CN206945881U - Novel current transformer polarity tester - Google Patents

Novel current transformer polarity tester Download PDF

Info

Publication number
CN206945881U
CN206945881U CN201720562835.5U CN201720562835U CN206945881U CN 206945881 U CN206945881 U CN 206945881U CN 201720562835 U CN201720562835 U CN 201720562835U CN 206945881 U CN206945881 U CN 206945881U
Authority
CN
China
Prior art keywords
test
loop
nodes
manual
polarity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720562835.5U
Other languages
Chinese (zh)
Inventor
汪毅
董岩
孙宁
徐伟
吴阳
杨嘉鹏
马振华
李伟
张党强
张勇斌
吴学荣
岳晨
逯洋
刘刚
夏建矿
李焕友
王翠霞
丁立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIZUISHAN POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Original Assignee
SHIZUISHAN POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIZUISHAN POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co filed Critical SHIZUISHAN POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Priority to CN201720562835.5U priority Critical patent/CN206945881U/en
Application granted granted Critical
Publication of CN206945881U publication Critical patent/CN206945881U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Current Or Voltage (AREA)

Abstract

A kind of novel current transformer polarity tester, including shell and the electric power loop being arranged in shell, manual test loop, automatic test loop and sound alarm circuit, also include the guidance panel for being arranged at case surface, the guidance panel is provided with master switch, manual/auto change-over switch, milliammeter display window, electricity display window, current limliting adjusting knob and manual test button, and transformer primary side binding post is integrated on guidance panel with transformer secondary side binding post.Using this novel current transformer polarity tester, maintainer's maloperation or device defect, which can be greatly decreased, causes the situation of test result mistake to occur, the accuracy of polarity test can also effectively be improved, improve the efficiency of polarity test, so as to reduce the time of transformer test, the time of power failure is reduced, can be in a manner of the test of convenient switch polarity automatic/manual switch, the reliability of polarity test is lifted, is advantageous to its popularization and promotes.

