CN206942119U - Building scaffold sets up device - Google Patents
Building scaffold sets up device Download PDFInfo
- Publication number
- CN206942119U CN206942119U CN201720757191.5U CN201720757191U CN206942119U CN 206942119 U CN206942119 U CN 206942119U CN 201720757191 U CN201720757191 U CN 201720757191U CN 206942119 U CN206942119 U CN 206942119U
- Authority
- CN
- China
- Prior art keywords
- pole section
- fishing rod
- pin
- tube socket
- short tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Building scaffold sets up device, including fishing rod, connection ring, fishhook, short rope, binding strap, pin, drawstring and short tube socket, one end of fishing rod is plugged in short tube socket from top to bottom, the other end of fishing rod is fixedly installed link, connection ring upper end is connected with link, connection ring lower end and fishhook, binding strap is the rope to join end to end in a ring, binding strap will be bound after the circle of scaffolding steel pipe winding one set up by pin grafting, fishhook lower end is connected with binding strap upper end, one end of pin is fixed with annulus, one end of drawstring is connected with annulus, the both ends of short rope are connected with annulus and connection ring respectively.The utility model uniqueness novel in design, construction can reduce labor intensity during setting up scaffold again, and more safe and reliable, and the utility model use is extensive, it may also be used for other field fishes dress finding to be used cooperatively with worker.
Description
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of building scaffold sets up device.
Background technology
With the sustained and rapid development of China's economy, building trade is in the development advanced by leaps and bounds, the living environment of people
Huge improvement is obtained with living environment, construction industry adopts scaffold mode and carry out auxiliary construction, adopts in one's early years always over the past thousands of years
Scaffold is set up with wooden and bamboo material, setting up scaffold using the long 6000mm steel pipes of φ 48 more after the seventies adopts so far,
Setting up for steel pipe scaffold is set up by hand using the manpower of most original always.The long every weight of 6000mm steel pipes of national standard φ 48
24.24kg, when setting up scaffold, worker wants a feet station, and another pin disk is in vertical φ on horizontal φ 48 steel pipe
On 48 steel pipe, the steel pipe that both hands hold the long 6000mm weights 24.24kg of φ 48 vertically lifts 6 meters of height and an other steel pipe pair
Connect, this operating method, when primitive labor intensity it is big requirement take personnel's body will good strength it is sufficiently large, operating personnel are on duty
Preceding also to pass through long-term training, common people can not operate.Accidentally or one is short of physical strength second, dangerous larger, in operation
Denier disequilibrium operating personnel will throw away the steel pipe in hand, and the steel pipe to fall can cause considerable safety to the personnel of lower surface construction
Hidden danger.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided a kind of labor intensity is small, security reliability
By force, the building scaffold that can improve efficiency of construction sets up device.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:Building scaffold sets up device, including
Fishing rod 1, connection ring 2, fishhook 3, short rope 4, binding strap 5, pin 6, drawstring 7 and short tube socket 8, short tube socket 8 pass through scaffold
Along being vertically fixed on the erect riser 10 of scaffold, one end of fishing rod 1 is plugged in short tube socket 8 fastener 9 from top to bottom, is fished
The other end of pole 1 is fixedly installed link 11, and the upper end of connection ring 2 is connected with link 11, the lower end of connection ring 2 and fishhook 3, binding strap
5 rope to join end to end in a ring, binding strap 5 will pass through the grafting of pin 6 after the scaffolding steel pipe 12 set up winds a circle
Binding, the lower end of fishhook 3 are connected with the upper end of binding strap 5, and one end of pin 6 is fixed with annulus 13, one end and the annulus 13 of drawstring 7
Connection, the both ends of short rope 4 are connected with annulus 13 and connection ring 2 respectively.
Fishing rod 1 includes rear plug 14, the first pole section 15, the second pole section 16 and the 3rd pole section 17, and rear plug 14 is fixed and is located at
The rear end of first pole section 15, the second pole section 16 by the front end of the first pole section 15 slide be plugged in the first pole section 15, the 3rd pole section 17 by
The front end of second pole section 16 is slided and is plugged in the second pole section 16, and the front end of the first pole section 15, which is connected with, to be set on the second pole section 16
First Spring capable of diameter varying 18, the front end of the second pole section 16 are connected with the second Spring capable of diameter varying 19 being set on the 3rd pole section 17, link 11
It is fixedly connected on the front end of the 3rd pole section 17.
