CN206945079U - A kind of Novel underground water-level instrumentation - Google Patents

A kind of Novel underground water-level instrumentation Download PDF

Info

Publication number
CN206945079U
CN206945079U CN201720412129.2U CN201720412129U CN206945079U CN 206945079 U CN206945079 U CN 206945079U CN 201720412129 U CN201720412129 U CN 201720412129U CN 206945079 U CN206945079 U CN 206945079U
Authority
CN
China
Prior art keywords
monitoring well
mud guard
underground
water
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720412129.2U
Other languages
Chinese (zh)
Inventor
彭康宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN201720412129.2U priority Critical patent/CN206945079U/en
Application granted granted Critical
Publication of CN206945079U publication Critical patent/CN206945079U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of Novel underground water-level instrumentation, including underground monitoring well, shaft bottom water fender, water inlet, the first mud guard, the second mud guard, monitor pipe laying, multiple monitor mounting seats, pipeline fixed seat, monitoring well top cover, liquid spill-way, drainage pipeline and blowout prevention well lid;Water inlet is located in the ground monitoring bottom by shaft bottom water fender, first mud guard is located in the ground in monitoring well and covered above water inlet, second mud guard is located in the ground in monitoring well and covered above the first mud guard, monitor pipe laying connects monitoring well top cover by pipeline fixed seat, monitoring well top cover, blowout prevention well lid are covered in the monitoring well of underground, monitor mounting seat connects monitor pipe laying, and liquid spill-way is located in the ground in monitoring well, and drainage pipeline connects liquid spill-way.The utility model can be used to monitor level of ground water, easy for installation, safe to use, the underground water in well is kept pure by obstructing silt, water level is accurately measured by multiple water-level instrumentation bodies.