Description

Novel current transformer polarity tester
Technical field
Electrical equipment technical field is the utility model is related to, more specifically to a kind of current transformer polarity testing Instrument.
Background technology
Current transformer is the important component of power system, and it is widely used in relay protection, electric energy metrical, remote measurement Monitoring, failure wave-recording etc..The polarity of current transformer is one of its important parameter, connection relay protection (it is such as differential, Directional power protection etc.) device, electric energy meter timing, it must be noted that the polarity of current transformer.The connection of polarized is correct, protects Protection unit and instrument could be acted correctly;Otherwise meter can be caused to show mistake, or even the situation of false protection occur, therefore electricity Current transformer must carry out polarity test before and after handing-over and overhaul.
Estimated current mutual inductor polarity is tested and typically all uses direct current method, and its flow is as follows:At least done with two people Experiment, a people take dry cell, battery plus-negative plate are connected to the both ends of current transformer primary side;Another person connects by milliammeter The secondary side of current transformer winding, observe the throw of pointer situation of milliammeter.Certainly also there are many functions strong on the market now Big C-V characteristic test device, but these devices generally have many functions, and the polarity test of current transformer is wherein One.
Two people are at least needed to complete test job when being tested using direct current method, personnel's redundancy is less efficient;Test is adopted With dry cell, capacity is small and can not intuitively observe the dump energy of battery;Test process needs manual ON/disconnection battery, holds Easily there is battery loose contact or both positive and negative polarity is reversed waits maloperation, cause result of the test mistake, increase testing time;Test process In communication between two people mainly by calling out or intercom is completed, easily disturbed by site environment noise, cause test anti- Multiple to carry out, testing efficiency is low.If mostly all bulky because apparatus function is more using existing C-V characteristic test device, Weight weight, not portable, complex operation, higher is required to field condition, the ground for only needing test current transformer polarity Side, this is obviously very inconvenient.
Therefore, existing current transformer polarity testing method is purely manual operation, easily occur battery loose contact or Both positive and negative polarity is reversed to wait maloperation, causes test result inaccurate, need to test repeatedly;Need simultaneously when testing by lifting up one's voice or Intercom is completed, and is easily influenceed by working site noise, the shortcomings of testing efficiency is low be present.
The content of the invention
For above-mentioned prior art, the technical problems to be solved in the utility model be a kind of polarity test degree of accuracy it is high, Testing efficiency is high, small instrument for testing polarity of current transformer is disturbed by site environment.
In order to solve the above technical problems, the utility model provides a kind of novel current transformer polarity tester, including Shell and the electric power loop being arranged in shell, manual test loop, automatic test loop and sound alarm circuit, in addition to set The guidance panel of case surface is placed in,
The guidance panel is provided with master switch, manual/auto change-over switch, milliammeter display window, electricity display window Mouth, current limliting adjusting knob and manual test button, transformer primary side binding post are integrated in transformer secondary side binding post On guidance panel;
The electric power loop includes:Battery, master switch, electric-quantity display device and DC/DC modules, when master switch closes, electricity Pond powers for transformer primary side, and be converted to 5V by DC/DC modules powers for single-chip microcomputer, and electric-quantity display device is used for showing that battery remains Remaining electricity;
The manual test loop includes:The K1 nodes of change-over switch, manual test button, transformer primary side binding post and Current-limiting resistance, after the K1 nodes closure of change-over switch, manual test loop is come into force, and manually the A1 nodes of testing button come The connection of transformer primary side and electric power loop is turned on/off, manually the A2 nodes on/off audible alarm of testing button Loop;Current-limiting resistance is an adjustable resistance, by the current limliting adjusting knob on rotation process panel, can limit transformer original The electric current of side test loop, prevent the excessive damage mutual inductor coil of electric current;
The automatic test loop includes:The K2 nodes of change-over switch, single-chip microcomputer, relay and its auxiliary node J1, J2, When the K2 nodes closure of change-over switch, automatic test loop comes into force, by according to the program write after microcontroller power supply connection 2S0-5V square wave occurs, so as to drive relay, is switched on or switched off relay;Its auxiliary node when relay is connected J1, J2 are closed, and J1 nodes connect transformer primary side and carry out polarity test with electric power loop, and node J2 connects audible alarm loop and entered Row audible alarm;
The audible alarm loop includes:The A2 nodes of manual test button, the J2 nodes of relay, buzzer I, buzzing Device II and FM microphone module, audible alarm loop includes automatic test audible alarm loop and manual test audible alarm returns Road, when device is operated in automatic mode, J2 nodes drive closure by single-chip microcomputer automatically, so as to connect buzzer II, then lead to FM microphone modules are crossed to quiet down and then retransmit away;When device is operated in manual mode, A2 nodes, which are manually tested, to be pressed Button manual ON, so as to connect buzzer I, then by FM microphone modules quiet down and then retransmit away.
Preferably, the battery is 12V lithium batteries, in addition to is used for filling to 12V lithium cell chargings on shell Electrical interface.
Preferably, in addition to FM antennas, the FM antennas are used for the antenna of FM microphone modules is external, are easy to FM signals Transmitting.
Preferably, the shell uses aluminum hull structure.
Preferably, the shell is provided with handle.
Beneficial effect:
The utility model has compared following several big advantages with existing transformer test method, apparatus:
(1) for the battery that conventional method uses for 1.5V dry cell, battery capacity is small, and can not intuitively see battery Electricity, cause sometimes to take to the battery at scene without electricity, situation about can not use occur.Tested using the new transformer After instrument, lithium battery capacity is big, chargeable, and devises powered show circuit, and electricity can be intuitively observed by electric-quantity display device The electricity in pond, avoid the occurrence of situation about can not use at the scene.
(2) easily there is battery loose contact or both positive and negative polarity is reversed using manual ON/disconnection battery in conventional method Deng maloperation, result of the test mistake is caused, increases testing time.The new transformer tester is devised automatically using single-chip microcomputer Polarity test loop, by programming realization turn on automatically/disconnection battery and transformer primary side loop, so as to realize mutual inductor polarity Automatic test, avoid the multi-pass operation of conventional method, improve the accuracy rate and testing efficiency of test result.