Block 20 is fixedly installed inside the lower end of short tube socket 8, the lower end sidepiece of short tube socket 8 is along the circumferential direction symmetrical arranged
There are two spacing pins 21, the spacing lower end of pin 21 is less than the lower end of short tube socket 8.
The erection method of device is set up using building scaffold of the present utility model, is comprised the following steps,
A, the making of fishing rod 1:First pole section 15, the second pole section 16 and the 3rd pole section 17 using fiberglass, carbon fiber or
Stainless steel makes, and the overall weight of fishing rod 1 is no more than 2kg, is similar to fishing rod, fishing rod 1 be also according to the principle of fishing rod and
Design;The maximum gauge of fishing rod 1 is on the premise of use intensity is met and considers to be convenient for carrying to be arranged to φ 24- φ with attractive in appearance
34mm, the first Spring capable of diameter varying 18 and the second Spring capable of diameter varying 19 are to allow the first pole section 15, the second pole section 16 and the 3rd pole section 17
Between flexible and be closely connected, the first Spring capable of diameter varying 18 and the second Spring capable of diameter varying 19 are used for deforming freight weight limit, a building
It is 24.24kg with the long 6000mm weight of scaffolding steel pipe φ 48, the design of fishing rod 1 fishes weight 20kg, when fishing rod 1 fishes weight 20kg first
The elastic force of the flexural deformation of 18 and second Spring capable of diameter varying of Spring capable of diameter varying 19, the first Spring capable of diameter varying 18 and the second Spring capable of diameter varying 19 is according to reality
Border test determines that remaining 4kg is docked by operator with a hand traction with required butt tube;
B, the making of short tube socket 8:The scaffolding steel pipe length for intercepting φ 48 is 300mm, is used in one end of short tube socket 8
3mm steel plate weldering block 20, block 20 are used to limit the position that fishing rod 1 is inserted into short tube socket 8, the lower end two of short tube socket 8
Side two spacing pins 21 of the long 50mm steel bar weldings of two φ 8, two spacing pins 21 are located at and scaffold transverse tube opposite sides
Short tube socket 8 is prevented to swing;
C, it is combination drawstring:With the φ 8mm girth 800mm of annular short rope 4, pass around on the annulus 13 of pin 6, then by ring
Shape short rope 4, which passes around, to be connected in connection ring 2, then the one end of drawstring 7 is worn on the annulus 13 for tying up to pin 6, and combination drawstring has combined
Into;
D, prepare to fish dress operation, binding strap 5 is connected on fishhook 3, short tube socket 8 is consolidated with a scaffold clasp 9
It is scheduled on the adjacent erect riser 10 to be docked, fishing rod 1 is pulled out into the first pole section 15, the second pole section 16 and the 3rd pole section 17 section by section
Locked at tight fit, it is accurate just as using fishing rod, then the rear end of the first pole section 15 is inserted perpendicularly into short tube socket 8
Standby work is ready;
E, dress scaffolding steel pipe is fished:The scaffolding steel pipe of the 24.24kg 6 meters long weights of dress will be fished, which to be placed on, can fish region, use
Power pulls combination drawstring the first Spring capable of diameter varying 18 and the second Spring capable of diameter varying 19 is bent to fishhook, 6 meters of dress long to be fished
Scaffolding steel pipe 12 is more than at 1/2, and binding strap 5 is fastened between the 3100mm-3500mm apart from one end, puts on pin 6, now
The love of scaffolding steel pipe 12 hung is fished to fish the scaffolding steel pipe 12 hung not leave ground to 20kg tractive force, at this moment grasp
One end 3100mm-3500mm of the hand-held 6 meters long colligation point of scaffolding steel pipe 12 length of author, applies one to scaffolding steel pipe 12
4kg's lifts power, make scaffolding steel pipe 12 be in stand vertically state, then will fish extension scaffolding steel pipe 12 draw to
Installing upper fixing card on its standpipe 10 to be docked, after docking additional, pull drawstring 7, drawstring 7 drives pin 6, and binding strap 5 is released from,
Binding strap 5 departs from the scaffolding steel pipe 12 of institute's colligation, slowly loosens drawstring 7 to discharge the surplus energy of fishing rod 1, completes a fishing and filled
Journey;
F, repeat step E, then other steel pipes is carried out with fishing and pretends industry, and then inserted with the replacing short tube that increases of scaffold
The position of seat 8.