Description

A kind of Novel underground water-level instrumentation
Technical field
It the utility model is related to a kind of water level monitoring equipment, more particularly to a kind of Novel underground water-level instrumentation.
Background technology
To improve, absolute altitude can be significantly larger than periphery municipal administration in place when cell quality is commonly designed for modern large-scale residential quarter Road elevation, i.e., the surface of internal earthing is higher than the extraneous surface banketed.The earth storehouse that basement is generally completely spread, and underground water Position rises typically as the heap in whole place is high, therefore underground garage structure anti-floating burden can increase.The water level of prior art Monitoring device is complicated, and cost is high, operation inconvenience.
The content of the invention
The purpose of this utility model:A kind of Novel underground water-level instrumentation is provided, simple in construction, easy to use, cost is low.
To achieve these goals, the technical solution of the utility model is:
A kind of Novel underground water-level instrumentation, including underground monitoring well, shaft bottom water fender, water inlet, the first mud guard, Two mud guards, monitor pipe laying, multiple monitor mounting seats, pipeline fixed seat, monitoring well top cover, liquid spill-way, drainpipe Road and blowout prevention well lid;Described underground monitoring well is vertically arranged in below ground, and described underground monitoring well is both ends open Hollow cylindrical structure, described shaft bottom water fender are circular plate-like shape structure and are adapted to the bottom for being arranged on described underground monitoring well Portion, described shaft bottom water fender and described underground monitoring well link into an integrated entity structure;Described water inlet is arranged on described On the water fender of shaft bottom, positioned at a side of described shaft bottom water fender, the first described mud guard is plane tabular structure and consolidated Surely the side inner wall lower of described underground monitoring well is arranged on, the first described mud guard horizontal cover is covered in described water inlet Top, and leave gap between the first described mud guard and the opposite side inwall of described underground monitoring well;Described Two mud guards are plane tabular structure and are fixedly installed on another side lower part of described underground monitoring well, described second gear mud Plate level cover is covered in the top of the first described mud guard, and the second described mud guard and the side of described underground monitoring well Gap is left between inwall;The upper end of described monitor pipe laying is fixedly installed on described by described pipeline fixed seat Monitoring well top cover inner side end on, described monitoring well dome is covered in the upper end of described underground monitoring well, is made described Monitor pipe laying be co-axially inserted in the center of described underground monitoring well, positioned at the top of the second described mud guard; Described multiple monitor mounting seats, which are respectively separated, is arranged on described monitor pipe laying and installs respectively water level monitoring Instrument body;Described liquid spill-way is arranged in described underground monitoring well, positioned at the top side of described underground monitoring well, institute The drainage pipeline stated is connected on described liquid spill-way, and described blowout prevention well lid closing cap is on the top of described underground monitoring well Portion, positioned at the top of described monitoring well top cover.
Above-mentioned Novel underground water-level instrumentation, wherein, described blowout prevention well lid is by being locked at described underground In monitoring well, and the center of top of described blowout prevention well lid is provided with handle of uncapping.
Above-mentioned Novel underground water-level instrumentation, wherein, the bottom of described shaft bottom water fender is connected with mud retaining net Cover, described mud retaining net cover are covered in the lower section of described water inlet in network structure and cover.
Above-mentioned Novel underground water-level instrumentation, wherein, it is coaxially connected with catch net on described monitor pipe laying Cover, described mat is cylindrical structural and cover is covered in the outside of described multiple monitor mounting seats.
Above-mentioned Novel underground water-level instrumentation, wherein, coaxially it is socketed with buffering elastic on described monitor pipe laying Spring, between described pipeline fixed seat and described mat.
Above-mentioned Novel underground water-level instrumentation, wherein, on the free end of the first described mud guard and the second mud guard It is respectively separated and is provided with multiple auxiliary permeable holes, multiple auxiliary permeable holes on the first described mud guard and described second gear mud Multiple auxiliary permeable holes on plate are staggered.
Above-mentioned Novel underground water-level instrumentation, wherein, on the upper surface of the first described mud guard and the second mud guard It is respectively separated and is provided with multiple stop hooks, described multiple stop hooks is between the end of described the first mud guard and the second mud guard Gap direction arc-shaped bend.
The utility model can be used to monitor level of ground water, easy for installation, safe to use, be made by obstructing silt in well Underground water keep pure, and accurately measure water level by multiple water-level instrumentation bodies.
Brief description of the drawings
Fig. 1 is a kind of sectional view of Novel underground water-level instrumentation of the utility model.
Fig. 2 is a kind of bottom top view of the underground monitoring well of Novel underground water-level instrumentation of the utility model.
Embodiment
Embodiment of the present utility model is further illustrated below in conjunction with accompanying drawing.
Refer to shown in accompanying drawing 1 and accompanying drawing 2, a kind of Novel underground water-level instrumentation, including underground monitoring well 1, shaft bottom gear Water plate 2, water inlet 3, the first mud guard 4, the second mud guard 5, monitor pipe laying 6, multiple monitor mounting seats 7, pipeline Fixed seat 8, monitoring well top cover 9, liquid spill-way 10, drainage pipeline 11 and blowout prevention well lid 12;Described underground monitoring well 1 is vertically arranged Below ground, described underground monitoring well 1 is the hollow cylindrical structure of both ends open, and described shaft bottom water fender 2 is circle Shape platy structure is simultaneously adapted to the bottom for being arranged on described underground monitoring well 1, and described shaft bottom water fender 2 is supervised with described underground Well logging 1 links into an integrated entity structure;Described water inlet 3 is arranged on described shaft bottom water fender 2, positioned at described shaft bottom dash One side of plate 2, the first described mud guard 4 are plane tabular structure and are fixedly installed on the one of described underground monitoring well 1 Side inner wall lower, the described horizontal cover of the first mud guard 4 are covered in the top of described water inlet 3, and the first described mud guard 4 Gap is left between the opposite side inwall of described underground monitoring well 1;The second described mud guard 5 be plane tabular structure simultaneously Another side lower part of described underground monitoring well 1 is fixedly installed on, the described horizontal cover of the second mud guard 5 is covered described first The top of mud guard 4, and leave gap between the second described mud guard 5 and the side inwall of described underground monitoring well 1;Institute The upper end for the monitor pipe laying 6 stated is fixedly installed on by described pipeline fixed seat 8 in described monitoring well top cover 9 On side end face, described monitoring well top cover 9 cover, which covers, in the upper end of described underground monitoring well 1, makes described monitor installing pipe Road 6 is co-axially inserted in the center of described underground monitoring well 1, positioned at the top of the second described mud guard 5;Described multiple prisons Instrument mounting seat 7 is surveyed to be respectively separated on the monitor pipe laying 6 described in being arranged on and water-level instrumentation body is installed respectively;It is described Liquid spill-way 10 be arranged in described underground monitoring well 1, positioned at the top side of described underground monitoring well 1, described row Waterpipe 11 is connected on described liquid spill-way 10, and the described closing cap of blowout prevention well lid 12 is in described underground monitoring well 1 Top, positioned at the top of described monitoring well top cover 9.
Described blowout prevention well lid 12 is by being locked in described underground monitoring well 1, and described blowout prevention well lid 12 Center of top be provided with and uncap handle 13, the overflow blowout of underground monitoring well 1 can be prevented, improve safety in utilization.
The bottom of described shaft bottom water fender 2 is connected with mud retaining net cover 14, and described mud retaining net cover 14 is in netted knot Structure and cover cover in the lower section of described water inlet 3, effectively filter silt, can prevent water inlet 3 from being blocked by silt, enable water to suitable Smooth enters in underground monitoring well 1.
Mat 15 is coaxially connected with described monitor pipe laying 6, described mat 15 is cylinder Structure and cover cover in the outside of described multiple monitor mounting seats 7, can play a part of protect water-level instrumentation body, avoid By silt, stone shock and damage.
Buffer spring 16 is coaxially socketed with described monitor pipe laying 6, positioned at described pipeline fixed seat 8 and institute Between the mat 15 stated, upward impact and buoyancy that available buffer mat 15 is subject to, mat 15 is avoided Bottom is damaged, it is ensured that mat 15 can protect multiple monitor mounting seats 7 all the time.
It is respectively separated on the first described mud guard 4 and the free end of the second mud guard 5 provided with multiple auxiliary permeable holes 17, Multiple auxiliary permeable holes 17 on the first described mud guard 4 and multiple auxiliary permeable holes 17 on the second described mud guard 5 It is staggered, can aids in permeable, the multiple auxiliary permeable hole 17 being staggered can avoid underground water entrainment of silt or other are miscellaneous It is upright to connect in unrestrained upper underground monitoring well 1.
It is respectively separated on the first described mud guard 4 and the upper surface of the second mud guard 5 provided with multiple stop hooks 18, it is described Multiple stop hooks 18 to described the first mud guard 4 and the second mud guard 5 tip-clearance direction arc-shaped bend, available for hooking Firmly strip, bag-shaped object, prevent rubbish from entering in underground monitoring well 1.
In use, underground monitoring well 1 is vertically arranged in below ground, underground water passes through the water inlet on shaft bottom water fender 2 Mouth 3 enters in underground monitoring well 1, and passes through the irrigation channel of the first mud guard 4 and the second mud guard 5 formation serpentine, reduces water Flow velocity degree, while obstruct the rubbish in underground water, silt etc.;The water-level instrumentation body of prior art can pass through multiple monitors Mounting seat 7 is arranged on monitor pipe laying 6, and is drawn connecting line by monitor pipe laying 6, is easy to Monitoring Data Transmission;Monitoring well top cover 9 is detachable, is easy to take out monitor pipe laying 6 and changes water-level instrumentation body, pipeline is fixed Seat 8 can facilitate the replacing of monitor pipe laying 6;If water level is higher, water can be discharged through drainage pipeline 11 by liquid spill-way 10, Blowout prevention well lid 12 can prevent blowout, improve safety in utilization.
In summary, the utility model can be used to monitor level of ground water, easy for installation, safe to use, pass through barrier Silt makes the underground water in well keep pure, and accurately measures water level by multiple water-level instrumentation bodies.
Preferred embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, Every equivalent structure transformation made using the utility model description, or it is directly or indirectly related with other are attached to The technical field of product, similarly it is included in scope of patent protection of the present utility model.