(3) conventional apparatus alarm free function, it can only be called out when mutual inductor polarity is tested by personnel or intercom exchanges It just can determine that whether battery is connected, at the scene that environment is noisy or transformer primary side is apart from each other with secondary side terminal box by week The influence of collarette border is very big, easily causes the situation of communication confusing communication, so as to want repeated multiple times test, adds maintainer Working strength, reduce operating efficiency.New equipment adds audible alarm loop, and buzzer sounding is triggered when battery is connected, Sound is sent by FM transmitter modules again, radio receives well within 3KM, especially suitable for it is noisy scene and Transformer primary side and secondary side terminal box scene apart from each other.
(4) when using conventional polar method of testing, no matter transformer primary side and the distance of secondary side terminal box distance, all At least two people are needed to complete polarity test, wherein a people beats polarity in transformer primary side with battery, another person is mutual Sensor secondary side terminal box measures the positive and negative of polarity.New polarity tester employs the design of integration, by transformer primary side Primary side polarity test loop integrates with transformer secondary secondary side measuring loop, in transformer primary side and secondary side When terminal box is closer to the distance, single polarity test can be completed, reduce number of work, improve operating efficiency.
In summary, this novel current transformer polarity tester, maintainer's maloperation or device can be greatly decreased Defect causes the situation of test result mistake to occur, and can also effectively improve the accuracy of polarity test, improves polarity test Efficiency, so as to reduce the time of transformer test, reduce the time of power failure, be advantageous to its popularization and promote.In addition, by turning Change switch designs automatic/hand polarity test switching circuit, in that context it may be convenient to the mode of switch polarity test, testing automatically The relatively low occasion of reliability can switch to manual mode, lift the reliability of polarity test.
Brief description of the drawings
Fig. 1 is the circuit diagram of novel current transformer polarity tester of the present utility model;
Fig. 2 is novel current transformer polarity tester guidance panel schematic diagram of the present utility model.
In figure:1- master switch, 2- change-over switches, 3- milliammeter display windows, 4- electricity display windows, the regulation rotation of 5- current limlitings Button, 6- manual test buttons, 7- transformer primary side binding posts, 8- transformer secondary side binding posts, 9- charging inlets, 10-FM Antenna, 11- handles
Embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings:
As shown in Figures 1 and 2, novel current transformer polarity tester of the present utility model, including shell and be arranged at Electric power loop, manual test loop, automatic test loop and sound alarm circuit in shell, in addition to it is arranged at case surface Guidance panel,
The guidance panel is provided with master switch 1, manual/auto change-over switch 2, milliammeter display window 3, electricity and shown Window 4, current limliting adjusting knob 5 and manual test button 6, transformer primary side binding post 7 and transformer secondary side binding post 8 It is integrated on guidance panel;
The electric power loop includes:Battery, master switch 1, electric-quantity display device and DC/DC modules, when master switch 1 closes, Battery is powered for transformer primary side, and be converted to 5V by DC/DC modules powers for single-chip microcomputer, and electric-quantity display device is used for showing battery Dump energy;
The manual test loop includes:K1 nodes, manual test button 6, the transformer primary side binding post of change-over switch 2 And current-limiting resistance, after the K1 nodes closure of change-over switch 2, manual test loop is come into force, manually the A1 sections of testing button 6 Put to turn on/off the connection of transformer primary side and electric power loop, manually the A2 node on/off sound of testing button 6 Sound alarm circuit;Current-limiting resistance is an adjustable resistance, by the current limliting adjusting knob 5 on rotation process panel, can be limited The electric current of transformer primary side test loop, prevent the excessive damage mutual inductor coil of electric current;
The automatic test loop includes:K2 nodes, single-chip microcomputer, relay and its auxiliary node J1 of change-over switch 2, J2, when the K2 nodes closure of change-over switch 2, automatic test loop comes into force, microcontroller power supply connect after by according to being write 2S0-5V square wave occurs for program, so as to drive relay, is switched on or switched off relay;Its auxiliary section when relay is connected Point J1, J2 are closed, and J1 nodes connect transformer primary side and carry out polarity test with electric power loop, and node J2 connects audible alarm loop Carry out audible alarm;
The audible alarm loop includes:The A2 nodes of manual test button 6, the J2 nodes of relay, buzzer I, honeybee Ring device II and FM microphone module, and audible alarm loop includes automatic test audible alarm loop and manual test audible alarm returns Road, when device is operated in automatic mode, J2 nodes drive closure by single-chip microcomputer automatically, so as to connect buzzer II, then lead to FM microphone modules are crossed to quiet down and then retransmit away;When device is operated in manual mode, A2 nodes, which are manually tested, to be pressed The manual ON of button 6, so as to connect buzzer I, then by FM microphone modules quiet down and then retransmit away.
The battery is 12V lithium batteries, in addition to the charging inlet 9 being used for 12V lithium cell chargings on shell.
Also include FM antennas 10, the FM antennas 10 are used for the antenna of FM microphone modules is external, are easy to FM signals to send out Penetrate.
The shell uses aluminum hull structure.
The shell is provided with handle 11.
Operation principle of the present utility model is:When master switch 1 closes, 12V lithium batteries are powered for transformer primary side, are passed through The switch polarity test mode of automatic/manual switch 2, when the K1 nodes closure of change-over switch 2, connect manual polarity test Loop, manually it can realize manual test by testing button 6;When the K2 junction closures of change-over switch 2, it is electromechanical to connect monolithic Source, realize automatic test.
Specifically, after the K1 nodes closure of change-over switch 2, manual test loop comes into force, manually testing button A1 nodes turn on/off the connection of electric power loop and transformer primary side, A2 nodes on/off audible alarm loop.When turn When changing the K2 nodes closure of switch 2,5V is converted to by DC/DC modules and powered for single-chip microcomputer, SCM program sends 2S automatically The square-wave pulse of (0-5V), pulsed drive relay.When pulse output is 5V, relay is powered to make its auxiliary node J1, J2 Closure, J1 nodes connect transformer primary side and electric power loop, carry out polarity test, now milliammeter display window in observable Fig. 2 The deflection situation of milliampere list index in mouth 3, J2 nodes connect audible alarm loop and realize warning function;When pulse exports 0V, J1, J2 node all disconnect, and now milliampere list index should be zeroed, so as to realize the polarity test of transformer.
Connected respectively in automatic test loop with manual test loop and accessed a buzzer, whether selection is automatic Or manual test, when power on transformer primary side, audible alarm loop can be all turned on so as to send sound, then passes through FM The sound that transmitter sends buzzer is launched, transformer secondary side survey crew by radio receive FM transmitting come Buzzer sound, so as to judge the break-make of power supply, complete polarity test.
Above-mentioned combination accompanying drawing is explained in detail to embodiment of the present utility model, but the present invention be not limited to it is above-mentioned Embodiment, in one skilled in the relevant art's possessed knowledge, many variations can also be made to it.