Fishing rod employed in the utility model is identical with the structure and principle of fishing rod, has higher toughness, rear stifled
The effect of head is to prevent from entering foreign matter by fishing rod rear end.Connection ring effect is connecting ring and fishhook, and short rope ties up to connection simultaneously
On ring, fishhook effect is hanging binding strap, and short rope effect is to complete the connection of connection ring and pin, and binding strap effect is binding institute
The scaffolding steel pipe of dress is fished, and office is formed with pin, pin effect is that fixed binding strap becomes office, drawstring effect
It is when applying pulling force to drawstring, drawstring drives pin to exit the office with binding strap composition.Can be by scaffold steel by fishing rod
Pipe, which fishes, to be lifted to required height, increases the purpose set up to scaffold so as to reach.Short tube socket is used to lay fishing rod, right
Fishing rod plays positioning supporting role.
In summary, the utility model it is simple in construction, it is novel in design it is unique, during scaffold is set up in construction again
Labor intensity can be reduced, and it is more safe and reliable, and the utility model use is extensive, it may also be used for other field fishing fills small by zero
Part is used cooperatively with worker.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the enlarged drawing at A in Fig. 1;
Fig. 3 is the enlarged drawing at B in Fig. 1;
Fig. 4 is the enlarged drawing at C in Fig. 1;
Fig. 5 is the schematic diagram after fishing rod contraction in the utility model;
Fig. 6 is the structural representation of short tube socket in the utility model;
Fig. 7 is schematic diagram of the utility model when capturing scaffolding steel pipe;
Fig. 8 is the enlarged drawing at D in Fig. 7.
Embodiment
As Figure 1-Figure 8, building scaffold of the present utility model sets up device, including fishing rod 1, connection ring 2, fishhook 3,
Short rope 4, binding strap 5, pin 6, drawstring 7 and short tube socket 8, short tube socket 8 is by scaffold clasp 9 along being vertically fixed on pin hand
On the erect riser 10 of frame, one end of fishing rod 1 is plugged in short tube socket 8 from top to bottom, and the other end of fishing rod 1 is fixedly installed
Link 11, the upper end of connection ring 2 are connected with link 11, and the lower end of connection ring 2 and fishhook 3, binding strap 5 are the rope to join end to end in a ring
Rope, binding strap 5 will be bound after the scaffolding steel pipe 12 set up winds a circle by the grafting of pin 6, the lower end of fishhook 3 and binding strap
5 upper ends are connected, and one end of pin 6 is fixed with annulus 13, and one end of drawstring 7 is connected with annulus 13, the both ends of short rope 4 respectively with
Annulus 13 and connection ring 2 connect.
Fishing rod 1 includes rear plug 14, the first pole section 15, the second pole section 16 and the 3rd pole section 17, and rear plug 14 is fixed and is located at
The rear end of first pole section 15, the second pole section 16 by the front end of the first pole section 15 slide be plugged in the first pole section 15, the 3rd pole section 17 by
The front end of second pole section 16 is slided and is plugged in the second pole section 16, and the front end of the first pole section 15, which is connected with, to be set on the second pole section 16
First Spring capable of diameter varying 18, the front end of the second pole section 16 are connected with the second Spring capable of diameter varying 19 being set on the 3rd pole section 17, link 11
It is fixedly connected on the front end of the 3rd pole section 17.
Block 20 is fixedly installed inside the lower end of short tube socket 8, the lower end sidepiece of short tube socket 8 is along the circumferential direction symmetrical arranged
There are two spacing pins 21, the spacing lower end of pin 21 is less than the lower end of short tube socket 8.
