrosion detection system based on earth's surface magnetic induction density
CN104779576A (en) Selective leakage protection method and system by composite signal method
CN106340731A (en) Flexible graphite grounding downlead
CN203786210U (en) Grounding resistance auxiliary measuring device
CN106785521A (en) A kind of combined type ground wire group
CN206976913U (en) A kind of transformer station dead earth device
CN206807004U (en) A kind of grounding transformer of wind power plant
CN109638483A (en) A kind of novel tree root shape structure spark thorn
CN206211062U (en) A kind of circlip type binding clip for ground wire group
CN207766075U (en) A kind of junction block for traction motor
CN206098764U (en) Mounting structure of ground net and ground net
CN206259504U (en) A kind of tongue piece formula binding clip for ground wire group
CN205376793U (en) Distribution lines overhauls ground wire earthing terminal
CN104950219B (en) The non-same famous prime minister's cross-line earth fault type diagnostic method of double-circuit line
CN212625119U (en) Transformer neutral point connecting system
CN202042879U (en) Three-phase combined voltage zero sequence transformer
CN201430402Y (en) Connection system for tower and ground wires
CN203734200U (en) GIS and transformer connecting device