Claims (5)

1. a kind of novel current transformer polarity tester, it is characterised in that returned including shell and the power supply being arranged in shell Road, manual test loop, automatic test loop and sound alarm circuit, in addition to the guidance panel of case surface is arranged at,
The guidance panel is provided with master switch, manual/auto change-over switch, milliammeter display window, electricity display window, limit Adjusting knob and manual test button are flowed, transformer primary side binding post is integrated in operating surface with transformer secondary side binding post On plate;
The electric power loop includes:Battery, master switch, electric-quantity display device and DC/DC modules, when master switch closes, battery is Transformer primary side is powered, and be converted to 5V by DC/DC modules powers for single-chip microcomputer, and electric-quantity display device is used for showing remaining battery electricity Amount;
The manual test loop includes:K1 nodes, manual test button, transformer primary side binding post and the current limliting of change-over switch Resistance, after the K1 nodes closure of change-over switch, manual test loop is come into force, and manually the A1 nodes of testing button connect On/off opens the connection of transformer primary side and electric power loop, and manually the A2 nodes on/off audible alarm of testing button returns Road;Current-limiting resistance is an adjustable resistance, by the current limliting adjusting knob on rotation process panel, can limit transformer primary side The electric current of test loop, prevent the excessive damage mutual inductor coil of electric current;
The automatic test loop includes:The K2 nodes of change-over switch, single-chip microcomputer, relay and its auxiliary node J1, J2, when turning When changing the K2 nodes closure of switch, automatic test loop comes into force, and microcontroller power supply will occur after connecting according to the program write 2S 0-5V square wave, so as to drive relay, it is switched on or switched off relay;Its auxiliary node J1, J2 when relay is connected Closure, J1 nodes connect transformer primary side and carry out polarity test with electric power loop, and node J2 connects audible alarm loop carry out sound Sound is alarmed;
The audible alarm loop includes:The A2 nodes of manual test button, the J2 nodes of relay, buzzer I, buzzer II And FM microphone modules, audible alarm loop include automatic test audible alarm loop and manual test audible alarm loop, when When device is operated in automatic mode, J2 nodes drive closure by single-chip microcomputer automatically, so as to connect buzzer II, then pass through FM wheats Gram wind module quiets down and then retransmited away;When device is operated in manual mode, manually testing button is manual for A2 nodes Connect, so as to connect buzzer I, then by FM microphone modules quiet down and then retransmit away.
2. novel current transformer polarity tester according to claim 1, it is characterised in that the battery is 12V lithiums Battery, in addition to the charging inlet being used for 12V lithium cell chargings on shell.
3. novel current transformer polarity tester according to claim 1, it is characterised in that also including FM antennas, institute State FM antennas be used for by the antenna of FM microphone modules it is external, be easy to FM signals launch.
4. novel current transformer polarity tester according to claim 1, it is characterised in that the shell uses aluminum hull Structure.
5. novel current transformer polarity tester according to claim 1, it is characterised in that the shell is provided with and carried Hand.
CN201720562835.5U 2017-05-19 2017-05-19 Novel current transformer polarity tester Expired - Fee Related CN206945881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720562835.5U CN206945881U (en) 2017-05-19 2017-05-19 Novel current transformer polarity tester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720562835.5U CN206945881U (en) 2017-05-19 2017-05-19 Novel current transformer polarity tester

Publications (1)

Publication Number Publication Date
CN206945881U true CN206945881U (en) 2018-01-30

Family

ID=61361822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720562835.5U Expired - Fee Related CN206945881U (en) 2017-05-19 2017-05-19 Novel current transformer polarity tester

Country Status (1)

Country Link
CN (1) CN206945881U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109633514A (en) * 2018-12-29 2019-04-16 国网山东省电力公司淄博供电公司 A kind of active defense formula electric power mutual-inductor polarity tester
CN111536864A (en) * 2020-05-07 2020-08-14 郑州上电电机科技发展有限公司 Central polarity correction circuit and portable correction instrument

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109633514A (en) * 2018-12-29 2019-04-16 国网山东省电力公司淄博供电公司 A kind of active defense formula electric power mutual-inductor polarity tester
CN109633514B (en) * 2018-12-29 2021-04-06 国网山东省电力公司淄博供电公司 Active protection type polarity tester for power transformer
CN111536864A (en) * 2020-05-07 2020-08-14 郑州上电电机科技发展有限公司 Central polarity correction circuit and portable correction instrument

Similar Documents

Publication Publication Date Title
CN205861839U (en) The insulation monitoring and warning device of a kind of charging pile and charging pile
CN206945881U (en) Novel current transformer polarity tester
CN205070865U (en) Electrically operated gate control circuit
CN211014620U (en) Polarity calibration device for current transformer
WO2018108095A1 (en) Charging power supply protection device
CN108448344A (en) Intelligence for connecting car emergency startup power supply and automobile storage battery takes firewire
CN107179487A (en) Partial discharge of switchgear monitoring device and method
CN206724948U (en) Electric operating ladder safety monitoring assembly
CN202025057U (en) Detector for short circuit and open circuit of printed-circuit board
CN212529324U (en) Contactor state determination device and vehicle
CN110646656B (en) In-transit grounding grid tide detection device
CN211061617U (en) High-voltage safety detection device for electric automobile
CN211263563U (en) Take positioning alarm function's strapping table case
CN209312185U (en) A kind of electrical fire monitoring device of accessible cloud platform
CN107677969A (en) The charge/discharge test device of distributed complete online batteries
CN105259428B (en) A kind of wireless signal strength detection device
CN104092499A (en) Portable wireless fiber optical transceiver
CN102121976A (en) Portable polarity calibration device for mutual inductor
CN206348628U (en) A kind of pole-mounted switch terminal
CN212694547U (en) Induction type closes on electrified safe distance early warning system
CN206618798U (en) Battery current impacts automatic testing equipment
CN204425009U (en) Based on the battery monitoring device that MCU controls
CN212008735U (en) Non-contact intelligent electroscope for high-voltage power equipment
CN209070001U (en) A kind of multi-functional current detector
CN208350977U (en) Mutual inductor secondary polarity device for fast detecting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20180519

CF01 Termination of patent right due to non-payment of annual fee