Using the utility model set up the erection method of scaffold, comprise the following steps,
A, the making of fishing rod 1:First pole section 15, the second pole section 16 and the 3rd pole section 17 using fiberglass, carbon fiber or
Stainless steel makes, and the overall weight of fishing rod 1 is no more than 2kg, is similar to fishing rod, fishing rod 1 be also according to the principle of fishing rod and
Design;The maximum gauge of fishing rod 1 is on the premise of use intensity is met and considers to be convenient for carrying to be arranged to φ 24- φ with attractive in appearance
34mm, the first Spring capable of diameter varying 18 and the second Spring capable of diameter varying 19 are to allow the first pole section 15, the second pole section 16 and the 3rd pole section 17
Between flexible and be closely connected, the first Spring capable of diameter varying 18 and the second Spring capable of diameter varying 19 are used for deforming freight weight limit, a building
It is 24.24kg with the long 6000mm weight of scaffolding steel pipe φ 48, the design of fishing rod 1 fishes weight 20kg, when fishing rod 1 fishes weight 20kg first
The elastic force of the flexural deformation of 18 and second Spring capable of diameter varying of Spring capable of diameter varying 19, the first Spring capable of diameter varying 18 and the second Spring capable of diameter varying 19 is according to reality
Border test determines that remaining 4kg is docked by operator with a hand traction with required butt tube;
B, the making of short tube socket 8:The scaffolding steel pipe length for intercepting φ 48 is 300mm, is used in one end of short tube socket 8
3mm steel plate weldering block 20, block 20 are used to limit the position that fishing rod 1 is inserted into short tube socket 8, the lower end two of short tube socket 8
Side two spacing pins 21 of the long 50mm steel bar weldings of two φ 8, two spacing pins 21 are located at and scaffold transverse tube 22 relative two
Side prevents short tube socket 8 from swinging;
C, it is combination drawstring:With the φ 8mm girth 800mm of annular short rope 4, pass around on the annulus 13 of pin 6, then by ring
Shape short rope 4, which passes around, to be connected in connection ring 2, then the one end of drawstring 7 is worn on the annulus 13 for tying up to pin 6, and combination drawstring has combined
Into;
D, prepare to fish dress operation, binding strap 5 is connected on fishhook 3, short tube socket 8 is consolidated with a scaffold clasp 9
It is scheduled on the adjacent erect riser 10 to be docked, fishing rod 1 is pulled out into the first pole section 15, the second pole section 16 and the 3rd pole section 17 section by section
Locked at tight fit, it is accurate just as using fishing rod, then the rear end of the first pole section 15 is inserted perpendicularly into short tube socket 8
Standby work is ready;
E, dress scaffolding steel pipe is fished:The scaffolding steel pipe of the 24.24kg 6 meters long weights of dress will be fished, which to be placed on, can fish region, use
Power pulls combination drawstring the first Spring capable of diameter varying 18 and the second Spring capable of diameter varying 19 is bent to fishhook, 6 meters of dress long to be fished
Scaffolding steel pipe 12 is more than at 1/2, and binding strap 5 is fastened between the 3100mm-3500mm apart from one end, puts on pin 6, now
The love of scaffolding steel pipe 12 hung is fished to fish the scaffolding steel pipe 12 hung not leave ground to 20kg tractive force, at this moment grasp
One end 3100mm-3500mm of the hand-held 6 meters long colligation point of scaffolding steel pipe 12 length of author, applies one to scaffolding steel pipe 12
4kg's lifts power, make scaffolding steel pipe 12 be in stand vertically state, then will fish extension scaffolding steel pipe 12 draw to
Installing upper fixing card on its standpipe 10 to be docked, after docking additional, pull drawstring 7, drawstring 7 drives pin 6, and binding strap 5 is released from,
Binding strap 5 departs from the scaffolding steel pipe 12 of institute's colligation, slowly loosens drawstring 7 to discharge the surplus energy of fishing rod 1, completes a fishing and filled
Journey;
F, repeat step E, then other steel pipes is carried out with fishing and pretends industry, and then inserted with the replacing short tube that increases of scaffold
The position of seat 8.
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc.
Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality
With the protection domain of new technique scheme.
Claims (3)
1. building scaffold sets up device, it is characterised in that:Including fishing rod(1), connection ring(2), fishhook(3), short rope(4), tie up
Band(5), pin(6), drawstring(7)With short tube socket(8), short tube socket(8)Pass through scaffold clasp(9)Edge is vertically fixed on
The erect riser of scaffold(10)On, fishing rod(1)One end be plugged in short tube socket from top to bottom(8)It is interior, fishing rod(1)It is another
End is fixedly installed link(11), connection ring(2)Upper end and link(11)Connection, connection ring(2)Lower end and fishhook(3), colligation
Band(5)For the rope to join end to end in a ring, binding strap(5)By scaffolding steel pipe to be set up(12)Pass through pin after the circle of winding one
Pin(6)Grafting is bound, fishhook(3)Lower end and binding strap(5)Upper end connects, pin(6)One end be fixed with annulus(13), draw
Rope(7)One end and annulus(13)Connection, short rope(4)Both ends respectively with annulus(13)And connection ring(2)Connection.