Claims (7)

  1. A kind of 1. Novel underground water-level instrumentation, it is characterised in that:Including underground monitoring well, shaft bottom water fender, water inlet, first Mud guard, the second mud guard, monitor pipe laying, multiple monitor mounting seats, pipeline fixed seat, monitoring well top cover, discharge Mouth, drainage pipeline and blowout prevention well lid;Described underground monitoring well is vertically arranged in below ground, and described underground monitoring well is two The hollow cylindrical structure of end opening, described shaft bottom water fender are circular plate-like shape structure and are adapted to the prison of the underground described in being arranged on The bottom of well logging, described shaft bottom water fender and described underground monitoring well link into an integrated entity structure;Described water inlet is set On described shaft bottom water fender, positioned at a side of described shaft bottom water fender, the first described mud guard is plane tabular Structure and the side inner wall lower for being fixedly installed on described underground monitoring well, the first described mud guard horizontal cover are covered described Water inlet top, and leave gap between the first described mud guard and the opposite side inwall of described underground monitoring well; The second described mud guard is plane tabular structure and is fixedly installed on another side lower part of described underground monitoring well, described Second mud guard horizontal cover is covered in the top of the first described mud guard, and the second described mud guard monitors with described underground Gap is left between the side inwall of well;The upper end of described monitor pipe laying is fixed by described pipeline fixed seat and set Put on the inner side end of described monitoring well top cover, described monitoring well dome is covered in the upper of described underground monitoring well End, makes described monitor pipe laying be co-axially inserted in the center of described underground monitoring well, positioned at described second gear mud The top of plate;Described multiple monitor mounting seats, which are respectively separated, to be arranged on described monitor pipe laying and installs respectively Water-level instrumentation body;Described liquid spill-way is arranged in described underground monitoring well, positioned at the upper of described underground monitoring well Portion side, described drainage pipeline are connected on described liquid spill-way, and described blowout prevention well lid closing cap is in described underground The top of monitoring well, positioned at the top of described monitoring well top cover.
  2. 2. Novel underground water-level instrumentation according to claim 1, it is characterised in that:Described blowout prevention well lid passes through lock It is locked in described underground monitoring well, and the center of top of described blowout prevention well lid is provided with handle of uncapping.
  3. 3. Novel underground water-level instrumentation according to claim 1, it is characterised in that:The bottom of described shaft bottom water fender Mud retaining net cover is connected with, described mud retaining net cover is covered in the lower section of described water inlet in network structure and cover.
  4. 4. Novel underground water-level instrumentation according to claim 1, it is characterised in that:On described monitor pipe laying Mat is coaxially connected with, described mat is cylindrical structural and cover is covered in described multiple monitor mounting seats Outside.
  5. 5. Novel underground water-level instrumentation according to claim 4, it is characterised in that:On described monitor pipe laying Buffer spring coaxially is socketed with, between described pipeline fixed seat and described mat.
  6. 6. Novel underground water-level instrumentation according to claim 1, it is characterised in that:The first described mud guard and second It is respectively separated on the free end of mud guard provided with multiple auxiliary permeable holes, multiple auxiliary permeable holes on the first described mud guard It is staggered with multiple auxiliary permeable holes on the second described mud guard.
  7. 7. Novel underground water-level instrumentation according to claim 1, it is characterised in that:The first described mud guard and second It is respectively separated on the upper surface of mud guard provided with multiple stop hooks, described multiple stop hooks are to the first described mud guard and The tip-clearance direction arc-shaped bend of two mud guards.
CN201720412129.2U 2017-04-19 2017-04-19 A kind of Novel underground water-level instrumentation Expired - Fee Related CN206945079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720412129.2U CN206945079U (en) 2017-04-19 2017-04-19 A kind of Novel underground water-level instrumentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720412129.2U CN206945079U (en) 2017-04-19 2017-04-19 A kind of Novel underground water-level instrumentation

Publications (1)

Publication Number Publication Date
CN206945079U true CN206945079U (en) 2018-01-30

Family

ID=61359438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720412129.2U Expired - Fee Related CN206945079U (en) 2017-04-19 2017-04-19 A kind of Novel underground water-level instrumentation

Country Status (1)

Country Link
CN (1) CN206945079U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797645A (en) * 2018-06-13 2018-11-13 贵阳红鸟智能技术服务有限公司 A kind of intelligent city's sewer pipe network well lid liquid level signal detection system
CN109000754A (en) * 2018-06-13 2018-12-14 贵阳红鸟智能技术服务有限公司 A kind of intelligent city's sewer pipe network manhole cover system liquid level signal detection device
CN112629610A (en) * 2020-12-26 2021-04-09 朱云法 Water level monitoring device for underground water

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797645A (en) * 2018-06-13 2018-11-13 贵阳红鸟智能技术服务有限公司 A kind of intelligent city's sewer pipe network well lid liquid level signal detection system
CN109000754A (en) * 2018-06-13 2018-12-14 贵阳红鸟智能技术服务有限公司 A kind of intelligent city's sewer pipe network manhole cover system liquid level signal detection device
CN112629610A (en) * 2020-12-26 2021-04-09 朱云法 Water level monitoring device for underground water

Similar Documents

Publication Publication Date Title
CN206945079U (en) A kind of Novel underground water-level instrumentation
KR100969488B1 (en) A prevention apparatus of rain and sand inflow for opening and closing point in time adjustable storm overflow chamber
CN105909309B (en) Major long tunnel counter-slope automatic drain system
CN206553872U (en) A kind of HDPE linear drainage ditches
KR101253061B1 (en) Screen device for removing adulterated materials without power
CN206635813U (en) A kind of shallow groundwater inspection well
KR20120007934U (en) Rain water collection apparatus
CN211948791U (en) City drainage reposition of redundant personnel well
CN205935177U (en) Cutting type sewage lifting device
CN207812617U (en) A kind of town road drainage system
CN208685639U (en) A kind of water drainage of deep foundation pit system
CN105318046B (en) A kind of check valve and with automatically adjusting the spoil disposal valve gear of valve port size
CN208056242U (en) A kind of anti-clogging blow-off line component
CN206625333U (en) Hydraulic engineering draining drain cover
CN201554118U (en) Stink-proof and leak-proof gutter cover
CN205501985U (en) Prevent blockking up side slope groundwater and draw row device
CN209277270U (en) A kind of town road water feeding and draining device
CN108755465B (en) Sewer structure
KR102072114B1 (en) Water Quality Observation Underground Water Top Protection
CN207749610U (en) The catch-basin of the anti-blocking anti-drop device of catch-basin and the application device
CN206173914U (en) Low -lying greenery patches overflow system based on arrange salt system
CN217711041U (en) Safe and guaranteed integrated intercepting well
CN216615482U (en) Bridge anti-blocking drainage device
CN210370579U (en) High-pressure-resistant anti-backflow orifice device for water detection and drainage hole
JP5285938B2 (en) Drainage hopper for water heater

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20180419