2. building scaffold according to claim 1 sets up device, it is characterised in that:Fishing rod(1)Including rear plug(14)、
First pole section(15), the second pole section(16)With the 3rd pole section(17), rear plug(14)Fixation is located at the first pole section(15)Rear end, the
Two pole sections(16)By the first pole section(15)Slide and be plugged in the first pole section in front end(15)It is interior, the 3rd pole section(17)By the second pole section
(16)Slide and be plugged in the second pole section in front end(16)It is interior, the first pole section(15)Front end, which is connected with, is set in the second pole section(16)On
First Spring capable of diameter varying(18), the second pole section(16)Front end, which is connected with, is set in the 3rd pole section(17)On the second Spring capable of diameter varying
(19), link(11)It is fixedly connected on the 3rd pole section(17)Front end.
3. building scaffold according to claim 1 sets up device, it is characterised in that:Short tube socket(8)It is solid inside lower end
Surely it is provided with block(20), short tube socket(8)Lower end sidepiece is along the circumferential direction symmetrically arranged with two spacing pins(21), it is spacing
Pin(21)Lower end is less than short tube socket(8)Lower end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720757191.5U CN206942119U (en) | 2017-06-27 | 2017-06-27 | Building scaffold sets up device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720757191.5U CN206942119U (en) | 2017-06-27 | 2017-06-27 | Building scaffold sets up device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206942119U true CN206942119U (en) | 2018-01-30 |
Family
ID=61366223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720757191.5U Active CN206942119U (en) | 2017-06-27 | 2017-06-27 | Building scaffold sets up device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206942119U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268973A (en) * | 2017-06-27 | 2017-10-20 | 中建二局第二建筑工程有限公司 | Building scaffold sets up device and its erection method |
-
2017
- 2017-06-27 CN CN201720757191.5U patent/CN206942119U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268973A (en) * | 2017-06-27 | 2017-10-20 | 中建二局第二建筑工程有限公司 | Building scaffold sets up device and its erection method |
CN107268973B (en) * | 2017-06-27 | 2022-11-25 | 中建二局第二建筑工程有限公司 | Building scaffold erecting device and erecting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206942119U (en) | Building scaffold sets up device | |
CN105864538B (en) | A kind of portable socket joint pipe joint machine | |
CN107268973A (en) | Building scaffold sets up device and its erection method | |
CN206052477U (en) | Dismantling of track device | |
CN201730098U (en) | Buried stand pipe artificial removing device | |
CN207131172U (en) | Windproof fence rack | |
CN207677356U (en) | Reinforced steel pipe suspension cable scaffolding | |
CN207167374U (en) | A kind of portable cow neck clip | |
CN204510767U (en) | The basket operating platform of Novel hanging | |
CN108551917A (en) | A kind of Landscape River movable green belt | |
CN203998634U (en) | A kind of petroleum drilling K type derrick lifting device | |
CN209620559U (en) | A kind of operation platform support device | |
CN207985116U (en) | A kind of ship anchor being applicable in sand mud geology | |
CN208425411U (en) | Fish-catching apparatus under a kind of ice face | |
CN208056777U (en) | A kind of electric pole pole centralizing device | |
CN201500393U (en) | Lifesaving dragging tool for deep and narrow wells | |
CN208814450U (en) | A kind of hanging basket | |
CN208402893U (en) | The purse seine of off-lying sea tubular pole seining cultivation system | |
CN206917293U (en) | A kind of assembling reinforcement locally above carries device | |
CN201469935U (en) | Narrow well life net | |
CN216662618U (en) | River course ecological environment protects prosthetic devices | |
CN202731103U (en) | Height-adjustable rebar split head capable of turning around | |
CN209256901U (en) | It is a kind of for standardizing the shelves of steel-bar | |
CN203705632U (en) | Portable metering device on-site calibration working platform | |
CN208996713U (en) | A kind of pressure break manifold system securing device with pressure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |